Construction Types: Heavy (Heavy and Sewer and Water Line) HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines)

Similar documents
Construction Types: Heavy (Heavy and Sewer and Water Line) Counties: Accomack, Essex, King George, Lancaster, Middlesex,

Construction Types: Heavy (Heavy and Sewer and Water Line) Counties: Alexandria*, Arlington, Clarke, Culpeper,

Alabama State Port Authority. Description

Solicitation FA441718R0003 Attachment 3

ATTACHMENT E INSURANCE REQUIREMENTS

San Juan County, New Mexico


DAVIS-BACON ACT WAGE DETERMINATION PER ADDENDUM NO. 1

wage determination 2018 General Decision Number: PA /07/2018 PA33 Superseded General Decision Number: PA State: Pennsylvania

Prevailing Wage Rates (No Fringes)


SECTION DAVIS BACON PREVAILING RESIDENTIAL WAGE RATES

Winnebago County Housing Authority

2018 Pipelines Water and Sewer Construction Contract Pkg I

BID PROPOSAL Mobilization for Non-Emergency Work Orders; 200 EA $ $ Mobilization for Emergency Work Orders; 2 EA $ $

Invitation to Bid Hogan House Historic Painting Project

Pierre City Hall Conference Room 222 E. Dakota Avenue, Pierre, South Dakota, 57501

A. Project Name: Water System Automated Meter Reading Program. B. Owner: City of Florence Alabama Water & Wastewater Department

General Decision Number: CO /26/2013 CO13. Superseded General Decision Number: CO State: Colorado. Construction Type: Heavy

NAVAL FACILITIES ENGINEERING COMMAND, MID - ATLANTIC

The City of Johnson City, Mayor Dawn Capra (date) November 17, 2016

Klamath Tribes Housing Department Invitation for Bids (IFB) IFB Number: KTHD Congregate Fire Rehab, 502 Charley Ave.

Delete Davis Bacon Wage Decision TX dated 9/25/2009. Add Davis Bacon Wage Decision TX dated 3/12/2010 (attached)

Please make the following changes in your copy of the bid proposal for the captioned project:

DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA

NOTICE TO BIDDER / REQUEST FOR CONSTRUCTION BID / INSTRUCTIONS TO BIDDERS. [SEPTIC to SEWER]

NOTICE TO BIDDER / REQUEST FOR CONSTRUCTION BID / INSTRUCTIONS TO BIDDERS. [SEPTIC to SEWER]

NOTICE TO CONTRACTORS INVITATION TO BID TREE REMOVAL

INVITATION FOR BIDS FOR UNITED CEREBRAL PALSY OF CENTRAL FLORIDA, INC. HVAC REPLACEMENT FOR DOWNTOWN/BETA CAMPUS

Request for Proposal for the Installation of 90 Smoke Detectors at Michaels J. Day Apartments For the Watervliet Housing Authority

ADDENDUM TO CONTRACT DOCUMENTS AND SPECIFICATIONS Tete Bayou Equalization Basin Levee Repairs for the City of New Iberia & IPSD #1

Greater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402

NOTICE TO CONTRACTORS INVITATION TO BID TREE REMOVAL/PLANTING

DAYTON METROPOLITAN HOUSING AUTHORITY dba GREATER DAYTON PREMIER MANAGEMENT

Norfolk Naval Shipyard, Portsmouth, Virginia Specification Work Order

Greater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402

B. Instructions for Bidders:

SECTION SIX DAVIS-BACON WAGE RATES REQUIRED CONTRACT PROVISIONS FOR FEDERAL AID CONSTRUCTION CONTRACTS FEDERAL AID / DBE GOALS AND REQUIREMENTS

LETTING: Page 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION U KA ACNHP-A485(001) CONTRACT PROPOSAL

March 11, C. In Part C of the IFB, delete Paragraph 9B, Reciprocal Local Preference, in its entirety.

LETTING: Page 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION K KA ACSTP-A499(501) CONTRACT PROPOSAL

REQUEST FOR BID- (RFB) - Quest, Inc.

LETTING: Page 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION U KA HSIP-A043(117) CONTRACT PROPOSAL

Competitive Quotes Request (Construction)

K KA STP-A510(301) CONTRACT PROPOSAL. DOT Form No. 202 Rev. 09/18

LETTING: Page 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION KA HSIP-A423(525) CONTRACT PROPOSAL

415 E. INDEPENDENCE TULSA, OK (918) PROJECT MANUAL FOR IFB # DRAINAGE REMEDIATION

LETTING: Page 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION TE TA-T043(801) CONTRACT PROPOSAL

FIRE STATION 35 CONTRACT NO ADDENDUM NUMBER TWO. Scope of this Addendum

CITY OF BATTLE CREEK PURCHASING REQUEST FOR PROPOSALS NO R PAGE 1

FEDERAL GRANT DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT (HUD) A COMMUNITY DEVELOPMENT BLOCK GRANT PROJECT (CDBG) A BOILER PLATE (GUIDE) FOR

415 E. INDEPENDENCE TULSA, OK (918) PROJECT MANUAL FOR IFB ROOF REPLACEMENT PHASE VIII

San Angelo Regional Airport Baggage Handler Maintenance

PHASE ONE - SELECTIVE DEMOLITION DOCUMENTS

Overview of Davis-Bacon Wages

LETTING: Page 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION TE TA-T043(901) CONTRACT PROPOSAL

LETTING: Page 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION C HSIP-C485(801) CONTRACT PROPOSAL

022 C STP-C487(201) CONTRACT PROPOSAL. DOT Form No. 202 Rev. 09/18

LETTING: Page 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION I KA HSIP-A043(218) CONTRACT PROPOSAL

LETTING: Page 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION C HSIP-C481(401) CONTRACT PROPOSAL

ADDENDUM No. 1 LRT MPOT RFP NUMBER: POTHOLING SERVICES FOR MESA EXTENSION. ADDENDUM NO: 1 DATE: July 28, 2010

LETTING: Page 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION TE TA-T044(401) CONTRACT PROPOSAL

PREVAILING WAGE RESOURCE BOOK 2010 DBA/DBRA COMPLIANCE PRINCIPLES

U KA NHPP-A510(801) CONTRACT PROPOSAL. DOT Form No. 202 Rev. 09/18

Walnut Avenue Homes BID NOTIFICATION PACKAGE BUILDING SECURITY TABLE OF CONTENTS

DBA/DBRA Compliance Principles

Bid Package. Driveways CI A thru F (DW) June 12, For

LETTING: Page 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION TE TA-T045(401) CONTRACT PROPOSAL

U KA NHPP-A425(601) CONTRACT PROPOSAL. DOT Form No. 202 Rev. 09/18

LETTING: Page 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION K KA STP-A502(901) CONTRACT PROPOSAL

LETTING: Page 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION U KA STP-A466(201) CONTRACT PROPOSAL

Circle B Farms Septic System and Driveway Bid Documents August 13, 2014 CONTENTS SECTION I INSTRUCTIONS TO BIDDERS

FEDERALLY FUNDED ONLY CONSTRUCTION CONTRACTS SPECIAL PROVISIONS DIVISION A - LABOR May 17, 2006

LETTING: Page 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION U KA HSIP-A043(116) CONTRACT PROPOSAL

LETTING: Page 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION C STP-C488(101) CONTRACT PROPOSAL

Maryland Apprenticeship Training Fund Law

Comparing Paid Sick Leave Requirements: San Francisco v. California

015 C STP-C487(501) CONTRACT PROPOSAL. DOT Form No. 202 Rev. 09/18

Fair Wage Policy for ICI Contracts

LETTING: Page 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION U KA ACNHP-A485(101) CONTRACT PROPOSAL

U KA NHPP-A499(301) CONTRACT PROPOSAL. DOT Form No. 202 Rev. 09/18

LETTING: Page 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION C HRRR-C037(101) CONTRACT PROPOSAL

County of Santa Clara Policy Name: Sick Leave Policy for Non-Coded Employees Page 1 of 5

Field Personnel & Prevailing Wage Compliance. Clancy Finnegan, MnDOT Labor Compliance Unit

Walnut Avenue Homes PRIME SUBCONTRACTOR FOR 607 WALNUT AVE CONTRACT BID NOTIFICATION PACKAGE TABLE OF CONTENTS

TERRITORY ENTIRE STATE NEW JERSEY DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT PREVAILING WAGE RATE DETERMINATION

Pacific Northwest Regional Council of Carpenters Oregon & SW Washington Schedule A Carpenter (Groups 1 and 2)

Attachment 17 RTD Pricing Conditions

FREQUENTLY ASKED QUESTIONS AND ANSWERS ABOUT VERMONT'S EARNED SICK TIME LAW, 21 V.S.A. 481 ET SEQ.

AVERAGE HOURLY INCREASES (Including Zero Increases) % 5.1% 3.8%

LETTING: Page 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION TE TA-T037(302) CONTRACT PROPOSAL

BENEFITS FRAUD ON PREVAILING WAGE JOBS. Apprenticeship, Health and Welfare, and Pension

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007

TERM CONTRACT FOR PROFESSIONAL SERVICES BUSINESS PLAN WRITING SERVICES FOR VSW COMMUNITIES CONTRACT # FY-VSW-VAR-XXX-XX

American Bar Association Section of Public Contract Law

Addendum No Verdi Main Extension Project PWP Bid No.: WA TMWA Capital Project No.: November 8, 2018

COLLECTIVE BARGAINING BULLETIN

.z:> By: Dan Tadic, P.E. Acting Public Works Director

TDHCA Tutorial Davis Bacon Compliance: DBRA Certified Payroll Form (WH 347)

ACQUISITION HOUR WEBINAR. Update on Federal wage hour laws

Transcription:

General Decision Number: VA170046 01/06/2017 VA46 Superseded General Decision Number: VA20160046 State: Virginia Construction Types: Heavy (Heavy and Sewer and Water Line) County: Franklin County in Virginia. HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines) Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017 SUVA2010-047 09/02/2010 Rates Fringes CARPENTER, Includes Form Work...$ 13.75 1.46 CEMENT MASON/CONCRETE FINISHER...$ 19.00 3.83 ELECTRICIAN...$ 22.08 6.30 IRONWORKER, REINFORCING...$ 22.45 11.85 IRONWORKER, STRUCTURAL...$ 20.55 8.25 LABORERS Common or General...$ 9.77 0.20 Flagger...$ 7.39 0.20 Landscape...$ 10.00 Pipelayer...$ 10.76 2.25 POWER EQUIPMENT OPERATOR: Backhoe...$ 11.90 2.14 Bobcat/Skid Loader...$ 11.40

Bulldozer...$ 20.63 7.28 Crane, All Types...$ 15.85 1.46 Excavator...$ 12.50 0.54 Loader...$ 11.71 2.11 Mechanic...$ 26.78 6.32 Trackhoe...$ 12.75 1.24 Tugboat...$ 19.00 TRUCK DRIVER: All Dump Trucks...$ 9.96 0.97 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other

health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates

the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/cba rate of the union locals from which the rate is based.

---------------------------------------------------------------- END OF GENERAL DECISION.