Velocity Hole RDD-009 Intersects New Zone at Rozino Gold Project, Southeast Bulgaria

Similar documents
Velocity Extends East Zone Discovery at Rozino Gold Project, Southeast Bulgaria

Velocity Continues to Expand East Zone Discovery at Rozino Gold Project, Southeast Bulgaria

Velocity Files NI Technical Report on SEDAR for the Maiden Inferred Mineral Resource Estimate at Rozino Gold Project, Southeast Bulgaria

Velocity Announces C$9M Strategic Investment by Atlantic Gold

APRIL Balkan Gold Project

JUNE 2018 Balkan Gold Project

ATLANTIC ANNOUNCES STRATEGIC INVESTMENT IN VELOCITY MINERALS LTD.

NEWS RELEASE. Resources at Galat Sufar South ( GSS ), in-pit and outside current design, continue to increase

NEWS RELEASE Orca Gold Intersects 13m at 10.19g/t Au and 93.7m at 1.72g/t Au at its Block 14 Gold Project in Sudan

NEWS RELEASE Orca Gold Intercepts 39m at 2.52 g/t Au in The Republic of The Sudan and 27.7 m at 1.74 g/t Au in Côte d Ivoire

NEWS RELEASE February 13, 2018

TSX.V:ORG Page 1 of 7. Orca Gold Inc West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: Fax: HIGHLIGHTS

NEWS RELEASE February 15, 2017

HIGHLIGHTS DETAILS. Commenting on the new discovery, Hugh Stuart, President and Director of Orca Gold, said Our aim in Côte 1 O r c a G o l d I n c.

GGX Gold Drill Intercepts Meter of 4.59 g/t Gold and g/t Silver. The COD Vein Greenwood BC

Trevali Provides Murray Brook Project Update

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia

Marlin Gold Closes Acquisition of Commonwealth Silver and Gold and Provides Corporate Update

NEWS RELEASE 03/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742

NEWS RELEASE New York AG February 25, 2019 Toronto FR Frankfurt FMV

AGNICO EAGLE TO ACQUIRE CAYDEN RESOURCES

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX: November 12, 2009

Cumberland Completes Cannu Gold Resource Estimate, Plans for New Reserves and Continued Exploration in 2007 at Meadowbank Gold Project

AUGUST 2018 Balkan Gold Project

Claude Produces 15,722 Ounces of Gold in Q3 and Improves Full Year Guidance

Capstone Mining 2017 Production Results and 2018 Operating and Capital Guidance

NEWS RELEASE K92 MINING INC. K92 Mining Discovers High Grade Extension of Kora Deposit in First Completed Exploration Hole

FIRST MAJESTIC SILVER CORP.

SilverCrest Announces Babi Sur Vein High-Grade Discovery at Las Chispas 2.2 Metres Grading 556 gpt AgEq. 1.5 Metres Grading 606 gpt AgEq

INTERIM QUARTERLY HIGHLIGHTS

Dalradian Resources Intersects 2.34 m Grading g/t Au and 3.97 m Grading 38 g/t Au and 4 m Grading 7.38 g/t Au at the Curraghinalt Gold Deposit

MANAGEMENT S DISCUSSION & ANALYSIS QUARTERLY HIGHLIGHTS SEPTEMBER 30, 2017

New Drilling Results and Mineral Resource Update for Certej Deposit Gold Resources Increase by 1,570,000 ounces

Claude Produces 20,672 Ounces of Gold in Q1

Trevali significantly increases resources at Santander zinc-lead-silver project in Peru

Trevali Reports Record Preliminary Q and 2017 Annual Production, and Provides 2018 Production and Cost Guidance

SANDSTORM GOLD ACQUIRES 2% NSR ROYALTY ON ENDEAVOUR S HOUNDÉ GOLD MINE FROM ACACIA MINING

KINROSS GOLD CORPORATION

Q CONFERENCE CALL

Detour Gold Reports Fourth Quarter and Full-Year 2014 Results and Year-end 2014 Mineral Reserve and Resource Estimates

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416)

Papuan Precious Metals Corp.

SILVERCORP REPORTS Q1 RESULTS: NET INCOME UP 73%, CASH FLOWS FROM OPERATIONS UP 52% TO US$20.2 MILLION

Spanish Mountain Gold Announces Results of New PEA for the First Zone

SAS REPORTS 2013 THIRD QUARTER RESULTS, WITH A SIXTH CONSECUTIVE QUARTER OF POSITIVE CASH FLOW FROM OPERATIONS

Detour Gold Reports Second Quarter 2017 Results

Great Panther Reports First Quarter 2019 Production Results

Northgate Minerals Reports Second Quarter Results

Operational Outlook & Update Conference Call November 29, 2018

LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD

555 Burrard Street, Suite 1800, Vancouver, B.C. V7X 1M August 14, 2018 SBB NR SBB TSX

Oracle Mining signs indicative term sheet for US$6.5 million secured convertible loan and up to CAD$20 million future project financing

JANUARY 2019 Gold in Bulgaria

ENTRÉE GOLD REPORTS ON SECOND QUARTER 2012

SECOND QUARTER 2018 RESULTS. August 10, 2018

Gold Hawk Resources Inc.

Detour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance

ELGIN MINING PROVIDES STRONG FOURTH QUARTER CASH COSTS AND POSITIVE 2014 OUTLOOK

For further information: Investor Relations (416)

Rizal Resources Corporation. Quarterly Highlights Three months ended March 31, 2018

September 15, 2016 News Release SILVER STANDARD PROVIDES MARIGOLD FIVE-YEAR OUTLOOK

Pretivm Reports Third Quarter 2018 Results

Alio Gold Reports First Quarter 2018 Results

ESPERANZA UPDATES CERRO JUMIL PROJECT

PRESS RELEASE SEPTEMBER 17, 2018

Northgate Announces Increase in Gold Reserves at its Stawell Gold Mine

LEAGOLD ANNOUNCES 2018 EARNINGS, INCLUDING AISC OF $974/oz AND AISC MARGIN OF $83.2 MILLION

Prophecy Reports 2.08 Million Tonnes of Indicated Resource Grading: 455 g/t Silver, 3.19% Zinc, 2.18% Lead (594 g/t Ag Eq.) for Pulacayo Project

Papuan Precious Metals Corp.

Avnel Gold Reports that Indicated Resources Increased 55% to 2 Million Ounces at the Kalana Main Project

MAG Silver Corp. August 14, 2013

Gold production for the quarter of 38,500 ounces with cash flow generation from operations of $18.9 million ( M ).

Q3 and First Nine Months 2017 Highlights

Management's Comments On Unaudited Financial Statements

Corvus Gold Announces Maiden Resource for Mother Lode Deposit, Nevada

News Release B2Gold Announces Positive Exploration Drill Results from the Fekola Property and Regional Targets in Mali, West Africa

Mako Mining Provides Corporate Update

METALLA ANNOUNCES FRIENDLY ACQUISITION OF VALGOLD AND ROYALTY ON THE GARRISON PROJECT

METALLA ADDS PRODUCING ROYALTY ON PAN AMERICAN SILVER PROPERTY AND ANNOUNCES BROKERED PRIVATE PLACEMENT

MCEWEN MINING INTERSECTS 53.9 g/t GOLD OVER 8.3 m AT THE FROOME FOOTWALL

Trevali reports Q financial results

YEAR END 2015 CONFERENCE CALL

Trevali expands high-grade zinc-lead-silver mineralization at Santander Zinc Mine and discovers new Central-Oyon zone

LUPAKA GOLD REPORTS PERFORMANCE AND FINANCIAL HIGHLIGHTS FOR THE SIX MONTHS ENDED JUNE 30, 2013

Marigold Life of Mine Plan

Teranga Gold Reports High-Grade Gold from Phase 2 Drilling at Golden Hill s C-Zone Prospect

AVINO SILVER & GOLD MINES LTD.

Q PRESENTATION

Detour Gold Reports Third Quarter 2018 Results

Capstone Mining Announces High Grade Step-out Holes at Cozamin Mine

Detour Gold Reports Second Quarter 2018 Results and Reaffirms Guidance for 2018

ABACUS MINING & EXPLORATION CORP.

MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE NINE MONTHS ENDED SEPTEMBER 30, 2018

MIDWAY ANNOUNCES SIGNIFICANT UPGRADE IN RESOURCE AND 2014 BUDGET INCREASE AT SPRING VALLEY PROJECT, NEVADA

CORPORATE PRESENTATION. June 2018

METALLA REPORTS FINANCIAL RESULTS FOR THE THIRD QUARTER OF FISCAL 2018

Fortress Enters into Agreement to Acquire the Fruta del Norte Project from Kinross

PRELIMINARY ECONOMIC ASSESSMENT FOR THE COMBINED LOS HELADOS AND JOSEMARIA COPPER/GOLD DEPOSITS NEARING COMPLETION

Revenues of $152.0 million on gold sales of 113,845 ounces at an average realized price of $1,281 per ounce

Caledonia Mining Corporation (TSX: CAL, OTCQX: CALVF, AIM: CMCL) Q2 and First Half Year 2013 Results and Confirmation of Management Conference Call

Transcription:

NR-17-11 October 19, 2017 Velocity Hole RDD-009 Intersects New Zone at Rozino Gold Project, Southeast Bulgaria Highlights include 27.0 metres @ 2.64 g/t gold Vancouver, British Columbia Velocity Minerals Ltd. (TSXV: VLC) ( Velocity or the Company ) announces that it has received laboratory results for four additional diamond drill holes at the Company s advanced Rozino gold project ( Rozino or the Project ) (Table 1). Drill holes RDD-008 and RDD-009 were collared outside of the main mineralized zone ( Main Zone ) and were targeted upon historical trench results. Positive results include 27.0m @ 2.64 g/t gold (6.03 g/t gold uncut) and demonstrate the excellent opportunities to discover new and additional mineralized zones at Rozino that are near surface and amenable to potential bulk tonnage, open pit development. Drill holes RDD-010 and RDD-011 are 50m step-outs from previously announced intersections and both holes intersected mineralization, which remains open in all directions. Drilling at Rozino is ongoing with 16 drill holes completed to date. A second drill rig is expected to arrive on site in the coming week. Figure 1: Velocity drill hole plan. Holes completed are shown in black. Results have been returned for holes RDD-001 through RDD-011. Sixteen drill holes have been completed. Drilling is ongoing. 1

Drillhole RDD-008 is located 300m east of Main Zone (Figure 1) and returned two broad intersects including 41.7m @ 0.85g/t gold (from surface) and 33.95m @ 0.79 g/t gold. The drill intersections provide confirmation that historical trenching and soil anomalies are indicative of sub-surface mineralization. The soil anomaly tested by RDD-008 measures 250m x 250m and will require additional drill testing. Drillhole RDD-009 targeted historical trench anomalies located 150m southwest of the central main zone (Figures 1 and 2), intersecting 27m @ 2.64g/t gold (6.03 g/t uncut). This new gold zone trends northwest, is subparallel to the main mineralization and remains open. Table 1: Drill Results from Velocity Drill Holes RDD-008, -009, -010 and -011 at Rozino. Drillhole From (m) To (m) Thickness (m)^ Gold (g/t) Uncut Gold (g/t) Top cut* RDD-008 2.3 44.0 41.7 0.86 0.86 and 112.8 146.75 33.95 0.79 0.79 RDD-009 3.0 30.0 27.0 6.03 2.64* including 6.0 22.0 16.0 9.90 4.17* RDD-010 1.1 12.7 11.6 0.88 0.88 81.8 83.8 2.0 2.99 2.99 RDD-011 56.9 81.2 24.3 1.20 1.20 ^ The current exploration model has not had sufficient drill testing to be able to determine true thickness of mineralization. * A top-cut of 40g/t was applied to the drill intersection in RDD-009. Drill hole RDD-010 (Figure 1) intersected 11.6m @ 0.88g/t gold from surface. Drill hole RDD-011 (Figure 1 and 3) is a 50m step out from previously disclosed intersections in hole RDD-002. The hole intersected 24.3m @ 1.20g/t gold in sediments above basement and the mineralization remains open. Quality Assurance / Quality Control The work program at Rozino was designed and is supervised by Stuart A. Mills, CGeol, the Company's Vice-President Exploration, who is responsible for all aspects of the work, including the quality control/quality assurance program. On-site personnel at the project rigorously collect and track samples which are then security sealed and shipped to ALS Global laboratory in Romania. Samples used for the results described herein are prepared and analyzed by fire assay using a 30-gram charge in compliance with industry standards. Field duplicate samples, blanks and independent controlled reference material (standards) are added to every batch. Drill intersections in this news release are calculated using a 0.2 g/t gold trigger, a minimum 0.5 g/t gold composite, and a maximum of 3 meters consecutive waste. 2

Figure 2: Section showing drill intersection from drill hole RDD-009. Mineralization is open and follow-up drilling will be required to fully test this newly discovered zone. Figure 3: Section showing drill intersection from drill hole RDD-011 and previously released intersections from RDD-002 and RDD-006. 3

Qualified Person The technical content of this release has been approved for disclosure by Stuart A. Mills, BSc, MSc, CGeol, a Qualified Person as defined by National Instrument 43-101 and the Company s Vice President Exploration. Mr. Mills is not independent of the Company. About Velocity Minerals Ltd. Velocity is a gold exploration and development company focussed on eastern Europe. The Company s management and board includes mining industry professionals with over 100 years of combined experience spanning Europe, Asia, and the Americas as employees of major mining companies as well as founders and senior executives of junior to mid-tier public companies. The team's experience includes all aspects of mineral exploration, resource definition, feasibility, finance, mine construction and mine operation as well as a track record in managing publicly listed companies. The Company s portfolio of advanced gold exploration assets is currently in Bulgaria, which is a member of the European Union (2007) and an attractive destination for mining investment. The country s mining law was established in 1999 and updated in 2011. Mining royalties are low and compare favourably with more established mining countries like Canada, Peru and Chile. Bulgaria also boasts a corporate tax rate of only 10% and the country s education system has yielded a good availability of experienced mining professionals in a favourable cost environment. Foreign mining companies are successfully operating in Bulgaria. Local knowledge and experience are essential components of mining investment in a foreign jurisdiction. Velocity Minerals has entered into a number of option agreements with Gorubso Kardzhali A.D. ("Gorubso'), an established and respected mining company in Bulgaria. Gorubso operates the underground Chala Gold Mine (2006) and the Kardzhali Carbon In Leach (CIL) processing plant (2011), which produces gold dore. Gorubso is the first and only company in Bulgaria to have secured a permit for cyanide-related processing of gold ores. Velocity s management has a long-standing relationship with Gorubso as well as significant previous experience in Bulgaria and elsewhere in the region. On Behalf of the Board of Directors "Keith Henderson" President & CEO For further information, please contact: Keith Henderson Phone: +1-604-638-3456 E-mail: info@velocityminerals.com Web: www.velocityminerals.com Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: This news release includes certain forward-looking statements under applicable Canadian securities legislation. Forward-looking statements include, but are not limited to, statements with respect to: future exploration and testing carried out on the Tintyava property; use of funds; and the future business and operations of Velocity. Often, but not always, forward looking statements can be identified by words such as pro forma, plans, expects, may, should, budget, scheduled, estimates, forecasts, intends, anticipates, believes, potential or variations of such words including negative variations thereof, and phrases that refer to certain actions, events or results that may, could, would, might or will occur or be taken or achieved. Forward looking information involves known and 4

unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to differ materially from any future results, performance or achievements expressed or implied by the forward-looking information. Such risks and other factors include, among others, operating and technical difficulties in connection with mineral exploration and development and mine development activities for the Tintyava property, including the geological mapping, prospecting and sampling programs for the projects, the fact that the Company s interests in the Tintyava property is only an option and there is no guarantee that the interest, if earned, will be certain, actual results of exploration activities, including the program, estimation or realization of mineral reserves and mineral resources, the timing and amount of estimated future production, costs of production, capital expenditures, the costs and timing of the development of new deposits, the availability of a sufficient supply of water and other materials, requirements for additional capital to fund the Company's business plan, future prices of precious metals, changes in general economic conditions, changes in the financial markets and in the demand and market price for commodities, possible variations in ore grade or recovery rates, possible failures of plants, equipment or processes to operate as anticipated, accidents, labour disputes and other risks of the mining industry, delays in obtaining governmental and regulatory approvals (including of the TSX Venture Exchange), permits or financing or in the completion of development or construction activities, changes in laws, regulations and policies affecting mining operations, hedging practices, currency fluctuations, title disputes or claims limitations on insurance coverage and the timing and possible outcome of pending litigation, environmental issues and liabilities, risks related to joint venture operations, and risks related to the integration of acquisitions, as well as those factors discussed under the heading. "Risk Factors" in the Company's annual management's discussion and analysis and other filings of the Company with the Canadian Securities Authorities, copies of which can be found under the Company's profile on the SEDAR website at www.sedar.com. Readers are cautioned not to place undue reliance on forward looking information. The Company undertakes no obligation to update any of the forward-looking information in this news release or incorporated by reference herein, except as otherwise required by law. - 30-5