Project Ranking & Decision Support: The Experience from the Slovenian TSO ELES

Similar documents
2 nd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes

H Marie Skłodowska-Curie Actions (MSCA)

THE operators of power transmission networks are

13 th February th February 2017 Page 1 of 7

THESL S REGULATORY REGIMS

6700 Forum Drive, Suite 150 Orlando, FL (407)

Risk Considerations in Asset Management Decisions

FLAVIO SOHLER PhD., DSc., MSc., PMI-PMP, PMI-RMP. Eletrobras Furnas Centrais Elétricas S.A.

RULES. For. Article 1

Policy for Regular Resource Allocation and Distribution for Country

513 North Belcher Road Clearwater, FL (866)

DEFINITION AND PRACTICAL APPLICATION OF KEY PERFORMANCE INDICATORS TO SUPPORT EUROPEAN GRID OPERATORS TO ENABLE THE ENERGY POLICY GOALS

RISK M A N A G E M E N T P L A N

Quick Reference Card PPM Pro Project Data Field Dictionary

METHODOLOGY ON DETERMINATION OF TRANSMISSION SYSTEM OPERATOR TARIFFS. -TUOS Tariff Methodology-

5151 Beltline Road, Suite 1200 Dallas, TX (972)

5120 West Goldleaf Circle, Suite 400 Los Angeles, CA (877)

Specific state of play with RDP / EIP programming in Slovenia

Project Selection Risk

Final Draft 2012 Request for Proposals. Oregon Public Utility Commission Workshop August 16, 2006

SUMMARY OF CAPITAL EXPENDITURES

Senior Director, Fire Life Safety & Risk Management

FUNDING REQUEST APPLICATION FORM

575 8 th Avenue, Suite 502 New York, NY (212)

LAB NOTES: EXAMPLES OF PRELIS RUNS

Certified in Risk and Information Systems Control

Open Science in View of Scientific Journal Geodetski vestnik. Teja Koler Povh, Ph.D.

Cricket Valley Energy Project: Security- Constrained Economic Dispatch Analysis

If I Had $1,000,000: An Effective Capital Budgeting Process

Non-Conforming Conventional LTV Matrix

Headquarters U.S. Air Force

Technics of financial assessment of an infrastructure project. Balázs Felsmann REKK December 2016 Tirana

E1/95. Green Evaluation TenneT Holding B.V. Green Bonds. Transaction Overview. Green Evaluation Overview. Overall Score. Transparency.

ANNEX. to the Commission decision on the reimbursement of personnel costs of beneficiaries of the Connecting Europe Facility

T-D Interconnections: Best Value Planning White Paper January 2016

RISK MANAGEMENT POLICY

Trading across borders - The key to manage portfolios at a regional scale

Hazim M Abdulwahid, MSC, MBA Hazim Consulting

For the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.

Risk and Risk Management. Risk and Risk Management. Martin Schedlbauer, Ph.D., CBAP, OCUP Version 1.1

Establishing a shared service provider to UNIQA in SEE region

Sample Fund Benchmark Report GRESB Infrastructure

Asset Management. Linking Levels of Service and Lifecycle Management Strategies Andrew Grunda Peter Simcisko

All Source Request for Proposal Bid Conference. October 22, 2008

WECC Criterion PRC-003-WECC-CRT-1.3

Risk Assessment Mitigation Phase Risk Mitigation Plan Lessons Learned (RAMP B) November 30, 2016

Investment Opportunity. BIO POWER PLANTS PORTFOLIO A portfolio of five Slovenian based companies operating with Bio Power Plants.

12567 West Cedar Drive Lakewood, CO (303) ; (866)

Joint European Standing Group (JESG) Requirements for Generators Tech Sub Group Issues

ACCESS RULES TO FRANCE-ITALY, SWITZERLAND-ITALY, AUSTRIA- ITALY, SLOVENIA-ITALY, GREECE-ITALY INTERCONNECTIONS (Capacity Allocation Auction Rules)

Monitoring Impacts of EU - Infrastructure Programmes. Werner Rothengatter. Universität Karlsruhe (TH)

COMPAÑÍA MINERA MILPO S.A.A. 4Q15 CONSOLIDATED EARNINGS RELEASE

RANKINGS REPORT 2017 BEST COLLEGES. For more historical data and benchmarking visit ai.usnews.com

Comparative Study between Linear and Graphical Methods in Solving Optimization Problems

Oversight Review Report of the Investment Industry Regulatory Organization of Canada

Risk Management FUN! Humor Me

Procedure for Address Business Risk and Opportunities

2012 Budget. Customer Presentation October 10, Helping to keep the lights on, businesses running and communities strong

Introduction to Finance, Part 2: Cash Flow Statement & Financial Statement Analysis

MARI Project. BSG meeting 7/12. Manually Activated Reserves Initiative - Creating a European platform for the exchange of mfrr balancing energy

The TSO side of pan-european XBorder trading in high frequencies: The Role of Scheduling. Michael Schaefer Project Manager, Amprion System Operation

GTE+ workshop 3 April 2009, Brussels

DECISION MAKING. Decision making under conditions of uncertainty

Regulatory framework for crossborder redispatching and countertrading

QDEU SPDR MSCI Germany StrategicFactors ETF

Honorable Council President Herb J. Wesson, Jr. Rules, Elections, Intergovernmental Relations and Neighborhoods Committee

Presented to: Eastern Idaho Chapter Project Management Institute. Presented by: Carl Lovell, PMP Contract and Technical Integration.

Core Portfolio Construction with Stock Market Indices

Capacity mechanisms in Europe

Risk Management Plan for the <Project Name> Prepared by: Title: Address: Phone: Last revised:

Obstacles to Trade and Compatibility of Market Rules in Southeast Europe

Investment and Investment Finance in Slovenia

Public-Private Partnerships in Infrastructure From Theory to Practice Astana, February 12-16, 2007

Individual Investor Profile Questionnaire

POWER MARKETS: CRITICAL ELEMENTS FOR PROPER FUNCTIONING

Integrated Single Electricity Market (I-SEM)

New Strategies for Prioritizing Old Projects Using Risk and Triple Bottom Line Criteria Presenter: Celine Hyer, PE ARCADIS/Malcolm Pirnie 5/23/2012

2019 Corporate Operating Plan

Technics of financial assessment of infrastructure projects. Balázs Felsmann REKK

MPI Quantitative Analysis

Demand assessment report for incremental capacity between Austria (Market Area East) and Slovenia

Integrated Single Electricity Market (I-SEM)

FEMA Modeling Task Force (MOTF) Hurricane Sandy Response. MOTF Hurricane Sandy Response Briefing USGS NEIC Monday, May 13th, 2013

Risk Management Policy

Project Risk Management. Prof. Dr. Daning Hu Department of Informatics University of Zurich

Univerza v Ljubljani. University office for research, development and intellectual property Intellectual property rules at UL. Jasna Donko Lesjak

MANITOBA PUBLIC INSURANCE

COMMISSION DECISION. of

Introduction to transmission network assessment methodology: the ENTSO-E CBA methodology and the PCI selection process.

RISK ANALYSIS GUIDE FOR PRIVATE INITIATIVE PROJECTS

Affecting Capital Planning and Investment Control (CPIC)

Transportation Economics and Decision Making. Lecture-11

Market Insights. The Benefits of Integrating Fundamental and Quantitative Research to Deliver Outcome-Oriented Equity Solutions.

2017 Integrated Resource Plan. Portfolio Development Detail September 8, 2016

XRT SPDR S&P Retail ETF

Energy Probe (EP) INTERROGATORY #50 List 1

EU Harmonisation of Maintenance Publications at Interconnections Points

Strategic Plan Alignment PMI Chicagoland Chapter

2018 National Electric Rate Study

PJM/MISO Cost Allocation For Economic Upgrades

Transcription:

1 Project Ranking & Decision Support: The Experience from the Slovenian TSO ELES Univerza v Ljubljani Fakulteta za elektrotehniko Assoc.Prof. Andrej F. Gubina University of Ljubljana, Slovenia andrej.gubina@fe.uni-lj.si Saša Jamšek, M.Sc. ELES d.o.o., Slovenia sasa.jamsek@eles.si Anton Urankar, M.Sc. ELES d.o.o., Slovenia anton.urankar@eles.si

2 ELES The Slovenian TSO Member of ENTSO-E Covers the 400 kv, 220 kv and 110 kv networks Why focus on Asset Management? Slovenia is a transit country for power flowing to Italy ELES: a regulated company Strong transmission network compared to domestic demand High losses, high loading High O&M costs

Tools matrix at ELES

4 Risk Focused Asset Management in ELES Risk Focused Asset Management has been embraced by ELES as leading concept to Achieve the strategic goals and Meet the owner and other stakeholder demands Prioritization of the planned investment portfolio Projects in the portfolio are ranked With respect to the business values connected to company strategic goals According to risk score, using risk matrices The objective is optimal risk mitigation Risk level reduction per invested funds

Risk-based Asset Management Core competences and processes were developed to analyze the investment portfolio Risk management model used is based on business values. Software tool was introduced for project ranking based on risk mitigation priority: PPM Portfolio Prioritization Model.

Types of Investment Projects TOTAL INVESTMENT PORFOLIO 19. Project leading to lower risk reduction 2. Project... 1. Project leading to highest risk reduction DISCRETIONARY PROJECTS Discretionary projects Mandatory projects Current projects

Priority of the Current Projects ELES uses distinct criteria for project prioritization: Current projects: IV CF( k) = W Project size IV Level of completion Mandatory and Discretionary Projects: Risk rank reduction of the project Where: CF(k) = Criterion function IV(k) = Total investment for project k PS2015 = Funds allocated for 2015 to project k IVMAX = Investment of the most expensive current project RRRBV i (k) = Risk rank reduction for the business value i RRRIV(k) = Risk rank reduction for the investment level U i, W 1, W 2 = weights ( k) PS2015( k) W2 IV ( k) 1 + max 7 = i ( k) ( k) RRRBV U i 1 i RRRIV ( k) = IV

8 Impact of the Projects on Business Values Business values TS operation quality Finance Company image Envir. sustainability Customer service Regulatory compliance Safety Risks Investment projects Project Analysis Rationale for execution Priority Ranking

Rule: a Project Reduces Risk at least in ONE Business Value matrika ocenjevanja tveganj Verjetnost <0,0001/leto <0,001/leto <0,01/leto <0,1/leto >1/leto >10/leto >100/leto DM - Dejansko nemogoče globalno se zgodi enkrat Mo - Mogoče Ve - Verjetno Re - Redno Le - Letno Me - Mesečno St - Stalno zgodi se večkrat v evropskih TSO zgodi se v sosednjih TSO zgodi se večkrat v ELESu zgodi se večkrat na leto v ELESu zgodi se večkrat mesečno v ELESu zgodi se večkrat na teden v ELESu ZR - Zelo resne S S V ZV K K K K = Katastrofalno Re - Resne Ni S S V ZV K K ZV = Zelo visoko Pr - Precejšne Ne Ni S S V ZV K V = Visoko Zm - Zmerne Ne Ne Ni S S V ZV S = Srednje Ma - Majhne Ne Ne Ne Ni S S V Ni = Nizko ZM - Zelo majhne Ne Ne Ne Ne Ni S S Ne = Nepomembno Ne - Nepomembne Ne Ne Ne Ne Ne Ni S

Risk Ranking Weights Exponential TOČKE TVEGANJA <0,0001/leto <0,001/leto <0,01/leto <0,1/leto >1/leto >10/leto >100/leto DM - Dejansko nemogoče Verjetnost Mo - Mogoče Ve - Verjetno Re - Redno Le - Letno Me - Mesečno St - Stalno 1 2 4 8 16 32 64 ZR - Zelo resne 64 64 128 256 512 1.024 2.048 4.096 Re - Resne 32 32 64 128 256 512 1.024 2.048 Pr - Precejšne 16 16 32 64 128 256 512 1.024 Zm - Zmerne 8 8 16 32 64 128 256 512 Ma - Majhne 4 4 8 16 32 64 128 256 ZM - Zelo majhne 2 2 4 8 16 32 64 128 Ne - Nepomembne 1 1 2 4 8 16 32 64

Risk level reduction due to project is estimated based on the business values. <0,0001/leto <0,001/leto <0,01/leto <0,1/leto Verjetnost >1/leto >10/leto >100/leto <0,0001/leto Mo - Mogoče <0,001/leto Ve - Verjetno<0,01/leto Re - Redno<0,1/leto Verjetnost Le - Letno >1/leto Me - Mesečno>10/leto St - Stalno>100/leto nemogoče <0,0001/leto Mo - Mogoče <0,001/leto Ve - Verjetno<0,01/leto Re - Redno<0,1/leto Verjetnost Le - Letno >1/leto Me - Mesečno>10/leto St - Stalno >100/leto nemogoče project the project <0,0001/leto Mo - Mogoče <0,001/leto Ve - Verjetno<0,01/leto Re - Redno<0,1/leto Verjetnost Le - Letno >1/leto Me - Mesečno>10/leto St - Stalno>100/leto ZR - Zelo resne S nemogočes V ZV K K K <0,0001/leto Mo - Mogoče <0,001/leto Ve - Verjetno<0,01/leto Re - Redno<0,1/leto Le - Letno >1/leto Me - Mesečno>10/leto St - Stalno>100/leto ZR - Zelo resne S nemogočes V ZV K K K ZR - Zelo resne Mo - Mogoče Ve - Verjetno Re - Redno Le - Letno Me - Mesečno St - Stalno S nemogočes V ZV K K K Re - Resne ZR Ni - Zelo S S V ZV K K resne S S V ZV K K K ZR Ni - Zelo Re - Resne S S V ZV K K resne S S V ZV K K K Ni Re - Resne S S V ZV K K Ne Re Pr - Precejšne Ni S S V ZV K - Resne Ni S S V ZV K K Pr - Precejšne Ne Re Ni S S V ZV K - Resne Ni S S V ZV K K Pr - Precejšne Ne Ni S S V ZV K Zm - Zmerne Pr Ne - Precejšne Ne Ne Ni S S V ZV Ni S S V ZV K Verjetnost Risk level with the Risk level without Zm - Zmerne Pr Ne - Precejšne Ne Ne Ni S S V ZV Ni S S V ZV K Zm - Zmerne Ne Ne Ni S S V ZV Ma - Majhne Zm Ne- Ne Ne Ne Ne Ni S S V Zmerne Ni S S V ZV Ma - Majhne Zm Ne- Ne Ne Ne Ne Ni S S V Zmerne Ni S S V ZV Ma - Majhne Ne Ne Ne Ni S S V ZM - Zelo majhne Ne Ma Ne Ne Ne Ne Ne Ne Ni S S - Majhne Ni S S V ZM - Zelo majhne Ne Ma Ne Ne Ne Ne Ne Ne Ni S S - Majhne Ni S S V ZM - Zelo majhne Ne Ne Ne Ne Ni S S ZM Ne - Zelo Ne - Nepomembne Ne Ne Ne Ne Ne Ne Ne Ne Ni S majhne Ni S S ZM Ne - Zelo Ne - Nepomembne Ne Ne Ne Ne Ne Ne Ne Ne Ni S majhne Ni S S Ne Ne - Nepomembne Ne Ne Ne Ne Ni S Ne - Nepomembne Ne Ne Ne Ne Ne Ni S Ne - Nepomembne Ne Ne Ne Ne Ne Ni S Business values: Transmission system operation quality Finance Company image Environmental sustainability Customer service Regulatory compliance Safety <0,0001/leto <0,001/leto <0,01/leto <0,1/leto Verjetnost >1/leto >10/leto >100/leto <0,0001/leto Mogoče <0,001/leto Verjetno<0,01/leto Redno<0,1/leto Verjetnost Le - Letno >1/leto Mesečno>10/leto >100/leto Mo - Ve - Re - Me - St - Stalno nemogoče <0,0001/leto Mogoče <0,001/leto Verjetno<0,01/leto Redno<0,1/leto Verjetnost Le - Letno >1/leto Mesečno>10/leto >100/leto Mo - Ve - Re - Me - St - Stalno nemogoče <0,0001/leto S Mogoče <0,001/leto V Verjetno<0,01/leto ZV Redno<0,1/leto Verjetnost Le - Letno K >1/leto K Mesečno>10/leto K >100/leto Mo - Ve - Re - Me - St - Stalno ZR - Zelo resne S nemogoče <0,0001/leto <0,001/leto <0,01/leto <0,1/leto >1/leto >10/leto >100/leto V ZV K K Mo - Mogoče Ve - Verjetno Re - Redno Le - Letno Me - Mesečno St - Stalno ZR - Zelo resne S S K nemogoče Mo - MogočeV Ve - Verjetno ZV Re - RednoK Le - Letno Me - Mesečno K St - Stalno ZR - Zelo resne S S K nemogoče Re - Resne ZR Ni - Zelo S S V ZV K K resne S S V ZV K K K Re - Resne ZR Ni - Zelo S S V ZV K K resne S S V ZV K K K Re - Resne Ni S S V ZV K K Pr - Precejšne Ne Re Ni S S V ZV K - Resne Ni S S V ZV K K Pr - Precejšne Ne Re Ni S S V ZV K - Resne Ni S S V ZV K K Pr - Precejšne Ne Ni S S V ZV K Zm - Zmerne Pr Ne - Precejšne Ne Ne Ni S S V ZV Ni S S V ZV K Verjetnost Zm - Zmerne Pr Ne - Precejšne Ne Ne Ni S S V ZV Ni S S V ZV K Zm - Zmerne Ne Ne Ni S S V ZV Ma - Majhne Zm Ne- Ne Ne Ne Ne Ni S S V Zmerne Ni S S V ZV Ma - Majhne Zm Ne- Ne Ne Ne Ne Ni S S V Zmerne Ni S S V ZV Ma - Majhne Ne Ne Ne Ni S S V Risk level without the project Risk level with the project ZM - Zelo majhne Ne Ma Ne Ne Ne Ne Ne Ne Ni S S - Majhne Ni S S V ZM - Zelo majhne Ne Ma Ne Ne Ne Ne Ne Ne Ni S S - Majhne Ni S S V ZM - Zelo majhne Ne Ne Ne Ne Ni S S Ne - Nepomembne ZM Ne - Zelo Ne Ne Ne Ne Ne Ne Ne Ne Ni S majhne Ni S S ZM Ne - Zelo Ne - Nepomembne Ne Ne Ne Ne Ne Ne Ne Ne Ni S majhne Ni S S Ne Ne - Nepomembne Ne Ne Ne Ne Ni S Ne - Nepomembne Ne Ne Ne Ne Ne Ni S Ne - Nepomembne Ne Ne Ne Ne Ne Ni S

BV1: Quality of supply BV2: Financial framework... BV7: Safety Weighted Risk Level Reduction for a Project Risk level reduction under Business value X X Weight for BV1 Weight for BV2 = X = X Weight for BV7 = Weighted risk level reduction under BV1 Weighted risk level reduction under BV2 Weighted risk level reduction under BV7 Business value weights TS operation quality 25% Finance 15% Company image 12% Environmental sustainability 12% Customer service 12% Regulatory compliance 12% Safety 12% Weighted risk level reduction

By ranking of the projects according to the business values and based on risk level reduction, ELES can: Show for each planned project its effect on the business values of ELES Show for each project the risks reduced and the level of risk reduction in each business value Rank the projects

Conclusion The proposed methodology can Be applied to all costs-influencing business values Help mitigating risks the company is exposed to Implemented end of 2014 First use: prioritization of the investment portfolio for the 3-year regulatory period 2016-2018

15 Questions? Thank you for your attention! Assoc. Prof. Andrej F. Gubina andrej.gubina@fe.uni-lj.si http://lest.fe.uni-lj.si/en