Department of the Environment Sustainable Planning Branch Sciences and Planning Division

Similar documents
Province of Alberta SAFETY CODES ACT PERMIT REGULATION. Alberta Regulation 204/2007. With amendments up to and including Alberta Regulation 208/2017

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.

APPLICATION FOR LIQUEFIED PETROLEUM GAS PERMIT TYPE OR PRINT LEGIBLY

*Editor's note: Art. XIII was formerly art. XII, div. 4. The section numbers have not changed.

A. The proper issuance of permits and inspection activities by Surry County relating to fire prevention; and

Guidelines for Management of Contaminated Sites in Nova Scotia

Plumbers, Gasfitters, and Drainlayers Board (Plumbing Registration and Licensing) Notice 2016

YOUR ENTIRE AGREEMENT

Assessing and Dealing with Environmental Liabilities of Local Governments. LGANT 2014 Dennis Kefalas, P. Eng. SAO City of Yellowknife

Exterior Sewer/Septic Line Terms and Conditions

2. Address: (Number) (Street) (City) (Prov) (Postal Code) 3. Is Applicant an Individual Partnership Corporation Other (give details)

Any environmental surveys/assessments/audits conducted within the past at any of the locations to be considered

ENVIRONMENTAL PROTECTION ACT MATERIALS STEWARDSHIP AND RECYCLING REGULATIONS

CITY OF FREEPORT STEPHENSON COUNTY, ILLINOIS ORDINANCE NO

CODIFIED ORDINANCES OF LANCASTER PART FIFTEEN - FIRE PREVENTION CODE. Chap Lancaster Fire Code. Chap Outside Tire Storage.


LAKE DON PEDRO COMMUNITY SERVICES DISTRICT Policy and Procedures Manual

T he New Home Warranty Insuranc e (Ca nada) Corpora tion

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2003 SESSION LAW HOUSE BILL 897

LETTER DECISION. File OF-Fac-OtherComm-H October 2016

ELECTRICAL SAFETY LAW (2015 Edition)

This policy is applicable to all Operations and Maintenance and Trade Shop personnel.

BUREAU OF WASTE MANAGEMENT. DIVISION OF MUNICIPAL and RESIDUAL WASTE GENERAL PERMIT WMGR147

Total Number of Locations: Is the mailing address above a covered location? YES NO

New York State Division of Housing and Community Renewal Office of Rent Administration

Appendix E Summary of Petroleum UST Cleanup Fund Regulations

STANDARD MORTGAGE TERMS. Filed By: CMLS Financial Ltd. Filing Date: February 8, Filing Number: MT121004

Land Registration Reform Act. Filing No filed by CMLS Financial Ltd. STANDARD CHARGE TERMS

THIS LICENCE IS ISSUED TO:/CET LICENCE EST DONNE A: MILLER ENVIRONMENTAL CORPORATION:

CORPORATION OF THE MUNICIPALITY OF PORT HOPE BY-LAW NO. 59/2006

CHAPTER 69A-46 FIRE PROTECTION SYSTEM CONTRACTORS AND SYSTEMS

1 Authority, Responsibility, and Policy

Consumer General Collateral Mortgage Standard Charge Terms Land Registration Reform Act

YOUR ENCLOSED DECLARATION PAGE IS AN INTEGRAL PART OF YOUR SERVICE AGREEMENT

DRAFT Tier 2 Compliance Letter Guide

THE CITY OF HAMMOND AND AUTO TITLE SERVICE, LLC AGREEMENT FOR PUBLIC LICENSE TAG AGENT / AUTO TITLE COMPANY

All About Oil tanks in Thurston County

AGREEMENT BETWEEN THE VAIL WATER COMPANY AND THE CITY OF TUCSON RELATING TO THE DELIVERY OF CENTRAL ARIZONA PROJECT WATER

Québec Reliability Standards Compliance Monitoring and Enforcement Program (QCMEP) October 10, Effective date: To be set by the Régie

PLEASE NOTE. For more information concerning the history of this Act, please see the Table of Public Acts.

I. General provisions. Article 1

DEED OF TRUST AND ASSIGNMENT OF RENTS SAN FRANCISCO POLICE IN THE COMMUNITY LOAN PROGRAM (PIC)

UNDERGROUND STORAGE TANK PETROLEUM PRODUCT CLEANUP FUND POLICY FOR DIRECT PAYMENT PROGRAM MASSACHUSETTS GENERAL LAWS CHAPTER 21J AND 503 CMR 2.

DEED OF TRUST AND ASSIGNMENT OF RENTS FIRST RESPONDERS DOWNPAYMENT ASSISTANCE LOAN PROGRAM (FRDALP)

The Boiler and Pressure Vessel Regulations, 2017

Electric Vehicle Single Occupancy Use of HOV and HOT Lane

The 2009 Farm and Ranch Water Infrastructure Program Regulations

OCCUPATIONAL SAFETY AND HEALTH ACT 1994 [ACT 514]

INSTRUCTIONS FOR PETROLEUM UNDERGROUND STORAGE TANK REMEDIATION, UPGRADE AND CLOSURE FUND

MORTGAGE PART 1 (This area for Land Title Office use) Page 1 of pages

Bill 24 (2006, chapter 32)

DEED OF HYPOTHECARY LOAN

SAFETY STANDARDS GENERAL REGULATION

TLA AMIN NATION TAX TREATMENT AGREEMENT

Memorandum of Understanding Victorian WorkCover Authority and Energy Safe Victoria

Pollution Exposures an a d n d Co C ve v r e a r g a e g s e

COMMISSION AGENDA Item No:

BIOSOLIDS MANAGEMENT

Form 3979 ( ) NWT Variable Rate. Land Titles Act (N.W.T.) Mortgage Residential (Variable Rate)

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 15/2015/NĐ-CP Hanoi, February 14, 2015 DECREE

SITE SPECIFIC POLLUTION LIABILITY APPLICATION This application is for a Claims Made and Reported Site Specific Pollution Liability Policy

INSTRUCTIONS FOR PETROLEUM UNDERGROUND STORAGE TANK REMEDIATION, UPGRADE AND CLOSURE FUND

t Terms and Conditions

HOMEOWNER PROTECTION ACT REGULATION 29/99

Attachment no. 9 to PS-12

Semi-Annual Report to the North Carolina General Assembly

FREEHOLD MINERAL RIGHTS TAX REGULATION

ARTICLES OF ASSOCIATION

Form 3978 ( ) NWT Fixed Rate. Land Titles Act (N.W.T.) Mortgage Residential (Fixed Rate)

Case No. Fee. Accepted By COMMERCIAL MEDICAL CANNABIS OPERATION PERMIT APPLICATION. Pursuant to City of Morro Bay Municipal Code Chapter 5.

REAL PROPERTY ACT (P.E.I.)

RECYCLER S COMPOSITE PACKAGE APPLICATION CGL / PROPERTY / POLLUTION Page 1 of 6

Snowboards ONE YEAR LIMITED WARRANTY 5150 ONE YEAR LIMITED WARRANTY

Rulemaking Hearing Rules of Tennessee Department of Environment and Conservation Division of Solid Waste Management

Name. Address. City, State, Zip. Telephone #

Place, as part of a concurrent rulemaking proceeding to implement House Bill (HB) 2259, 81st

Consumer General Collateral Mortgage Standard Mortgage Terms

RRC STAFF OPINION PLEASE NOTE: THIS COMMUNICATION IS EITHER 1) ONLY THE RECOMMENDATION OF AN RRC

Pollution Legal Liability Questionnaire

HOSPITAL WING MEMBERSHIP PROGRAM AND TERMS AND CONDITIONS

TOWN OF NEW SHOREHAM, RHODE ISLAND BASIC FINANCIAL STATEMENTS YEAR ENDED JUNE 30, 2009

CMLS FINANCIAL LTD. Alberta Land Titles Act STANDARD MORTGAGE TERMS. Registration No

NEW JERSEY OFFICE OF ADMINISTRATIVE LAW N.J.A.C. Expiration Report

Registration Number: Date: February 4, 2016

Retail Collateral Mortgage

The following set of additional terms and conditions form part of Canadian Imperial Bank of Commerce. Contents

TRUE NORTH MORTGAGE INC. The Skinny STANDARD CHARGE TERMS

NEW BUSINESS CHECKLIST

UNIFORM TAX EXEMPTION POLICY JEFFERSON COUNTY INDUSTRIAL DEVELOPMENT AGENCY UNIFORM TAX EXEMPTION POLICY AND GUIDELINES

40) Other financial intermediation n.e.c. (PKD Z), 41) Activities auxiliary to financial intermediation n.e.c. (PKD

Business Name. Principal(s) Name(s) Mailing Address. City State Zip. Business Phone. Mobile Phone. Fax # . Web Address

Sewer/Septic Line Plus Restoration Terms and Conditions

CITY AND COUNTY OF SAN FRANCISCO Port of San Francisco. Contract No Pier 23 Roof Repair. ADDENDUM No. 1 Issued: December 16, 2016

Articles of Association of Bangkok Bank Public Company Limited. Chapter 1 General Provision

ADDITIONAL TERMS AND COVENANTS TABLE OF CONTENTS 1. DEFINITIONS/TERMS YOU NEED TO KNOW...3

Type: Film TV Commercial Photo Shoot Other. Project title: Brief description: Company name: Address: City, State, Zip: Local Project address:

INFORMATION FOR CONTRACTORS

SUMMER VILLAGE OF VAL QUENTIN Province of Alberta BYLAW

Montpelier Village Club, Inc. Vehicle Storage Application

STORAGE TANK APPLICATION

Transcription:

Department of the Environment Sustainable Planning Branch Sciences and Planning Division HANDOUT ON PETROLEUM STORAGE WITHIN A WELLFIELD PROTECTED AREA CONDITIONS/REQUIREMENTS For the purposes of this policy, emergency purposes in relation to the storage of petroleum means for the purposes of ensuring the uninterrupted delivery of essential services to the public, i.e., essential services that are necessary to protect the health, safety and general welfare of the public. Without limiting the generality of the foregoing, such services include those related to health care, water, sanitation, electricity, transportation, fire, and policing. For the purposes of this policy, elevators that use petroleum based products will be converted to non-petroleum based products if the total amount of petroleum permitted per parcel by the Wellfield Protected Area Designation Order (Order) is exceeded. This will be done subject to a phased exemption process. 1. In cases where elevators have no secondary containment on the hydraulic cylinder, exemptions may be issued for periods of 7 and 10 years after designation in Zones A and B, respectively, during which time the conversion to a non-petroleum based product must take place. If an exemption is required in Zone C, it may be for an indefinite period of time. 2. In cases where elevators have secondary containment on the hydraulic cylinder, exemptions may be issued for periods of 10 and 15 years after designation in Zones A and B, respectively, during which time the conversion to a non-petroleum based product must take place. If an exemption is required in Zone C, it may be for an indefinite period of time. Applications for exemptions for the storage of volumes of liquid petroleum products in amounts that exceed what is permitted by the Order shall be dealt with in the following manner: Page 1 of 8

ZONE A 26 1200 Litres (Zone A): The Order permits up to 25 litres of petroleum storage per parcel in Zone A. Therefore, anyone using a home heating oil tank in Zone A will require an exemption. The Minister or the Minister s municipal delegate may provide exemptions with respect to existing petroleum storage tanks in Zone A subject to the following conditions: 1) The term of the exemption cannot exceed a period of 13 years after the wellfield is designated, except in situations where the petroleum is stored for emergency purposes in which case the duration of the exemption may exceed 13 years upon whatever conditions the Minister deems necessary. 2) If after a period of three years from the date the wellfield is designated the tank is or becomes 10 or more years old, it must immediately be replaced by a new tank constructed of at least a 12-gauge metal that must be installed by a licensed Oil Burner Technician in accordance with the requirements of CSA-B139 and the tank manufacturer s instructions. The age of the tank will be determined from the manufacturers tag affixed to the tank. Tanks that do not have a specific date of manufacture will be assumed to have been manufactured on January 1 of the year of manufacture. 1201-10 000 Litres (Zone A): The Minister or municipal delegate may provide exemptions with respect to existing petroleum storage tanks, subject to the following conditions: 1) The applicant must submit an exemption application to the Minister or municipal delegate. 2) Prior to an exemption being issued, the applicant must acquire a report which fully describes the petroleum storage system and confirms that the system is in compliance with all applicable laws, standards and regulations. This report must be prepared by Registered Professional Engineer or Geoscientist and be submitted within one year of the date of designation to the Regional Water Planning Officer or municipal delegate. 3) Should an exemption be granted, the exemption holder will be given three years from the date of designation to ensure that petroleum storage tanks are equipped with secondary containment systems satisfactory to the Minister. Page 2 of 8

4) The exemption holder must acquire an annual report, prepared by a Registered Professional Engineer or Geoscientist, for the duration of the exemption. This report is to be sent to the municipal delegate or the Regional Water Planning Officer. The first report is due one year after the issuance of the exemption. The report must state that: (a) the liquid petroleum storage tanks and associated infrastructure are in satisfactory condition; (b) the practices of product delivery, handling, storage, utilization and transfer are consistent with the protection of the ground and groundwater from contamination; (c) no further actions are required to reduce the risk of ground and groundwater contamination to acceptable levels; and (d) the liquid petroleum storage tanks and associated infrastructure are in full compliance with all applicable laws, standards and regulations. 5) Such other requirements as may be required by the Minister (e.g., the adoption of any recommendations outlined in the above report, the provision of emergency response plans, proof of insurance, or groundwater monitoring plans). 6) If no secondary containment systems are installed in accordance with paragraph 3 shown above, exemptions will expire three years from the date of designation. If secondary containment systems are installed in accordance with the above, exemptions will expire 10 years from the date of installation. In situations where the petroleum is stored for emergency purposes, the duration of the exemption will be at the discretion of the Minister upon whatever conditions the Minister deems necessary. 7) Upgrades of petroleum storage systems within the exemption period are permitted, however, overall storage volumes on the parcels shall not increase nor shall the exemption period change. 8) Reporting conditions (see 2 and 4 above) in this document do not apply to petroleum storage systems that store less than 2000 litres of petroleum product. 9) Exemptions for new or expanded petroleum storage systems will not be granted. 10 001 150 000 Litres (Zone A) All previous conditions shown under Zone A (1201 10 000 Litres) apply, in addition to the following: 1) The applicant may be permitted by the Minister or municipal delegate to transfer the petroleum to a parcel in Zone C (See Zone C 10 001 150 000 Litres). Greater than 150 000 Litres (Zone A): Page 3 of 8

The previous conditions (excluding conditions 3 and 6) shown under Zone A (1201 10 000 1) Exemptions to exceed the Order s petroleum storage requirements shall be limited to 5 years after Designation of the wellfield, except in situations where the petroleum is stored for emergency purposes in which case the duration of the exemption may exceed 5 years upon whatever conditions the Minister deems necessary. ZONE B 76-1200 Litres (Zone B) As stated earlier, the Order permits up to 1200 litres of petroleum storage per parcel in Zone B. The Order does not prescribe the mode of storage for amounts up to 75 litres in Zone B but any amount between 76 and 1200 litres must be stored in a tank equipped with a secondary containment system acceptable to the Minister. The Minister or municipal delegate may provide exemptions with respect to existing petroleum storage tanks which do not meet the above requirements in Zone B upon the following conditions: Stainless Steel and Fiberglass Tanks The Department considers a stainless steel or fibreglass tank to be equivalent in safety to a steel tank equipped with a secondary containment system acceptable to the Minister. Therefore, exemptions may be granted to persons who store petroleum in a stainless steel or fiberglass tank for a period of time in accordance with the manufacturer s warranty. In other words, the exemption expires upon the expiration of the manufacturer s warranty. All tanks must be installed by a licensed Oil Burner Technician in accordance with the requirements of CSA-B139 and the tank manufacturer s instructions. All Other Tanks 1) For all other tanks, the term of the exemption cannot exceed a period of 15 years after the wellfield is designated, except in situations where the petroleum is stored for emergency purposes in which case the duration of the exemption may exceed 15 years upon whatever conditions the Minister deems necessary. 2) If after a period of five years from the date the wellfield is designated the tank is or becomes 10 or more years old, it must immediately be replaced by a new tank constructed of at least a 12-gauge metal that must be installed by a licensed Oil Burner Technician in accordance with Page 4 of 8

the requirements of CSA-B139 and the tank manufacturer s instructions. The age of the tank will be determined from the manufacturers tag affixed to the tank. Tanks that do not have a specific date of manufacture will be assumed to have been manufactured on January 1 of the year of manufacture. Note: After an exemption expires, any amount between 76-1200 litres in Zone B must then be stored in a tank equipped with a secondary containment system acceptable to the Minister or else in an exempted stainless steel or fibreglass tank as set out above. 1201 10 000 Litres (Zone B): The previous conditions (excluding conditions 3 and 6) shown under Zone A (1201 10 000 1) Should an exemption be granted, the exemption holder will be given five years from the date of designation to ensure that petroleum storage tanks are equipped with secondary containment systems satisfactory to the Minister. 2) If no secondary containment systems are installed in accordance with the above, exemptions will expire five years from the date of designation. If secondary containment systems are installed in accordance with the above, exemptions will expire 20 years from the date of installation. In situations where the petroleum is stored for emergency purposes, the duration of the exemption will be at the discretion of the Minister upon whatever conditions the Minister deems necessary. 10 001 150 000 Litres (Zone B): The previous conditions (excluding condition 3 and 6) shown under Zone A (1201 10 000 1) Should an exemption be granted, the exemption holder will be given five years from the date of designation to ensure that petroleum storage tanks are equipped with secondary containment systems satisfactory to the Minister. 2) If no secondary containment systems are installed in accordance with the above, exemptions will expire five years from the date of designation. If secondary containment systems are installed in accordance with the above, exemptions will expire 20 years from the date of installation. In situations where the petroleum is stored for emergency purposes, the duration of the exemption will be at the discretion of the Minister upon whatever conditions the Minister deems necessary. Page 5 of 8

3) The applicant may be permitted by the Minister or municipal delegate to transfer the petroleum to a parcel in Zone C (See Zone C 10 001 150 000 Litres). >150 000 Litres (Zone B): The previous conditions (excluding condition 3 and 6) shown under Zone A (1201 10 000 1) Should an exemption be granted, the exemption holder will be given five years from the date of designation to ensure that petroleum storage tanks are equipped with secondary containment systems satisfactory to the Minister. 2) If no secondary containment systems are installed in accordance with the above, exemptions will expire five years from the date of designation. If secondary containment systems are installed in accordance with the above, exemptions will expire 7 years from the date of installation. In situations where the petroleum is stored for emergency purposes, the duration of the exemption will be at the discretion of the Minister upon whatever conditions the Minister deems necessary. ZONE C 2001 10 000 Litres (Zone C): The previous conditions (excluding conditions 3 and 6) shown under Zone A (1201 10 000 Litres) apply to existing petroleum storage systems, in addition to the following: 1) Should an exemption be granted, the exemption holder will be given five years (time starts after designation of the wellfield) to ensure that petroleum storage tanks are equipped with secondary containment systems satisfactory to the Minister. Once the secondary containment system is installed, the duration of the exemption is valid for an indefinite period of time. The Minister may approve new and renovated storage systems exemptions upon the following terms: 1) An exemption will not be issued if an option or alternative exists to achieve the function of the facility. 2) Only above ground petroleum storage systems equipped with secondary containment systems satisfactory to the Minister will be considered for an exemption. 3) The Minister may only grant exemptions for new installations following receipt of a report by a Page 6 of 8

Registered Professional Engineer or Geoscientist on behalf of the property owner. The report shall fully describe the proposed installations and confirm that they are in full compliance with all applicable laws, standards and regulations. 4) The exemption holder must acquire an annual report, authored by a Registered Professional Engineer or Geoscientist, for the duration of the exemption. This report is to be sent to the Minister. The first report is due one year after the exemption is issued. The report must state that: (a) the liquid petroleum storage tanks and associated infrastructure are in satisfactory condition; (b) the practices of product delivery, handling, storage, utilization and transfer are consistent with the protection of the ground and groundwater from contamination; (c) no further actions are required to reduce the risk of ground and groundwater contamination to acceptable levels; and (d) the liquid petroleum storage tanks and associated infrastructure are in full compliance with all applicable laws, standards and regulations. 5) Such other requirements as may be required by the Minister with input from the municipality (e.g., the adoption of any recommendations outlined in the above report, the provision of emergency response plans, proof of insurance, or groundwater monitoring plans). 10 001 150 000 Litres (Zone C) Existing petroleum storage systems will be allowed in Zone C subject to the previous conditions (excluding conditions 3 and 6) shown under Zone A (1201 10 000 Litres), in addition to the following: 1) Should an exemption be granted, the exemption holder will be given five years (time starts after designation of the wellfield) to ensure that petroleum storage tanks are equipped with secondary containment systems satisfactory to the Minister. Once the secondary containment system is installed, the duration of the exemption is valid for an indefinite period of time. The Minister may approve the transfer of 10 001 150 000 litres of petroleum from Zone A or B to Zone C upon the following terms: 1 Only the installation of above-ground petroleum storage systems equipped with secondary containment systems satisfactory to the Minister will be considered for an exemption. However, if the system is too large, the Minister may consider an underground system. 2 The Minister may only grant exemptions for new installations following receipt of a report by a Registered Professional Engineer or Geoscientist on behalf of the property owner. The report shall fully describe the proposed installations and confirm that they Page 7 of 8

are in full compliance with all applicable laws, standards and regulations. 3 The exemption holder must acquire an annual report, authored by a Registered Professional Engineer or Geoscientist, for the duration of the exemption. This report is to be sent to the Minister and copied to the Regional Water Planning Officer. The first report is due one year after the exemption is issued. The report must state that: (a) the liquid petroleum storage tanks and associated infrastructure are in satisfactory condition; (b) the practices of product delivery, handling, storage, utilization and transfer are consistent with the protection of the ground and groundwater from contamination; (c) no further actions are required to reduce the risk of ground and groundwater contamination to acceptable levels; and (d) the liquid petroleum storage tanks and associated infrastructure are in full compliance with all applicable laws, standards and regulations. 4 Such other requirements as may be required by the Minister with input from the municipality (e.g., the adoption of any recommendations outlined in the above report, the provision of emergency response plans, proof of insurance, or groundwater monitoring plans). >150 000 Litres (Zone C): The previous conditions (excluding conditions 3 and 6) shown under Zone A (1201 10 000 1) Should an exemption be granted, the exemption holder will be given five years from the date of designation to ensure that petroleum storage tanks are equipped with secondary containment systems satisfactory to the Minister. 2) If no secondary containment systems are installed in accordance with the above, exemptions will expire five years from the date of designation. If secondary containment systems are installed in accordance with the above, exemptions will expire 10 years from the date of installation. In situations where the petroleum is stored for emergency purposes, the duration of the exemption will be at the discretion of the Minister upon whatever conditions the Minister deems necessary. Page 8 of 8