PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE July 21, 2017 Report No.: MG Public Finance Sustainability and Investment II DPO

Similar documents
Central government administration (80%); Sub-national government administration (20%) Operation ID

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE. First Governance and Competitiveness Development Policy Operation (DPO1) Region

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No:

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE. MA-Second Capital Market Development and SME Finance DPL Region

PROGRAM INFORMATION DOCUMENT (PID)

Myanmar Development Policy Operation Region

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Second Disaster Risk Management Development Policy Loan with a CAT-DDO Region

Public Disclosure Authorized. Project Name Mali - Third Structural Adjustment Credit (SAC III) Public Disclosure Authorized

Program Information Document (PID)

Mauritius First Public Sector Performance Development Policy Loan Region

Fourth Poverty Reduction Support Development Policy. Operation ID

PROJECT INFORMATION DOCUMENT

Program Information Document (PID)

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5715 Project Name. Cambodia Agribusiness SME Access to Finance Project Region

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project

AFRICA. Investment Project Financing P Federal Ministry of Finance

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region

Power Sector Reform: Second Development Policy Credit Region

Governance for Improved Service Delivery Region. Program-for-Results Program ID. Republic of Kenya Implementing Agency

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.:

Project Name Comoros-Health Project... (Previously Second Human Resources Project)

Dar es Salaam Tanzania June

PROGRAM INFORMATION DOCUMENT (PID) Appraisal stage Report No Operation Name Financial Sector Development Policy Loan Region

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA5305. Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE <October 4, 2013> Report No.: 86550

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

SUMMARY POVERTY IMPACT ASSESSMENT

Decision The decision review meeting, held on November 26, 2012 authorized the team to continue with appraisal and negotiation.

Vietnam: IMF-World Bank Relations *

Ghana: Promoting Growth, Reducing Poverty

Initial Project Information Document (PID) Report No: AB484. INDONESIA - Domestic Gas Sector Restructuring Region. Project Name

Project Information Document/ Identification/Concept Stage (PID)

Table 1 the Road Network of Mozambique (in kilometers)

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR

Ukraine. Systematic Country Diagnostic

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Senegal Structural Reform Development Policy Operation Series Region. General energy sector (50%); General communications sector (50%) Operation ID

International Monetary and Financial Committee

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Governor's Statement No. 33 October 10, Statement by the Hon. MAREK BELKA, Governor of the Bank for THE REPUBLIC OF POLAND

THE INTERNATIONAL DEVELOPMENT ASSOCIATION AND THE INTERNATIONAL MONETARY FUND REPUBLIC OF MADAGASCAR

Project Name. Region. Date of Board Approval July 29, 2008

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name. Region. Country

G. Communique, at the 33rd IMFC (Washington, D.C. / April 16, 2016) April 17, 2016

Emergency SME Revitalization and Governance Project. I. Key development issues and rationale for Bank involvement

INTERNATIONAL MONETARY FUND AND INTERNATIONAL DEVELOPMENT ASSOCIATION ARMENIA

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Executive Summary. An IDEV Country Strategy Evaluation

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

I. Key development issues and rationale for Bank involvement

Program Information Document (PID)

POVERTY REDUCTION STRATEGY PAPER JOINT STAFF ADVISORY NOTE

Communiqué. Meeting of Finance Ministers and Central Bank Governors, 23 April 2010

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Financial Sector Lending Instrument. Government of Sierra Leone Implementing Agency

Jordan Country Brief 2011

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Strengthening DAK Transfers To Local Governments Region

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

INTERNATIONAL MONETARY FUND INTERNATIONAL DEVELOPMENT ASSOCIATION SERBIA AND MONTENEGRO. February 27, 2006 I. INTRODUCTION

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE September 30, 2017 Report No.:

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

[ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) [ ] S 1 [X ] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined)

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6976 DRC-Multimodal Transp Additional Financing. AFRICA Sector.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

MYANMAR: SYSTEMATIC COUNTRY DIAGNOSTIC (SCD)

WHAT WILL IT TAKE TO ERADICATE EXTREME POVERTY AND PROMOTE SHARED PROSPERITY?

International Monetary Fund. Not for Redistribution

Mongolia The SCD-CPF Engagement meeting with development partners September 1 and 22, 2017

G20 Emerging Economies St. Petersburg Structural Reform Commitments: An Assessment

MADAGASCAR ECONOMIC UPDATE: A Transition but Challenges are coming soon

Governor's Statement No. 30 October 7, Statement by the Hon. ZHOU XIAOCHUAN, Governor of the Fund for the PEOPLE'S REPUBLIC OF CHINA

Program Information Document (PID)

REPUBLIC OF MADAGASCAR

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 87961

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3313 Project Name. BO-Enhancing Human Capital of Children and Youth Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

1. Key development issues and rationale for Bank involvement

FOR OFFICIAL USE ONLY

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE

Accrual concepts are vital to manage Fiscal Risks

International Monetary Fund Washington, D.C.

Document of The World Bank Group FOR OFFICIAL USE ONLY INTERNATIONAL DEVELOPMENT ASSOCIATION AND INTERNATIONAL FINANCE CORPORATION

International Monetary Fund Washington, D.C.

G20 STUDY GROUP ON CLIMATE FINANCE PROGRESS REPORT. (November )

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Health Service Delivery Project (HSDP) Region

2012 Development Policy Lending Retrospective

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Health Sector Enhancement Project Additional Financing

Øystein Olsen: The economic outlook

NINETY-FOURTH MEETING WASHINGTON, D.C. OCTOBER

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Economic Growth, Inequality and Poverty: Concepts and Measurement

EAST ASIA AND PACIFIC. Investment Project Financing P People's Republic of China

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE July 21, 2017 Report No.: 120763 Operation Name MG Public Finance Sustainability and Investment II DPO Region AFRICA Country Madagascar Sector General public administration sector (50%); Central government administration (50%) Operation ID P164137 Lending Instrument Development Policy Financing Borrower(s) Republic of Madagascar Implementing Agency Ministry of Finance and Budget Date PID Prepared July 21, 2017 Estimated Date of Appraisal Estimated Date of Board October 10, 2017 Approval Concept Review Decision Following the Concept Note Review Meeting, the team reverted to the chair and it was decided to keep this DPO series limited to two operations, merging when appropriate reforms in DPO3 into DPO2. Key development issues and rationale for Bank involvement 1. Madagascar is characterized by political fragility, although there have been notable signs of progress to build resilience. Governance challenges are deep rooted as evidenced by a prolonged political crisis from 2009 to 2013. The return to constitutional order in 2014 was widely welcomed, and important signs of progress are evident. The Government has elaborated a National Development Plan 2015-2019 (NDP) that aims to improve economic management and promote private-sector led growth. With support from the international community, municipal and senatorial elections were peacefully held in July and December 2015, the Independent National Commission for Elections was established, and security reforms are ongoing. While the forthcoming elections are expected to be tense, it is widely hoped that this will be the first time since independence that a Presidential term starts and ends through democratic means. 2. The costs of fragility have been high, where Madagascar is one of the poorest countries in the world. 1 Since 2001, there have been two political crises, disruptions in access to markets for textiles and manufacturing exports, severe climatic shocks, and global food price fluctuations. Against this backdrop, the headcount poverty rate declined slightly over the 2001-2012 period, but it remains exceedingly high at 70.7 percent in 2012. The average Malagasy is 42 percent poorer today than she was in 1960 2, the 1 World Bank (2016). Recent Trends and Analytical Findings on the Causes of Madagascar s Persistent Poverty. It uses household survey data from EPM 2001, 2005, 2010, and ENSOMD 2012. Also see World Bank (2014). Face of Poverty in Madagascar: Poverty, Gender, and Inequality Assessment. The next household survey is expected to take place in 2018, following the census. 2 Measured in real GDP per capita. Only DRC and Liberia fared worse than Madagascar over the 1960-2010 period.

year of Madagascar s independence. In 2012 3, only 30 percent of Malagasy lived above the national poverty line and only 10 percent above the international poverty line. Inequality is defined not by an excessive concentration of wealth for a few but by deep poverty, where the average Malagasy consumes 46 percent less than a person living right at the national poverty line. 3. Promoting broad-based growth is key to reducing poverty and enhancing resilience. As noted in Madagascar s Systematic Country Diagnostic (SCD), low tax revenues have been a constraining force to spending on the country s priorities, where the country has one of the lowest tax to GDP ratios in the world. Fiscal space is further constrained by transfers and subsidies to non-priority areas such as State- Owned Enterprises (SoEs) and a Pension Fund, which are regressive and are not targeted to the poor. As the authorities seek to scale-up public investments, it is critical that resources are directed to wellplanned and prioritized projects to address the country s deficiencies in human and physical capital. And while a modest growth momentum has started, there is significant scope to improve key sectors such as electricity and air transport, as well as enhance the business environment. These measures will be critical for stimulating productivity and creating jobs, which are key for realizing the objectives of the NDP and reducing poverty. 4. At the request of the authorities, this DPO series aims to continue supporting the Government s reform efforts. Proposed Objective(s) 5. The program development objectives of the proposed operation are (i) to strengthen Madagascar s fiscal framework to increase social spending and investment, and (ii) to enhance the environment for investment. It supports the macroeconomic stability pillar of the government s national development plan most directly, and the inclusive growth pillar indirectly. The two pillars were selected as the priority foundations for overcoming the country s main challenges to reducing poverty. To conduct appropriate pro-poor policies, economic growth and fiscal space for the government are necessary. The other three pillars, governance, human capital development and natural resources and resilience against catastrophes, are supported by complementary investment and technical assistance operations. Preliminary Description 6. The actions supported by this operation are arranged around two pillars which reflect the two program development objectives. The two objectives of the DPO are complementary by seeking to stimulate broad based growth. By strengthening Madagascar s fiscal framework and reducing nontargeted expenditures, the reforms under the first pillar seek to enhance fiscal space for spending on pro-poor policies and investment, which should contribute to reduced poverty (provided spending is well targeted) and further stimulate growth. Under the second pillar, the reforms seek to support the recovery of electricity and air transport sectors, which are critical for realizing Madagascar s economic potential, as well as enhancing the investment climate, thereby contributing to broad based growth. Poverty and Social Impacts and Environment Aspects 3 Most recent data available drawn from the ENSOMD 2012 survey.

Poverty and Social Impacts 7. The overall poverty and social impact of the policies supported by this DPO are positive. The improvements to the fiscal framework are expected to contribute to poverty reduction as the Government spends additional resources on priority sectors and increases investment. However, these intended impacts will depend on how well the authorities target social expenditures and whether investments are well selected and implemented. Benefits are more likely to be felt over the mediumterm. 8. The tax administration reforms are not likely to have an adverse effect on poorer households. The analysis for the first tax expenditures statement undertook an assessment of which households were likely to benefit from VAT exemptions. The study found that the very poorest households that are based in rural areas are likely to not benefit from exemptions since levels of subsistence consumption are high, at around 40 percent. Rather, VAT exemptions particularly for rice, are more of a benefit for urban households that are non-agricultural producers. Further, the customs reforms focus on large economic operators that present a higher risk for fraud. 9. The reforms related to the fuel subsidy removal are expected to increase the cost of living, with the burden largely falling on richer households. The estimated share of the total direct burden of fuel price increases is much higher for the top quintile, at 42 percent compared with 10 percent for the bottom quintile. Estimation of the indirect effects of a fuel price increase through higher food and public transportation costs mirror the data for direct effects, with the burden largely falling on the wealthier decile. It is estimated that the bottom quintile bears 7 percent of the indirect burden compared with 46 percent burden for the top quintile (IMF, 2014). The Bank is currently undertaking an incidence analysis of higher fuel prices to inform the dialogue with the authorities on mitigating policies. 10. Some mitigating measures have been implemented by the government ahead of the transition to the automatic pricing adjustment. The authorities have distributed school kits to pupils at primary school (school year 2014-2016) and subsidized urban public transport (January 2015 to June 2017). An evaluation of these mitigating measures revealed that the distribution of school kits seems to have been effective in encouraging school enrolment by reducing the financial burden on the poorest parents although the government did not clearly communicate about the link between the removal of fuel subsidies and the operation. The government is also providing a subsidy for urban transport companies to maintain the cost of a bus ticket. The impact of this policy is currently being assessed in the incidence analysis underway. 11. Improvements to JIRAMA s procurement practices are expected to have progressive distributional indirect impacts in the long run. The intended impact is that JIRAMA secures advantageous contracts in power supply, which in turn should improve its finances and allow the State to reduce subsidies to the company. Improved financial soundness of the electricity provider could in the long run result in an expansion and improvement of services, which would help to stimulate the business environment. Electricity coverage is very low and excludes most of the poor. 4 Since electricity usage, and therefore explicit and implicit subsidies, are highly regressive, reduction of subsidies to JIRAMA would have progressive impacts. Improvements to JIRAMA would also improve the business environment. 4 Only 14 percent of the population had access to electricity in 2010, and new connections have been expanding at approximately 1 percentage point per year.

12. The prior actions on commercial justice and banking supervision complement the improvement in JIRAMA s electricity supply in enhancing the attractiveness of the business environment. These measures address some of the most pressing constraints to operations and growth identified by formal entrepreneurs. Improving commercial justice would enhance the operating environment for private operators while a stable financial sector would translate into a solid financial sector able to facilitate economic growth. A more dynamic private sector would increase productive employment opportunities which would benefit the general population, including the poor. Environment Aspects 13. The ongoing reforms to JIRAMA and the PPP framework may result in increased use of renewable energy. The authorities are in the process of assessing possible small hydro projects as a source of energy supply for JIRAMA, potentially financed through PPP contracts. This use of renewable energy sources would reduce reliance on expensive thermal generation, which has comparatively larger detrimental effects for the environment. The use of smaller hydro sites would also have a reduced impact on the environment than larger sites, and it would be more feasible to mobilize financing. Further, the expansion of energy supply, particularly to rural areas, could in the long term reduce reliance on wood as a daily energy source, which contributes to deforestation and environmental degradation. 14. Efforts to scale-up public investment may have an environmental impact, which will be assessed through the Government s Environmental and Social Impact Assessment (ESIA) mechanism. Certain investment projects may have an impact on the environment. Since the Government is still at an early stage of scaling-up public investments it is not possible to determine the nature of these effects. However, the Government does have its own safeguards mechanism in place. The Malagasy Environment Code requires that all investment projects private or public, that are likely to have an impact, prepare an ESIA. 5 Each ESIA must be approved by the Ministry of Environment, and thereafter published in the project area and the National Environment Office (NEO). The recently adopted PPP decrees states that a preliminary assessment of a project is undertaken to estimate the environmental and social feasibility (amongst others) and that this information is presented in a risk matrix. Tentative financing Source: ($m.) BORROWER/RECIPIENT 0 International Development Association (IDA) 40 Borrower/Recipient IBRD Others (specify) Total 40 Contact point World Bank Contact: Natasha Sharma Title: Senior Economist 5 See decree No. 2004-167 of 3 February 2004 on Development of Investment Compatibility with the Environment (MECIE).

Tel: 5339+6008 / 261-20-225-6000 Fax: Email: nsharma9@worldbank.org Location: Antananarivo, Madagascar (IBRD) Borrower Contact: Mrs. Vonintsalama Andriambololona Title: Minister of Finance Tel: 261 20 22 646 81 Email: For more information contact: The InfoShop The World Bank 1818 H Street, NW Washington, D.C. 20433 Telephone: (202) 458-4500 Fax: (202) 522-1500 Web: http://www.worldbank.org/infoshop