Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA

Similar documents
Pipeline Safety for Elected Officials and Government Agencies

Vehicle and Equipment Crossing Kinder Morgan Canada s Pipeline

WASHTENAW COUNTY ROAD COMMISSION Permit Engineering Section 555 N. Zeeb Road Ann Arbor, MI 48103

WASHTENAW COUNTY ROAD COMMISSION Permit Engineering Section 555 N. Zeeb Road Ann Arbor, MI 48103

Discussion Paper: DAMAGE PREVENTION FRAMEWORK FOR FEDERALLY REGULATED POWER LINES

RIGHT-OF-WAY PERMIT APPLICATION

CHAPTER 2 REQUIREMENTS FOR STATEWIDE ONE-CALL NOTIFICATION CENTER

Special Conditions, Regulations and Instructions for Right of Way Permit Applications

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number:

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

ASSEMBLY, No STATE OF NEW JERSEY. 211th LEGISLATURE INTRODUCED JUNE 14, 2004

NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES. CHAPTER Puc 800 UNDERGROUND UTILITY DAMAGE PREVENTION PROGRAM

BID TABULATION BID REQUEST NO

Electric Service Information Sheet Georgia Power Company

DART AND THE T LICENSE PROCEDURES

Right-of-Way Construction Permit Application

PIPELINE / WIRE LINE PROCESS INSTRUCTIONS

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

SENATE, No STATE OF NEW JERSEY. 217th LEGISLATURE INTRODUCED JUNE 6, 2016

ROAD CROSSING AGREEMENT FOR SUB-SURFACE FACILITIES. - and - NAME ADDRESS CITY, POSTAL CODE

Rock Chalk Park - Infrastructure Report. July 2013

FOR OFFICE USE ONLY CONTRACTOR/DEVELOPER APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN THE RIGHT-OF-WAY/EASEMENT

Floodplain Development Permits A Technical Guidance Document

Laois County Council Licence for Opening Roads, Footpaths and Verges. Application Form

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

DEVELOPMENT PERMIT APPLICATION CHECKLIST New: Commercial Industrial Institutional - Multiple Family Residential

BETWEEN: CANADIAN NATIONAL RAILWAY COMPANY, a corporation having its head office at 935 de la Gauchetière Street West, Montreal, Quebec H3B 2M9

Gladwin County Road Commission 2016 Hot Mix Asphalt (HMA) Paving. Page 1 of 5

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

Right-of-Way Utilization Permit Please complete a separate application for each road

CURB CUTS SPECIFICATIONS AND STANDARDS

THE NARRAGANSETT ELECTRIC COMPANY POLICY 2 LINE EXTENSION POLICY FOR RESIDENTIAL DEVELOPMENTS

Storm Water Mitigation Services ITB SEMINOLE TRIBE OF FLORIDA INVITATION TO BID

Village of Fife Lake 616 Bates/Box 298 Fife Lake, MI Phone: (231) Fax: (231)

Best Practice Guide for Locating Underground Services

residential property. A one-call notification system may be for a region of the state or statewide in scope, unless federal law provides otherwise.

RULE H NEW SERVICE ATTACHMENTS AND DISTRIBUTION LINE INSTALLATIONS OR ALTERATIONS (Continued)

TRENCH PERMIT. CITY OF SOMERSWORTH NH 18 Lilac Lane - (603) Please Fax at (603) Date: Permit# Dig Safe # Fee = $70.

TOTAL QUANTITY UNIT COST UNIT

CITY OF JENKS COMMERCIAL BUILDING PERMIT P.O. Box N. Elm Jenks, OK 74037(918)

Spartanburg County Roads & Bridges 9039 Fairforest Road Spartanburg, South Carolina Telephone Fax

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

Baltimore Gas and Electric Company Gas Extensions

ROCKLAND ELECTRIC COMPANY B.P.U. NO. 3 - ELECTRICITY. 1st Revised Leaf No. 18 Superseding Original Leaf No. 18 GENERAL INFORMATION

RULE H NEW SERVICE ATTACHMENTS AND DISTRIBUTION LINE INSTALLATIONS OR ALTERATIONS

Revised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E. ELECTRIC RULE NO. 15 Sheet 1 DISTRIBUTION LINE EXTENSIONS

CARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES. EFFECTIVE MARCH 1, 1995 Revised (09/01/2015)

APPLICATION FOR DEMOLITION PERMIT

BID TABULATION. Engineer's Estmated Opinion of Costs

Water and Wastewater System Schedules of Rates and Charges and Fees As of July 1, 2015

SUBDIVISION IMPROVEMENTS AGREEMENT

APPLICATION FOR RIGHT-OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI

GENERAL LICENSE PROCESS INSTRUCTIONS

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

A NEW online entry system for applications and submittal of documents will be available in summer of 2018.

9 th Revision of Sheet No. 85 Canceling 8 th Revision WN U-60 of Sheet No. 85

Standard Specifications for Work on Railroad Property

DEVELOPMENT SERVICES PROCESS MANUAL

GENERAL PROVISIONS I. WORK REQUIREMENTS

CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT

Best Practice Guide for Locating Underground Services

Fees: An application fee of one hundred dollars ($100) shall be included with the application submission.

Allen County Highway Engineering Department Problems and Progress

Alger Delta Cooperative Electric Association

INFORMATION & APPLICATION FOR LARGE SIDEWALK PATIOS ON CITY PROPERTY

LETTING : CALL : 056 COUNTIES : MILLE LACS

COMMONWEALTH ELECTRIC COMPANY Cancels M.D.T.E. No. 300 Appendix B-3 Page 1 of 9 TERMS AND CONDITIONS - DISTRIBUTION SERVICE

Rosewood Hills Property and Homeowners Association, Inc. Water System Policies and Procedures

PIPELINE INVESTIGATION REPORT P07H0014 CRUDE OIL PIPELINE RUPTURE

CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST

THE GOVERNMENT PIPELINE & STORAGE SYSTEM STANDARD REQUIREMENTS FOR CROSSING OR WORKING NEAR TO GPSS PIPELINES

MAINTENANCE DEPARTMENT

Monroe County Road Commission. 840 S. Telegraph Road Monroe, MI Phone Fax Driveway Procedures. Driveway Procedures

Underground Utility Line Protection Act AKA Damage Prevention Act. HB2627 ACT 187 Signed: 12/19/96 PN Effective: 12/19/96 to 12/31/06

ARTICLE I. Section 1. "City" shall mean the City of Marion, Linn County, Iowa.

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

City of Bowling Green Department of Public Works

Only fill out the portion of this supplemental that applies to your operation. Lawn Service

PUBLIC UTILITY DISTRICT NO. 1 of Whatcom County 2019 Small Works Roster Application for Qualification

KINDER MORGAN CANADA LIMITED ANNOUNCES 2018 FINANCIAL EXPECTATIONS Trans Mountain Expansion Project Pursuing a Primarily Permitting Spend Strategy

DESIGN BUILD PARKING LOT AND MODULAR FACILITY FOR LYNX PARATRANSIT OPERATIONS (LOC EXPANSION) RFP 18-R01 ADDENDUM NUMBER ONE (1) August 3, 2018

Best Practice (Technical) Guide for Locating Underground Services

COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.

Public Works Maintenance STORMWATER AND

Highway Work Permit Application

MACKINAC COUNTY ROAD COMMISSION PERMIT FEE SCHEDULE Approved Section Type of Permit Fee

Why is a maintenance dig initiated?

TESTIMONY WALTER C. PHILLIPS GENERAL PARTNER DORSO ENERGY LP I TREASURER, BEFORE THE PENNSYLVANIA HOUSE OF REPRESENTATIVES COMMITTEE CONSUMER AFFAIRS

Genesee & Wyoming Railroad Services, Inc.

Title 37 PUBLIC UTILITIES AND PUBLIC TRANSPORTATION.

TOWN OF NORTH HERO MUNICIPAL WATER DEPARTMENT

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.

WISCONSIN PUBLIC SERVICE CORPORATION. C4. Standard Rules & Regulations Construction Policy RIIIM

Transcription:

Applying for a Kinder Morgan Canada Proximity Permit Design and Construction Guidelines CANADA

A Guide to Applying for a Kinder Morgan Canada Proximity Permit Kinder Morgan Canada operates the Trans Mountain Pipeline ULC, Trans Mountain Pipeline (Puget Sound) LLC and Trans Mountain (Jet Fuel) Inc. A Proximity Permit is required for installing any permanent structure within Kinder Morgan Canada s right-of-way. This brochure will assist you in applying for a Kinder Morgan Canada Proximity Permit. Damage Prevention Damage prevention is a shared responsibility. Excavation and other ground disturbance activities can damage pipelines. Making contact with a pipeline can have severe consequences ranging from service disruptions to environmental damage and personal injury. Pipeline Markers and the Right-of-Way Our pipelines are located within a right-of-way or road easement, which is a narrow stretch of land that provides safe access for monitoring and maintenance. Pipeline markers provide important safety information such as the type of product carried, the local One Call number, and Kinder Morgan Canada s emergency notification number. Although markers identify that a pipeline is in the area, they do not give the exact location or depth only a qualified Kinder Morgan Canada Technician can do so. Call or Click Before You Dig Before you begin any ground disturbance work, contact your local One Call centre. If your proposed work is near our pipeline rightof-way, a Kinder Morgan Canada representative will call you back to discuss your proposed work and, if required, meet with you onsite to determine the exact location of the pipeline. This service is typically provided at no cost to you. A guide to applying for a Kinder Morgan Canada Proximity Permit / 2

Permits Kinder Morgan Canada s pipelines are regulated federally or provincially. These regulations require us to approve any activity near our pipeline right-of-way. Kinder Morgan Canada provides permission in the form of 30 Metre (100 Foot) Permits and Proximity Permits. A 30 Metre (100 Foot) Permit is required for any ground disturbance work within 30 metres (100 feet) of our pipeline right-of-way. Examples of ground disturbance activities include, but are not limited to: Heavy equipment crossings Driving objects into the ground and/or excavation Installing irrigation systems and ditching Landscaping Stump grinding Plowing at a depth greater than 12 inches Drilling, digging, compacting, stockpiling or using any equipment causing ground vibrations A Proximity Permit is required for installing anything of permanent nature within our pipeline right-of-way. This includes, but is not limited to: Constructing roads, driveways, trails or ditches Fences or posts Realtor, political or property development signs Moveable sheds, outbuildings, or other structures Underground utilities A guide to applying for a Kinder Morgan Canada Proximity Permit / 3

Pipeline Protection Zones Minimum Standards Kinder Morgan Canada Representative grade (2 ft.) 5m (17 ft.) Excavations using power operated equipment within 5m (17 ft.) (hot zone) of pipe Require prior hand/hydrovac exposure of pipe 7.5m (25 ft.) 30m (100 ft.) Work within 30m (100 ft.) Ground disturbance safety zone 30 metre (100 foot) Ground disturbance safety zone permit required 0.6m 0.6m (2 ft.) Work within 0.6m (2 ft.) of pipe No mechanical excavation Hydrovac/shovel only zone 5m (17 ft.) 7.5m (25 ft.) Work within 7.5m (25 ft.) distance from pipe Kinder Morgan Canada Representative must be on site 30m (100 ft.) A guide to applying for a Kinder Morgan Canada Proximity Permit / 4 A guide to applying for a Kinder Morgan Canada Proximity Permit / 5

A guide to applying for a Kinder Morgan Canada Proximity Permit / 6

Proximity Permits: Drawing and Design Requirements For the Proximity Permit application, both a plan view and a profile or elevation view drawing are required. 0 The Plan View Drawing should have at a minimum: Unverified location of the pipeline and right-of-way boundary (the location will be verified onsite by a Kinder Morgan Canada Technician) Complete legal land description and the street address of the property (you can obtain the legal land description from your local city hall, municipal office, regional district or county office) Location of proposed works, including dimensions to a reference point such as a legal property line, the pipeline, or the right-of-way boundary Location of all applicable property boundaries as well as road and utility boundaries A north arrow The Profile or Elevation View Drawing should have at minimum: For surface crossings the profile should be taken along the pipeline For underground and aerial crossings, the profile should be taken along the proposed new crossing facility Location of any pipeline and associated depth of cover All horizontal and vertical clearances from the pipeline A guide to applying for a Kinder Morgan Canada Proximity Permit / 7

Special Project Considerations For certain projects, additional information must be included in your application: Roads and Parking Lots For the Plan View Drawing: All existing buildings within 30 metres (100 feet) of the pipeline right-of-way Parking stall layout (no parking or storing of materials is permitted within 3 metres (10 feet) of the pipeline) Location of all access roads For the Profile or Elevation View Drawing: Detail and describe the proposed backfill structure around the pipeline Ensure that all roads and parking lots that cross the rightof-way are completed in accordance with Kinder Morgan Canada s Engineering Standard MP3120D. Please contact us for the latest copy if required Depth of Cover: Minimum depth of cover is 1.2 metres (4 feet) from the top of the pipeline to the final road grade. Do not exceed 1.8 metres (6 feet of cover) A Kinder Morgan Canada Technician must be onsite for any backfill Inspection Cut-Outs for Parking Lots: Inspection cut-outs shall be installed in the pavement directly over the pipeline every 10 metres (33 feet) The inspection cut-outs should consist of a 150 millimetre (6 inch) diameter cast iron grate in a concrete or rigid PVC collar filled with free draining gravel The layout of the inspection cut-outs may be determined at the time of construction with the Kinder Morgan Canada Technician A guide to applying for a Kinder Morgan Canada Proximity Permit / 8

Railways Specific requirements for new railway crossings will be established on a case-by-case basis. Please contact us directly to discuss your project. Trails The minimum depth of cover shall be 1 metre (3.3 feet) from the top of the pipeline to the final grade and 1.2 metres (4 feet) if the trail is used for vehicle access. Ditches For the Profile or Elevation View Drawing: Include the dimensions of the width at the top of the ditch, the invert width of the ditch, and the depth of the ditch Depth of Cover: The minimum depth of cover required is 1 metre (3.3 feet) from the top of the pipeline to the invert ditch Liners: A description of any ditch liners, including the material type, must be included in your application A guide to applying for a Kinder Morgan Canada Proximity Permit / 9

Aerial Cable Utilities For the Plan View Drawing: Include the location of all proposed poles, towers, guys, anchors, or any other supporting structure in all plan view drawings None of the above are permitted on the right-of-way or its projected limits across a road easement For the Profile or Elevation View Drawing: Provide a dimension of the proposed minimum height of the overhead cable(s) across the right-of-way Cable Information Requirements: Provide a description of the type, size, and voltage of the proposed cable(s) A guide to applying for a Kinder Morgan Canada Proximity Permit / 10

Underground Utilities Clearances For fibre optic cables the minimum vertical clearance is 0.6 metres (2 feet) For most other utilities, the minimum vertical clearance is 0.3 metres (1 foot) For parallel works within a road allowance, the minimum horizontal clearance is 1.5 metres (5 feet) from the edge of the pipe Kinder Morgan Canada reserves the right to increase the minimum clearances listed in the application if deemed necessary. Constant Elevation: All underground facilities shall maintain a constant elevation across the entire width of the right-of-way and extend a minimum of 0.6 metres (2 feet) beyond the right-of-way boundaries Cable Information Requirements: Provide the voltage, conduit size, and method of installation in your application Using trenching methods, install the cable within rigid PVC type conduit Encase in concrete Place applicable warning tape across the width of the right-of-way A guide to applying for a Kinder Morgan Canada Proximity Permit / 11

Pipeline Information Requirements: Pipe material Outside diameter Wall thickness Pipe grade Type of cathodic protection Substance pipeline will be transporting Method of installation For steel pipelines, the installation of a test tap may be required at the crossing to monitor cathodic protection. During the permit application process, Kinder Morgan Canada will determine if one is necessary. All costs associated with the test tap installation will be the responsibility of the applicant. Limitations For perpendicular works across the pipeline, the following are not permitted within the right-of-way or its protected limits across the roadway: Junction boxes Kiosks Valves Other similar facilities Manholes Catch basins Meters A guide to applying for a Kinder Morgan Canada Proximity Permit / 12

Landscaping When submitting your landscaping plans for approval, please include the following: Property lines and length Position and dimensions of your house or building Right-of-way of pipeline location (the location will be verified onsite by a Kinder Morgan Canada Technician) Driveways, sheds, fences and any other structures Trees, hedges, lawn areas, and garden beds Kinder Morgan Canada requires clear access to the pipeline and right-of-way for monitoring and maintenance. Refer to our Design and Landscaping Guidelines for more detailed information. Fences, Posts and Bollards The minimum clearance from the pipeline centre line to the centre line of a post or bollard is 2 metres (6.5 feet). For applications regarding installing a fence, please include the fence height and construction material with your application. Storing Materials Storing materials of any kind is not permitted within 3 metres (10 feet) on either side of the pipeline. You can store materials outside this area as long as they are easily moved in the event that Kinder Morgan Canada needs access to the right-of-way. A Proximity Permit is still required. A guide to applying for a Kinder Morgan Canada Proximity Permit / 13

Application Process and Approvals APPLICATION APPLICATION PERMIT Obtain a copy of our Pipeline/Right-of-Way Proximity Permit Application from our website kindermorgan.com/pipelinesafety Contact your local One Call centre and provide them with details of your planned activity Prepare your application and provide all the required detail for us to access your application Submit your application and drawings to a Kinder Morgan Canada s Permit Technician by emailing permits_bc@kindermorgan.com for permits in British Columbia and Washington state and permits_ab@ kindermorgan.com for permits in Alberta Kinder Morgan Canada will process the application and will send a copy to the applicant for signature Applicant signs and returns application to the Permit Technician Before beginning construction, arrange an onsite safety meeting with a Kinder Morgan Technician. At the meeting the Technician will:»» Locate and mark the pipe»» Issue a 30 Metre (100 Foot) Permit»» Stay onsite for any work within 7.5 metres (25 feet) of the pipeline A guide to applying for a Kinder Morgan Canada Proximity Permit / 14

With all required documentation, a Proximity Permit can take up to 10 business days to process. Once Kinder Morgan Canada has reviewed and approved your plan, a Proximity Permit will be issued for the work detailed in the application (subsequent to any changes in the process). If your scope of work changes, you will need to notify the Permit Technician to approve any changes. Copies of all Permits must be kept at the job site and available when requested by a Kinder Morgan Canada representative or government inspector. A guide to applying for a Kinder Morgan Canada Proximity Permit / 15

Frequently Asked Questions Why do I need a Proximity Permit? A Proximity Permit is required for anything of permanent nature within the pipeline right-of-way. Proximity Permits are also required for landscaping and storing materials. Where do I get a Proximity Permit application from? You can contact a Permit Technician at 1.888.767.0304 or download an application from our website at kindermorgan.com/pipelinesafety What do I need for my application? To process any application, we require the following: Proximity Permit Application form A copy of all applicable design drawings A guide to applying for a Kinder Morgan Canada Proximity Permit / 16

Will you provide me with a drawing so I can plan around your pipelines? During the planning stages, we can provide drawings detailing the right-of-way, however, these drawings cannot be used for any ground disturbance activity and you will be required to sign a disclaimer. A Kinder Morgan Canada Technician will still be required to be onsite for any work within 7.5 metres (25 feet) of the pipeline. Please contact our Permit Technician to obtain a drawing. Is there a Permit fee? No. We typically provide this service at no cost to you. However, if a Technician is required to be onsite for an extended length of time a charge may be levied. This information will be detailed in the Proximity Permit application process. Do I also need a 30 Metre Permit? Yes. A 30 Metre Permit is required for any ground disturbance work taking place within 30 metres (100 feet) of our pipeline right-of-way. This will be provided to you during the required safety meeting. You will be required to keep both Permits at the work site along with your One Call ticket. When will I find out if my application has been approved? Applications typically take 7 to 10 days to process. You will be notified by the Permit Technician once your application has been approved. A guide to applying for a Kinder Morgan Canada Proximity Permit / 17

About Kinder Morgan Canada Kinder Morgan Canada is a leader in energy transportation. We operate the Trans Mountain pipeline that transports crude oil and refined petroleum products from Edmonton, Alberta to Burnaby British Columbia and into Whatcom and Skagit Counties in Washington state. Our Trans Mountain Jet Fuel pipeline transports jet fuel from Burnaby to the Vancouver International Airport. Kinder Morgan Canada is committed to safe, reliable and efficient operations of our pipelines. BRITISH COLUMBIA Edson Jasper Edmonton Clearwater ALBERTA Kamloops Burnaby Hope Trans Mountain Pipeline Ferndale Trans Mountain Jet Fuel Abbotsford Trans Mountain Puget Sound Anacortes community A guide to applying for a Kinder Morgan Canada Proximity Permit / 18

CANADA Damage prevention is a shared responsibility. Prior approval from Kinder Morgan Canada is required for any ground disturbance activity within our pipeline right-of-way. For more information on permits, please contact a Permit Technician in your area: Alberta Phone: 1-888-767-0304 or 780.449.5906 E-mail: permits_ab@kindermorgan.com British Columbia and Washington State Phone: 1-888-767-0304 or 604.268.3093 E-mail: permits_bc@kindermorgan.com If you suspect a pipeline emergency, please contact Kinder Morgan Canada s Emergency Notification Line: 1.888.876.6711 February 2016