CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT

Similar documents
BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study

City of Riverbank. Water Rate Study FINAL 6/18/2015

WATER USER RATES & FEE STUDY

Water Rate Study FINAL January 31, 2018

Santa Clarita Water Division

The City of Sierra Madre

La Cañada Irrigation District

Notice of a public hearing

WATER AND WASTEWATER RATE STUDY

Water Rates Adjustments Phase 2

Temescal Valley Water District

Town of Yountville Wastewater Rate Study Update 2017/18

West Valley Sanitation District FINANCIAL PLAN & RATE STUDY. January 2018

Town of Hillsborough. City Council Public Hearing. Water Rate Cost-of-Service Study. February 13, 2017

MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013

CITY OF REDLANDS WATER AND WASTEWATER RATE STUDY. Prepared by:

Goleta Water District

WATER AND SEWER RATE STUDY

City of San Carlos Sewer Financial Plan & Rate Update

YORBA LINDA WATER DISTRICT

Water Rate Study for City of Lemoore

Rainbow Municipal Water District

Water and Sewer Utility Rate Studies

Lorie Tinfow, City Manager, City of Pacifica Lorenzo Hines Jr., Assistant City Manager, City of Pacifica

Water Rate Study Final Report

Agenda Rio Linda / Elverta Community Water District Planning Committee

WATER VALIDATION, COST OF SERVICE & RATE DESIGN ANALYSIS WASTEWATER VALIDATION & RATE ANALYSIS MISCELLANEOUS FEES & OVERHEAD RATE ANALYSIS

Final COST OF SERVICE STUDY SEPTEMBER City of San Clemente

CITY OF THOUSAND OAKS

SANTA FE IRRIGATION DISTRICT

April 6, Katherine Godbey Director of Finance, Coachella Valley Water District Hovley Lane East Palm Desert, CA 92260

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009

City of Benicia. Rate Study Update: Water & Wastewater Rates

ES.1 Findings and Recommendations... ES Overview Current Rates Rate Making Objectives

Valencia Water Company. Cost of Service Study

CITY OF BEVERLY HILLS

Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 MEMORANDUM

Water & Sewer Rate Study. Water & Sewer Cost of Service Rate Study. City of Norco, CA. Draft Report for

Squaw Valley PSD. Water & Sewer Rate and Connection Fee Study. Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc.

City of La Palma Agenda Item No. 5

Beaumont-Cherry Valley Water District 2018 Operating Budget

FORT COLLINS- LOVELAND WATER DISTRICT

YORK COUNTY, SOUTH CAROLINA

Santa Ynez River Water Conservation District, ID No. 1. Water Rates & Finances. December 13, 2016

Table 2-2 Projected Water Production and Costs

Richard Pearson, Community Development Director Tim Tucker, City Engineer

Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY

Utility Rates. October 13, 2015

Water Consultancy. Montecito Sanitary District Wastewater Rate Study Report. Montecito Sanitary District

Water Services Rate Study

WHEREAS, the rates of the Proposed Ordinance take into account the cost of service study recently completed by LADWP; and

San Francisco Public Utilities Commission

LONG BEACH WATER DEPARTMENT COST OF SERVICE AND RATE STUDY

STAFF REPORT. ITEM NO. 4 MEETING DATE: March 7, 2017 MEETING: Board of Directors SUBJECT:

NALDRAFT SEPTEMBER2015 WASTEWATE

2016 Water and Recycled Water Rate Study PUBLIC HEARING DECEMBER 12, 2016

City of Signal Hill Cherry Avenue Signal Hill, CA RESOLUTION DECLARING INTENTION TO AMEND SIGNAL HILL

City of Napa Modification of Water Rates. September, City of Napa Water Rates. Service Area. >75,000 customers. 25,000 connections

Capital Region Water. Water and Wastewater Rate Study Report. November 22, Capital Region Water Water and Wastewater Rate Study

2016 Water and Recycled Water Rate Study WEBINAR WITH DISTRICT STAFF JUNE 29, 2016

City of Riverbank. Sewer Rate Study June 18, 2015 FINAL

WATER UTILITY FINANCIAL PLAN AND RATE STUDY CITY OF WHITEFISH, MT MARCH 2016

Water Rates Rate Restructure and Rate Adjustments

WATER AND SEWER UTILITIES RATE STUDY

Marina Coast Water District Marina, California

Comprehensive Water Rate Study

1. Accept staff report on the updated study of cost of service to provide potable water to San Jose Municipal Water System (SJMWS) customers; and

WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY

City and Borough of Juneau, AK WATER UTILITY AND WASTEWATER UTILITY RATE STUDY

CITY OF TACOMA. Wastewater, Surface Water, and Solid Waste Cost of Service Rate Study December 31, 2016

PREFERRED FINANCIAL PLAN SCENARIO & WATER RATE DESIGN ALTERNATIVE

Water and Wastewater Utility Rates

Note: Letter has been updated to reflect changes to proposed rates as ordered by the Board of Directors.

Study Workshops are designed to be both educational and to seek broad direction from the Board

Sewer Rate Study July 2016

WATER, WASTEWATER AND STORM DRAIN RATE STUDY

SQUAW VALLEY PUBLIC SERVICE DISTRICT

WASTEWATER FINANCIAL PLAN STUDY REPORT

CITY OF ANAHEIM WATER UTILITY FUND. Financial Statements. June 30, 2014 and (With Independent Auditors Report Thereon)

Sanitation Rate Study Final Report

M54. Developing Rates for Small Systems. Second Edition. Copyright 2016 American Water Works Association. All Rights Reserved.

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS ENTERPRISE FUNDS

STEGE SANITARY DISTRICT FINANCIAL PLAN AND RATE REVIEW

Meeting & Outreach efforts

SPRINGVILLE CITY CULINARY WATER IMPACT FEE ANALYSIS (IFA) MAY 2014

3.1. Construction Meter Additional Charges for Temporary Meters OTHER FEES, CHARGES, AND DEPOSITS CAPACITY FEES...

City of Newport News Virginia. Waterworks Ratings Presentation. April 27, 2017

Revenue Plan. August 12, Dennis Davies Deputy Director of Public Works 200 Civic Center Way El Cajon, CA 92020

11/16/ November 16, 2015 TO: Honorable Mayor and City Council. THROUGH: Municipal Services Committee (November 10, 2015) FROM:

Focused Water Rate Study

Frequently Asked Questions from Claremont Customers

SAUSALITO-MARIN CITY SANITARY DISTRICT 1 EAST ROAD SAUSALITO, CALIFORNIA Telephone: (415) Fax: (415)

FINANCIAL PLAN REVIEW AND FORECAST

City Services Appendix

Alameda County Water District. Financial Workshop Proposed Rates & Charges

City of Cocoa FY 2010 Utility Rate Study. Final Report. Water, Sewer & Reclaimed Water Rates, Fees & Charges Study. Prepared by:

FUNDING SOURCES Restricted vs. Un-Restricted Funding Sources Fund Balances and Projected Funding Availability IBank Loan

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d.

City of Norco WATER AND SEWER RATES Frequently Asked Questions

SUMMERLAND SANITARY DISTRICT

Transcription:

CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT February 2, 218

This page was intentionally left blank. City of Calistoga Water Rate Study Report Page 2

February 2, 218 Dylan Feik City Manager City of Calistoga 1232 Washington Street Calistoga, CA 94515 Re: Water Rate Study Bartle Wells Associates (BWA) is pleased to submit to the City of Calistoga (City) the attached Water Rate Study Report. The results of the of the study are a product of Ad-Hoc committee review composed of BWA, Staff and Council members and were presented to the Calistoga City Council at its meeting on November 7, 217. This study presents BWA s analysis of the operating and non-operating expenses of the City s water fund and provides five-year cash flow projections and rates. The primary purpose of this study was to analyze the City s water enterprise fund and make recommendations that would achieve financial sustainability. Another important purpose of this study was to review rates to ensure that they adhere to the State s legal requirements. The enclosed report recommends updating rates and charges to more accurately recover the costs of providing service to the City s water customers. Recommendations were developed with substantial input from City staff and Ad-Hoc Committee members. BWA finds that the rates and charges proposed in our report are based on the cost of service for each customer, follow generally accepted rate design criteria, and adhere to the substantive requirements of Proposition 218. BWA believes that the proposed rates are fair and reasonable to the City s customers. We have enjoyed working with the City on this rate study. Please contact us with any future questions about this study and the recommended water rates. Sincerely, Doug Dove, CIPFA Principal Abigail Seaman Financial Analyst City of Calistoga Water Rate Study Report Page 3

This page was intentionally left blank. City of Calistoga Water Rate Study Report Page 4

Table of Contents 1 Executive Summary... 6 1.1 Background... 6 1.2 Proposition 218... 6 1.3 Use of Generally Accepted Rate-Making Principles... 7 1.4 Water System Overview... 8 1.4.1 Factors driving Rate Increases... 9 1.4.2 Current Water Rates... 9 1.4.3 Proposed Water Rates... 1 2 Water Financial Projections and Rates... 1 2.1 Water Financial Overview... 1 2.2 Current Monthly Water Rates... 11 2.3 Current Water Accounts... 12 2.4 FY 216 Water Consumption... 12 2.5 Financial Challenges/Key Drivers of Rate Increases... 14 2.5.1 Current Operating Deficit, Ongoing Operating Cost Inflation... 14 2.5.2 Debt Obligations... 14 2.5.3 Water Capital Plan... 14 2.6 Water Enterprise Revenue Requirements... 15 2.6.1 Cash Flow Projection... 16 2.7 Water Rate Structure Recommendations... 17 2.7.1 Cost Allocation... 17 2.7.2 Fixed Service Charge Recommendations... 17 2.7.3 Water Variable Charge Recommendations... 17 2.8 Regional Water Survey... 18 2.9 Single Family Residential Bill Impacts... 18 3 Conclusion and Recommendations... 19 3.1 Conclusion... 19 3.2 Recommendations... 19 Appendix A: Water Tables... 2 City of Calistoga Water Rate Study Report Page 5

1 Executive Summary 1.1 Background The City of Calistoga (City) provides water service to 1,566 accounts, serving a population of approximately 6, residing both inside and adjacent to the City. Key components of the water system include the Kimball Reservoir and Treatment Plant, storage tanks with a capacity of 2.5 million gallons, 3 miles of distribution and 2 miles of transmission mains. Twenty percent of the City s water system is over 5 years old and in five years the percent will increase to almost fifty percent. The City s water system is a self-sustaining enterprise, meaning revenues (mostly sourced from water rates) aim to recover the cost to operate and maintain the water system. Over the past four years, the Water Enterprise Fund has reported an average annual operating deficit of $64, with a projected FY 217/18 deficit of $618,. Primary cost factors impacting water rates include the significant cost of water and capital improvements to repair aging infrastructure. Rates were last increased in 216. The City has contracted Bartle Wells Associates (BWA) to conduct a water rate study which examines current and projected costs and the existing water rate structure as it pertains to California legislation. Basic objectives of the rate study include: Identify rate setting principles. Develop long-term financial projections to determine future annual water enterprise revenue requirements. Evaluate rate alternatives and recommend water rates designed to equitably recover the costs of providing service. Based on input from City staff, key guiding principles included developing rates that: Are fair and equitable to all customer classes. Recover the costs of providing service and generate adequate funding for capital needs. Are easy to understand and implement. Comply with the legal requirements of Proposition 218 and other California laws. 1.2 Proposition 218 Utility rates are subject to the procedural and substantive requirements as set forth in Proposition 218. Proposition 218 was adopted by California voters in 1996 and added Articles 13C and 13D to the California Constitution. Article 13D, Section 6 governs property related charges, which the California Supreme Court subsequently ruled includes ongoing utility service charges such as water and wastewater. Article 13D, Section 6 establishes a) procedural requirements for imposing or increasing property related charges, and b) substantive requirements for those charges. Article 13D also requires City of Calistoga Water Rate Study Report Page 6

voter approval for new or increased property related charges but exempts from this voting requirement rates for water and wastewater service. The substantive requirements of Article 13D, Section 6 require the City s utility rates to meet the following conditions: Revenues derived from the fee or charge shall not exceed the funds required to provide the property related service. Revenues derived from the fee or charge shall not be used for any purpose other than that for which the fee or charge was imposed. The amount of a fee or charge imposed upon any parcel or person as an incident of property ownership shall not exceed the proportional cost of the service attributable to the parcel. No fee or charge may be imposed for a service unless that service is used by, or immediately available to, the owner of the property in question. No fee or charge may be imposed for general governmental services, such as police or fire services, where the service is available to the public at large in substantially the same manner as it is to property owners. The procedural requirements of Proposition 218 for all utility rate increases are as follows: Noticing Requirement: The City must mail a notice of proposed rate increases to all affected property owners. The notice must specify the basis of the fee, the reason for the fee, and the date/time/location of a public rate hearing at which the proposed rates will be considered/adopted. Public Hearing: The City must hold a public hearing prior to adopting the proposed rate increases. The public hearing must be held not less than 45 days after the required notices are mailed. Rate Increases Subject to Majority Protest: At the public hearing, the proposed rate increases are subject to majority protest. If 5% plus one of affected property owners submit written protests the proposed rate increases, the increases cannot be adopted. 1.3 Use of Generally Accepted Rate-Making Principles The rates developed in this study use a straightforward methodology to establish an equitable system of fixed and variable charges that recover the cost of providing service and fairly apportion costs to each rate component. The rates were developed using generally accepted cost-based principles and methodologies for establishing water rates, charges, and fees contained and discussed in the American Water Works Association (AWWA) M1 Manual. In developing water rates, it is important to know that there is no one-size-fits-all approach for establishing cost-based water rates. The (M1 Manual) is aimed at outlining the basic elements involved City of Calistoga Water Rate Study Report Page 7

in water rates and suggesting alternative rules of procedure for formulating rates, thus permitting the exercise of judgment and preference to meet local conditions and requirements. 1 BWA used the following criteria when developing our recommendations for the City s water rates and finances: 1) Revenue Sufficiency: Rates should recover the annual cost of service and provide revenue stability. 2) Rate Impact: While rates are calculated to generate sufficient revenue to cover operating and capital costs, they should be designed to minimize, as much as possible, the impacts on ratepayers. 3) Equitability: Rates should be fairly allocated among all customer classes based on their estimated demand characteristics. Each user class only pays its proportionate share. 4) Practicality: Rates should be simple in form and, therefore, adaptable to changing conditions, easy to administer, and easy to understand. 1.4 Water System Overview The City owns and operates a water system which collects, treats and distributes potable water. Twenty percent of the City s water system is over 5 years old and in five years the percent will increase to almost fifty percent. The City has two water sources, the State Water Project via the North Bay Aqueduct (NBA) and Kimball Reservoir. The annual costs of the NBA water purchase and treatment by the City of Napa is almost $1 million. The cost to operate the Kimball Reservoir is approximately $5, annually. Additionally, the City has spent almost $1.6 million dollars in litigation expenses associated with water rights which has thus far been funded by the general fund. The City s main source of water revenue is bi-monthly water rates which were last increased on January 1, 217. Rates are not currently sufficient to fund necessary expenses and the current rate structure does not reflect the cost of water service. BWA recommends (1) increasing overall water rate revenue to better reflect the cost of service; (2) increasing the proportion of fixed revenue to 4% fixed, 6% variable to more reliably recover revenue; and (3) modifying the volumetric rate structure by shifting from a complex multi-tiered structure to a uniform rate per hundred cubic foot for all customers. 1 AWWA Manual M1 Manual, Principles of Water Rates, Fees, and Charges, Sixth Edition, 212, page 5. City of Calistoga Water Rate Study Report Page 8

1.4.1 Factors driving Rate Increases The primary factors impacting the water rates are the significant cost of water and capital improvements to repair aging infrastructure. The City s revenues are not sufficient to cover current and projected costs, and this deficit precludes access to grants and low interest loans. 1.4.2 Current Water Rates The City s current water rates are shown in Table 1 below. Table 1: Current Water Rates Fixed Charge Peak service Unit (hcf) of water use Meter Size per month Fixed Monthly Charge 5/8" or 3/4" 35 $23.5 1" 88 $57.63 1 1/2" 175 $115.25 2" 28 $184.4 3" 525 $345.75 4" 875 $576.25 6" 175 $1,152.5 8" 28 $1,844. Meter Demand Factor Customer Class Meter Demand Factor Single Family Residential 1. Multi-Family Residential 1.42 Mobile Home Parks 2.11 Commerical-General 1.1 Commercial-Restaurants 2.39 Commercial-Laundry 1.1 Commerical-Transient Occupancy 1.25 Commercial-Spa Resorts 2.57 Industrial 3.19 [1] Peak unit equal to meter demand factor multiplied by meter peak service unit Single Family Volume Charge Tier Bimonthly water use Volume Charge Tier 1 1-32 hcf $6.5 Tier 2 33-5 hcf $6.83 Tier 3 51-99 hcf $7.15 Tier 4 1+ hcf $8.71 Multi-Family and Commercial Volume Charge Volume Charge per hcf $6.5 Volume charge per hcf over peak [1] $9.27 Out of city customers subject to 115% of volumetric rates Low income rate assistance available to single family, multi-family, and mobile home park customers at 2% bill reduction City of Calistoga Water Rate Study Report Page 9

Current water rates include a monthly fixed charge which is determined by meter size, and a variable charge which varies by customer class. Single Family Residences pay volume-based charges according to a four-tier rate structure, and Multi-Family and Commercial users pay a two-tier rate structure based on peak use determined by a meter demand factor: peak service unit of water use by meter size multiplied by the meter demand factor for their customer class. 1.4.3 Proposed Water Rates Proposed Water Rates are shown on Table 2. Table 2: Proposed Water Rates BWA recommends front-loaded rate increases to address the current revenue deficit and gradually recover the costs necessary to fund operations costs and the Capital Improvement Plan. BWA also recommends restructuring rates to more accurately reflect the cost of water service and maintain equitability between customers by implementing a 4% fixed, 6% variable rate structure and condensing the current tiered volumetric rate structure into a single volumetric rate for all water usage. 2 Water Financial Projections and Rates 2.1 Water Financial Overview Bartle Wells Associates conducted an independent evaluation of the City s water enterprise finances. Key observations include: Water rates have not been increased since FY 216 17. Staff has strived to keep costs down but the Water enterprise is experiencing a revenue deficit while operations and capital costs continue to rise. City of Calistoga Water Rate Study Report Page 1

The water enterprise has debt service requirements totaling approximately $6, per year. CSDA installment agreement payments are expected to reduce in 225/26 by $18,. The City is not currently meeting its debt service requirement of 1.25x net operating expenses. The current Capital Improvement Plan which addresses aging infrastructure and other needed improvements will require additional funds to maintain prudent reserves. Additional debt financing may be needed to help fund capital improvement projects. $3.6 million in grants is expected to be awarded to the City, which will offset these costs for the ratepayer. The City has had to draw down fund reserves in recent years to support annual operating and capital funding needs. The water enterprise has faced ongoing litigation expenses to defend water rights totaling $1.6 million as of 216/17 which has thus far been covered by the General Fund. Projected water expenses were determined by developing projections based on historical audits, budgets, and up to date information provided by the City. Projected expenses and minimum reserve fund targets were used to develop annual revenue requirements. Current water rate structure of 32% fixed revenue, 68% variable revenue may lead to unstable revenue as consumption changes. Rates are complicated and require adjustments to comply with Proposition 218 requirements. 2.2 Current Monthly Water Rates The City bills water service bi-monthly for residential customers and monthly for some commercial customers. The current water rates include several components: 1) Fixed Base Charge: Customers pay a fixed fee (calculated monthly) based on meter size. Rates are higher as meter size increases according to meter factor ratios based on American Water Works Association (AWWA) guidelines. 2) Variable Charges: a. Residential customers are billed according to a 4-tier inclining rate structure. Water use is first billed in tier 1 and subsequently billed in higher, more expensive, tiers as water use increases in each billing period. Quantity Charges are billed per hundred cubic feet (HCF), with 1 HCF equal to approximately 748 gallons of water. b. All other users (Multi Family and Commercial) are billed according to a two-tier inclining rate structure. Water use is first billed in tier 1 up to the customer s peak unit according to a meter demand factor and subsequently billed in a higher rate if peak use is reached. Meter demand factors are determined by meter size and customer class. 3) Outside City Charges: Water customers residing outside the city face a 115% surcharge on the volumetric rate which recovers costs associated with operating and maintaining the infrastructure required to serve these customers such as additional pipelines. There are very few customers in this category and revenue related to this surcharge is less than $15, per year. City of Calistoga Water Rate Study Report Page 11

4) Low Income Discount: Customers who qualify under PG&E s low-income discount ( CARE Program ) are also eligible to receive low income water rate assistance from the City at a 2% total bill reduction. This is funded through non-rate revenue and incurs a cost of approximately $15, per year. In the future, the City has elected to increase low income rate assistance spending to $3, per year. In general, rates do not currently cover the cost of water service. The existing volumetric tier structure needs to be cost-justified, is complex from a billing perspective and is difficult to explain to customers. The current rate structure may lead to unstable revenue as consumption changes. 2.3 Current Water Accounts The City serves approximately 1,566 accounts, 45% of which are single family residential. Table 3 shows current number of meters (several of which are billed to the same account). Table 3: Water Accounts FY 216 Meter Size (inches) # of meters Max Continuous Flow (gpm) (AWWA) Flow Factor for 5/8" x 3/4" Base (AWWA) Meter Equivalent Units 5/8 1,454 1 1 1,454 3/4 15 1.5 1 143 25 2.5 357.5 1 1/2 38 5 5 19 2 38 8 8 34 3 6 16 15 9 4 4 25 25 1 6 3 5 5 15 8 2 8 8 16 Calistoga is a relatively slow-growth community and therefore can conservatively expect.5% of revenue growth per year as a result of new rate-payers or increased consumption. In 218/19, the City expects that two new resort communities will begin paying water rates totaling approximately $3, and increased each year according to the proposed rates. 2.4 FY 216 Water Consumption The water rate study conservatively assumes consumption has remained static since FY 216 except for a small growth projection of approximately.5% per year between potential new users and a small increase in consumption. Single-family water consumption is shown in Figure 1 below. Average bimonthly water use is 12 hcf per month, which reflects considerable conservation efforts and is fairly typical for the Napa/Sonoma area. The largest percentage of bills are for bimonthly usage of hcf, which reflects part-time residences and other very low water users. These users only pay the fixed fee, which does not fully recover fixed costs that the water enterprise faces regardless of water usage. City of Calistoga Water Rate Study Report Page 12

Commercial bills for FY 215/16 are shown in Figure 2 below. These bills are much more varied but still have a relatively large percentage of bills for hcf, which represents vacant or part-time multi-family and commercial accounts. Typical bimonthly usage is about 61 hcf. City of Calistoga Water Rate Study Report Page 13

2.5 Financial Challenges/Key Drivers of Rate Increases The City s water enterprise will need to have front-loaded consistent water rate increases over the next five years to address the current and projected revenue deficit. Key drivers of future rate increases are summarized as follows. 2.5.1 Current Operating Deficit, Ongoing Operating Cost Inflation The City s water operations budget totals approximately $2.7 million for FY 217/18 including costs for water distribution, treatment, and conservation. The City s largest expense is the purchase of water from the City of Napa (North Bay Aqueduct) totaling approximately $1 million per year. Napa has adopted rate increases over the next 5 years according to Table 4. Table 4: City of Napa Proposed Rate Increases 217/18 218/19 219/2 22/21 221/22 Projected Rate Increase 9% 9% 9% 4% 4% All other expenses are projected to increase 4% per year according to the average yearly percentage change in operations costs FY 211-216. FY 217/18 budget revenue is projected to be $2.5 million, illustrating the current deficit that the Water enterprise faces as these costs continue to rise. 2.5.2 Debt Obligations In addition to operating costs, the City pays semi-annual debt service payments on three debt issuances shown on Table 5. Table 5: Water Projected Debt Service Schedule FY17/18 FY18/19 FY19/2 FY2/21 FY21/22 CSCDA Installment Agreement $353,991 $355,791 $352,157 $357,893 $353,69 28 Certificates of Participation $113,199 $112,624 $113,6 $112,299 $112,549 211 Certificates of Participation $135,9 $134,421 $134,796 $135,121 $134,49 Total Debt Service $62,199 $62,837 $599,959 $65,313 $6,27 The City has a total debt service coverage requirement of 1.25x which is currently not being met. 2.5.3 Water Capital Plan The City s Water Capital Improvement Plan addresses aging infrastructure and other necessary improvements. Twenty percent of the City s water system is over 5 years old and in five years the percent will increase to almost fifty percent. The City s Capital Plan is as follows: Table 6: Water Capital Improvement Plan 217/18 218/19 219/2 22/21 221/22 Total Water Capital Improvement Plan $3.5m $4.49m $1.76m $.82m $3.9m City of Calistoga Water Rate Study Report Page 14

The City aggressively pursues grants to fund capital projects and has secured $3.6 million in grant funding over the next 5 years. This will offset some capital costs but cannot fully cover what is needed to meet the City s capital needs. Additionally, the City s current operating deficit precludes access to many grants and low-interest loans. 2.6 Water Enterprise Revenue Requirements The water cash flow projections incorporate the latest information available as well as reasonable, prudently conservative assumptions. Key assumptions include: Growth & Water Demand Assumptions The City is a relatively slow-growth community but has two major resorts projected to come online in 217/18 with revenues of approximately $3, increasing each year with proposed rate increases. Otherwise, growth is projected at.5% per year Future water sales are projected to increase with growth. Revenue Assumptions Investment income is estimated based on current budget. Future projections are conservatively estimated to increase at.5% per year; actual amounts will vary based on reserves and future interest earning rates. Other revenues are projected to increase.5% per year Expense Assumptions Operations and maintenance costs are based on the 217-18 budget and escalate at the annual rate of 4.% to account for future cost inflation. The City is projecting water costs for the North Bay Aqueduct to increase according to the proposed Napa water rate increases (Table 6). Capital expenditures include $14 million in projects through FY 221/22 To address the needs outlined in Section 2.5, the City will need to increase water rates. Based on the assumptions above, BWA created a cash flow projection that determined revenue requirements for the next 5 years. The proposed rate increases are shown on Table 7. Table 7: Water Proposed Rate Increases Fiscal Year 217/18 218/19 219/2 22/21 221/22 Proposed Rate Increases 15% 14% 1% 1% 1% The proposed rates accomplish the following: Full Operations and Capital Improvement Plan funding (front-loaded for faster recovery from current deficit and minimized rate increase impact in outer years) City of Calistoga Water Rate Study Report Page 15

Minimum debt service coverage of 1.25x net operating revenues over the next 5 years (with the use of a Rate Stabilization Fund) Minimum target fund balance of 9 days Operations and Maintenance expenses Rates would be effective following a mailed Proposition 218 notice and successful public hearing. The effective date is projected to be March 1, 218 and January 1 each fiscal year thereafter, which aligns with the City s current trend of increasing rates on January 1. Additionally, BWA has included two bank loans in fiscal years 217/18 and 22/21 to facilitate smooth implementation of the Capital Improvement Plan. This would increase the City s debt service payments by about $3, per year (thereby increasing the needed 1.25x debt service coverage requirement). Alternatively, the City could choose to defer or reduce capital expenditures in the near future. To minimize the impact of these rate increases on low income users, the City has elected to increase low income rate assistance spending to $3, which will be funded by non-rate revenue. 2.6.1 Cash Flow Projection Figure 3 shows the City s overall financial position with the proposed rate increases. This stacked bar chart shows expenses as a stacked bar chart and revenue and fund balance as line graphs. With the proposed rate increases, the City is projected to have revenues sufficient to fully cover operating expenses after the first five years and maintain prudent reserve levels above the target (red line) of 9 days O&M expenses in each year. The full cash flow projection can be seen in Appendix A: Water Tables. City of Calistoga Water Rate Study Report Page 16

2.7 Water Rate Structure Recommendations In addition to the proposed increases, Bartle Wells Associates also recommends a rate structure change to align with requirements set forth in Proposition 218 and ensure greater security of revenue collection. 2.7.1 Cost Allocation BWA recommends that the City recover 4% of revenue from fixed charges and 6% from variable charges. This would represent an increase in the current fixed portion of revenue recovery and would secure more fixed revenues for the City. 2.7.2 Fixed Service Charge Recommendations The proposed fixed rate aims to recover 6% of rate revenue through fixed charges based on meter size. This requires an increase in the fixed charge beyond the proposed total revenue increase of 15% in the first year. After the first year of increases, the fixed/variable ratio will remain the same. Proposed fixed charges are shown in Table 8 below. Table 8: Proposed Fixed Charges 2.7.3 Water Variable Charge Recommendations The proposed fixed rate aims to recover 4% of rate revenue through variable charges based on water use. This requires decrease in the volumetric charge combined with the proposed total revenue increase of 15% in the first year. After the first year of increases, the fixed/variable ratio will remain the same. BWA also examined the current volumetric rate structure. Though the City does have costs incurred by excess water use (water supply, conservation costs), these costs have been determined to be difficult to quantify and the potential Tier 2 rate would have little difference from the Tier 1 rate. It is therefore proposed that the City shift to a single rate for all water use in all customer classes. The proposed volumetric rates are shown in Table 9 below. City of Calistoga Water Rate Study Report Page 17

Table 9: Proposed Volumetric Charges 2.8 Regional Water Survey Figure 4 shows the proposed rates in the context of water rates in the Napa/Sonoma Area. The City s bill is among the highest in the area and will continue to be among the highest with the proposed rate increase. Other Napa/Sonoma agencies such as Napa, St. Helena and Yountville have adopted rate increases effective early 218. 2.9 Single Family Residential Bill Impacts Estimated residential bill impacts are shown on Table 11. Unfortunately, condensing the residential tiered water rates causes bills with low use to increase because the base Tier 1 rate has increased and bills with high use to decrease because the higher use rates in Tiers 3 and 4 have been eliminated. Current rates were put in place to encourage water conservation, but the City can no longer cost-justify four water tiers for single family users. City of Calistoga Water Rate Study Report Page 18

Table 1: Estimated Single Family Bill Impacts hcf usage Current 217/18 218/19 219/2 22/21 221/22 projected bimonthly bills (recommended increases) Single Family Residences 5/8 meter Minimum $46.1 $66.7 $75.32 $82.85 $91.13 $1.25 25th percentile 4 $72.1 $94.43 $17.65 $118.41 $13.25 $143.28 5th percentile 8 $98.1 $122.79 $139.98 $153.98 $169.37 $186.31 75th percentile 15 $143.6 $172.42 $196.56 $216.21 $237.83 $261.62 High Water User 4 $523.39 $349.67 $398.62 $438.48 $482.33 $53.57 3 Conclusion and Recommendations This water rate study report presents a comprehensive review of the City of Calistoga s water revenue requirements, cost allocations, and rate structures. The City last conducted a comprehensive cost of service review in 212. Since then, the City has identified needed capital improvements and experienced significant revenue shortfalls. Current rates are complex and do not accurately reflect the cost of service. These factors were considered in the rate study to fairly develop rates for customers. 3.1 Conclusion The City practices sound financial planning that has provided for the financial health of the water enterprise. Historically, the City has increased rates on a yearly basis to keep up with inflationary cost increases and to accumulate reserves. This allows the City to avoid rate spikes when new costs are incurred. Unfortunately, the City is facing a revenue deficit while operations and capital costs continue to increase. These recent developments have been factored into a comprehensive water rate study and are reflected in the above proposed rates. Adoption of these rates reflect the City s commitment to stewarding financially sound utilities and providing reliable, high quality water service that will benefit the community many years into the future. 3.2 Recommendations BWA recommends that the City adopt the rates shown in this report. Rates were developed as part of a collaborative process that included Ad-Hoc committee review with Council members and Staff. At minimum, BWA recommends that the City review and update its water rate study every five years and/or concurrent with Master Plan Updates. Proposition 218 allows public agencies to adopt rates over a five-year planning period. Any further rate increases must be supported by a comprehensive rate study. City of Calistoga Water Rate Study Report Page 19

Appendix A: Water Tables City of Calistoga Water Rate Study Report Page 2

City of Calistoga Rate Study 217 Water Final Tables 2/2/218 BARTLE WELLS ASSOCIATES Independent Public Finance Advisors 1

Table 1 City of Calistoga Water Rates rates effective January 1, 217 Fixed Charge Meter Size 5/8" or 3/4" 1" 1 1/2" 2" 3" 4" 6" 8" Peak service Unit (hcf) of water use per month Fixed Monthly Charge 35 $23.5 88 $57.63 175 $115.25 28 $184.4 525 $345.75 875 $576.25 175 $1,152.5 28 $1,844. Meter Demand Factor Customer Class Single Family Residential Multi-Family Residential Mobile Home Parks Commerical-General Commercial-Restaurants Commercial-Laundry Commerical-Transient Occupancy Commercial-Spa Resorts Industrial Meter Demand Factor 1. 1.42 2.11 1.1 2.39 1.1 1.25 2.57 3.19 Single Family Volume Charge Tier Bimonthly water use Tier 1 1-32 hcf Tier 2 33-5 hcf Tier 3 51-99 hcf Tier 4 1+ hcf Volume Charge $6.5 $6.83 $7.15 $8.71 Multi-Family and Commercial Volume Charge Volume Charge per hcf Volume charge per hcf over peak [1] $6.5 $9.27 [1] Peak unit equal to meter demand factor multiplied by meter peak service unit Out of city customers subject to 115% of volumetric rates Low income rate assistance available to single family, multi-family, and mobile home park customers at 2% bill reduction 2

Chart 1: Single Family Residence Bi-Monthly Water Bills FY216 14% Meters: 1,27 12% Total use: 87,11 hcf Mean bimonthly use: 12 hcf Median bimonthly use: 8 hcf 1% % of toal bills 8% 6% 4% <.5% of bills > 3 hcf 2% % 1 2 3 4 5 6 7 8 9 does not include out of city customers 1 11 12 13 14 15 16 HCF billed 17 18 19 2 21 22 23 24 25 26 27 28 29 3 Chart 2: Single Family Residence Total Bimonthly Use FY216 3,5 3, Total Residential Use (hcf) 2,5 2, 1,5 1, 5 3 6 HCF billed 3 9 12

Chart 3: All Other Users Bimonthly Water Consumption FY216 14% Meters: 383 Total use: 139,246 hcf Mean bimonthly use: 61 hcf Median bimonthly use: 16 hcf 12% % of toal bills 1% 8% 6% 4% < 1% of bills > 145 hcf 2% % 1 2 3 4 5 6 includes multi-family, mobile home and commercial users does not include out of city customers 7 8 HCF billed 9 1 11 12 13 14 Chart 4: All Other Users Bimonthly Water Use FY216 9 8 7 Total All Other Use (hcf) 6 5 4 3 2 1 1 2 3 4 5 6 7 8 HCF Billed 4 9 1 11 12 13 14

Table 2 City of Calistoga 1-year Water CIP Plan Project Critical Priority Replace Fiege Tank Kimball Intake and Drain Valve Replacement Kimball Inflow Stream Study THM Compliance Improvements Lake Street Water Line Replacement Cross Connection Control Total Critical Priority FY16/17 FY17/18 FY18/19 $1, 4, $4, 9, 2, 25, 3, 25, $2,75, $1,5, 2, $52, High Priority Taste & Odor Dweyer Road Pump Station Project Utility Survey/Mobile GIS Abandon Old Kimball Main and Relocate Bennett Lane Water Services Replacement Mains & Valves Update & Recalibrate Water Model Automatic Meter Read Program Total High Priority 5, 75, $ Normal Priority NBA Cathodic Protection Program Relocate Dunaweal Booster Pump Station Down Valley Start Planning, Design, Permitting for Replacing NBA Pipeline - St. Helena to Calistoga Kimball Water Treatment Plant Upgrades Investigate Additional (Down Valley) Well Supply Source Total Normal Priority FY19/2 FY 2/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 1, 25, 3, $1,88, 35, $35, $5, 1,5, $8, 35, 2, 36, 37, 5, $975, 5, $2,61, 1, $1,27, 4, $4, $ $ $ $ $ Total Cost $2,, 1,3, 3, 5, 3, 15, $4,55, Known Grant Funding $1,326,1 1,3, $2,626,1 $1,3, 2,, 75, 38, 1, 3, $78, 39, 4, 45, 42, 43, $39, $4, $45, $42, $43, 2, 3,55, 1, 5, $7,68, 5, 1,, $47, 1,5, 35, 1,, 25, $3,57, $1,, $47, $ $ $ $ $47, $ $ $ $25, $1,, 35, 25, 25, $1,85, Total Critical CIP $52, $2,75, $1,88, $35, $4, $ $ $ $ $ $4,55, $2,626,1 Total Critical and High Priority CIP $52, $3,5, $4,49, $1,35, $82, $39, $4, $45, $42, $43, $12,23, $2,626,1 Total All CIP $52, $3,5, $4,49, $1,775, $82, $39, $4, $655, $1,42, $2,28, $15,8, $3,626,1 5 25, 5, 1,,

Table 3 City of Calistoga Water Expenses Title WATER DISTRIBUTION Personnel Services Full-Time Salaries Overtime FICA/Medicare Part-Time Salaries Special Pay PERS Medical/Dental Workers Comp Other Pay Housing Allowance Total Personnel Services Services & Supplies Materials & Supplies Contract Services Utilities Repairs & Maintenance Training & Seminars: Staff Uniform Allowance Postage Fuel & Oil Pension Expense Health & Safety Meters Dues & Subscriptions Vehicles BAD Debt Expense Training & Seminars: Management Equipment Fund Rental Total Services & Supplies Other Vehicles Misc Office Equipment Misc Computer Misc Field Equipment Total Other TOTAL WATER DISTRIBUTION Actual FY15-16 Revised Budget Adopted Budget FY16-17 FY17-18 Escalation1 FY18-19 Projected FY19-2 FY2-21 FY21-22 $244,398 9,71 2,118 3,62 14,117 64,885 48,443 16,67 4,322 1,225 $426,878 $261,336 9,792 23,19 4,591 17,383 68,711 47,886 17,242 1,98 1,575 $452,633 $292,476 11,83 24,915 4,966 17,161 7,518 73,57 18,662 1,212 $514,563 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% $34,175 11,526 25,912 5,165 17,847 73,339 76,513 19,48 1,26 $535,146 $316,342 11,987 26,948 5,371 18,561 76,272 79,573 2,185 1,311 $556,551 $328,996 12,467 28,26 5,586 19,34 79,323 82,756 2,992 1,363 $578,813 $342,156 12,966 29,147 5,81 2,76 82,496 86,66 21,832 1,418 $61,966 $5,22 14,211 456 3,291 2,883 2,427 1,6 8,973 91 4,294 7,813 5,12 29,892 $157,551 $18,5 5,15 578 5 1, 3, 1, 4, 1,2 9, 1,26 32,727 $158,915 $13,85 31, 6 8,32 2, 3,12 425 4, 2, 5,2 12 1,4 3,129 $137,84 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% $14,44 32,24 624 8,653 2,8 3,245 442 41,6 2,8 5,48 125 1,82 31,334 $143,316 $14,98 33,53 649 8,999 2,163 3,375 46 43,264 2,163 5,624 13 1,125 32,588 $149,49 $15,579 34,871 675 9,359 2,25 3,51 478 44,995 2,25 5,849 135 1,17 33,891 $155,11 $16,23 36,266 72 9,733 2,34 3,65 497 46,794 2,34 6,83 14 1,217 35,247 $161,211 $ 6,276 $6,276 $ 4,968 $4,968 $ 3, 23,335 $53,335 4.% 4.% 4.% 4.% $ 31,2 24,268 $55,468 $ 32,448 25,239 $57,687 $ 33,746 26,249 $59,995 $ 35,96 27,299 $62,394 $59,75 $616,516 $75,72 $733,93 $763,287 $793,819 $825,572 6

Title WATER TREATMENT Personnel Services Full-Time Salaries Overtime FICA/Medicare Part-Time Salaries Special Pay PERS Medical/Dental Workers Comp Other Benefits Housing Allowance Total Personnel Services Actual FY15-16 Revised Budget Adopted Budget FY16-17 FY17-18 Escalation1 FY18-19 Projected FY19-2 FY2-21 FY21-22 $189,76 7,417 16,457 5,486 24,93 5,45 28,41 15,553 4,328 1,4 $343,39 $242,847 19,667 2,764 7,591 26,78 56,74 41,654 16,51 1,39 1,8 $434,933 $246,848 22,737 22,236 4,966 16,113 55,333 46,92 16,655 1,34 $432,14 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% $256,722 23,646 23,125 5,165 16,758 57,546 47,936 17,321 1,75 $449,295 $266,991 24,592 24,5 5,371 17,428 59,848 49,853 18,14 1,118 $467,266 $277,67 25,576 25,12 5,586 18,125 62,242 51,847 18,735 1,163 $485,957 $288,777 26,599 26,13 5,81 18,85 64,732 53,921 19,484 1,21 $55,395 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% 4.% $67,6 93,28 88,4 32,24 2,6 3,12 4,164 9,48 2,777 41,6 312 2,288 38,667 85,8 $7,34 96,749 91,936 33,53 2,74 3,245 4,331 9,41 2,888 43,264 324 2,38 4,214 89,232 $73,116 1,619 95,613 34,871 2,812 3,375 4,54 9,786 3,3 44,995 337 2,475 41,822 92,81 $76,41 14,644 99,438 36,266 2,925 3,51 4,684 1,178 3,124 46,794 351 2,574 43,495 96,513 Services & Supplies Materials & Supplies Contract Services Utilities Repairs & Maintenance Training & Seminars: Staff Uniform Allowance Advertising Taxes & Fees Postage Fuel & Oil Pension Expense Health & Safety Dues & Subscriptions Fees Vehicle Repairs Central Serv. Overhead Water Purchase - NBA NBA Purchase Misc NBA Costs Total Water Purchase $26,829 223,933 96,691 11,995 1,513 1,74 1,871 5,761 2,358 62,453 321 27 36,735 14,267 82,5 $62,732 175,5 81,4 33, 2,15 1,685 4,174 7,679 2,565 4, 1,812 37,553 12, 82,5 $65, 89,45 85, 31, 2,5 3, 4,4 8,7 2,67 4, 3 2,2 37,18 82,5 443,157 65,358 1,93,515 443,157 463,73 96,86 483,42 487,868 97,91 Varies 2 4.% Varies 2 526,515 57,383 1,33,898 573,92 527,679 1,11,58 596,858 548,786 1,145,643 62,732 57,737 1,191,469 Training & Seminars: Management Equipment Fund Rental Total Services & Supplies 89,82 $1,752,491 9,491 $1,541,651 5 68,995 $1,493,99 4.% 4.% 52 71,755 $1,577,817 541 74,625 $1,667,256 562 77,61 $1,733,946 585 8,714 $1,83,34 $ $ $ $ $15,5 $15,5 4.% 4.% 4.% $16,12 $16,12 $16,765 $16,765 $17,435 $17,435 $18,133 $18,133 $2,95,881 $1,976,584 $1,941,423 $2,43,232 $2,151,287 $2,237,339 $2,326,832 Other Misc Field Equipment Misc Office Equipment Computer Equipment Total Other TOTAL WATER TREATMENT 7

Title WATER CONSERVATION Personnel Services Full-Time Salaries FICA/Medicare Part-Time Salaries PERS Medical/Dental Workers Comp Benefits Total Personnel Services Actual FY15-16 Revised Budget Adopted Budget FY16-17 FY17-18 Escalation1 FY18-19 Projected FY19-2 FY2-21 FY21-22 $8,353 2,16 19,73 3,781 1,91 3,659 91 $39,63 $9,123 2,979 8,742 5,913 2,227 4,14 151 $33,239 $12,612 965 3,645 2,954 723 54 $2,953 4.% 4.% 4.% 4.% 4.% 4.% 4.% $13,116 1,4 3,791 3,72 752 56 $21,791 $13,641 1,44 3,942 3,195 782 58 $22,663 $14,187 1,85 4,1 3,323 813 61 $23,569 $14,754 1,129 4,264 3,456 846 63 $24,512 $52 1,142 114 5,863 2 4,718 $ 3,125 24 4,59 2, $5,2 5,2 25 2,5 4 2, 4.% 4.% 4.% 4.% 4.% 4.% $5,48 5,48 26 2,6 416 2,8 $5,624 5,624 27 2,74 433 2,163 $5,849 5,849 281 2,812 45 2,25 $6,83 6,83 292 2,925 468 2,34 Water Use Efficiency - Toilet Replacement Washer Rebate Program Total Services & Supplies 12,736 $24,645 6,42 $16,78 13, $28,55 4.% 13,52 $29,692 14,61 $3,88 14,623 $32,115 15,28 $33,399 TOTAL WATER CONSERVATION $64,248 $49,317 $49,53 $51,483 $53,542 $55,684 $57,912 $2,75,834 $2,642,417 $2,696,628 $2,828,645 $2,968,117 $3,86,841 $3,21,315 Services & Supplies Materials & Supplies Contract Services Training & Seminars Advertising Postage Pension Expense TOTAL WATER EXPENSES 1 - Escalation based on average yearly percent change in actual operating expenses FY211-216 (3.6%) 2 - NBA Purchase is escalated by proposed Napa water rate increases: 9%, 9%, 9%, 4%, 4% over the next 5 years. Expenses do not include depreciation 8

Table 4 City of Calistoga Water Debt Service CSCDA Installment Agreement 28 Certificates of Participation 211 Certificates of Participation Total Debt Service Fund Water Operations Water Operations Water CIP FY15/16 $354,111 $113,131 $135,71 $62,313 FY16/17 $356,794 $112,687 $134,559 $64,39 FY17/18 $353,991 $113,199 $135,9 $62,199 FY18/19 $355,791 $112,624 $134,421 $62,837 9 Total Payment (interest + principal) FY19/2 FY2/21 FY21/22 $352,157 $357,893 $353,69 $113,6 $112,299 $112,549 $134,796 $135,121 $134,49 $599,959 $65,313 $6,27 FY22/23 $351,95 $112,712 $134,659 $599,321 FY23/24 $354,325 $112,787 $134,859 $61,971 FY24/25 $355,95 $112,774 $135,9 $63,733 FY25/26 $171,575 $112,674 $135,19 $419,358

Table 5 City of Calistoga Water Estimated Revenue Total Annual Estimated Revenue SFR Inside SFR Outside All Other Inside All Other Outside Total % total Volumetric Revenue $574,199 $49,998 $935,389 $2,527 $1,58,113 68% Single Family Residences Inside City Limits Volumetric Charges Tier $/hcf Tier 1 $6.5 Tier 2 $6.83 Tier 3 $7.15 Tier 4 $8.71 Total Fixed Charges Meter Size 5/8 1 1 1/2 2 3 4 6 8 Total Fixed Revenue $375,74 $32,128 $324,42 $7,953 $739,196 32% Tier breakpoint 32 5 99 >1 # Units 1121 78 8 127 Monthly Rate $23.5 $57.63 $115.25 $184.4 $345.75 $576.25 $1,152.5 $1,844. Single Family Residences Outside City Limits Volumetric Charges Tier $/hcf (115%) Tier Breakpoint Tier 1 $7.48 32 Tier 2 $7.85 5 Tier 3 $8.22 99 Tier 4 $1.2 >1 Total Fixed Charges Meter Size 5/8 1 1 1/2 2 3 4 6 8 Total # Units 51 8 6 65 Monthly Rate $26.51 $66.27 $132.54 $212.6 $397.61 $662.69 $1,325.38 $2,12.6 Total Estimated Revenue $949,273 $82,126 $1,259,43 $28,48 $2,319,39 Total Annual Use 76,947 4,858 3,425 1,88 87,11 % total 41% 4% 54% 1% 1% % Total Use 88.33% 5.58% 3.93% 2.16% Revenue $5,155.5 $33,18.14 $24,488.75 $16,374.8 $574,199 % Total Use 58.49% 5.38% 7.57% 28.56% Revenue $26,49.18 $2,552.71 $3,757.68 $17,278.46 $49,998 Fixed Revenue $31,68.6 $53,941.68 $11,64. $. $. $. $. $. $375,74 Total Annual Use 3,533 325 457 1,725 6,4 Fixed Revenue $16,222.59 $6,362.35 $9,542.7 $. $. $. $. $. $32,128 All Other Users Inside City Limits Volumetric Charges Meter Size 5/8 1 1 1/2 2 3 4 6 8 Total % total Peak Service Unit 35 88 175 28 525 875 175 28 $/hcf (115%) $6.5 $6.5 $6.5 $6.5 $6.5 $6.5 $6.5 $6.5 Fixed Charges Meter Size 5/8 1 1 1/2 2 3 4 6 8 Total $/hcf over peak (115%) $9.27 $9.27 $9.27 $9.27 $9.27 $9.27 $9.27 $9.27 Total annual use Total annual use under peak over peak Rev under peak Rev over peak 24,773 1,97 $161,24 $18,263 21,76 8,26 $141,9 $76,569 13,454 283 $87,448 $2,619 3,84 $195,546 $ 8,535 $55,478 $ 7,257 $47,171 $ 6,219 $4,424 $ 16,886 $19,759 $ 128,914 1,512 837,938 97,451 92% 8% 9% 1% # Units Monthly Rate Fixed Revenue 231 $23.5 $63,894.6 81 $57.63 $56,16.36 22 $115.25 $3,426. 36 $184.4 $79,66.8 6 $345.75 $24,894. 4 $576.25 $27,66. 3 $1,152.5 $41,49. $1,844. $. 383 $324,42 continued on next page 1 Total Revenue $179,287 $217,659 $9,67 $195,546 $55,478 $47,171 $4,424 $19,759 $935,389

All Other Users Outside City Limits Volumetric Charges Meter Size Peak Service Unit 5/8 35 1 88 1 1/2 175 2 28 3 525 4 875 6 175 8 28 Total % total $/hcf $7.48 $7.48 $7.48 $7.48 $7.48 $7.48 $7.48 $7.48 Fixed Charges Meter Size 5/8 1 1 1/2 2 3 4 6 8 Total $/hcf over peak $1.66 $1.66 $1.66 $1.66 $1.66 $1.66 $1.66 $1.66 # Units 2 4 1 1 8 Use under peak 364 56 1,22 686 2,632 97% Monthly Rate $26.51 $66.27 $132.54 $212.6 $397.61 $662.69 $1,325.38 $2,12.6 Uses 215/16 Consumption and Rates as of January 1, 217 11 Use over peak Rev under peak Rev over peak 61 $2,724 $646 $4,186 $ 2 $7,636 $28 $5,128 $ $ $ $ $ $ $ $ $ 8 19,673 854 3% 96% 4% Fixed Revenue $636.18 $3,181.18 $1,59.45 $2,544.72 $. $. $. $. $7,953 Total Revenue $3,37 $4,186 $7,844 $5,128 $ $ $ $ 2,527

Table 6 City of Calistoga Cash Flow Projection Option 1 - All Capital Actual 215/16 % Rate Revenue Increase January 1 % Growth per Fiscal Year Typical Single Family Bimonthly Bill (5/8", 8hcf) REVENUE Operations Fund Revenue Charges for Services Residential Sales Transient Sales Commercial Sales Industrial Sales Silver Rose Estimated Sales Calistoga Hills Estimated Sales Interest Earnings Napa County Measure A Funding General Fund Subsidy Other Revenues Total Operating Revenues Capital Fund Revenue Connection/Impact Fees Interest Earnings Napa County Measure A Other Grants/Loans1 Other Sources and Uses Debt Proceeds - USDA Loan Proposed Loan Proceeds2 Total Water Capital Fund Revenue Budget 216/17 217/18 15.%.5% $112.82 $98.1 $1,54,947 397,448 288,13 82,34 89 79,4 316,984 $2,67,22 $7,239 1,295 121,685 56,123 $1,617,188 416,291 35,326 78,863 155,944 $2,573,612 218/19 14.%.5% $128.61 projected 219/2 1.%.5% $141.47 22/21 1.%.5% $155.62 221/22 1.%.5% $171.18 $1,747,169 449,75 329,867 85,22 $1,878,819 483,639 354,722 91,622 177,85 225,279 $1,982,623 51,36 374,32 96,684 $186,695 236,543 $2,92,163 538,558 395,2 12,25 $196,3 248,37 $2,27,755 568,313 416,825 17,662 $25,832 26,789 156,724 $2,768,712 157,57 $3,369,393 158,295 $3,545,521 159,86 $3,731,234 159,882 $3,927,58 $93,828 $33,476 $33,476 $33,476 $33,476 $1,72,217 636,647 5, 1,286,481 4, 9, 926,1 $249,342 $4,143,345 7,88,9 $8,482,728 $1,256,576 $33,476 1,21, $1,54,476 $33,476 TOTAL REVENUE $2,919,364 $6,716,957 $11,251,44 $4,625,968 $3,875,996 $5,271,71 $4,257,534 EXPENSES Operations Fund Expenses Water Distribution Water Treatment Water Conservation Equipment Operation Fund Debt Service Low Income Rate Assistance3 Total Operations Fund Expenses $59,75 2,95,881 64,248 6,276 467,242 13,695 $3,238,47 $616,516 1,976,584 49,317 469,481 13,695 $3,125,592 $75,72 1,941,423 49,53 3, 467,191 3, $3,223,819 $733,93 2,43,232 51,483 3, 468,416 34,2 $3,361,261 $763,287 2,151,287 53,542 3, 465,162 37,62 $3,5,899 $793,819 2,237,339 55,684 3, 47,192 41,382 $3,628,415 $825,572 2,326,832 57,912 3, 465,618 45,52 $3,751,453 $135,71 $134,559 $134,421 18,835 4,49, $134,796 361,67 1,775, $135,121 41,27 82, $134,49 392,537 39, $4,85,257 $2,271,467 $1,356,148 $916,946 $4,984,563 $4,668,399 Capital Expenses Capital Fund Debt Service Proposed Loan Debt Service4 Capital Improvement Project Transfer Out - Rate Stabilization Fund Total Capital Expenses 122,296 52, $257,367 $654,559 $135,9 18,835 3,5, 63, $3,995,844 $3,495,414 $3,78,151 $7,219,663 $8,166,517 $5,772,366 ($568,25) ($8,25) ($576,5) ($551,98) $3,488,786 $2,936,86 ($455,17) $4,486,884 $4,31,777 $8,132 ($3,548,681) ($3,54,549) $44,621 ($1,94,991) ($1,896,369) $12,819 $184,328 $287,147 Ending Fund Balance Unrestricted Operating Fund Unrestricted Capital Fund Total Unrestricted Fund Balance $787,954 $164,342 $952,296 $235,974 $3,653,128 $3,889,12 ($219,133) $8,14,12 $7,92,879 ($211,1) $4,591,331 $4,38,33 ($166,379) $2,65,34 $2,483,961 ($63,56) $2,834,668 $2,771,18 $112,44 $2,248,198 $2,36,242 Total Unrestricted Fund Target (9 Days O&M) # Days O&M $798,422 17 $77,694 454 $794,914 897 $828,84 476 $863,235 259 $894,678 279 $925,16 23.25 no 6.72 yes 1.85 yes 2.21 yes.87 no 2.1 yes.98 no TOTAL EXPENSES Net Revenues - Operating Fund Net Revenues - Capital Fund NET REVENUES Debt Service Coverage (Min. 1.25x) Target Met Rate Stabilization Fund Draw Debt Service Coverage using Rate Stabilization Fund $36, 1.25 1 - Known grant funding for capital improvement projects 2 - FY16/17 loan covers capital projects FY17/18 - FY19/2 minus grant funding received in those years. FY2/21 loan covers capital projects FY2/21 - FY21/22 3 - Total 215/16 LIRA discount escalated by rate increases (funded from other revenue), increased to $3, in FY 217/18 4 - assumes 5% loan over 3 year period, 1/2 payments for first two years 12 $175,65 ($586,47) ($41,866) $27, 1.25

Chart 5: Water Projected Revenue, Expenses & Reserves (Option 1 - All Capital Projects) $16,, $14,, $12,, Includes Loan 1 $1,, $8,, $6,, Includes Loan 2 $4,, $2,, $ 215/16 216/17 217/18 218/19 219/2 22/21 221/22 Water Distribution Water Treatment Water Conservation Equipment Total Debt Service Capital Improvement Projects Total Revenue Fund Balance Fund Balance Target 13

Table 7 City of Calistoga Water Cost Analysis -- 4% fixed, 6% volumetric revenue Expenses 216/17 Budget Expenses Recovered by Meter Charges Water Distribution Fixed Water Treatment Fixed Debt Service (82%) Capital Improvement Total Fixed Cost $547,288 75,542 498,26 52, $2,315,856 Expenses Recovered by Usage Charges Utilities Materials & Supplies Contract Services Water Purchase - NBA Conservation Debt Service (18%) Total Variable Cost $81,978 81,232 225,2 96,86 49,317 16,14 $1,45,61 Total Costs1 $3,766,456 1 - Does not include Low Income Rate Assistance Costs, which are funded by Other Revenue 14

Table 8 City of Calistoga Water Meter Charge Calculation Meter Charges - 4% of total revenue requirement 216/17 Fixed Operating Costs + Reserve Surplus Total Fixed Operating Costs $2,315,856 2,936,86 $5,252,661 Less: Non Rate Operating Revenues Connection Fees Capital Project Grants Measure A Funding Other Sources and Uses Other Revenues (less LIRA costs) Total Non Rate Operating Revenues 1,72,217 5, $636,647 $1,286,481 142,249 $4,285,594 Fixed Operating Revenue Requirement $967,67 Meter Equivalent Units (5/8 inch)1 $/Meter Equivalent (Annual) 2,86 $345 Projected Monthly Meter Charge 5/8" or 3/4" 1" 1 1/2" 2" 3" 4" 6" 8" Projected Basic Rate Revenue percent of total revenue $967,67 4% Includes Out of City Customers 1- based on AWWA flow factor meter ratios $28.73 $71.81 $143.63 $229.8 $43.88 $718.13 $1,436.27 $2,298.3 15

Table 9 City of Calistoga Water Volumetric Charge Calculation Volumetric Charges - 6% of total revenue requirement Base Rate Volumetric Costs Total Use Base Rate 216/17 $1,45,61 235,288 $6.17 Residential Use Residential Revenue 93,15 $574,29 All Other Use All Other Use Revenue 142,138 $876,311 Total Volumetric Revenue percent of total revenue $1,45,61 6% Includes Out of City Customers 16