New York s Clean Energy Standard. Doreen Harris, NYSERDA December 1, 2016

Similar documents
Summary of Value of Distributed Energy Resources Phase 1 Order

83C Questions and Answers

Welcome. Welcome to the VDER Phase I Solar Installer Roundtable Info Session April 26, 2017

STATE OF NEW YORK PUBLIC SERVICE COMMISSION

REQUEST FOR PROPOSALS FOR LONG-TERM CONTRACTS FOR RENEWABLE ENERGY PROJECTS

Amended Solicitation Plan for the Purchase and Sale of Connecticut. Class I Renewable Energy Credits. from Low and Zero Emission Projects

GATS Subscriber Group Meeting

Associated Industries of Massachusetts (AIM) is pleased to provide the following comments to the above mentioned issue.

Installed Capacity (ICAP) Market Introduction

Portland General Electric Company Sheet No SCHEDULE 201 QUALIFYING FACILITY 10 MW or LESS AVOIDED COST POWER PURCHASE INFORMATION

Long Run Marginal Cost (LRMC)

Imposition of a Load-Based GHG Emissions Cap & Trade System on California s Electricity Market: Can This System Work with MRTU?

Proposed 2017 Project Integrating Public Policy

We Energies. Request for Proposal Renewable Energy Supply 2014

This document supplements the questions and answers that were previously posted on December 1 and 16, 2015.

83D Questions and Answers

Dominion Energy Virginia

No. 47. An act relating to the Vermont Energy Act of (H.56) It is hereby enacted by the General Assembly of the State of Vermont:

2013 RPS Solicitation Request for Proposals Conference. January 13, 2014

Long Term FTR Market Education

The Commonwealth of Massachusetts

COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION : : : : COMMENTS OF RETAIL ENERGY SUPPLY ASSOCIATION

REQUEST FOR PROPOSALS FOR LONG-TERM CONTRACTS FOR CLEAN ENERGY PROJECTS

Mass. DPU Approves RFP Process for Long- Term Renewable Solicitations

Marin Clean Energy 2016 Open Season Procurement Process Procedural Overview & Instructions

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Value of DER. Con Edison and Orange & Rockland. Developer Workshop

KEEGAN WERLIN LLP. ATTORNEYS AT LAW 99 HIGH STREET, Suite 2900 BOSTON, MASSACHUSETTS 02110

RECOMMENDED PRINCIPLES AND BEST PRACTICES FOR STATE RENEWABLE PORTFOLIO STANDARDS

No An act relating to the Vermont energy act of (S.214) It is hereby enacted by the General Assembly of the State of Vermont:

Powering Beyond. EEI Finance Conference November 11 13, 2018

Installed Capacity (ICAP) Market

November 12, 2015 SPECIFIED STATE AGENCIES AND ELECTRIC DISTRIBUTION COMPANIES IN CONNECTICUT, MASSACHUSETTS AND RHODE ISLAND

PacifiCorp Utah All Source Request for Proposal 2016 Resource. Issued January 6, 2012 Responses May 9, 2012

Procurement and Risk Management Update. Presented to RCEA Board of Directors October 16, 2017

MARIN ENERGY AUTHORITY REQUEST FOR PROPOSALS

Earnings Conference Call

h) Minimum Offer Price Rule for Certain Generation Capacity Resources for Generation Capacity Resources

NYISO Carbon Pricing

Powering Beyond. UBS investor meeting August 24, 2018

Long Run Marginal Cost (LRMC) Ryan Steele Power Supply Planning Specialist

Midwest Renewable Energy Tracking System Operating Procedures

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Powering Beyond. Guggenheim investor meetings June 20 21, 2018

Recommended Criteria and Process for the Evaluation and Selection of Offshore Wind Applications

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION

Carbon Charge Residuals: Allocation Options

ALBERTA MARKET RE-DESIGN CAPACITY MARKET DESIGN AND IMPLEMENTATION

D Los Angeles ""VV Department of

RETAIL ENERGY SUPPLIERS WHAT EVERY CONSUMER SHOULD KNOW BEFORE YOU SIGN

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46))

Illinois Power Agency. Ameren Illinois Company

APPENDIX B: PORTFOLIO OPTIMIZATION MODEL

Flexible Capacity Procurement. Market and Infrastructure Policy Issue Paper

Southern California Edison s Renewable Auction Mechanism (RAM) Program. June 6, 2014 EPRG Workshop on Distributed Generation and Smart Connections

H 7991 SUBSTITUTE A ======== LC005162/SUB A/4 ======== S T A T E O F R H O D E I S L A N D

VCE Board Meeting. May 10, 2018 Woodland City Council Chambers

Forward looking statements

Half Year Results 6 Months Ended 30 June July 2018

STATE OF NEW YORK PUBLIC SERVICE COMMISSION

Appendix. Investor Conference April 4, 2007 New York, NY

BC Hydro s Clean Power Call

Community-Solar Utility Programs

ISO-NE s CASPR and State RPSs

5.14 Installed Capacity Spot Market Auction and Installed Capacity Supplier Deficiencies LSE Participation in the ICAP Spot Market Auction

KEY FINDINGS AND RESOURCE STRATEGY

The Commonwealth of Massachusetts

BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION. The following Commissioners participated in the disposition of this matter:

Estimating Capacity Benefits of the AC Transmission Public Policy Projects

GARDEN STATE OFFSHORE ENERGY STRAW PROPOSAL FOR NEW JERSEY OFFSHORE WIND RPS CARVE-OUT

Summary of California s Proposed Cap-and-Trade Regulations

MTEP16 Futures Development Workshop 1/15/15

SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. ENERGY EFFICIENCY AND CUSTOMER-OWNED RESOURCES.

Appendix C-2. Entergy Arkansas, Inc. May 26, 2016

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON

9. Integrated Resource Plan and Risk Analysis

MMU Redline. Cost Development Guidelines. PJM Manual 15: Revision: XX. Effective Date: XX. Prepared by Cost Development Task Force

UNIQUE ATTRIBUTES OF RENEWABLE POWER PURCHASE AGREEMENTS

E1/95. Green Evaluation TenneT Holding B.V. Green Bonds. Transaction Overview. Green Evaluation Overview. Overall Score. Transparency.

STATE OF RHODE ISLAND PUBLIC UTILITIES COMMISSION

83C Questions and Answers

Power Contracts in Florida. Eduardo Balbis, P.E. Commissioner Florida Public Service Commission

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION

Stakeholder Comment Matrix

Powering Beyond. Wells Fargo Equity Investor Meetings April 6, 2018

APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST

Midwest Renewable Energy Tracking System, Inc. Overview

Ameren Illinois Utilities

NYISO Study on Renewable Exempt

ISO filed a tariff amendment to implement the rates, terms, and conditions of the ISO s Reliability Coordinator Service

SCHEDULE C ELECTRICITY PURCHASE AGREEMENT TERM SHEET TRANSMISSION AND LARGE DISTRIBUTION CONNECTED PROJECTS

Oregon John A. Kitzhaber, MD, Governor

SCHEDULE 85 COGENERATION AND SMALL POWER PRODUCTION STANDARD CONTRACT RATES

ICAP Demand Curve. Zachary T. Smith Supervisor, ICAP Market Operations, NYISO. Intermediate ICAP Course. November 7-8, 2017 Rensselaer, NY 12144

Green Bond Framework

Establishing the New York Green Bank (NYGB) and Reforming the Energy Vision (REV)

CHAPTER 17. BE IT ENACTED by the Senate and General Assembly of the State of New Jersey:

TVA BOARD MEETING AUGUST 22, 2013

This document supplements the questions and answers that were previously posted on December 1, 2015.

Transcription:

New York s Clean Energy Standard Doreen Harris, NYSERDA December 1, 2016

2 Clean Energy Standard - Overview

3 New York s Clean Energy Standard By Order issued August 1, 2016, the New York Public Service Commission adopted the State Energy Plan (SEP) goal that 50% of New York s electricity is to be generated by renewable sources by 2030 as one strategy to reduce GHG emissions 40% by 2030. The Clean Energy Standard (CES) anticipates a series of initiatives including, but not limited to, obligations upon LSEs and opportunities for voluntary contributions, all of which will contribute to attaining the 50 by 30 goal. The Order provides for two mandated requirements: a Renewable Energy Standard (RES) requirement, and a Zero-Emissions Credit (ZEC) requirement. The RES component and the ZEC component are interrelated but the goals are additive. ZECs will not count toward satisfying the 50% by 2030. A series of implementation plans will provide further details regarding the design of the program for public comment.

Renewable Energy Standard (RES) Tier 1 4

LSE Tier 1 Obligation 5 The cornerstone of the RES is the obligation placed on all LSEs under the Commission s jurisdiction to acquire an increasing portion of their annual retail load from new (in service after December 31, 2014) renewable resources. The Order set, through 2021, the annual goal in total statewide MWh translated as a percentage of each LSEs load: CES goal Year MWh Percentage of LSE Load 2017 974,000 0.6% 2018 1,741,270 1.1% 2019 3,124,100 2.0% 2020 5,302,371 3.4% 2021 7,530,642 4.8% LSE 2107 Obligation (0.035%) Clarified in November 17, 2016 Order (next section)

6 LSE Tier 1 Obligation An LSE may satisfy its obligation by one of the following ways: LSEs may purchase RECs from NYSERDA; The Commission directed NYSERDA to conduct Tier 1 REC procurement solicitations at least once annually. LSEs may enter directly into agreements, including long-term power purchase agreements (PPAs), with renewable energy resources; LSEs may pay an alternative compliance payment (ACPs); Or some combination of the three.

Renewable Energy Standard Tier 2 7

Zero Emissions Certificate (ZEC) Program 8

9 LSE ZEC Obligation The LSE ZEC obligation is designed to ensure that enough revenues are in place so that the plants continue to operate and produce carbon-free emission. ZEC cap = 27,618,000 per year. Based on July 2015 June 2016 output. If not all owned by same owner, then separate limits for each owner. If fewer MWh are produced, then the level of required ZEC purchases goes down. Each LSE will be responsible for purchasing ZECs equal to their load share percentage for the entire State. The annual compliance period is April 1 - March 31.

10 Updates Based on November 17, 2016 Commission Orders

11 November 17, 2016 Order Issued in response to NYSERDA Petition for Clarification 2017 Tier 1 RES Obligation on LSEs is equal to 0.035% of total load served by an LSE during 2017. Relates directly to the estimated number of Tier 1 RECs that NYSERDA will offer for sale in 2017 and projected 2017 compliance period load (details covered in a later section). The new renewable resources from NYSERDA-funded NY Sun and other Customer Sited Tier projects are counted toward the 50% statewide renewable goal but are not included in the mandated quantity that the LSEs are mandated to procure in 2017.

12 November 17, 2016 Order PSC approved: 1. Standard agreements for LSE purchase of RECs and ZECs from NYSERDA Agreements to be executed by LSEs within 30 days of the Order issuance date (by December 19, 2016) 2. NYSERDA administrative budget for 2017 REC administration, system builds and cost recovery fee funded through repurposed funds Administrative adder for ZEC purchases ($0.0594/ZEC)

13 NYSERDA REC Sales to LSEs

NYSERDA filing regarding 2017 REC Sales 14 Filed under Case 15-E-0302 on November 1, 2016 Available on NYSERDA s website at nyserda.ny.gov/clean-energy-standard Directly correlates with 0.035% Tier 1 LSE RES Obligation clarified in November 17, 2016 Order 2017 Tier 1 RECs to be offered for sale by NYSERDA 2017 Tier 1 REC Price 2017 ACP Price 56,142 $21.16 $23.28

15 CES Phase 1 Implementation Plan

16 Phase 1 Implementation Plan Filed jointly by New York Department of Public Service and NYSERDA on October 31, 2016 for public comment and Commission decision-making. Comments due January 3, 2017. Proposes the following details and processes regarding: RES Eligibility Certification Long Term Procurement for RECs LSE Demonstration of Compliance Reporting Requirements

Eligibility 17

18 Tier 1 Eligibility Per the August CES Order, Tier 1 eligibility mirrors the current Renewable Portfolio Standard (RPS) Main Tier with two exceptions: The former 30 MW limit on hydro facilities is eliminated Geographic eligibility is expanded (with delivery of energy) to the control areas adjacent to New York Additional details are included in the implementation plan regarding the eligibility of: Upgrades Repowering

19 Tier 2 Eligibility Provide support to those at risk eligible facilities which, if not for the support, are demonstrated to be economically inviable without such support. Tier 2 Maintenance Resource eligibility: Currently operating run-of-river hydroelectric facilities of 5 MWs or less, wind turbines, and direct combustion biomass facilities that comply with eligible fuel source requirements for Tier 1 eligibility. Commercial operation prior to January 1, 2003 and the output must have been originally included in New York s baseline of renewable resources as of that date. Process is similar to RPS Maintenance Resource program.

20 Project Certification

21 Renewable Energy Standard Certification Certification is a prerequisite to generation facility participation in the RES program as an eligible resource. NYSERDA will perform all services related to the development, review, approval and ongoing validation of RES certification materials. NYSERDA will develop a RES certification process modeled on the RPS Main Tier certification process but adapted to be available on a continuous basis, with similar provisional and operational certification provisions.

22 Key Proposed Changes to Procurement - 2017

NYSERDA filing regarding 2017 Long Term Procurement Schedule (November 1, 2016) 23 2017 Renewable Energy Credit RFP 1 Release April 2017 RFP 1 Awards August 2017 NYSERDA/DPS announcement on need for 2017 RFP 2 September 2017 Procurement 2017 Renewable Energy Credit RFP 2 Release (if October 2017 needed) RFP 2 Awards February 2018

Step One: Thresholds for Project Eligibility Establish project threshold criteria to send clear signal to market participants for project maturity expectations, fortify project pipeline, and minimize false starts Must meet minimums (e.g., interconnection, permitting, site control) or face automatic rejection Leverage/harmonize existing development best practices to establish minimum maturity levels Require project self-certification plus documentation Requirements are intended to maintain a robust solicitation response & maintain cycle times 24

Step Two: Revised Bid Evaluation Criteria Quantitative Ranking Price 70% (maintained) Economic Benefits 10% (reduced from 30%) Project Viability 10% Operational Flexibility and Peak Coincidence 10% Obtain Preliminary Rank Order Technical Evaluation Panel (TEP) Consists of NYSERDA, DPS, and qualified Independent Evaluators Application of Portfolio Risk Assessment Technical Evaluation Panel recommendation to NYSERDA management Department of Public Service approval of results 25

Changes to 2018 and Subsequent Procurements 26 Extension of Commercial Operation Date post award with additional extensions/security options Introduction of phased approach for procurement evolution Increased development maturity More granular pricing (peak/off-peak, seasonal) More rigorous documentation (equipment vendor certifications, project partner details, more financial disclosure, etc.)

27 Settlement and Reporting

REC and ZEC Banking ZECs No Banking Allowed Tier 1 RECs NYSERDA can bank for two years LSE s can bank For up to two subsequent compliance years Banked certificates cannot exceed 30% of the certificates needed by the LSE for compliance in the year in which they were generated LSE s can also sell excess Tier 1 RECs to NYSERDA in 2017 (per Order) Borrowing is not permitted 28

29 Settlement/Compliance LSEs must demonstrate compliance with the CES s RES Tier 1 and ZEC programs for each compliance period for which a RES and ZEC LSE compliance target is established. Separate compliance timelines NYGATS reports used for documentation ACP Payments under RES to NYSERDA State Compliance Reporting

Value of Distributed Energy Resources 30

Offshore Wind 31

32 Thank You Doreen Harris Program Manager, Large Scale Renewables NYSERDA Doreen.Harris@nyserda.ny.gov 518-862-1090, x3337