2nd Evaluation Steering Group Meeting EU Twinning project KS

Similar documents
Evaluation of investment support. in the Austrian RDP: Comparison of results

EN 1 EN. Rural Development HANDBOOK ON COMMON MONITORING AND EVALUATION FRAMEWORK. Guidance document. September 2006

Support for marketing of agricultural quality products is profitable

Progress on the Strengthening of the European Integration Structures

EVALUATION AND FITNESS CHECK (FC) ROADMAP

DG AGRI MULTI-ANNUAL EVALUATION PLAN

Evaluation Activities Evaluation Perspectives

OECD Workshop on Evaluation and Priority Setting September 2008, 2

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

Outline. Agriculture and Rural Development

Project Fiche IPA Annual Action Programme 2007 for Bosnia and Herzegovina Support for Rural Development Programming (SRDP) in B&H

Possibilities for management by objectives in EU rural development policy

Conditions for successful preparation and absorption of assistance. Joint presentation by respective units in DGs AGRI, EMPL and REGIO

EUROPEAN COMMISSION DIRECTORATE-GENERAL COMMUNICATION Representations in the Member States Edinburgh

SPECIFIC TERMS OF REFERENCE Country Programme Interim Evaluation (CPiE)

At the latest by 31 December At the latest by 31 December 2016

Marche Region. Ex Ante Evaluation report. Executive summary. Roma, June 2015

Generating successful projects, developing and managing the project pipeline Trainer: Robin Smail Independent Consultant & Visiting Expert EIPA

The future CAP: towards a performance based delivery model. ENRD Workshop. Saxony and the proposal for EAFRD-RESET. 30 January 2018 Thomas Trepmann

CBIB. 2 nd STEERING COMMITTEE MEETING. Belgrade 14/02/2007. The European Union's CARDS Regional Programme

Working Paper Elements of strategic programming for the period

LEADER/CLLD - COMMUNITY LED LOCAL DEVELOPMENT. Alina Cunk Perklič, May 19th 2017

Instrument for Pre-accession Assistance (IPA): the Rural Development Component IPARD

IMPACT ASSESSMENT OF THE DRAFT EU STRUCTURAL FUNDS REGULATIONS

REPIM Curriculum Vitae Sharon Hanson-Cooper

PROBLEMS WITH THE CAP REFORM PROCESS AND RECOMMENDATIONS FOR SUPPORT FOR SUSTAINABILITY

THE COMMON AGRICULTURAL POLICY POST Designing a Generational renewal Strategy in the CAP plan

Ensuring result-orientation in Operational Programmes

Joint program between SNF and SDC Support research addressing global challenges 5 thematic areas plus open call for investigatordriven

Specific state of play with RDP / EIP programming in Slovenia

THE DIMENSIONS OF WELL BEING IN OECD REGIONS. CAGLIARI Terminal Crociere- Molo Ichnusa 26 to27 September 2013

FINANCIAL ENGINEERING SCHEMES IN ROMANIA. Belgrade, East Agri meeting, June 19 th, 2014

The Philippine Rural Development Project (PRDP) Terms of Reference for the Conduct of Mid-term Evaluation Study. 1. Background.

Programming Period. European Social Fund

Home Study Quiz 2017 ARMS 3

CAP post 2020 Overview of proposals for LEADER and state of play of discussions

Evaluation and Monitoring of EU Structural and Cohesion Funds Programmes, Introduction. What is this course about?

The ex ante evaluation of SWOT and needs assessment prerequisite for a sound RDP intervention logic?

Ex-ante assessment process of financial instruments. Eugenio Saba European Investment Bank

Mid-Term-Evaluation on behalf of WHH Country Office Afghanistan

INTERIM REPORT ON THE ABSORPTION OF THE EUROPEAN FUNDS IN THE REPUBLIC OF BULGARIA FOR 2011

Netherlands. May 2018 Statistical Factsheet

Italy. May 2018 Statistical Factsheet

Austria. May 2018 Statistical Factsheet

Estonia. May 2018 Statistical Factsheet

LATVIA. Programme Complement Latvia Objective 1 Programme

Conditions and Perspectives of financial lending in Macedonian Agriculture and rural Development

The CAP after Round tables on the green architecture of the CAP. #FutureofCAP. Brussels, 12 November 2018

:: MEETING NOTES :: 1 ST MEETING OF THE WORKING GROUP FOR DEVELOPING REGIONAL STANDARDS FOR ROMA RESPONSIBLE BUDGETING

The CAP Post 2020: Impact Assessment

Guidelines Assessing RDP impacts and achievements in 2019

France. May 2018 Statistical Factsheet

Project Management for the Professional Professional Part 3 - Risk Analysis. Michael Bevis, JD CPPO, CPSM, PMP

Statistical Factsheet. France CONTENTS. Main figures - Year 2016

Statistical Factsheet. Belgium CONTENTS. Main figures - Year 2016

Statistical Factsheet. Italy CONTENTS. Main figures - Year 2016

PLANNING BUREAU SUMMARY. December 2009

The approved ESPON 2020 Cooperation Programme. ESPON ECP Meeting 9-10 December 2015 in Luxembourg

Expert meeting 2. Developing SSPARS and Integration into NSDS. Challenges & Best Practices

Statistical Factsheet. Lithuania CONTENTS. Main figures - Year 2016

Final Evaluation & Outcome Assessment of Promotion of Sustainable Agriculture for Nutrition and Food Security (POSAN FS) Project

Modernization of WBC universities through strengthening of structures and services for knowledge transfer, research and innovation

BRINGING FINANCE TO RURAL PEOPLE MACEDONIA S CASE

TCP Facility COMPONENT DESCRIPTION

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED

ANNEX. DAC code Sector Economic and Development Planning

Annex 1 Citizen s summary 1

MID TERM REVIEW OF THE MFF TOWARDS A SIMPLER AND MORE FLEXIBLE SINGLE RULE BOOK FOR THE EU BUDGET

PHARE 2005 PROJECT FICHE. 1.2 Title: Institutional Capacity Building and Support for Implementation of SAPARD/IPA-RD Programme

The 2017 budget and the European Commission recommendations

Capacity Building and Mainstreaming of Sustainable Land Management St. Kitts and Nevis. Terminal Evaluation

Common Agricultural Policy Modernisation and Simplification

Multi-country European Integration Facility

TURKEY. Support for negotiating Chapters 11 and 13 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary

COMMISSION DECISION. C(2007)5980 of 10/12/2007

Selection Criteria European Regional Development Fund and European Social Fund

CAP, including rural development, and IPARD post-2013

Financial viability of the social housing sector: introducing the Affordable Homes Programme

EU Enlargement. its Financial Support. Istanbul 27 June European Commission. EU Enlargementand

The CAP towards 2020

ALI Inventory Methodological inventory/questionnaire on the compiling of Agricultural Labour Input (ALI) Questionnaire identification

BOSNIA AND HERZEGOVINA

Basic Introduction to Project Cycle. Management Using the. Logical Framework Approach

EAP Task Force. EAP Task

Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme Project Fiche for Programme Support

KOSOVO* EU for Food Safety in Kosovo INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary

FINANCIAL MANAGEMENT OF THE EUROPEAN AGRICULTURAL FUNDS

GUIDELINES FOR CONDUCTING A PROVINCIAL PUBLIC EXPENDITURE REVIEW (PPER) OF THE AGRICULTURE SECTOR

Assessing RDP impacts in Austria: Lessons learned from the ex-post evaluation and the way ahead for AIR 2019

Action Fiche for Mongolia. EU contribution: EUR

Greece. Sources: European Commission, Eurostat, and Directorate General for Economic and Financial Affairs. Updated: M ay 2018

SELECTION CRITERIA. for applications submitted to the INTERREG V-A Austria-Hungary Programme

COM (2018) 533. Information Note

Evaluation of ESF. US-EU Exchange on workforce development programmes. Brussels, 04 September Barbara ROUBICEK, DG EMPL

GUIDE THROUGH THE PROCESS OF PROGRAMMING AND MONITORING OF IMPLEMENTATION OF IPA II IN THE REPUBLIC OF SERBIA FOR MEMBERS OF SECO MECHANISM

FAQs Selection criteria

Denmark. Sources: European Commission, Eurostat, and Directorate General for Economic and Financial Affairs. Updated: M ay 2018

Terms of Reference. Impact Assessment Study of

Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 18

Transcription:

2nd Evaluation Steering Group Meeting EU Twinning project KS Author: Karl Ortner (AT), Evaluation team Twinning Project of Kosovo, Prishtina, 19.04.2012 1 MTE Inception Presentation ARDP Payments Evaluation ation criteria Indicators Evaluation questions Methodology - effects Data collection Structure of MTE report Organisation 2 1

Direct payments and Rural Development 31,18 Mio. from 2007-2011 Rural Development 54% Direct Payments 46% 3 Agri-environment Measure 5 8% Rural Development 16,97 Mio. from 2007-2011 LAG s Measure 8 1% Vocational training Measure 1 1% Procesing and Marketing Measure 4 30% Physical Potential Measure 2 34% Irrigation Measure 3 26% 4 2

Heifers 2% Direct payments 14,21 Mio. from 2007-2011 Fuel Support 12% Winter Wheat 38% Sheep&Goats 23% Maize 0,2% Milk cows 16% Tables grapes 9% 5 Main Evaluation Criteria Relevance The extent to which an intervention s objectives are pertinent to needs, problems and issues; Effectiveness The extent to which objectives pursued by an intervention are achieved; Efficiency Best relationship between resources employed and results achieved in pursuing given objectives through an intervention; 6 3

Indicators baseline situation at the outset of the programme or measure (starting point) and its evolvement over time in quantitative terms input public support payments outputs immediate outputs of a measure, i. e. the number of farms, beneficiaries, hectares, livestock units, projects etc. supported results changes which occurred or can be expected to occur at the level of the beneficiaries gross effects contribution of the measure to these changes impacts on rural areas and the wider economy (net effects) 7 Evaluation Questions baseline situation at the outset of the programme or measure (starting point) and its evolvement over time in quantitative terms EU Reg. 1974/2006, MTE ARDP Kosovo, 19.4.2012 8 4

Common Impact Indicators EU Reg. 1974/2006, MTE ARDP Kosovo, 19.4.2012 9 Evaluation questions (example) Income, competitiveness Production factors Product quality Working conditions EU Standards Environment friendly 10 5

Wirkung (brutto) Methodology Effect = (x T x 0 ) (x N x 0 ) = (x T x N ) Indicator x Effect Change x T Beneficiary x N x 0 t 0 t 1 Non-Beneficiary Zeit Karl Ortner, BA für Agrarwirtschaft, Wien, 20.5.2011 11 Primary data collection Stakeholder group discussions ministries, municipalities, schools, NGOs, donor organizations (rural areas, ARDP) Interviews of implementing personnel MAFRD, Municipal Offices, Regional Offices (programming, management, applications, selection, ) Interviews of beneficiaries project representatives (measures 4, 5 and 8) Questionnaires (via interviews) beneficiaries and non-beneficiaries (measure 2, direct payments) 12 6

Sampling Select one municipality per region (at random) Select another municipality (at random) until for each of 4 (major) RD measures at least 20 applicants who were rejected have been selected at least 20 applicants who were accepted have been selected In the selected municipalities visit 20 applicants who were rejected visit 20 applicants who were accepted ~ 160 questionnaires Check how many of them got direct payments Repeat the procedure for each of 4 direct payments until for every DP measure there are 20 rejected and 20 accepted apllicants 13 Secondary data Reports and documents ARDP Implementation provisions Implementation reports Gap analysis report of previous Twinning project ARDP monitoring tables ARDP applications and payments (DP, M2) FADN report Statistics Agricultural Household Surveys Foreign Trade.. 14 7

Structure of report 1 SWOT analysis and needs if available 2 Baseline situation and recent developments (context) 3 Objectives, targets and achievements (table) 4 Measure design 5 Implementation 6 Allocation of funds, delivery, absorption, inputs and outputs 7 Intervention logic, data and indicators 8 Assessment of effects 9 Answers to evaluation questions 10 Recommendations 15 Timetable Evaluation - Kosovo 2007 2013 Programming Implementation 2006: SWOT Ex-ante-Evaluation 2012: Mit-term Evaluation 2015: Ex-post- Evaluation 8

Work plan Start: 27.2.2012 17 Resources for MTE Federal Institute of Agricultural Economics Karl M. Ortner, team leader Hubert Janetschek Karl Heinz Pistrich Christoph Tribl Kastner International Robert Kastner Local experts Muja Gjonbalaj, Local Senior Expert 5 Local Junior Experts Twinning Project Act. 1.2 Michaela Pichler Senior Experts 18 9

Achievements of Evaluation Identification and appraisal of needs for support Assessment of strategic orientation of policies and programme Assessment of quality, effectiveness and efficiency of measures and ARDP overall Support for programming and targeting Compliance with legal requirements and guidelines Accountancy of public money 19 Time for discussion 20 10