RESOLUTION OF THE BOARD OF TRUSTEES OF THE TRUSTEES OF PURDUE UNIVERSITY (THE CORPORATION )

Similar documents
Honors College and Residences Request BOT Approval to Finance, Construct and Award Construction Contract

PHYSICAL FACILITIES. Members of the Board of Trustees Michael B. Cline, Vice President for Physical Facilities DATE: July 24, 2017

Submitted by: Richard J. Nork, Vice President, Finance and Business Operations AUTHORIZATION TO SELL BONDS

The bonds may be issued for the following projects/purposes:

NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE UNIVERSITY OF ARKANSAS:

REQUEST FOR ACTION. Authorization to Issue General Revenue Bonds

It is the recommendation of the administration, the Finance and Audit and Capital Assets Committees that the Board of Regents approve:

REFUNDING, REDEMPTION AND LETTERS OF CREDIT RESOLUTION

RESOLUTIONS & BACKUP INFORMATION FOR THE REGULAR MEETING OF DECEMBER 14, 2017

SOUTH DAKOTA BOARD OF REGENTS. Full Board ******************************************************************************

UNIVERSITY OF CONNECTICUT. as Issuer. and U.S. BANK NATIONAL ASSOCIATION. as Trustee FIFTH SUPPLEMENTAL INDENTURE AUTHORIZING

Tompkins County Development Corporation

SOUTH DAKOTA BOARD OF REGENTS. Full Board ******************************************************************************

County Council of Cuyahoga County, Ohio. Resolution No. R

THE UNIVERSITY OF MIC HIGAN REGENTS COMMUNICATION REQUEST FOR ACTION. Sale of Commercial Paper by the University

Authorizing Statutes Document 1 of 34

3. Adopt Bond Resolution for Electrical System Conversion Project; Approve the Execution of Various Documents in Connection Therewith KSU

INDENTURE OF TRUST. Dated as of May 1, between the REDEVELOPMENT AGENCY OF THE CITY OF LAKEPORT. and. UNION BANK OF CALIFORNIA, N.A.

$71,710,000 Indiana University Student Fee Bonds Series X

STATE OF SOUTH CAROLINA WINTHROP UNIVERSITY A RESOLUTION

2. Act on Request to Adopt Bond Resolution for Expansion of Existing Chilled Water Plant; Approve the Execution of Various Documents KSU

BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF ORANGE COUNTY, FLORIDA:

Closing Item A-l. and HAWAIIAN PARADISE PARK OWNERS ASSOCIATION. UNION BANK OF CALIFORNIA, N.A., as Trustee TRUST INDENTURE

Article 8. State Energy Conservation Finance Act Short title. This Article is the State Energy Conservation Finance Act. ( , s. 9.

UNIVERSITY OF CONNECTICUT. as Issuer. and U.S. BANK NATIONAL ASSOCIATION. as Trustee TWENTY-FIFTH SUPPLEMENTAL INDENTURE AUTHORIZING

NC General Statutes - Chapter 116D 1

UNITED STATES SECURITIES AND EXCHANGE COMMISSION. Washington, D.C FORM 8-K CURRENT REPORT

MINUTES OF THE MEETING OF THE BOARD OF DIRECTORS OF PHILADELPHIA AUTHORITY FOR INDUSTRIAL DEVELOPMENT JUNE 20, 2017

THE MEMBERS OF THE BOARD OF DIRECTORS OF THE PHILADELPHIA AUTHORITY FOR INDUSTRIAL DEVELOPMENT

COLLEGE SAVINGS TRUST FUND PROGRAM. EDUCATIONAL INVESTMENT PLAN ( TNStars College Savings 529 Program ) INVESTMENT POLICY REVISED AND RESTATED

ROLL CALL. The Board of Trustees of the University of Illinois (the Board ), from

RESOLUTION NO

Resolution FINANCING AND PROJECT AUTHORIZATION

SUBTITLE II Deferred Compensation Board

Mr. Bunny Adcock Mr. Victor Green Ms. Kay Hinkle Mr. Bobby Reynolds. Ms. Elizabeth Farris was absent. ACTION AGENDA

Board of Trustees Meeting Minutes

Issuance of OSU Revenue Bonds

NC General Statutes - Chapter 142 Article 9 1

BE IT RESOLVED by the Board of Directors of South Carolina Public Service Authority as follows:

STATE OF SOUTH CAROLINA WINTHROP UNIVERSITY A RESOLUTION

Refinancing of a Pmtion of the Commercial Paper and Financing of New Projects. Authorization to Issue General Revenue Bonds

THE REFUNDED BONDS; AUTHORIZING THE EXECUTION AND DELIVERY OF A BOND REGISTRAR AGREEMENT AND

$93,070,000. Indiana University Consolidated Revenue Bonds, Series 2016A

LINCOLN NATIONAL CORP

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

[MASTER TRUST LOAN AGREEMENT - AUTHORITY FORM] LOAN AGREEMENT BY AND BETWEEN NEW JERSEY ENVIRONMENTAL INFRASTRUCTURE TRUST AND [NAME OF BORROWER]

RESOLUTION. BE IT RESOLVED by the members of the Hillsborough County Industrial Development

RESOLUTION NUMBER RDA 292

1. POLICY 2. PROCEDURES REGARDING BONDS. 2.1 Issuance of Bonds

Agenda Item No. 3.2 AGENDA ITEM BRIEFING

Revised ROLL CALL APPROVE VARIABLE RATE DEMAND UIC SOUTH CAMPUS DEVELOPMENT PROJECT REVENUE REFUNDING BONDS, SERIES 2008

BETA HEALTHCARE GROUP RISK MANAGEMENT AUTHORITY AMENDED AND RESTATED JOINT POWERS AUTHORITY AGREEMENT

Resolution No. Date: 12/7/2010

RESOLUTION NO

Title 35-A: PUBLIC UTILITIES

Development Ordinance, Wilmington City Code, Chapter 8, Article II (the General

PRELIMINARY RESOLUTION Olivet University Project Series 2017

WEST VIRGINIA UNIVERSITY BOARD OF GOVERNORS September 28, 2004

The meeting will be webcast, with a link available at

BE IT RESOLVED BY THE BOARD OF DIRECTORS OF SEMINOLE BOOSTERS, INC.:

PRELIMINARY RESOLUTION THE CULINARY INSTITUTE OF AMERICA SERIES 2016 BONDS

SIXTH SUPPLEMENTAL TRUST INDENTURE BY AND AMONG PENNSYLVANIA TURNPIKE COMMISSION AND

REQUEST FOR ACTION. Refinancing of a Portion ofthe Commercial Paper and Financing ofnew Projects. Authorization to Issue General Revenue Bonds

$45,380,000 ILLINOIS HOUSING DEVELOPMENT AUTHORITY Affordable Housing Program Trust Fund Refunding Bonds Series 2004

ACTION AGENDA. BE IT RESOLVED: That the Board of Trustees authorizes the administration to enter into the contracts with the companies listed above.

Imperial Irrigation District Energy Financing Documents. Electric System Refunding Revenue Bonds Series 2015C & 2015D

As added by P.L , SEC.69.

ORDINANCE NO

S 2909 S T A T E O F R H O D E I S L A N D

Mini-Brooks Qualifications Based Selection Supplement of Design/Build Statutes

LOGAN ELM LOCAL SCHOOL DISTRICT BOARD OF EDUCATION NOVEMBER 26, 2018 SPECIAL MEETING 4:30 P.M. DISTRICT OFFICE AGENDA. 2. Adoption of Agenda M S V

CALIFORNIA CHARTER SCHOOLS ASSOCIATION JOINT POWERS AUTHORITY. (as amended, 2012)

PRELIMINARY OFFICIAL STATEMENT DATED MAY 26, 2010

NC General Statutes - Chapter 116D Article 4 1

NOW, THEREFORE, BE IT RESOLVED by the Board of Education of the Norton City School District, County of Summit, State of Ohio, that:

PRELIMINARY LIMITED OFFERING MEMORANDUM DATED NOVEMBER 1, 2016

LOUISIANA ADMINISTRATIVE CODE Title 71 - Treasury Public Funds Part III. Bond Commission Debt Management. Page The Commission - Purpose 1

THE TENNESSEE BACCALAUREATE EDUCATION SYSTEM TRUST FUND PROGRAM

ARTICLE 5 RELATING TO CAPITAL DEVELOPMENT PROGRAM. SECTION 1. Proposition to be submitted to the people. -- At the general election to be

NEW YORK STATE PUBLIC AUTHORITIES CONTROL BOARD. R E S O L U T I O N No. 13-ERDA-117

FC 10/14/16 FY 2017 FINAL BUDGET. Purdue University Board of Trustees OCTOBER 2016

Verano Center & #1-5. Community Development Districts

JOINT POWERS AGREEMENT. MONTANA ASSOCIATION OF COUNTIES PROPERTY & CASUALTY TRUST (MACo PCT) PROPERTY AND CASUALTY SELF-INSURED POOL

AGENDA PORTLAND WATER DISTRICT 225 Douglass Street, Portland, Maine Jeff P. Nixon Training Center 6:00 p.m., Monday, June 25,

Attachment 1 EIGHTH SUPPLEMENTAL INDENTURE. by and between REDEVELOPMENT AGENCY OF THE CITY OF PITTSBURG. and

RESOLUTION. Inducement Resolution Exel Inc. d/b/a DHL Supply Chain (USA)

AGENDA Nardozzi LLC, 70 Nardozzi Place- Authorizing Resolution, Bond Issuance

INGHAM COUNTY BOARD OF COMMISSIONERS 2011 BORROWING RESOLUTION (2010 DELINQUENT TAXES) RESOLUTION #11-060

STATE OF WEST VIRGINIA HIGHER EDUCATION POLICY COMMISSION STATE UNIVERSITY SYSTEM BONDS

University of Connecticut Office of Treasury Services Debt Management Policy

MINUTES OF THE SPECIAL MEETING OF THE UNIVERSITY OF ARKANSAS BOARD OF TRUSTEES TELEPHONE CONFERENCE CALL 2:30 P.M., FEBRUARY 15, 2016

/4 Chié in -ncial Officer

STATE FAIR COUNCIL; FAIRGROUND OPERATIONS, PROPERTIES AND FACILITIES

BOARD OF EDUCATION SAN DIEGO UNIFIED SCHOOL DISTRICT SAN DIEGO, CALIFORNIA

CITY OF KODIAK RESOLUTION NUMBER 08-1

Request for Bid/Proposal

SEVENTH SUPPLEMENTAL TRUST INDENTURE BY AND AMONG PENNSYLVANIA TURNPIKE COMMISSION AND

UNIVERSITY OF SOUTH FLORIDA

Policy on the Approval of Contracts and Designation of Signing Authority (EFFECTIVE MAY 1, 2018)

ACTION BY WRITTEN CONSENT OF THE BOARD OF DIRECTORS OF PHOENIX BIOINFORMATICS CORPORATION IN LIEU OF FIRST MEETING

Transcription:

PFC 5/15/14 Action Item 4 BT 5/16/14 IV-7 RESOLUTION OF THE BOARD OF TRUSTEES OF THE TRUSTEES OF PURDUE UNIVERSITY (THE CORPORATION ) 1. DECLARING THE NECESSITY FOR THREE ENGINEERING RESEARCH LAB PROJECTS IDENTIFIED AS THE: a. HIGH PRESSURE RESEARCH LAB TEST CELLS CONSTRUCTION AND CONTROL CENTER RENOVATION AND ADDITION; b. JISCHKE HALL ADDITION, AND c. FLEX LAB FACILITY; 2. GRANTING APPROVAL TO PLAN, FUND AND CONSTRUCT THE PROJECTS AND TO AWARD CONTRACTS FOR THEIR COMPLETION; 3. IN THE CASE OF THE FLEX LAB FACILITY PROJECT, APPROVING THE CONSTRUCTION AND FINANCING THEREOF PURSUANT TO THE PROVISIONS CONTAINED IN IC 21-35-3 AND OTHER APPLICABLE STATUTES; 4. AUTHORIZING CERTAIN OFFICERS OF THE CORPORATION TO REQUEST ALL NECESSARY STATE APPROVALS FOR THE PROJECTS; 5. AUTHORIZING CERTAIN OFFICERS OF THE CORPORATION TO NEGOTIATE FOR AND OBTAIN INTERIM AND/OR PERMANENT FINANCING FOR THE FLEX LAB FACILITY PROJECT, SUBJECT TO ALL STATUTORY PROVISIONS AND SUBJECT TO THEIR PRIOR APPROVAL BY THE TREASURER; AND 6. DECLARING OFFICIAL INTENT TO REIMBURSE CERTAIN PROJECT COSTS RELATED TO THE FLEX LAB FACILITY PROJECT WITH BOND PROCEEDS WHEREAS, Article VII, Section 1 of the Bylaws of The Trustees of Purdue University (the "Corporation") sets forth the various authorizations required for contracts and instruments that, by virtue of the level of expenditure involved, require approval of the Board of Trustees (the Board ), the Board s Physical Facilities Committee (the "Committee"), and/or the Treasurer ( Treasurer ) of the Corporation; and

WHEREAS, although not expressly required by Article VII, Section 1 of the Bylaws, the Board and the Committee have from time to time granted the respective approvals required of them at separate stages of a project or transaction, including the planning, finance and construction, and contract award stages, thus resulting in the need to consider the project or transaction multiple times over the course of several meetings; and WHEREAS, the Board has considered the potential efficiencies, time savings, market timing opportunities and other benefits to be derived from a single, comprehensive authorization and approval granted at the early stage of a project or transaction, pursuant to which the appropriate officers of the Corporation would be delegated the full authority to take the project or transaction through the contract award stage, thus avoiding the need to revisit an alreadyapproved project or transaction at later meetings all while remaining cognizant of the Committee s and the Board s oversight responsibilities under the Bylaws; and WHEREAS, the Board has been kept apprised of activities and preliminary plans for three new engineering research lab facility projects: (a) construction of a High Pressure Research Lab Test Cells and Control Center facility that will contain five test cells, a laser lab and associated preparation space for research (the Zucrow High Pressure Research Lab Test Cells Construction and Control Center Renovation and Addition Project ); (b) construction of a Jischke Hall addition that will house research labs, expanded multidisciplinary student design lab, additional instructional spaces that support innovative active-learning pedagogy, office space, grad office areas, support spaces for instructional and research laboratories and add significantly to the University s biomedical engineering research capabilities (the Jischke Hall Addition Project ); and (c) construction of a new Flex Lab Facility that will serve as a centralized space for engineering design courses featuring mobile equipment that can be rapidly reconfigured for the varied aspects of prototype design and testing (the Flex Lab Facility Project and, with the other two aforementioned projects, collectively the Projects ); and WHEREAS, the Board has evaluated and is comfortable with the amount of due diligence and preliminary planning that has been conducted by the officers and representatives of the Corporation in order to bring the proposed Projects to the Board for consideration; and WHEREAS, as a project involving one or more contracts with an estimated aggregate cost in excess of $5,000,000, each Project requires the authorization and approval of both the Committee and the Board; and WHEREAS, under the provisions of Indiana Code 21-35-3, the Corporation is authorized and empowered, upon finding that a necessity exists, and subject to certain constraints on the sources and uses of related funds, to construct research facilities and to borrow funds to finance such projects upon obtaining certain specified state approvals; and WHEREAS, the Corporation expects to issue debt for the purposes of paying or reimbursing a portion of the costs of designing, planning, acquiring, constructing, furnishing or equipping the Flex Lab Facility Project, as more particularly set forth below; and

WHEREAS, the Committee has recommended approval of each Project by adopting these resolutions and the actions described herein at a duly constituted meeting; and WHEREAS, the Board now desires to declare the necessity for, and to approve, each of the Projects, and to authorize the designated officers of the Corporation to undertake necessary steps to complete each Project, all as more particularly set forth below: NOW, THEREFORE, it is hereby RESOLVED by the Board of the Corporation as follows: 1. The Board hereby finds and declares that (a) a necessity exists for the planning, funding, construction, furnishing, equipping, operating, controlling, managing and financing of each of the Projects, as well as for the awarding of one or more contracts for the completion of each such Project, all in order to realize the benefits of the expanded engineering research capabilities these facilities are expected to afford Purdue University (the University ), as shared with and discussed by the Board, and (b) with respect to the Flex Lab Facility Project, revenue from state, federal, local or private gifts, grants, contractual payments or reimbursements will be available in an amount that is reasonably expected to at least equal the annual debt service requirements of any bonds or other obligations and the costs to operate such Project for each fiscal year that such bonds or other obligations are outstanding. Specific Approvals with respect to the Zucrow High Pressure Research Lab Test Cells Construction and Control Center Renovation and Addition Project: 2. The proposal to plan, finance, construct and award one or more contracts for the completion of the Zucrow High Pressure Research Lab Test Cells Construction and Control Center Renovation and Addition Project is hereby authorized and approved. 3. In order to provide funds with which to accomplish the Zucrow High Pressure Research Lab Test Cells Construction and Control Center Renovation and Addition Project, the Treasurer of the Corporation is hereby authorized, under the authority of these resolutions, and without the need for further authorization from this Board, to use up to $7,450,000 of gift funds and up to $750,000 of Repair and Rehabilitation funds, for a total Project cost of up to $8,200,000 (the Authorized Cost Level ) for said Project. 4. The Treasurer of the Corporation be, and hereby is, authorized and empowered: (a) to solicit, evaluate, select, retain and contract with (i) one or more architectural/engineering firms to provide planning services for said Project, and (ii) one or more construction firms to construct said Project, in each case in such an amount (within the above-referenced Authorized Cost Level), in such phases or parts, and on such terms as he, in his sole discretion, shall deem to be in the best interests of the Corporation and Purdue University, and in any case in the manner prescribed by law; and (b) to authorize, approve and execute all change orders in connection with any of the above-referenced contracts so long as all such change orders, considered

collectively, do not cause the aggregate amount of expenditures incurred under such contracts to exceed the Authorized Cost Level. 5. For purposes of Article VII, Section 1(c) of the Bylaws, no change orders in connection with any of the above-referenced contracts shall require further Board or Committee authorization and approval unless and until such a change order, together with all other change orders previously authorized, approved and executed by the Treasurer, causes the aggregate amount of expenditures incurred under such contracts to exceed the Authorized Cost Level for the Zucrow High Pressure Research Lab Test Cells Construction and Control Center Renovation and Addition Project (it being understood that any change order or any other action that would cause such Authorized Cost Level to be exceeded must, before it is given effect, receive the express prior approval of the Committee and the Board). Specific Approvals with respect to the Jischke Hall Addition Project: 6. The proposal to plan, finance, construct and award one or more contracts for the completion of the Jischke Hall Addition Project is hereby authorized and approved. 7. In order to provide funds with which to accomplish the Jischke Hall Addition Project, the Treasurer of the Corporation is hereby authorized, under the authority of these resolutions, and without the need for further authorization from this Board, to use up to $14,000,000 of gift funds for a total Project cost of up to $14,000,000 (the Authorized Cost Level ) for said Project. 8. The Treasurer of the Corporation be, and hereby is, authorized and empowered: (a) to solicit, evaluate, select, retain and contract with (i) one or more architectural/engineering firms to provide planning services for said Project, and (ii) one or more construction firms to construct said Project, in each case in such an amount (within the above-referenced Authorized Cost Level), in such phases or parts, and on such terms as he, in his sole discretion, shall deem to be in the best interests of the Corporation and Purdue University, and in any case in the manner prescribed by law; and (b) to authorize, approve and execute all change orders in connection with any of the above-referenced contracts so long as all such change orders, considered collectively, do not cause the aggregate amount of expenditures incurred under such contracts to exceed the Authorized Cost Level. 9. For purposes of Article VII, Section 1(c) of the Bylaws, no change orders in connection with any of the above-referenced contracts shall require further Board or Committee authorization and approval unless and until such a change order, together with all other change orders previously authorized, approved and executed by the Treasurer, causes the aggregate amount of expenditures incurred under such contracts to exceed the Authorized Cost Level for the Jischke Hall Addition Project (it being understood that any change order or any other action that would cause such Authorized Cost Level to be exceeded must, before it is given effect, receive the express prior approval of the Committee and the Board).

Specific Approvals with respect to the Flex Lab Facility Project: 10. The proposal to plan, finance, construct and award one or more contracts for the completion of the Flex Lab Facility Project is hereby authorized and approved. 11. In order to provide funds with which to accomplish the Flex Lab Facility Project, the Treasurer of the Corporation is hereby authorized, under the authority of these resolutions, and without the need for further authorization from this Board, to use up to $38,000,000 of proceeds from bonds or other obligations, up to $13,500,000 of gift funds, and up to $2,500,000 of Central Reserve funds, for a total Project cost of up to $54,000,000 (the Authorized Cost Level ) for said Project. 12. The Treasurer of the Corporation be, and hereby is, authorized and empowered: (a) to solicit, evaluate, select, retain and contract with (i) one or more architectural/engineering firms to provide planning services for said Project, and (ii) one or more construction firms to construct said Project, in each case in such an amount (within the above-referenced Authorized Cost Level), in such phases or parts, and on such terms as he, in his sole discretion, shall deem to be in the best interests of the Corporation and Purdue University, and in any case in the manner prescribed by law; and (b) to authorize, approve and execute all change orders in connection with any of the above-referenced contracts so long as all such change orders, considered collectively, do not cause the aggregate amount of expenditures incurred under such contracts to exceed the Authorized Cost Level. 13. For purposes of Article VII, Section 1(c) of the Bylaws, no change orders in connection with any of the above-referenced contracts shall require further Board or Committee authorization and approval unless and until such a change order, together with all other change orders previously authorized, approved and executed by the Treasurer, causes the aggregate amount of expenditures incurred under such contracts to exceed the Authorized Cost Level for the Flex Lab Facility Project (it being understood that any change order or any other action that would cause such Authorized Cost Level to be exceeded must, before it is given effect, receive the express prior approval of the Committee and the Board). 14. The Board further authorizes the financing of said Project, as further provided herein, subject to (i) the provisions for the financing thereof contained in IC 21-35-1, 21-35-3, 21-35-5 and 21-32-2 (collectively, the Act ), (ii) the additional state approvals required by the Act, and (iii) the limitations as to costs which may be financed for said Project as set forth in the Act, so long as the principal amount of bonds or other obligations issued for the costs of said Project (excluding additional costs allowable for interest and financing charges, underwriter s discount, debt service reserves, credit enhancement or bond or reserve insurance, or other incidental costs permitted by statute) does not exceed, in the aggregate, $38,000,000. 15. Accordingly, the Board hereby authorizes and directs the Chairman, Vice Chairman, Treasurer, Assistant Treasurer, Secretary, Assistant Secretary, Legal Counsel and Assistant Legal Counsel of the Corporation, and each of them, on behalf of and in the name of

the Corporation, to request and obtain all necessary approvals from the Indiana Commission for Higher Education, the Governor of the State of Indiana, the State Budget Committee and the State Budget Agency, as well as any other necessary government approvals, for the proposed design, acquisition, construction, equipping, furnishing and financing of the Project in the manner set forth herein. 16. The Board further authorizes and directs said officers of the Corporation, and each of them, as follows: (a) If in their judgment it appears prudent, under then-current market conditions, said officers may obtain one or more series of interim, construction-period financings for the Flex Lab Facility Project prior to the issuance of long-term bonds, or, in lieu thereof or in conjunction therewith, they may negotiate with commercial banks, trust companies or departments, or other lending or financial institutions, for the borrowing of funds on an interim basis, for the construction and related costs of said Project (or for one or more individual phases of said Project), in aggregate principal sums not exceeding any statutory limitations, on such terms as may be legally permissible and as said officers may determine to be in the best interests of Purdue University and of the Corporation; subject, however, to the prior approval of such interim financings and all related bonds, notes or other documents by the Treasurer of the Corporation. (b) Subsequent to the obtaining of interim financing, or promptly upon any determination that the use of interim financing is not prudent, said officers shall commence negotiations with commercial banks, investment banking or underwriting firms, or other lending or financial institutions, and to undertake preparation of documents for the proposed permanent financing of said Project through the issuance and sale of one or more new series of fixed or variable rate student facilities system revenue bonds (covering all or less than all of said Project or a combination of all or less than all of said Project together with other properly authorized projects). Such proposed bonds are to be issued as additional First Lien Bonds under the existing Indenture of Trust dated as of January 1, 2003 (as heretofore amended and supplemented) between the Corporation and The Bank of New York Mellon Trust Company, N.A., ultimate successor in interest to Bank One Trust Company, National Association, as Trustee, relating to student facilities system revenue bonds under one or more proposed new supplements to such Indenture, to be prepared in connection with the proposed series of new bonds, all subject, however, to prior approval of the proposed terms and conditions of the proposed bonds and all of the documents related to the issuance and sale thereof by the Treasurer of the Corporation. The bonds may be issued in any denomination not greater than $100,000 with maturities not later than 30 years from the date of issuance, may be sold at a negotiated sale as provided by IC 21-32-3, and may bear interest payable at any interval or intervals not exceeding one year. The Treasurer is authorized to grant the approvals described in this Section 16(b), to execute, sell and deliver, or to authorize the execution, sale and delivery of any such bonds and to delegate to said

officers of the Corporation such authority to determine and fix the final terms and conditions of the fixed or variable rate transaction as, in his sole discretion, the Treasurer deems appropriate. 17. The Board hereby declares its official intent, pursuant to applicable Treasury Regulations, to plan, design, acquire, construct, equip and furnish the Flex Lab Facility Project and to reimburse certain costs of design, acquisition, construction, equipping and furnishing of said Project with the proceeds of debt to be incurred by the Corporation with respect to said Project and to issue debt not in excess of the maximum amounts for said Project as set forth in this Resolution and as otherwise limited or permitted by applicable statues. General Approvals with respect to All Three Projects: 18. Except for the authority delegated specifically to the Treasurer in Section 16 above with respect to the financing of the Flex Lab Facility Project, the Treasurer of the Corporation be, and hereby is, further authorized and empowered to delegate to one or more officers and representatives of the Corporation such tasks and responsibilities with respect to the completion of each Project as he, in his sole discretion, shall deem to be in the best interests of the Corporation and Purdue University and consistent with the exercise of the authority granted above. 19. The Chairman, Vice Chairman, Treasurer, Assistant Treasurer, Legal Counsel, Assistant Legal Counsel, Secretary and Assistant Secretary of the Corporation, and the Executive Vice President for Business and Finance, Treasurer and the Senior Vice President for Business Services and Assistant Treasurer of Purdue University, and each of said officers respectively, are hereby authorized and empowered for, on behalf of, and in the name of the Corporation, or of Purdue University, to: (a) request any necessary approvals (if not already obtained and to the extent not otherwise provided in this Resolution) of the Indiana Commission for Higher Education, the Governor of the State of Indiana, the State Budget Committee and the State Budget Agency for the actions hereinabove authorized, as well as such other governmental approvals as may be required by law; and (b) execute and deliver any and all documents and instruments and take any and all other actions as may be necessary or appropriate to carry out the purpose and intent of this Resolution, whether therein or herein specifically authorized or not, except for such actions as are specifically required by law to be taken by the Board as the governing body of the Corporation.

Zucrow High Pressure Research Lab Test Cells Construction and Control Center Renovation and Addition Request BOT Approval to Plan, Finance, Construct and Award Campus: Project Description: Architect/Engineer: West Lafayette Construct new 9,600 GSF building containing five test cells, a laser lab and associated preparation space for research. Renovate and expand the existing ZL3 to approximately 5,000 GSF including control center, research offices and new parking lot. Estimated A/E Fee: $700,000 Estimated Project Budget: $8,200,000 Gross Square Feet: 14,600 Assignable Square Feet: 8,500 Estimated Cost/GSF: $561.64 Source of Funds: Gift Funds $7,450,000 Repair and Rehabilitation ARRA Funds F&A 750,000 $8,200,000 BOT Plan, Finance, Construct and Award Approval: Request May, 16, 2014 Budget Agency Approval: Request May 16, 2014 A/E M/WBE Participation: General Contractor M/WBE Participation:

Jischke Hall Addition Request BOT Approval to Plan, Finance, Construct and Award Campus: Project Description: Architect/Engineer: West Lafayette Construction will include a three story addition and basement to the existing Jischke Hall and will house research-type labs, an expanded multidisciplinary student design lab, additional instructional spaces that support innovative active-learning pedagogy, office space, grad office areas, and support spaces for instructional and research laboratories. Estimated A/E Fee: $1,000,000 Estimated Project Budget: $14,000,000 Gross Square Feet: 32,000 Assignable Square Feet: 21,500 Estimated Cost/GSF: $437.50 Source of Funds: Gift Funds BOT Plan, Finance, Construct and Award Approval: Request May 16, 2014 Budget Agency Approval: A/E M/WBE Participation: General Contractor M/WBE Participation:

Flex Lab Facility Request BOT Approval to Plan, Finance, Construct and Award Campus: Project Description: Architect/Engineer: West Lafayette The project will construct a new multidisciplinary research facility designed to support the growth of the College of Engineering and to meet the ever changing research needs of the University. The facility will provide a transformative environment which encourages collaboration, team based research, learning, and engagement among peers with diverse research interests. Both wet and dry lab needs will be accommodated in this facility designed to address the needs of today s diverse research portfolio and to adapt to the changing needs of the future. Infrastructure will be built-out to accommodate future expansion of this facility on this site. Estimated A/E Fee: $3,840,000 Estimated Project Budget: $54,000,000 Gross Square Feet: 75,000 Assignable Square Feet: 60,000 Estimated Cost/GSF: $720 Source of Funds: Support and Research Facilities Revenue Bonds $38,000,000 Gift Funds 13,500,000 University Funds Central Reserves 2,500,000 $54,000,000 BOT Plan, Finance, Construct and Award Approval: Request May 16, 2014 Budget Agency Approval: A/E M/WBE Participation: General Contractor M/WBE Participation: Additional Comments: $3,000,000 dedicated toward utility infrastructure