Tier 1 Net Metering and Renewable Resource Interconnection Agreement. Grantee: Abbreviated Legal Description: Assessor s Tax Parcel Number(s):

Similar documents
Mason County PUD No. 1. Net Energy Metering Interconnection Agreement

Clark Public Utilities

SALEM CITY. NET METERING LICENSE AGREEMENT For Customer-Owned Electric Generating Systems of 100kW or Less

Interconnection of Electric Generators

Public Utility District No. 1 Of Jefferson County

INTERCONNECTION GENERATION AND NET METERING POLICY

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620

Taunton Municipal Lighting Plant. This INTERCONNECTION & NET METERING AGREEMENT 1. CUSTOMER ELECTRIC GENERATING SYSTEM

Parkland Light & Water Company Park Ave Tacoma, WA 98444

INTERCONNECTION AGREEMENT FOR NET BILLING FOR RENEWABLE ELECTRICAL GENERATING FACILITIES OF ONE MEGAWATT OR LESS

CITY OF UKIAH PHOTOVOLTAIC INTERCONNECTION AGREEMENT FOR NET ENERGY METERING FROM SOLAR ELECTRIC GENERATING FACILITIES OF 1 KW (KILOWATT) TO 100 KW

SAMPLE INTERCONNECTION AGREEMENT FOR NET ENERGY METERING

7 th Revision of Sheet No. 150 Canceling 6 th Revision WN U-60 of Sheet No. 150

2. IDENTITY AND LOCATION OF GC

Solar: Wind: Total: (AC Nameplate Rating) x (720 hrs/mo) x (0.15 = solar/ 0.10 = wind) Date(s) of Parallel Operation Rebate Expiration

Net Metering Interconnections Standards

STANDARD INTERCONNECTION APPLICATION FOR NET METERING FACILITIES

INTERCONNECTION & NET ENERGY METERING AGREEMENT FOR RESIDENTIAL AND COMMERCIAL ELECTRIC GENERATING FACILITIES

NET ENERGY METERING AND INTERCONNECTION AGREEMENT

NET-ENERGY METER AGGREGATION INTERCONNECTION AGREEMENT FOR RESIDENTIAL AND COMMERCIAL ELECTRIC CUSTOMERS

Net Metering Interconnection Standards

Customer Information Packet on Net(B) Metering SYSTEM MUST BE OWNED AND OPERATED BY CUSTOMERS OF WAKEFIELD MUNICIPAL GAS AND LIGHT DEPARTMENT

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

STANDARD GENERATION INTERCONNECTION AGREEMENT BETWEEN CITY OF ANAHEIM AND

STANDARD INTERCONNECTION AGREEMENT Fayetteville Public Works Commission

POWER PURCHASE and INTERCONNECTION AGREEMENT FOR SNAP GENERATION

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Town of Highlands Board Approved as of May 17, 2012

PHOTOVOLTAIC INTERCONNECTION AGREEMENT FOR ELECTRIC GENERATING FACILITES Customer Owned Generation-Distribution Rate (Schedule G-1)

Holden Municipal Light Department Interconnection Agreement for Net Metering Service

STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES

STANDARD INTERCONNECTION AGREEMENT FOR QUALIFYING FACILITIES (QF) 10 KW OR LESS

Interconnection of Electric Generators

INTERCONNECTION AND OPERATING AGREEMENT

ALAMEDA MUNICIPAL POWER INTERCONNECTION AGREEMENT GENERAL CONDITIONS

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Renewable Generation (Category 1-20 kw and less):

Renewable Generation (Category 1 20 kw and less):

Superseding REVISED Sheet No. 38 REVISED SHEET NO. 38 Effective March 20, 2008 Effective February 6, 2014 RULE NO. 18. Net Energy Metering

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR RESIDENTIAL NET METERING FACILITIES (for systems 20 kw or less)

Issued: September 2, 2014 Effective: October 3, 2014 WN U-60 Attachment B to Schedule 150, Page 1

ALAMEDA MUNICIPAL POWER INTERCONNECTION AGREEMENT GENERAL CONDITIONS

Please Refer to Attached Sample Form

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR NON-RESIDENTIAL NET METERING FACILITIES (for kw systems)

Rate Code: L L-16 SOUTH CAROLINA PUBLIC SERVICE AUTHORITY (SANTEE COOPER) LARGE LIGHT AND POWER SCHEDULE L-16

GARLAND POWER & LIGHT. GP&L s Solar Generation Installation Requirements 2018

Tier 1 Standard Interconnection Agreement Customer-Owned Renewable Generation System

MODEL DISTRIBUTION COOPERATIVE AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION LONG FORM CONTRACT

STANDARD INTERCONNECTION AGREEMENT FOR RENEWABLE GENERATION SYSTEM

APPLICATION FOR STANDARD CONTRACT BY A QUALIFYING COGENERATOR OR SMALL POWER PRODUCER

ENTERGY NEW ORLEANS, INC. STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES LOCATED IN ORLEANS PARISH

I. Members Applying for New Interconnection/Submission of Plans/Specifications.


Berkeley Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Up To 500 KVA with the Cooperative s Electric Systems (CES)

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

Please Refer to Attached Sample Form

ENTERGY LOUISIANA, LLC STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES

Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) 1. Overview:

TRI-COUNTY ELECTRIC COOPERATIVE APPLICATION AND AGREEMENT FOR INTERCONNECTION AND NET METERING OF SYSTEMS WITH CAPACITY OF 100 kw OR LESS

Standard Interconnection Agreement for Customer-Owned Renewable Generation System

Palmetto Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Less Than 2 MVA With Cooperative s Electric Systems (CES)

EL PASO ELECTRIC COMPANY SCHEDULE NO. DG INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION

Customer s Name: Address: Contact Person: Telephone Number: Service Point Address: (Name and Address) Signature

Form No. 23 DECLARATIONS

Please Refer to Attached Sample Form

Standard Interconnection Agreement for Customer-Owned Renewable Generation System kw

FIRSTENERGY INTERCONNECTION AGREEMENT

WITNESSETH: WHEREAS, This Agreement does not address the sale of electricity to or from Consumers; and

STANDARD INTERCONNECTION AGREEMENT FOR INTERCONNECTED CUSTOMER-OWNED BATTERY SUBSYSTEMS 1 KW OR MORE

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

Solar Generator Interconnection Agreement

AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION

DEVELOPER EXTENSION AGREEMENT

Electricity (Net-Metering) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 45 and 46) THE ELECTRICITY (NET-METERING) RULES, 2018

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

Standard Tariff for Electricity Purchases From And Sales to Qualifying Facilities. Applicant: Dated 20

SURPLUS ENERGY PURCHASE AGREEMENT PARALLEL CUSTOMER GENERATION CGS 8 WISCONSIN AGGREGATE RENEWABLE CAPACITY OF 20 KILOWATTS OR LESS

Lane Electric Cooperative, Inc. Eugene, Oregon Policy 311 (Net-Metering Services)

LEVEL 1: STANDARD APPLICATION FORM AND INTERCONNECTION AGREEMENT

PARALLEL OPERATION AGREEMENT FOR RENEWABLE GENERATION OPERATING UNDER TVA APPROVED PROGRAMS

INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS

ENERGY EFFICIENCY CONTRACTOR AGREEMENT

PEPCO CUSTOMER NET ENERGY METERING CONTRACT. Qualifying facility of 1000 KW or less

STANDARD INTERCONNECTION AGREEMENT FOR TIER 2 RENEWABLE GENERATOR SYSTEMS

NET METERING CUSTOMER SITED RENEWABLE GENERATION FACILITIES POLICY

SERVICE AGREEMENT. THIS AGREEMENT ( Agreement ) is made and entered into as of, 20 by and between ( Owner ) and ( Vendor ).

CITY OF TUMWATER SERVICE PROVIDER AGREEMENT (TOWING CONTRACT) THIS AGREEMENT is made and entered into in duplicate this 1 st day of

NET METERING AGREEMENT

STANDARD INTERCONNECTION AGREEMENT FOR TIER 1 RENEWABLE GENERATOR SYSTEMS

APPENDIX A. Main Extension Agreement (MEA)

RESERVATION REQUEST FORM INSTRUCTIONS

Recitals: Whereas, Interconnection Customer is the State of Maryland ( State ) or a local governmental entity of the State of Maryland;

PROFESSIONAL SERVICES AGREEMENT For Project Description, Project #

Advice Notice No. 21

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No E.

KOSCIUSKO REMC AGREEMENT FOR INTERCONNECTION OF DISTRIBUTED GENERATION

WHITBY HYDRO CONNECTION AGREEMENT FOR A GENERATOR WITH MOMENTARY CLOSED TRANSITION OPERATION

PUBLIC SERVICE COMPANY OF NEW MEXICO AGREEMENT NO.

CITY OF ELMHURST WIRELESS RADIO ALARM LEASE

SPECIAL RULES GOVERNING THE APPLICATION OF RATE RIDER RGB

Transcription:

Return to: Inland Power & Light Co. PO Box A Spokane, WA 99219-5000 Reference numbers of related documents: N/A Tier 1 Net Metering and Renewable Resource Interconnection Agreement Grantor: Inland Power & Light Co. Grantee: Abbreviated Legal Description: Assessor s Tax Parcel Number(s): ****************************************************************************************** Member Owned Electric Generating Facilities of 25 Kilowatts or Less This Net Metering and Renewable Resource Interconnection Agreement (Agreement) is executed this day of, 20 between (hereinafter referred to as "Member"), and Inland Power & Light Co. (hereinafter referred to as Inland ). Both parties, who may be herein further referred to collectively as "Parties" and individually as "Party", agree as follows: RESOURCE INTERCONNECTION AGREEMENT - 1

Application for Net Metering and Renewable Resource Interconnection of a Generating Facility No Larger than 25kW Complete, Sign and Submit with non-refundable $150 Engineer Fee PRIOR TO INSTALLATION OR MODIFICATION. Additional Metering Fees as detailed in Inland Power Procedure No. 9-8-1 will be assessed on the power bill following acceptance by Inland Power. Interconnection Member Account Name: Contact Name: Account #: Existing Service New Service Service Address: (Street) (City) (State) (Zip) Mailing Address: (Street) (City) (State) (Zip) Telephone (Day): (Evening): Fax: E-Mail Address: Ownership of the facility (include % ownership by any electric utility): Generating Facility Information New Installation Modification New Owner of existing facility Type of Generator: Solar Wind Other (describe) _ Location on Property: Electrical Permit # Service Pole or UG Transformer # Generator Design Capacity: (kw) Battery backup? Yes No CT Service? Yes No Generator (qty, mfr, model, watts) Generator manufactured within the State of Washington? Yes No Inverter (qty, mfr, model, watts, volts) Inverter manufactured within the State of Washington? Yes No Cost of system including installation: Interconnection Member Signature I hereby certify that, to the best of my knowledge, the information provided in this Application is true. Signed: Title: Date: RESOURCE INTERCONNECTION AGREEMENT - 2

1. MEMBER ELECTRIC GENERATING FACILITY a. Member has elected to operate an electric generating facility, with a generating capacity of not more than twenty five kilowatts, in parallel with the Inland s transmission and distribution facilities. In accordance with RCW 80.60, the Member s wind, solar or biogas electric generating facility (generating facility) is intended to offset either part or all of the Member's electrical requirements. Further, in accordance with RCW 82.12, Member desires to operate such generation in order to qualify for state approved incentive payments for a portion or all of the renewable energy produced. Inland has no direct financial involvement in the investment, construction, operation or maintenance of Member s generation facility. b. Member s electric generating facility shall be located upon Member s real property (hereinafter Member s Premises ). c. Inland, upon request, can aggregate member-generator meters on premises owned by the membergenerator. d. A separate agreement shall be entered into for each Member s electrical service location(s). e. The electrical generating system facility used by the Member shall be located on the Member s premises. It shall include all equipment necessary to meet applicable safety, power quality and Interconnection requirements established by the National Electrical Code, National Electrical Safety Code, the Institute of Electrical and Electronics Engineers, Underwriters Laboratories and Inland s Net Metering and Renewable Resource Interconnection Standards, as set forth in Inland s Procedure 9-8-1. f. Inland shall have the sole authority to determine which Interconnection requirements set forth herein are applicable to Member s proposed generating facility. 2. TERM OF AGREEMENT This Agreement shall be in effect when signed by the Member and Inland and shall remain in effect thereafter month to month unless terminated by either Party on thirty (30) days' prior written notice to the other party. 3. BILLING TREATMENT OF NET METERING AND INCENTIVE PAYMENTS FOR RENEWABLE RESOURCES The billing treatment for Net Metering per RCW is specified in IPL Procedure 9-8-1. Incentive payment for Renewable Resources per RCW is specified in IPL Procedure 9-8-1. Currently, the maximum incentive payments available by the State of Washington has been reached and therefore, Inland is placing a moratorium on its voluntary participation in the incentive payment program for this agreement. If the State of Washington increases the available funds for incentive payments in the future, Inland will notify Member to determine eligibility. 4. INTERRUPTION OR REDUCTION OF DELIVERIES Inland may require Member to interrupt or reduce deliveries as follows: a. When necessary in order to construct, install, maintain, repair, replace, remove, investigate or inspect any of its equipment or part of its system; or b. If it determines that curtailment, interruption or reduction is necessary because of emergencies, force major or compliance with prudent electrical practices. Whenever possible, the utility shall give Member reasonable notice of the possibility that interruption or reduction of deliveries may be required. Notwithstanding any other provision of this Agreement, if at any time the utility determines that either: c. The generating facility may endanger utility personnel or other individuals, or d. The continued operation of Member's generating facility may endanger the integrity of the utility's electric system, Then Inland shall have the right to disconnect Member's generating facility from Inland s electric system. Member's generating facility shall remain disconnected until such time as Inland is satisfied the condition(s) referenced in (a) or (b) of this Section 4 have been corrected. 5. INTERCONNECTION. RESOURCE INTERCONNECTION AGREEMENT - 3

a. Member shall deliver the excess energy to Inland at Inland s revenue meter. b. Member shall pay for designing, owning, installing, inspecting, operating, and maintaining the electric generating facility and for metering the energy produced by the facility in accordance with all applicable laws and regulations and shall comply with Inland s Interconnection Standards set forth in Inland s Procedure 9-8-1. c. Unless otherwise provided, Member shall pay for Inland s standard watt-hour meter electrical hook-up, if not already present and other related reasonable costs as may be incurred by Inland. d. Member shall not commence parallel operation of the generating facility until written approval of the Interconnection facilities has been given by Inland. Such approval shall not be unreasonably withheld. Inland shall have the right to have representatives present at the initial testing of Member's protective apparatus. Member shall notify Inland when testing is to take place. 6. MAINTENANCE AND PERMITS Member shall: a. Maintain the electric generating facility and Interconnection facilities in a safe and prudent manner and in conformance with all applicable laws and regulations including, but not limited to, Inland s Interconnection Standards, and b. Obtain any governmental authorizations and permits required for the construction and operation of the electric generating facility and Interconnection facilities, including electrical permit(s). c. Reimburse Inland for any and all losses, damages, claims, penalties or liability it incurs as a result of Member's failure to obtain or maintain any governmental authorizations and permits required for construction and operation of Member's generating facility or failure to maintain Member's generating facility as required in (a) of this Section 6. 7. ACCESS TO PREMISES Inland may enter Member's premises or property to: a. Inspect, with prior notice, at all reasonable hours, Member's generating facility s protective devices; b. Read meter; and c. Disconnect the designated disconnect switch or Inland s meter or transformer, without notice, the generating facilities if, in Inland s opinion, a hazardous condition exists and such immediate action is necessary to protect persons, or Inland s facilities, or property of others from damage or interference caused by Member's electric generating facilities, or lack of properly operating protective devices or inability to inspect the same. Inland inspection or other action shall not constitute approval by Inland. The Member remains solely responsible for the safe and adequate operation of its facilities. 8. INDEMNITY AND LIABILITY a. The Member assumes the risk of all damages, loss, cost and expense and agrees to indemnify the utility, its successors and assigns, and its respective directors, officers, employees and agents from and against any and all claims, losses, costs, liabilities, damages and expenses including, but not limited to, reasonable attorney fees, resulting from or in connection with performance of the agreement or which may occur or be sustained by Inland on account of any claim or action brought against Inland for any reason including by not limited to loss to the electrical system of the Member caused by or arising out of an electrical disturbance. b. Such indemnity, protection and hold harmless includes any demand, claim, suit or judgment for damages, death or bodily injury to all persons, including officers, employees or agents and subcontractors of either Party hereto including payment made under or in Interconnection with any Worker s Compensation Law or under any plan for employees disability and death benefits or property loss which may be caused or contributed to by the Interconnection, maintenance, operation, use, presence or removal of Member s equipment. The only exception will be liability occasioned by the sole negligence or willful misconduct of Inland or its employees acting within the scope of their employment and liability occasioned by a partial negligence of Inland or its RESOURCE INTERCONNECTION AGREEMENT - 4

employees acting within the scope of their employment to the extent that such partial liability is fixed by a court of competent jurisdiction. c. The provisions of the Section 8 shall not be construed to relieve any insurer of its obligations to pay any insurance claims in accordance with the provisions of any insurance policy. d. Inland shall have no liability, ownership interest, control or responsibility for the Member s Electric Generating Facility or its Interconnection with Inland s electric system, regardless of what Inland knows or should know about the Member s Electric Generating Facility or its Interconnection. e. Member recognizes that it is waiving immunity under Washington Industrial Insurance law and further agrees that this indemnification clause has been mutually negotiated. This indemnification shall extend to and include attorney s fees and the costs of establishing the right of indemnification hereunder in favor of Inland. 9. INDEPENDENT CONTRACTORS The Parties hereto are independent contractors and shall not be deemed to be partners, joint ventures, employees, franchisees or franchisers, servants or agents of each other for any purpose whatsoever under or in connection with this Agreement. 10. GOVERNING LAW This Agreement shall be interpreted, governed and construed under the laws of the State of Washington as if executed and to be performed wholly within the State of Washington. Venue of any action arising hereunder or related to this agreement shall lie in Spokane County, Washington. 11. FUTURE MODIFICATION OR EXPANSION Any future modification or expansion of the Member owned generating facility and related equipment will require an engineering review and prior written approval by Inland. Inland reserves the right to require the Member, at Member s expense, to provide modifications or additions to existing electrical devices including, but not limited to protection device and meters, in the event of changes to government or industry regulation and/or standards. 12. AMENDMENTS, MODIFICATIONS OR WAIVER Any amendments or modifications to this Agreement shall be in writing and agreed to by both Parties. The failure of any Party at any time or times to require performance of any provision hereof shall in no manner affect the right at a later time to enforce the same. No waiver by any Party of the breach of any term or covenant contained in this Agreement, whether by conduct or otherwise, shall be deemed to be construed as a further or continuing waiver of any such breach or waiver of the breach of any other term or covenant unless such waiver is in writing. 13. ASSIGNMENT The Member shall not assign its rights under this Agreement without the express written consent of Inland. Inland may impose reasonable conditions on any such assignment to ensure that all of Member s obligations under this Agreement are met and that none of Member s obligations under this Agreement are transferred to Inland as a result of default, bankruptcy or any other cause. Prior to any sale or transfer of Member s interest in Member s Premises, Member shall either terminate this Agreement in accordance with the provisions of Section 2 above or Member s successor in interest with respect to Member s Premises and Member shall enter into a written assignment of this Agreement with Inland, the terms and conditions of which must be reasonably acceptable to Inland. At any time after any transfer of Member s interest in Member s Premises or any attempted assignment hereunder not in conformity with the provisions of this Section 13, Inland shall have the right to terminate this Agreement upon posting written notice of such termination upon Member s Premises and mailing a copy of such Notice of Termination to Member at Member s address set forth below by certified mail, return receipt requested. Such RESOURCE INTERCONNECTION AGREEMENT - 5

termination shall be effective upon the later of the posting of such Notice or deposit of such Notice, properly addressed as set forth above, in the United States Mail. 14. SIGNATURES IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed by their duly authorized representatives. This Agreement is effective as of the last date set forth below. Member: Signature Print Name Title Date Inland Power & Light Co.: Signature Print Name Title Date STATE OF WASHINGTON ) ) ss. County of ) On this day of, 20, personally appeared before me Member, to me known to be the individual(s) described in and who executed the within and foregoing instrument, and acknowledged that he/she/they signed the same as his/her/their free and voluntary act for the uses and purposes mentioned in the instrument. My Commission Expires: NOTARY PUBLIC in and for the State of Washington, residing at RESOURCE INTERCONNECTION AGREEMENT - 6