TRACKING AND MANAGEMENT OF CONSTRUCTION PROJECTS USING PRIMAVERA

Similar documents
Detailed Project Scheduling and Cost Management

Planning, Scheduling and Tracking Of Ongoing Bridge Construction Project Using Primavera Software and EVM Technique

Project Performance Evaluation By Earned Value Method

A Study on Risk Analysis in Construction Project

Base Line Fixing and Earned Value Analysis in Construction Industry using Primavera

INSE 6230 Total Quality Project Management

CS 413 Software Project Management LECTURE 9 COST MANAGEMENT FOR SOFTWARE PROJECT III

Earned Value Management An Overview March 2014

Monitoring System For Project Cost Control In Construction Industry

Application of Earned Value Analysis in Analysing Project Performance

CONTROL COSTS Aastha Trehan, Ritika Grover, Prateek Puri Dronacharya College Of Engineering, Gurgaon

Monitoring and Controlling RCC Work in Delayed Construction Projects

EARNED VALUE MANAGEMENT. Is it worth the effort?

PMP Exam Prep Coaching Program

EARNED VALUE FEASIBILITY ANALYSIS FOR SOUTH GUJARAT REGION TO ENHANCE PROJECT PERFORMANCE

Analysis of Estimate at Completion of a Project's duration to improve Earned Value Management System 1 N.Vignesh

Earned Value Management Guide

PMP. Preparation Training. Cost Management. Your key in Successful Project Management. Cost Management Processes. Chapter 7 6/7/2005

The Cost Monitoring of Construction Projects Through Earned Value Analysis

Realization on Construction management of residential apartments

Earned Schedule .EMERGING PRACTICE. Eleanor Haupt IPPM. ASC/FMCE Wright-Patterson AFB OH ANL327

4/14/2017. Unit 7 Slide Lectures of 19/20/21 April 2017 PROJECT PROGRESS AND PROJECT PERFORMANCE ASSESSMENT (CH. 13)

Cumulative trends Problems and issues since last report

Application of Earned Value Management (EVM) for Effective Project Control

The First Steps in Implementing a Simplified Earned Value Management System

9/24/2010. Information System Structure (cont d) Information System Structure. Progress since last report Current status of project.

James A. Wrisley, President 9070 Lakes Blvd. West Palm Beach FL (561)

Earned Schedule Analysis

Formulas to Know for EXAM

Earned Value Management - EVM

Project Management -- Monitoring the progress

PROJECT BY PROJECT MANAGEMENT T OOLS

Carlos Consulting Group

RETURN TO ROME Dr. Kenneth F. Smith, PMP Project Management Fundamentals 1

Introduction to Project Management. Modeling after NYS ITS

Department of Industrial Engineering

PMP Exam Preparation Course. Madras Management Training W.L.L All Rights Reserved

[Project Name] Monthly Performance Report for mmm/yyyy. [Sub-Project, phase, etc.] [Company] [Company Address] Marc Arnecke, PMP

europe GENEVA 2009 Haute école de gestion de Genève Geneva School of Business Administration EVA Europe 2009 was jointly organised by Gold Sponsors

Thomas Carlos Consulting. Simple Earned Value Management

EVM WITHOUT QUALITY IS UNSUITABLE FOR SOFTWARE PROJECT & PROGRAM MANAGEMENT

30 April 2 May 2018 ICC Sydney Unlocking the Future through Systems Engineering. sete2018.com.au BRETT THIELE

Jefferson Science Associates, LLC. 900 Glossary. Project Control System Manual Revision 7

GPE engineering project management. Project Management in an Engineering Context

Lesson 7 The Project Budget

Earned Value Project Management. Amber L. Romero, CPM, P.M.P., Policy Analyst Sandia National Laboratories 505/ ;

Pass PMP in 21 Days - ITTO Toolbox PROCESS MAP

PROJECT MANAGEMENT BODY OF KNOWLEDGE

INTRODUCING PROJECT COST MANAGEMENT EXERCISES & QUIZ. Introducing Project Cost Management Exercises & Quiz

Earned Value Management. Danielle Kellogg. Hodges University

IP-CIS : CIS Project Management

Use of EVM Trends to Forecast Cost Risks 2011 ISPA/SCEA Conference, Albuquerque, NM

Project Controls Expo 16 th Nov 2016

NEW HORIZONS ONLINE LIVE. Project Management Professional (PMP ) PMBOK Guide 6th Edition DAY 4

EARNED VALUE AS A RISK ASSESSMENT TOOL

Earned Value Formulae

Professional Development Seminar Series

Gate Value Method Overview document

From Suspicion to Invaluable Transition of Two Project Managers

The Mystery of Earned Value - An Oil & Gas Owner s Perspective

Earned Value Management Handbook. arne. alu

The Value of EVM. Earned Value Management

Administration. Course Aim. Introductions

Schedule Analysis and Predictive Techniques Using Earned Schedule. 16 th IPM Conference Tysons Corner, Virginia

NOVEMBER 9, An overview of the core elements of the Earned Value Management technique. Presenter:

EVMS Fundamentals v.7.0. (Part 2 of 2) Slides and Notes

Performance measurement

Homework 6 Questions and Answers

THE PMP EXAM PREP COURSE

Financial Management & Accounting in Construction (CUE304) FINANCIAL MANAGEMENT. Dr. Ahmed Elyamany

An Automated Framework for the Integration between EVM and Risk Management

MMZG 523 PROJECT MANAGEMENT

Earning Value From Risk

Risk Analysis and Strategic Evaluation of Procurement Process in Construction

Factors Affecting Cost and Inflation of a Project

The Four Pillars of project management

PROJECT COST MANAGEMENT

SCHOOL OF ACCOUNTING AND BUSINESS BSc. (APPLIED ACCOUNTING) GENERAL / SPECIAL DEGREE PROGRAMME END SEMESTER EXAMINATION JULY 2016

Measuring Time An earned value simulation study

Application of Data Mining Tools to Predicate Completion Time of a Project

DEFENSE ACQUISITION UNIVERSITY EMPLOYEE SELF-ASSESSMENT. Outcomes and Enablers

Understanding the Differences. Accounting Practice for Measuring. Supertech Project Management

Earned Schedule schedule performance

EFFECT OF DEMONETIZATION IN INFLATION OF STATE OF TAMIL NADU. Mr Sankaramoorthy K Mr Balamurugan S Mr Sivasankar S ABSTRACT

Humphreys &Associates, Inc.

ANALYZE THIS! EARNED VALUE MANAGEMENT CONCEPTS AND ADVANCED FORECASTING?

Project health monitoring by Earned Value Analysis

A Case for Project Revenue Management. Peter Varani PMP

EVMi 101: EARNED VALUE MANAGEMENT FUNDAMENTALS

next level PMP Exam Preparation Formula Guide for the PMP Exam

Prepared by DCMA Lockheed Martin Fort Worth

Earned Value Management

THE VALUE OF EARNED VALUE MANAGEMENT

Presenting Earned Value

Optimization on Earned Value Method Combined with Critical Path

Predicting Project Completion Date Using Earned Value Management

Earned Value Management (EVM) and the Acquisition Program

Earned Schedule. James C. Blair, PhD, PMP. Project Management Institute May 19, Paladin Project Management Consultants, LLC

AN EXPERIMENTAL STUDY FOR EVALUATION OF TIME AND COST DRIVEN FACTORS ANALYSIS OF A COMMERCIAL COMPLEX

ievm (INTEGRATED EARNED VALUE MANAGEMENT) AN APPROACH FOR INTEGRATING QUALITY WITH TRADITIONAL EVM FOR EFFECTIVE PROGRAM AND PROJECT MANAGEMENT

Transcription:

TRACKING AND MANAGEMENT OF CONSTRUCTION PROJECTS USING PRIMAVERA Suchithra L 1, Anne Ligoria S 2 1PG Student, Department of Civil Engineering, Jerusalem College of Engineering, Tamil Nadu, India 2Professor of Civil Engineering Department and Dean- Academics, Jerusalem College of Engineering, Tamil Nadu, India ----------------------------------------------------------------------------***-------------------------------------------------------------------------- Abstract: Construction industry is an integral component of a nation s infrastructure and industrial growth. Eventhough construction industry is the second largest industry in India, the growth of this industry has been differential across the nation. Proper planning, scheduling, tracking and application are the major parameters in construction industry. This study involves tracking of the ongoing construction and management of a new building using primavera. The tracking of the project during construction is necessary to control the variance in the project and to know the forecasting cost of the project. Construction planning and scheduling is one of the important tool in construction. In the present study the tracking and forecasting was done by a method called Earned Value Management (EVM). The importance of construction management has been reviewed and the tracking of ongoing residential building as well as the management of new construction of an apartment building has been done. Key Words: Planning, Scheduling, Construction Management, Tracking, Primavera, EVM 1. INTRODUCTION The construction industry has been developed rapidly from the early days. One of the development was planning and scheduling using software. In construction industry, mostly used software for the planning and scheduling are MS Project and Primavera. But in India the use of the Primavera is rare and most of the construction has been taken place without the use of software which leads to extension of the duration and the cost of the project. In this study, the use and need of the project management software has been explained considering residential building and apartment building. The tracking was done in residential building and the management of the apartment building up to planning process using the project management software Primavera P6.R8.2. 1.1. PROJECT MANAGEMENT Planning is important for any work to reach its goal and Proper Planning leads to excellent result. The three basic things needed for the planning of construction projects are scope, time and cost. The efficient planning in a construction project involves project management plan, managing scope, collecting requirements, creating WBS, defining activities and their relationships, sequencing the activities, duration of the activities and estimation. If any risk arises then steps are taken to minimize or remove the risk. 1.2. EARNED VALUE MANAGEMENT Earned Value Management is the most frequently used performance measurement method. EVA looks at schedule, cost and scope performance measurements of a project together. To perform the earned value calculations, it is needed to determine the following three parameters: Planned Value (PV) Earned Value (EV) Actual Cost (AC) The planned value is the cost of the work that has been budgeted for an activity or for the project during a certain time period. The estimations and budgets are established during Planning Process. The Actual Cost is the cost of the work including direct and indirect costs. The Earned Value is the value of work that has been completed to date. The EVM is categorized as shown in Fig.1 2017, IRJET Impact Factor value: 5.181 ISO 9001:2008 Certified Journal Page 677

EVM Tracking Forecasting Schedule Variance (SV) Estimate to Complete (ETC) Cost Variance (CV) Estimate at Completion (EAC) Schedule Performance Index (SPI) Variance at Completion (VAC) Cost Performance Index (CPI) Budget At Completion (BAC) Fig-1: EVM Types 1.2.1. TRACKING: Planning is important for the success of the project. To know the project has been executed according to the planning, tracking has been takes place. Tracking helps to stick to the plan during execution. The tracking is the process of analyses the updated schedule whether the cost and units of the project are beyond or ahead or equal of the planning. The tracking is done by EVM (Earned Value Management). Tracking is comes under the process of monitoring and controlling of the construction project. Tracking of the project can be done after updating the project by monitoring. If the project is deviated from the schedule or cost it can easily be identified and controlling can be done. SV = EV - PV CV = EV AC SPI = EV / PV CPI = EV / AC a. Schedule Variance Cases Case 1: if SV = 0 ; as per schedule, SPI =1 Case 2: if SV = -ve ; behind schedule, SPI <1 Case 3: if SV = +ve ; ahead schedule, SPI >1 b. Cost Variance Cases Case 1: if CV = 0 ; as per budget, CPI =1 Case 2: if CV = -ve ; budget at over run, CPI <1 Case 3: if CV = +ve ; budget at under run, CPI >1 1.2.2. FORECASTING OF THE PROJECT The forecasting is also done under EVM which helps us to know the forecasting end date of the project. It determines the estimation cost of the project during tracking and also the needed cost to complete the project till the end of the project. It helps to know the future performance of a construction project. 2017, IRJET Impact Factor value: 5.181 ISO 9001:2008 Certified Journal Page 678

Case 1: if variance is not going to continue ETC = BAC EV EAC = AC + ETC EAC = AC + [BAC EV] VAC = BAC EAC Case 2: if variance is going to continue but affects only cost ETC = [BAC EV] / CPI EAC = AC + ETC VAC = BAC EAC Case 3: if variance is going to continue but affects the cost and schedule ETC = [BAC - EV] / [CPI * SPI] EAC = AC + ETC VAC = BAC EAC where, PV is Planned Value EV is Earned Value AC is Actual Cost SPI is Schedule Performance Index CPI is Cost Performance Index SV is Schedule Variance CV is Cost Variance ETC is Estimate to Complete EAC is Estimate to Completion VAC is Variance at Completion BAC is Budget at Completion 2. APPLICATION OF PRIMAVERA SOFTWARE The study involves tracking of ongoing construction project and management of new construction project of residential and apartment buildings respectively using the project management software Primavera. 2.1. TRACKING OF ONGOING CONSTRUCTION PROJECT Tracking of the construction projects involves following steps: Getting Information of the Project from the Organisation Entering the Details of the Project in Primavera Monitoring the Execution of the Project Entering the Planned and the Actual Cost Tracking the Project Forecasting the Project Report and Conclusion 2.2. CONSTRUCTION MANAGEMENT OF NEW PROJECT The management of the new construction project in Primavera software involves following steps: New Building Project Calendar Creation 2017, IRJET Impact Factor value: 5.181 ISO 9001:2008 Certified Journal Page 679

Work Breakdown Structure Define Activities Applying Durations Sequence of Activities Finding the Critical Path Creation of Resources Assigning the Resources into a task Analysing the Resources Levelling the Resources Creating Baseline Develop the Schedule Report Preparation 3. PROGRESS OF TRACKING OF A CONSTRUCTION PROJECT The tracking of an ongoing project is located in Chennai. It is residential project. The plot area of the project is 2322 sq.ft and the built up area is 1357sq.ft. It is a G+1 building. After the drawing designs the project started with the preparation of documents on May 2 nd 2016. The project contractor said the project would be finished in 9 months for the construction of the building which starts in Sep 2 nd 2016 and the cost of the project is Rs.55 Lakhs. But during the scheduling of the project using management software Primavera the end date of the project was 24 th Aug 2017 which is nearly to 1 year. The cost of the project is Rs.5842311.52 excludes the indirect cost of the building. The tracking has been done in four months. The Table.1 shows the EVM parameters of tracking in four months Table 1: EVM of the tracking of the ongoing project EVM Parameter Tracking 1 Jan 31 st 2017 Tracking 2 Feb 28 th 2017 Tracking 3 Mar 31 st 2017 Tracking 4 April 30 th 2017 Budget at Completion Rs.5842311.52 Rs.5842311.52 Rs.5842311.52 Rs.5842311.52 Planned value Rs.1200890.29 Rs.1501963 Rs.2641957 Rs.3238450 Earned Value Rs.1199770.29 Rs.1392929 Rs.1647009 Rs.2689678 Actual Cost Rs. 1225770.29 Rs.1442429 Rs.1702143 Rs.27779012 Schedule Variance Rs.1120 Rs. 109035 Rs.994948 Rs.548772 Cost Variance Rs.26000 Rs. 49500 Rs.551341 Rs.89334 Schedule Performance Index 1 0.93 0.92 0.83 Cost Performance Index 0.98 0.97 0.97 0.97 Estimate at Complete Rs.5869511.52 Rs. 5893012 Rs. 5893645 Rs.5932845 Estimate to Complete Rs.4643741.24 Rs. 4450582 Rs.4196503 Rs.3153833 Planned schedule % complete 51.61% 54.97% 63.32% 68.48% Actual Schedule % complete 20.55% 24.39% 45.21% 55.42% Forecasting end date Oct 14 th 2017 Oct 19 th 2017 Oct 25 th 2017 Nov 7 th 2017 2017, IRJET Impact Factor value: 5.181 ISO 9001:2008 Certified Journal Page 680

Fig-2: Updation of the Project Fig-3: Tracking Cost of the Project 4. CONSTRUCTION MANAGEMENT OF NEW BUILDING Managing the new construction project using the software of Primavera. The project has initiation and planning up to scheduling and estimation of the project. The project has the plot area of 2460 sq. ft. and building area of 2130 sq. ft. The project starts at August 7 th 2017. The project has the Budgeted total cost of Rs.8072726. The projects finish date is Dec 5 th 2019. It is G+2 building. It has car parking at ground floor and 3 flats in each floor. The building has been spacious and it is 2BHK apartment. The planning and scheduling has been done in Primavera. The baselines also created to know the deviation in the project duration during execution. Then develop a schedule and report of the project. 2017, IRJET Impact Factor value: 5.181 ISO 9001:2008 Certified Journal Page 681

5. CONCLUSION Fig-4: Scheduling of the apartment building Residential Project progress is 55.42% of the total work had been completed in the time period of 68.48% of the total project duration. Schedule variance index of a residential project is -0.17 therefore the residential building is 17% behind schedule. SPI is 0.83 says that the residential project is only 83% rate had been done as originally planned. CPI is 0.97 indicates that the project is only progressing at 97% of the originally planned rate. The original estimated completion of the project was 15 months but due to the natural calamities, shortage of labour and fund the duration had been extended to 3 months which has 18 months to complete the project. The project has a cost variance of Rs.89334 and cost variance index is -.03. A negative value of CV means that the project is over budget. Apartment building has a budgeted cost of Rs.8072726. The duration of the new management project is 22 months. REFERNCES [1] Mohd Khalil Bin Abdur kadir on Construction Planning and Scheduling: A Case Study of Cadangan Membjna Dan Menyiapkan Kejll1yyah Sains Untuk Universiti Islam Antarabangsa Malaysia Nov 2006. [2] Rong-yau Huang and Kuo-Shun Sun on Non-UnitBased Planning and Scheduling of Repetitive Construction Projects. Journal of Construction Engineering and Management in American Society of Civil Engineers, June 2006. [3] Yong-Cheol Yang, Chan-Jung Park, Ju-Hyung Kim and Jae-Jun Kim on Management of Daily Progress in a Construction Project of Multiple Apartment Buildings. Journal of Construction Engineering and Management, American Society of Civil Engineers, March 2007. [4] Weng HoonKwak, Frank T Anbari on Analyzing Project Management Research: Perspective from Top Management Journals. International Journal of Project Management 27 (2009) 435 446, March 2008. [5] Andrew Fernans Tom, Sachin Paul on Project Monitoring and Control using Primavera International Journal of Innovative Research in Science, Engineering and Technology Vol. 2, Issue 3, March 2013 ISSN: 2319-8753. [6] Subramani.T, Sarkunam.A, Jayalakshmi.J Planning and Scheduling of High Rise Building Using Primavera, International Journal of Engineering Research and Applications, Volume. 4, Issue. 6 (Version 5), pp 134-144, 2014. 2017, IRJET Impact Factor value: 5.181 ISO 9001:2008 Certified Journal Page 682