Indonesia Infrastructure Development: Sectoral Policy Update

Similar documents
A brief on current Indonesia s PPP Program. Directorate General of Budget Financing and Risk Management - Ministry of Finance Republic of Indonesia

The way ahead for Indonesia : How to ensure the financing for its infrastructure projects Dr. Robert Pakpahan, Ak

PPP IDENTIFICATION AND PPP PLANNING

and PINA Schemes Social Investment Investment that does not possess direct investment feedback to the object.

Quality Infrastructure Preparation and Transaction

FACILITATING ACCESS TO FINANCE FOR INFRASTRUCTURE PROJECTS: ESTABLISHING DEDICATED INSTITUTIONS

Innovative Financing Scheme to Accelerate the New Urban Agenda s Infrastructure Development Targets

Indonesia. PPP Country Profile Indonesia. 1. Overview

Exposure of Indonesia Infrastructure Project

EXECUTING AND DEVELOPING PPP PROJECTS: AN INDONESIAN EXPERIENCE

Exposure of Indonesia Infrastructure Project

Indonesia s Business Potentials

Improving Creditworthiness and Project Quality in Ensuring The Implementation of Government-Business Infrastructure Project

INFRASTRUCTURE INVESTMENT IN EMERGING MARKETS AND DEVELOPING ECONOMIES A BRIEF LOOK AT INDONESIA. Raj Kannan, Managing Director

SMI AS A LOCAL PARTNER FOR FOREIGN INVESTORS IN INFRASTRUCTURE PROJECT INVESTMENT IN INDONESIA

The Future of Indonesia s Cities

Indonesia. 1. Noteworthy practices for project preparation. Case Study

National Urban Policy: Cities as Engine of Growth

Boosting Infrastructure Financing through Risk Mitigation Instruments

THE ECONOMY WITH REMARKABLE ADAPTABILITY

For any enquiries to :

A Master Plan for Ports Port Development and Connectivity Asia Presented By: David Wignall David Wignall Associates

The 5 th Asian Think Tank Development Forum Colombo, September 2017

Joint Press Release on the Third Steering Committee Meeting of the Metropolitan Priority Areas for Investment and Industry

Agreement Establishing the ASEAN Australia-New Zealand Free Trade Area INDONESIA S SCHEDULE OF SPECIFIC SERVICES COMMITMENTS

INVESTMENT IQ INDONESIA

GLOBAL INFRASTRUCTURE FACILITY. A partnership platform for greater investment in the infrastructure of emerging markets and developing economies

Public Disclosure Copy

THE COORDINATING MINISTRY FOR ECONOMIC AFFAIRS REPUBLIC OF INDONESIA

SECTOR ASSESSMENT (SUMMARY): INDUSTRY AND TRADE

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1

Opportunity of Infrastructure Financing. Darmawan Junaidi Director PT Bank Mandiri (Persero) Tbk

By Darmawan Djajusman Deputy Chairman of Investment Promotion INVESTMENT COORDINATING BOARD

The Role of Bank Mandiri in Infrastructure Financing. Ferry M.Robbani Senior Vice President PT Bank Mandiri (Persero) Tbk

Japanese ODA Loan. Ex-ante evaluation

INDONESIA INVESTMENT COORDINATING BOARD. Press Release Investment Realization in the Second Quarter of 2016 Rose 12.3 %

The Emergence of Indonesia s Gas Sub-holding. Jakarta, 11 January 2019

Kecamatan Development Program M a y 2002

WHAT ARE CHALLENGES TO ACHIEVE INCLUSIVE DEVELOPMENT, TECHNOLOGY TRANSFER, EMPLOYMENT CREATION AND HUMAN DEVELOPMENT THROUGH QUALITY INFRASTRUCTURE

INDONESIA PHASE II OF THE INDONESIA GREEN GROWTH PROGRAM OVERVIEW HIGHLIGHTS OVERALL OBJECTIVES CONTEXT. RELEVANT SDGs

1 PPP in Indonesia: Risk Allocation Guideline

PPP Fiscal Risk Management - The Implementation

Investing in Indonesia:

Indonesia Infrastructure Investment Forum Seoul, September 2017 INFRASTRUCTURE PROJECTS PIPELINE

INVESTING IN INDONESIA Investment Policy & Opportunity

THE COORDINATING MINISTRY FOR ECONOMIC AFFAIRS PRESS RELEASE

Conference Call. FY2008 Results: Delivering Higher Performance

The Role of PT. Sarana Multi Infrastruktur in Infrastructure Development

H UPDATE. PT Perusahaan Gas Negara (Persero) Tbk

Thailand s Innovation Financing for Infrastructure

The Role of Non-Government Budget Investment (PINA) for Infrastructure Development in Indonesia

Developing Institutional Framework for Regulatory Reform: Indonesian Experience

CONFERENCE REPORT BACKGROUND

Financing Sustainable Infrastructure In Asia. Fei Yu Deputy Representative Asian Development Bank North American Representative Office

JANUARY 2018 LEGAL ALERT. banking. capital markets. education, research and technology

B. Whereas the development of infrastructure requires debt of longer maturity to supplement the debt funds presently available; and

Press Release Investment Realization of January - September 2017: Rp Trillion, 75.6% of the 2017 s Target

PT. BANK RAKYAT INDONESIA (PERSERO) Tbk. Financial Update Q Jakarta, October 2008

Ninth UNCTAD Debt Management Conference

INDONESIAINVESTMENT OUTLOOK AND POLICY DEVELOPMENT

Economic Policy Package. Macro Economy Improvement

Citi ASEAN C-Suite Forum 2016

Investment Opportunities in Infrastructure Exciting Times to be in India

Indonesia Deep Dive GIF ADVISORY COUNCIL MEETING OCTOBER 16, 2018

OFFICE OF THE COORDINATING MINISTER FOR ECONOMIC AFFAIRS OF THE REPUBLIC OF INDONESIA

Cement companies in Indonesia

Report and Recommendation of the President to the Board of Directors

Jokowi s Infrastructure Focus: Is it Indonesia s New Growth Strategy?

Human Settlements Improvement Project (2)

APPENDICES. Appendices 191

Southeast Asian Infrastructure

PPIAF Assistance in Indonesia

Republic of Indonesia

INDONESIA I N V E S T I N. Indonesia Investment Climate and How to Approach the Indonesian Market. invest in

CORPORATE PRESENTATION. Ap r i l 2017

Infrastructure financing challenges of Cambodia

Foreign Direct Investment in Indonesia

Draft PPP Policy Outline

PT. BANK RAKYAT INDONESIA (PERSERO) Tbk.

Financing Strategies: Improving Public Expenditure Efficiency

Strategy #1: Partnering with the Private Sector through PPP. EY Infrastructure Advisory. October 2017

Initial Project Information Document (PID) Report No: AB484. INDONESIA - Domestic Gas Sector Restructuring Region. Project Name

INDONESIA ECONOMIC QUARTERLY CLOSING THE GAP. Frederico Gil Sander Lead Economist October 3, 2017

GASIFICATION TECHNOLOGIES CONFERENCE 2015 INDONESIA-CURRENT OUTLOOK FOR FOREIGN INVESTMENT. Richard Cant-North American Director October 12 th, 2015

Cement companies in Indonesia

13. What banking business in foreign currency is permitted to use foreign currency?

Outline. Laos in Brief. Battery of Asia and Land-Linked. Investment Support in Lao for investors

Implementing of Risk Assessment Model for Public Private Partnership (PPP) of Airport Infrastructure Development in Indonesia

Presidential Regulation No 91/2017 on Acceleration of Doing Business

Staying competitive in an oversupplied market. Overview of Indonesia s cement industry

One Stop Integrated Services Geothermal Licensing

Indonesia: Navigating the Legal Landscape for Chinese Investors

COPY REGULATION OF THE CHAIRMAN OF INVESTMENT COORDINATING BOARD REPUBLIC OF INDONESIA NUMBER 17 OF 2015

MESSAGE FROM THE BOARD OF COMMISSIONER 02 MESSAGE FROM PRESIDENT DIRECTOR 05 BRIEF HISTORY 09

Reforms for Indonesia s Future

Cement companies in Indonesia

Company Overview & Investment Opportunities

Partnership Brief. Cofinancing with Spain

Private Capital in Infrastructure in ASEAN: How the Global Infrastructure Facility can help. November, 2015

CEMENTING USTAINABLE ROWTH

Transcription:

Indonesia Infrastructure Development: Sectoral Policy Update Indonesia Infrastructure Investment Forum Dwianto Eko Winarno Project Director of Transportation Sector Seoul, 21 September 2017

Infrastructure is the 2 nd Pillar of the Global Competitiveness Index assessment and considered as one of the critical factors to ensure the effective functioning of the economy Indonesia s Global Competitiveness Index The quality and extensiveness of infrastructure networks significantly impact economic growth and reduce income inequalities and poverty in a variety of ways (WEF, 2016) Source: World Economic Forum (2016). The Global Competitiveness Report 2016-2017 2

Infrastructure Overview Indonesia is behind in almost every indices and sectors Thus became a priority issue for RPJMN 2015-2019 Travel Time (hrs/100km) Modal Share (%) Road Ratio (%) Malaysia 1.1 Hong Kong 25 11 63 0 Tokyo 22% China Thailand Vietnam Indonesia 1.2 1.35 Poor quality of roads and high levels of congestion have made the travel time in Indonesia the highest in the region, causing logistics costs to be the highest in the region. 2 2.6 Taipei Jakarta 2.3 14 46 62.2 20 12.9 19 22.6 Rail Private Transport Non-Rail Public Transport Others Lack of government investments in public transport over the years has resulted in excessive use of private transport for commuting, thus causing major congestion in most cities. London Singapore Jakarta 6.26% 12% Despite the general perception that Jakarta has sufficient roads, the reality is the opposite. General land acquisition problems combined with severe underinvestment in roads have caused this bottleneck. 21% Ratio of Double Track (%) Japan China India Malaysia Thailand Indonesia 7.7% 18.0% 13.4% 28.4% Lack of Double tracking reduces efficiency of the rail system in the country both for freight and passenger rail services. 41.1% 38.8% Source: Tusk Advisory Analysis For RPJMN 2015-2019 Dwelling Time (days) Tanjung Priok Thailand Malaysia (Port UK, Los Angeles Australia, NZ France Hong Kong Singapore 2 1.1 4 4 3 3 A major issue in the seaport sector is the high dwelling time that currently takes up to 7 days in Tanjung Priok, far longer than Thailand (5 days), and Singapore (1.2 days). 5 7 Air Transport Indicators Quality of Air Transport Infrastructure (WEF Rank) Available airline seat km/week Airport Density (number per ha) 5 4 3 2 1 0 SHIA Connectivity index : 652 Ranking (World) : 17 Ranking (Asia Pacific) : 1 Passengerkilometers (million person-km) Cargo (tons-km) Malaysia Thailand Vietnam Philippines Indonesia Since the deregulation in 2004, growth in air travel has gone up double digit per year, but new airport development or expansion of existing airports has not caught up. For example, SHIA is designed for 22 mil passengers but currently handles 55 million passengers per year (9 th highest in the world). It is also the most connected airport in Asia Pacific. 3

Since 2015, Indonesia s economy grows stronger compared to the previous years. This stronger growth is aligned with the increasing of Infrastructure Budget Allocation in recent years 5.3 5.2 5.1 5 4.9 4.8 4.7 4.6 4.5 Indonesia s GDP Growth (YOY %) 5.12 4.94 4.93 5.05 4.82 4.74 4.77 5.17 4.92 5.18 5.01 4.94 5.01 The Indonesian economy has grown by 5.01 % year-on-year in the second quarter of 2017. This growth was driven by a rebound in government spending and increase in investment. 5.01 450.0 400.0 350.0 300.0 250.0 200.0 150.0 100.0 50.0 0.0 National Budget Allocation (APBN) 20% Beginning of Budget Reformation 10% 177.9 375.5 4% 67.5 Graphic: Budget allocation (in IDR Trillion) Number in box: percentage to total APBN 350.3 19% The commitment in the Reformation 19% 20% 416.1 387.3 4% 5% 104.0 77.3 2011 2012 2013 2014 2015 2016 2017 10.8% Education 117.7% Infrastructure 54.1% Health 77.9% Energy Subsidy Source: Ministry of Finance, Republic of Indonesia 4

To achieve higher economic growth, Indonesia has determined its infrastructure targets for the period of 2016 2019 which were stipulated in the National Medium Term Plan (RPJMN) Logistic Related Banda Aceh Padang Enggano Belawan Kuala Tanjung Dumai Panjang Batam Kertajati Pontianak Pangkal Pinang Cilacap Tj. Priok Singkawang Muara Teweh Palangkaraya Banjarmasin Tj. Perak Lombok Improve transport efficiency by road development and maintenance develop 2,650 km of new roads develop 1,000 km of new toll roads rehabilitate 46,770 km of existing road Maloy Maratua Makassar Tojo Una- Una Sultan Hassanuddin Kupang Pohuwato Bitung Halmahera Moa Miangas Sorong Ambon Namniwel Merauke Jayapura Taria Kenyam Aboy Koroway Batu Location of 24 new seaports & 15 new airports Source: Bappenas Reduce logistic cost by improving railway infrastructure develop new tracks in Java, Sumatra, Sulawesi, and Kalimantan: 2,159 km inter-urban railways 1,099 km urban railways Sea toll concept as a means to support Indonesia in becoming the world maritime axis. develop 24 new seaports increase number of substantial vessels (pioneer cargo, transport vessels, pioneer crossing vessels) develop 60 crossing ports Strengthen connectivity through air transport infrastructure development develop 15 new airports develop air cargo facilities in 6 locations increase number of pioneer airplanes Develop urban transport develop Bus Rapid Transit (BRT) in 29 cities develop Mass Rapid Transit (MRT) in 6 metropolis and 17 large cities. Energy Related Achieve electrification ratio of 96.6% by 2019 through generating capacity improvement develop power plants with total capacity of 35,000 MW Achieving food sovereignty through irrigation system improvement develop 33 new dams and 30 hydropower plants expand 1 million ha irrigation system rehabilitate existing irrigation system Ensure efficiency of fuel production by optimizing domestic refineries build new oil refineries of 2x300,000 barrels Expand existing refineries in Cilacap and Balongan 5

Program Project Government of Indonesia introduced 245 projects and 2 programs as National Strategic Projects (PSN) with estimated total investment of US$322.8 Billion 61 24 Projects Projects Sumatra Kalimantan US$49.1 B US$43.3 B 27 Projects Sulawesi US$11.9 B 13 Projects Maluku & Papua US$34.2 B 93 Projects Java US$81.9 B National 12 10 12 US$101.5 B Programs Proyek Projects 15 Projects Bali & Nusa Tenggara US$0.8 B PSN includes 15 sectors at project level and 2 sectors at program level ROAD RAILWAY SEAPORT AIRPORT INDUSTRI- AL ZONE HOUSING HOUSING 74 23 10 8 30 3 3 9 54 7 4 6 12 Projects Projects Projects Projects Projects Projects Projects Projects Projects Projects Projects Projects Projects WATER & SANITA- TION DAM IRRIGA- IRIGASI TION TECH- NOLOGY SMELTER OIL REFINERY FISHERY 1 Project SEA DIKE 1 Project Electricity 1 PROGRAM Small- Medium Airplane 1 PROGRAM Exchange rate: US$ 1 = IDR 13,000 6

In addition, KPPIP has selected 30 Priority Projects out of the PSN, that will be revised to be 37 priority projects The Government of Indonesia has also issued the Coordinating Ministry of Economic Affairs Regulation No. 12/2015 to stipulate 30 priority projects which will potentially be revised to 37 priority projects # # 4 4 24 14 22 4 24 New Priority Projects 4 4 27 23 4 24 22 23 22 22 27 4 11 23 4 Existing Priority Projects 4 1. Balikpapan-Samarinda Toll Road 2. Manado-Bitung Toll Road 3. Panimbang-Serang Toll Road 4. 15 Segments of Trans Sumatera Toll Road 5. Probolinggo-Banyuwangi Toll Road 6. Yogyakarta-Bawen Toll Road 7. SHIA Express Railway 8. MRT Jakarta North South Line 9. Makassar Parepare Railway 10.Light Rail Transit (LRT) of Jakarta, Bogor, Depok and Bekasi 11.Light Rail Transit (LRT) of South Sumatera 12.East Kalimantan Railway 24 24 4 4 36 7 34 8 16 33 3 27 13 24 10 13 17 19 32 20 24 37 21 35 20 37 27 6 37 24 Text in blue are New Priority Projects 24 37 26 5 23 29 24 23 24 23 12 24 37 1 30 25 27 24 9 24 2 18 13. Light Rail Transit (LRT) of DKI Jakarta 14. Kuala Tanjung International Hub Seaport 15. Bitung International Hub Seaport 16. Patimban Port 17. Inland Waterways/Cikarang Bekasi Laut (CBL) 18. Palapa Ring Broadband 19. Central Java Power Plant (CJPP) 20. Central West Java Transmission Line 500 kv 21. Indramayu Coal-fired Power Plant 22. Sumatera 500 kv Transmission (4 Provinces) 23. Mulut Tambang Coal-fired Power Plant (6 Provinces) 24. PLTGU (16 Provinces) 25. Bontang Oil Refinery 37 15 28 18 24 18 18 18 31 18 18 26. Tuban Oil Refinery 27. RDMP/Revitalization of Existing Oil Refineries (Balikpapan, Cilacap, Balongan, Dumai, Plaju) 28. Abadi WK Masela Field 29. Unitization Field Has Jambaran-Tiung Biru 30. Indonesian Deepwater Development (IDD) 31. Tangguh LNG Train 3 Development 32. West Semarang Drinking Water Supply 33. Jakarta Sewerage System 34. National Capital Integrated Coastal Development (NCICD) Phase A 35. Jatiluhur Drinking Water Supply 36. Lampung Drinking Water Supply 37. Waste to Energy Program in 8 Cities 18 24 18 18 7

To achieve such target, Government of Indonesia has underwent reforms in fiscal, institutional and regulatory 1. Fiscal Reforms 2. Institutional Reforms 1) Viability Gap Funding (VGF) Increase project financial feasibility by contributing up to 49% of the construction cost. (MoF Reg. No. 223/2012). 2) Availability Payment Issuance of regulatory framework to allow annuity payment by the Gov t during concession period to concessionaire since project operation based on infrastructure service availability. (MoF Reg. No. 190/2015 j.o. MoF Reg. No. 260/2016 for Central Gov t and MoHA Reg. No. 96/2016 for Regional Gov t). 1) KPPIP KPPIP is actively involved in accelerating delivery of priority infrastructure projects. 2) PT Sarana Multi Infrastruktur A merger between PT SMI and Gov t Investment Center (PIP) to become an infrastructure funding company. 3) PT Indonesia Infrastructure Finance (IIF) PT Indonesia Infrastructure (IIF) provides capital for infrastructure development and support the GCA in the preparation and transaction stages for PPP projects). 3. Regulatory Reforms 4) PPP Unit Provide facilities to help GCA on preparing PPP project (PDF/TA). 5) BLU LMAN The State Asset Management Agency (BLU LMAN) is mandated to provide land fund for National Strategic Projects to ensure timely land acquisition process. 6) Indonesia Infrastructure Guarantee Fund (IIGF) IIGF has the potential to provide project guarantee for non-ppp projects. 3) Risk-sharing Guidelines 1) Direct Lending 2) Land Acquisition 3) 16 Economic Policy Packages IIGF has issued risk allocation and mitigation guidelines for PPP project. Allow guarantee for direct lending to SOE to accelerate financial close process for infrastructure projects. (Presidential Reg. No. 82/2015.). Stipulate land acquisition acceleration based on Law No. 2/2012. (Presidential Reg. No. 148/2015). Conduct deregulation for issues hindering infrastructure delivery and develop a task force under CMEA to ensure the implementation s effectiveness of Economic Policy Packages. 8

Other Government s new initiatives provided in 2017 1 2 Government Reg. No. 13/2017 on National Spatial Plan (RTRWN) The issuance of RTRWN can encourage the settlement of obstacles that are caused by spatial mismatch in the implementation of infrastructure projects listed in the annex of Government Reg. No. 13/2017. A number of breakthroughs are arranged, and one of them is that the Minister of Agrarian and Spatial can issue a recommendation of spatial utilization; so that the process of obtaining project permission can be done. MoF No. 60/2017 on Procedures for the Provision of Central Government Guarantee for the Acceleration of the National Strategic Projects Implementation The implemented regulation of Presidential Reg. No. 3/2016 on the Acceleration of the National Strategic Projects Implementation. This regulation regulated the scope and general requirements and procedures to propose guarantees, to grant guarantees, to allocate state budget obligation on government guarantees to all PSN. The guarantee provision is expected to increase the feasibility and trust of investors to participate in the implementation of PSN. 3 Presidential Reg. No. 56/2017 on Social Impact Handling in Land Acquisition Process for PSN This Presidential Reg. allows the Executing Agency who needs the land to pay for land acquisition fees to impacted community who does not have the rights over the land required for PSN. This regulation can help to solve the land acquisition problem due to community objection over the land use. 4 MoF No. 21/2017 on Procedures for Land Acquisition for National Strategic Projects and Asset Management of Land Acquisition by State Asset Management Agency The implemented regulation of Presidential Reg. No.102/2016 on Financing of Land Acquisition for the Development of Public Interest in the Framework of the National Strategic Implementation. This regulation becomes the legal basis for the financing of the procurement of National Strategic and Priority Projects by BLU LMAN, either through the mechanism of the use of corporate funds first (bailout funds) as well as direct payment mechanism by BLU LMAN. 9

Sectoral policy update (non-project specific) in 2016-2017 to boost infrastructure investment (1/3) RAILWAY SECTOR (non-project specific) PORT PORT SECTOR SECTOR (non-project specific) specific) Government Regulation No. 6/2017 on Railway Implementation This regulation enables the establishment of a Railway Business Entity to be involved in an unsolicited railway project without bidding process after the Railway Business Entity receives proposal approvals from the Minister, Governor or Regent / Mayor in accordance with its respective authority. This can be done if there s no State/Regional Budget involvement in the project investment. Previous Regulation: Government Reg. No. 56/2009 Presidential Regulation No. 44/2016 on List of Business Fields Closed and Open with Conditions to Investment Ministry of Transportation (MoT) Regulation No. 24/2017 on Elimination of Capital Requirement in Shipping and Navigation Related Activities This regulation eliminates the required minimum capital and paid-up capital by the shipping and navigation related Business Entities. By issuing this regulation, the Government of Indonesia expects to boost more investment in shipping and navigation sector. Previous Regulation: MoT Reg. 152/2016, MoT Reg. 146/2016, MoT Reg. No. 11/2016, MoT Reg. No. 45/2015, MoT Reg. 51/2015 and MoT Reg. No. 93/2013 The railway sector is not included in the investment negative list. This gives broad opportunities for foreign investment to involve in the railway sector, both in the railway infrastructure and its means. Previous Regulation: Presidential Reg. No. 39/2014 10

Sectoral policy update (non-project specific) in 2016-2017 to boost infrastructure investment (2/3) ENERGY SECTOR (non-project specific) WATER SECTOR (non-project specific) Presidential Regulation No. 14/2017 on Acceleration of Electricity Infrastructure Development This regulation allows PLN to direct appointment its subsidiaries. The increase local content requirement can be fulfilled through commitment. Therefore, PLN, through its subsidiaries, can partner with foreign entities who have shown their commitments in providing electricity tools and components, utilizing local human resources and ensuring technology transfer while conducting electricity infrastructure development. This regulation aims to accelerate the procurement process of Government of Indonesia s 35,000 MW Electricity Program. Previous Regulation: Presidential Reg. No. 4/2016 Ministry of Public Works and Public Housing Reg. No. 19/2016 on Government Support for PPP in Drinking Water Supply This regulation enables PPP scheme to be implemented for drinking water supply projects that are not financially feasible. Moreover, it stipulates clear definition of who is the Government Contracting Agency (GCA) and clear scope of work. The Regional Water Supply Company (PDAM) will become the GCA and act as private investor counterpart. The scope of cooperation is also clearly defined, ranging from bulk water to main distribution. This clear definition sets a firm ground for private investor involvement in advancing drinking water supply system infrastructure. Previous Regulation: Government Reg. No. 56/2009 11

Sectoral policy update (non-project specific) in 2016-2017 to boost infrastructure investment (3/3) TOLL ROAD SECTOR (non-project specific) Government Regulation No. 30/2017 on Toll Road This regulation allows assignment to State-Owned Enterprises to deliver toll road concessions or continue existing concessions for toll road projects that have not been completed by the Government, including toll road operation and maintenance. Ministry of Public Works and Public Housing Regulation No. 1/2017 on Toll Road Project Concessionaire Procurement This regulation was issued to provide guidance and detailed procedure for stakeholders on procurement process of toll road concessionaires (both solicited or unsolicited project) and to ensure the processes are transparent, competitive, effective, and efficient. This regulation also stipulated that Government revenue portion of the total revenues from a toll road project during the concession period and/or additional concession period can be used by the Government to develop non bankable toll road projects. Such scheme increases the Government of Indonesia s capacity to provide fiscal support to a toll road project like availability payment scheme. Previous Regulation: Government Reg. No. 15/2005 12

THANK YOU KPPIP Menara Merdeka, 8 th floor Jl Budi Kemuliaan I No 2, Jakarta 10110 E-mail : sekretariat@kppip.go.id Landline : +62 21 2957 3771

SELECTED PROJECT PROFILES OF PRIORITY PROJECTS

Selected Project Updates Central Java Power Plant (CJPP) Location Central Java Investment Value US$ 4.2 Billion 1 Funding Scheme Contact Person/Project Owner Estimated Concession Period PPP fani.vebriliona@ptbpi.co.id/ Ministry of Energy and Mineral Resources/PT PLN 25 Years Construction 2016 Target Operation 2018 Description The development of coal-fired power plant in Batang Regency, Central Java with capacity of 2x1,000 MW. This project is considered as the largest PPP electricity project by capacity in Asia. Latest Status The project has reached financial close on 6 June 2016 with PT Bhimasena Power Indonesia as the investor. Construction progress has reached 25% by September 2017. 1 ) USD: IDR 13,000 15

Selected Project Updates Soekarno - Hatta International Airport (SHIA) Express Railways Location DKI Jakarta - Banten Investment Value US$ 1.84 Billion 1 Funding Scheme Potentially PPP (to be determined) Contact Person/Project Owner Estimated Concession Period Target Construction 2018 Target Operation 2022 bagrenka@gmail.com/ Ministry of Transportation Not yet determined Description The development of an express railway from the center of DKI Jakarta to the Soekarno-Hatta International Airport (SHIA). Based on the Pre-Feasibility Study (Pre-FS) conducted in 2013, the travelling time from Central Jakarta to the SHIA will only take 17 minutes using the SHIA Express Railways. Latest Status PT Sarana Multi Infrastruktur has developed the Pre-FS in 2013. However, the Pre-FS needs to be revised by taking into account the current transportation development in DKI Jakarta. Awaiting the Ministry of Transportation to determine the funding scheme of the project. 1 ) USD: IDR 13,000 16

Selected Project Updates Makassar Parepare Railways Location South Sulawesi Investment Value US$ 620.16 Million 1 (Phase I) Funding Scheme Contact Person/Project Owner Estimated Concession Period Construction 2015 Target Operation 2018 State/Regional Budget bagrenka@gmail.com/ Ministry of Transportation Not yet determined Description The development of 144 Km railways from Makassar to Parepare in South Sulawesi, as part of Trans Sulawesi project. The railway is used as public transportation that will connect to the ports in South Sulawesi. The project is funded by State Budget, allocated by Ministry of Transportation. Latest Status The bidding process of contractor for the construction of 44 Km railway in Barru region had been done. Ministry of Transportation had allocated IDR 219 Billion (US$ 16.22 Million 2 ) for the land acquisition in 2017. Land acquisition fund from LMAN had been allocated for IDR 1.15 Trillion (US$ 85.19 Million 2 ). There is a possibility to use PPP scheme for Phase III. 1) USD: IDR 13,000 2) IDR: USD 13,500 17

Selected Project Updates Bitung International Hub Port Location North Sulawesi Investment Value Estimated US$ 2.55 billion 1 Funding Scheme Potentially PPP (to be determined) Contact Person/Project Owner Estimated Concession Period rip.sd1pelpeng@gmail.com/ Ministry of Transportation Not yet determined Target Construction Estimated in 2020 Target Operation Estimated in 2022 Description The development of an International Hub Seaport in Bitung, North Sulawesi, to support the development of Bitung SEZ. The International Hub Seaport will also support the industrial activities in East Indonesia, including Ambon and Ternate (Agriculture, Manufacturing, and Mining), and Samarinda, Balikpapan, Tarakan, and Nunukan (Coal, Oil, and Plywood). In 2034, the capacity is planned to be up to 2.25 Million TEUs. Latest Status Currently in the tender process for OBC consultant, facilitated by KPPIP. The OBC will analyze the integration of the existing port, Bitung SEZ, and Lembeh Island. Land acquisition will be started after the completion of the OBC. Private sector has the potential to participate as developer and operator of the port and terminal. The private role will be defined based on the OBC. PT Pelindo IV is currently developing the existing port in Bitung. 1 ) USD: IDR 13,000 18

Selected Project Updates Kuala Tanjung International Hub Port Location Investment Value Funding Scheme Contact Person/Project Owner Estimated Concession Period North Sumatra Estimated US$ 2.25 billion 1 (Phase II) Landlord model via assignment to Pelindo I (to be determined) rip.sd1pelpeng@gmail.com/ Ministry of Transportation Not yet determined Target Construction Estimated in mid 2019 Description The development of an international hub seaport as the gateway to Western Indonesia. The port is expected to serve transshipment cargo by 2.3 million TEUs in 2030. The International Hub Port is expected to accommodate captive and transshipment cargos from international and domestic, especially from and to Sei Mangkei SEZ and Kuala Tanjung Industrial Zone. Target Operation Estimated in 2021 Latest Status The Outline Business Case (OBC) has been completed and distributed to stakeholders. The OBC s objective is to ensure the planning and preparation of the project meets the criteria and depth of study that is accepted by the market, and also provide recommendation on port area and regional infrastructure development. Private sector can participate as developer and operator of the port, terminal and industrial zone. The land including industrial zone is currently being acquired by the Pelindo I through its subsidiary. 1 ) USD: IDR 13,000 19

Selected potential projects for private investment Yogyakarta Bawen Toll Road Location Investment Value Funding Scheme Yogyakarta Central Java Estimated USD 911.4 Million Potential for PPP 1 ) USD: IDR 13,000 Contact Person/Project Owner Estimated Concession Period Target Construction investasi2.bpjt@gmail.com/ministry of Public Works and Public Housing Not yet determined Estimated in 2018 Target Operation Estimated in 2020 Description The Yogyakarta - Bawen Toll Road is expected to support tourism around Yogyakarta, Semarang, and Solo, especially The Borobudur Temple. This toll road will connect the existing toll road, Semarang Solo Toll Road with the Special Region of Yogyakarta. Based on the study, the toll road will be 71,56 km with the expected average daily traffic amounted to 16,322 car/day. Latest Status The feasibility study of Yogyakarta Bawen Toll Road has been completed in 2008. But, it needs to be redeveloped to accommodate the updated information. Thus, KPPIP is currently preparing the Outline Business Case (OBC) which will be completed in December 2017. The funding scheme for the construction of Yogyakarta Bawen is potential for PPP. However, the funding scheme determination will be based on the OBC result. 20

Selected Project Updates Palapa Ring Broadband Location National Investment Value Estimated US$ 1.52 billion 1 Funding Scheme Private with Bank Loan Contact Person/ Project Owner Concession Period adlan0311@gmail.com/ministry of Communication and Informatics 15 Years Target Construction 2016-2017 Target Operation 2018 Description Palapa Ring Broadband is a fiber optic network construction project (divided into three packages, West, Central and East) as the backbone of the national telecommunication system that reaches all cities / districts in Indonesia. The provision of fiber optic network aims to meet the target RPJMN 2015-2019 by providing quality broadband access equally throughout Indonesia. Implementing Agency: East Package, PT Palapa Ring Barat; Central Package, PT Len Komunikasi Indonesia; East Package, PT Palapa Timur Telematika. Latest Status East Package: Physical construction has reached 17%. Land and sea optical cable is soon to be installed. Of the total 51 Network Operation Center (NOC) lands, 17 cities have completed land acquisition. Currently conducting a Line of Sight survey of Microwave Repeaters. Central Package: Physical construction has reached 26%. The Sea Cable Factory Acceptance Test has been undertaken at the German s NSW plant on August 1-5, 2017. Marine cable is targeted to be installed in October 2017. West Package: Physical construction has reached 74% and is targeted to operate on February 11, 2018. Civil works are soon to completion and are currently installing NOC. 1 ) USD: IDR 13,162 21

APPENDICES

1. Fiscal: MoF provides Viability Gap Fund (VGF) facility to attract investor s interest to invest in infrastructure projects that are not financially feasible VGF is a government support to improve financial feasibility of infrastructure project. Presidential Reg. No. 38/2015: 1 Legal Basis This Presidential Reg. stipulates that GCA can provide VGF to the implementing Business Entity in order to obtain the expected investment return (capital, operational cost, and profit for a certain period). VGF can only be provided to PPP project which has social interests and benefits. MoF Reg. No. 143/2013: This MoF Reg. regulates the VGF granting mechanism for partial construction of PPP project in infrastructure provision Principle approval has been given to the following projects: 2 Implementation To Date 2.1 Manado Bitung Toll Road Investment value: Rp5.12 triliun VGF: Rp2.37 (46% from the total construction cost)* Location: North Sulawesi 2.2 Umbulan s Water Supply Investment value : Rp4.5 triliun VGF: Rp2.05 triliun (49% from the total construction cost) Location: East Java *In the form of partial construction (Section 1) 23

1. Fiscal: MoF has also issued a regulation on Availability Payment to increase the attractiveness of a project to investor Income Availability Payment Availability Payment allows private participation in an infrastructure project that is not commercially viable and has demand risk. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Construction Cost O & M Cost Gov t adopted this scheme to achieve the following objectives: Ensuring the service quality for users Increasing the value for money for the government Providing an attractive return on investment for private sector Legal Basis Presidential Reg. No. 38/2015 Stipulate Availability Payment as one of the PPP return on investment payment schemes to Business Entity for infrastructure delivery MoF Reg. No. 190/2015 j.o. PMK No. 260/2016 Stipulate the requirement for a project that can be financed by Availability Payment, where the fund comes from state budget Ministry of Home Affairs Reg. No. 96/2016 Stipulate the budgeting system for Availability Payment implementation where the fund source comes from regional budget

1. Fiscal: Project Development Facility is given to boost private sector participation in various stages of infrastructure preparation phase Private Sector Roles Improved Support for Private Sector Planning Preparation Propose unsolicited project Prepare OBC (Outline Business Case) and other planning documents Prepare FBC (Final Business Case) Provide Transaction Advisory Land Acquisition The Public Private Partnership Presidential Regulation no 38/2015 provides incentives for unsolicited projects New procurement regulation and OBC facilities from KPPIP and Bappenas debottlenecking support New procurement regulation and PDF/TA facilities from PPP unit under MoF Direct appointment allowed for investors that propose power projects, which have acquired the land Land acquisition regulations provide certainty and acceleration Land Bank and LMAN facilities debottlenecking support Implementation Design and construct infrastructure O&M Fiscal support and guarantee from MoF and IIGF to improve project bankability Availability payment from state and regional budgets for construction, operations and maintenance Long-term financing by PT SMI and PT IIF 25

1. Fiscal: The Government has expanded the scope of government guarantee, thus increasing the scope of projects that may be covered Government Guarantee for PPP Government Guarantee for Direct Lending Regulatory Basis Presidential Reg. No. 78/2010 on Infrastructure Guarantee for Public Private Partnership Provided by The Entity for Infrastructure Guarantee Presidential Reg. No. 82/2015 on Central Government Guarantee for Infrastructure Financing with Direct Lending from International Finance Institution to State Owned Enterprises Implementation to Date Approved guarantee for Central Java Power Plant, Palapa Ring Broadband and Batang- Semarang Toll Road Letter of Intent has been issued for Lampung Water Supply Project, Umbulan Water Supply Project Potential guarantee for Sumsel 9 and 10 Mine Mouth Power Plants Potential guarantee for PT PLN (National Electricity Company) is expecting to obtain Direct Lending for IPP projects for power plants and transmission projects (e.g. Sumatera 500 kv Transmission). Potential guarantee to construction SOEs which have been assigned by Presidential Regulation to implement infrastructure projects 26

2. Institution: PT Sarana Multi Infrastructure is one of the non-bank institution with the capacity to provide funding for infrastructure projects PT SMI is a State-Owned Enterprise that acts as a Catalyst in Accelerating Infrastructure Development. Its duty is to support the Government s infrastructure agenda for Indonesia through partnerships with private and/or multilateral financial institutions in PPP projects. State Additional Equity Injection Funding Sources Loans and Grants from Domestic and Foreign Capital Market (Bonds, Securities) Securitization FINANCING Infrastructure Financing o Senior Loan o BankingComplementary: Take Out Financing Promoter Financing Mezzanine Equity Investment Subordinated Loan o Arranger & Underwriter o PPP Standby Lender o Geothermal Financing Municipal Financing / Regional Infrastructure Development Fund (RIDF) ADVISORY SERVICES Public Sector Advisory o Municipal Training & Capacity Building o Municipal Technical Assistance o Donor Fund Management for Municipalities Private Sector Advisory o Investment Advisory o Financial Advisory o Training & Capacity Building (Commercial) PROJECT DEVELOPMENT Project Development Facilities (PDF) o PPP Project Development PPP Showcase Projects PPP Priority Projects PDF & Donor Fund Management Technical Assistance for municipal project Electricity & Energy Efficiency Transportation Road & Bridges Sector Focus Water Supply Train Rolling Stock Hospital Prison School Telecommunication Waste Water & Waste Management Oil & Gas Irrigation & Waterway Renewable Energy Regional Infrastructure Market Tourism Infrastructure Social Infrastructure 27

2. Institution: PT Indonesia Infrastructure (IIF) provides capital for infrastructure development and support the GCA in the preparation and transaction stages for PPP projects PT Indonesia Infrastructure (IIF) is a private non-bank financial institution formed by and under the Ministry of Finance of the Republic of Indonesia. Licensed under the Minister of Finance Regulation (PMK) No. 100/2009, IIF is professionally managed and focused on supporting and investing in commercially feasible infrastructure projects. The establishment of IIF is a key element of strategic development by Government of Indonesia and development partners among international financial institutions to address the constraints on the flow of private investment in Infrastructure. Current Shareholding Composition Target Investment Sector 30.00% 19.99% 19.99% 15.12% 14.90% Transportation infrastructure Waste / waste-water infrastructure Road infrastructure Telecommunication and information infrastructure IIF s Vision and Mission To provide capital for infrastructure in Indonesia and to work closely with Infrastructure sponsors, the financial sector, and the Government of Indonesia to accelerate the construction of wellconceived, commercially viable infrastructure projects. Irrigation infrastructure Electricity infrastructure To ensure investors needs are reflected in contractual structures and concessions. To lead in offering a mix of long term financing instruments appropriate for infrastructure. To work with Indonesia s financial institutions and other institutional investors to channel the nation s saving into the long term development of Indonesia s Infrastructure. Drinking water infrastructure Oil and gas infrastructure 28

2. Institution: Indonesian Infrastructure Guarantee Fund (IIGF)/PT PII is the institution mandated to provide Government Guarantee IIGF/PT PII established on 30 December 2009 to be a Single Window Process for Government Guarantee. It has a mandate to provide guarantees for Government Contracting Agencies (Ministries, Regional Governments, SOEs) contractual obligations under Cooperation Agreement of PPP infrastucture projects. Presidential Regulation 67/2005* Presidential Regulation 78/2010 MOF Regulation 260/2010 Single Window Mechanism for Guarantee Provision 1. Improve credit-worthiness bankability of PPP projects Primary Objective of IIGF 2. Provide guarantees to well structured PPPs 3. Improve governance, transparency and consistency of guarantee provision process 4. Ring-fence GOI Contingent Liabilities and minimize Sudden Shock to RoI State Budget *as has been ammended by Presidential Regulatian No. 13/2010; No. 56/2011; No.38/2016 29

3. Regulation: The latest policy reforms (non-sectoral) in 2017 are aiming to create a more conducive investment climate for infrastructure delivery Government Reg. No. 13/2017 on National Spatial Plan (RTRWN) The issuance of RTRWN can encourage the settlement of obstacles that are caused by spatial mismatch in the implementation of infrastructure projects listed in the annex of Government Reg. No. 13/20 Presidential Reg. No. 56/2017 Mitigation of Social Impact in the Land Acquisition for National Strategic Projects This Presidential Regulations is the Government s effort to minimize the social impact of land acquisition for National Strategic Projects delivery, especially in state-owned land but illegally occupied by local community. MoF No. 21/2017 on Procedures for Land Acquisition for National Strategic Projects and Asset Management of Land Acquisition by State Asset Management Agency The implementing regulation of Presidential Reg. No.102/2016 on Financing of Land Acquisition for the Development of Public Interest in the Framework of the National Strategic Implementation. This regulation becomes the legal basis for the financing of the procurement of National Strategic and Priority Projects by BLU LMAN MoF No. 60/2017 on Procedures for the Provision of Central Government Guarantee for the Acceleration of the National Strategic Projects Implementation The implemented regulation of Presidential Reg. No. 3/2016 on the Acceleration of the National Strategic Projects Implementation. This regulation regulated the scope and general requirements and procedures to propose guarantees, to grant guarantees, to allocate state budget obligation on government guarantees to all PSN. 30

3. Regulation: Economic Policy Package I-XVI to ease infrastructure provision Economic Policy Package (PKE) PKE 1: National industrial competitiveness, PSN, property investment PKE 9: Electricity infrastructure, stabilization of meat price PKE 2: Investment permit, tax holiday PKE 10: Micro Small Medium Enterprises PKE 3: Electricity tariff PKE 11: Business credit, pharmaceutical PKE 4: Worker welfare PKE 12: Ease of doing business in Indonesia PKE 5: Revaluation of assets, double taxation and Sharia Bank PKE 13: Cheap houses PKE 6: Special Economic Zone PKE 14: E-commerce PKE 7: Labor-intensive industries PKE 15: Logistic PKE 8: One Map, Oil Refinery, Aircraft parts inventory PKE 16: Acceleration of business permits issuance Policy package that is directly related to the provision of infrastructure activities 31

Law No 2 / 2012 3. Regulation: One of the example of a regulatory reform that has been implemented successfully is the Land Acquisition Policy - Law No. 2/2012 Planning Preparation Implementation Hand over of land rights Time span in working days (Assuming there will be objections from land owners): If there is no objection from the land owners, total days needed could be speeded up to around 15 20 % of maximum days above. TOTAL 518 DAYS Has been successfully applied in Palembang Indralaya section of Trans Sumatera Toll Road Implementation of Law No. 2/2012: BPN as central agency in implementation of land acquisition More detailed regulation on implementation of land acquisition Neutral decision making regarding community rejection Successful case of the implementation of the New Law The best example of a successful implementation of the law is the city of Bojonegoro, where the civil society was socialized early to the law and where the land appraisal and compensation amount were attractive. Better Land Appraisal Team Appointment Less bureaucratic land right revocation process Outcome: the overall land acquisition process for the Java North Line Double Track Rail project took less than 2 years. 32

The reforms also impacted in a number of PPP projects that have reached financial close and desirable milestones Selected PPP projects delivery milestones Supported by Viability Gap Funding Umbulan Drinking Water Supply (US$ 333 Mio) reached Financial Close in December 2016 The Government has shown its commitment in developing a robust project pipeline to boost infrastructure delivery Taking an active stance towards creating a desirable PPP environment and introducing policies that will ease infrastructure investment Supported by Availability Payment Accelerated by Land Acquisition Regulatory Reform Palapa Ring Broadband (Rp 8,1 Triliun) Financial close for West, Central and East Packages in August 2016, September 2016, and March 2017 respectively Financial close for Central Java Power Plant (US$ 2,962 Mio) in June 2016 PPP contract signing of Balikpapan Samarinda (US$ 739 Mio), Manado Bitung (US$ 379 Mio), and Pandaan Malang Toll Road (US$ 220 Mio) in June 2016 The issuance of Location Determination for Serang Panimbang Toll Road (US$ 843 Mio) in June 2016 33