Potential Changes to the 2015 to 2018 TIP Highway List Proposed Administrative Adjustment # PROJECT #60644, WORCESTER CENTRAL BUSINESS DISTRICT STREETSCAPE IMPROVEMENTS Move the FY 2015 Statewide Transportation Enhancements (STP TE) portion of the project to FY 2016.
2015 Central Mass MPO Transportation Improvement Program 05/14/2014 Draft Released 06/25/2014 Endorsed Amendment/Adjustment Type MassDOT MassDOT Project ID Project Description MassDOT District Funding Source Total Programmed Funds Federal Funds Non-Federal Funds Additional Information Section 1A / Federal Aid Target Projects HSIP - Highway Safety Improvement Program 606485 MILLBURY - SUTTON - MEDIAN BARRIER REPLACEMENT ON ROUTE 146, FROM ROUTE 122A TO BOSTON ROAD HSIP $ 1,000,000 $ 900,000 $ 100,000 = 2. / STP + HSIP+ SW HSIP Total Project Cost = $5,50,000 60647 STURBRIDGE - RESURFACING AND RELATED WORK ON ROUTE 20, FROM ROUTE 49 TO I-84 HSIP $ 1,000,000 $ 900,000 $ 100,000 Construction / Design Status = Book Job / TEC Score =. / STP + HSIP Total Project Cost = $2,700,000 HSIP Subtotal $ 2,000,000 $ 1,800,000 $ 200,000 CMAQ - Congestion Mitigation and Air Quality Improvement Program 607484 DISTRICT - INSTALLATION OF CCTV CAMERAS AND VMS ON I-290 BETWEEN I- 295 AND I-90 CMAQ $ 1,00,000 $ 1,040,000 $ 260,000 Project Cost = $1,00,000 605964 MILLBURY - BRIDGE REPLACEMENT, M-22-020, ROUTE 146 (NB & SB) OVER WEST MAIN STREET AND IMPROVEMENTS ON ROUTE 146 @ ELM STREET, ELMWOOD STREET & WEST MAIN STREET (ROTARY) CMAQ $ 2,17,000 $ 1,85,600 $ 46,400 = 6.90 / Total Project Cost w/nfa Funding = $1,647,54 / See also NFA Bridge Project under Section 2B CMAQ Subtotal $,617,000 $ 2,89,600 $ 72,400 TAP - Transportation Alternatives Program TAP01 TAP02 606629 CMRPC REGION - BIKE RACKS INTALLATION WORCESTER - INSTALLION OF INFORMATIONAL KIOSK AT UNION STATION TAP $ 100,000 $ 80,000 $ 20,000 TAP $ 100,000 $ 80,000 $ 20,000 WORCESTER - BLACKSTONE VISITOR CENTER TAP $ 226,09 $ 180,81 $ 45,208 Construction / TEC Score = 1.0 / Total Project Cost = $100,000 Construction / TEC Score = 1.2 / Design Status = Pre 25% / Total Project Cost = $100,000 Construction / TEC Score = 2.4 / Design Status = Pre 25% / Total Project Cost = $226,09 TAP Subtotal $ 426,09 $ 40,81 $ 85,208 Non-CMAQ/HSIP/TAP (Other) 606485 MILLBURY - SUTTON - MEDIAN BARRIER REPLACEMENT ON ROUTE 146, FROM ROUTE 122A TO BOSTON ROAD STP $,100,000 $ 2,480,000 $ 620,000 = 2. / STP + HSIP+ SW HSIP Total Project Cost = $5,50,000 605559 WARREN - RESURFACING & INTERSECTION IMPROVEMENTS AT ROUTE 67 & ROUTE 19 (WARREN TOWN CENTER) 2 STP $ 1,98,000 $ 1,118,400 $ 279,600 Construction / Design Status = 75% / TEC Score = 4.57 / Total Project Cost = $1,98,000 606686 WARREN - RESURFACING AND RELATED WORK ON ROUTE 67 @ WEST WARREN AND WARREN TOWN CENTERS 2 STP $ 1,50,000 $ 1,224,000 $ 06,000 = 1.7 / Total Project Cost = $1,50,000
60647 STURBRIDGE - RESURFACING AND RELATED WORK ON ROUTE 20, FROM ROUTE 49 TO I-84 STP $ 1,700,000 $ 1,60,000 $ 40,000 Construction / Design Status = Book Job / TEC Score =. / STP + HSIP Total Project Cost = $2,700,000 Non-CMAQ/HSIP/TAP (Other) Subtotal $ 7,728,000 $ 6,182,400 $ 1,545,600 Section 1A / Fiscal Constraint Analysis Section 1B / Federal Aid Bridge Projects Total Federal Aid Target Funds Programmed $ 1,771,09 $ 1,797,888 Total Target $ 26,849 Target Funds Available Total Non-CMAQ/HSIP/TAP (Other) Programmed $ 7,728,000 $ 9,147,480 Max. Non- $ 26,849 Non-CMAQ/HSIP/TAP (Other) A CMAQ/HSIP/TAP Total HSIP Programmed $ 2,000,000 $ 965,570 Min. HSIP $ (1,04,40) HSIP Minimum Met Total CMAQ Programmed $,617,000 $,258,799 Min. CMAQ $ (58,201) CMAQ Minimum Met Total TAP Programmed $ 426,09 $ 426,09 Min. TAP $ - TAP Minimum Met HSIP, CMAQ, TAP Overprogrammed $ (1,92,61) Statewide Bridge Maintenance Program 605588 WORCESTER, WEST BOYLSTON - WORK ON I-190, INCLUDING W-44-124, I- 190 OVER ROUTE 12 & RAMP B NHPP $,501,980 $ 2,801,584 $ 700,96 Construction / Design Status = Pre 25% / Bridge Maintenance + Interstate Maintenance + Stormwater Total Project Cost = $19,05,780 Statewide Bridge Maintenance Program Subtotal $,501,980 $ 2,801,584 $ 700,96 On System 605972 SOUTHBRIDGE - BRIDGE PRESERVATION, S-21-002, SR 11 (MAIN STREET) OVER QUINEBAUG RIVER NHPP $ 4,168,95 $,4,716 $ 8,679 Project Cost = $4,168,95 On System Subtotal $ 4,168,95 $,4,716 $ 8,679 Off-System 604675 HOLDEN - BRIDGE REHABILITATION, H-18-020, RIVER STREET OVER QUINAPOXET STREET STP-BR-OFF $ 4,806,620 $,845,296 $ 961,24 Construction / Design Status = 25% / Total Project Cost = $4,806,620 Off-System Subtotal $ 4,806,620 $,845,296 $ 961,24 Statewide Bridge Inspection Program Statewide Bridge Inspection Program Subtotal $ - $ - $ - Section 1C / Federal Aid Non-Target Projects Other Federal Aid 604892 WORCESTER - BIKE PATH CONSTRUCTION, FROM TAINTER STREET TO KILBY STREET AND ROAD RESURFACING OF GARDNER AND KILBY STREET. 608018 WORCESTER - BLACKSTONE VISITOR CENTER AND BIKEWAY EARLY ACTION SITE WORK HPP $ 2,918,510 $ 2,4,808 $ 58,702 HPP $ 1,500,000 $ 1,200,000 $ 00,000 Construction / HPP#918 - MA16 & HPP#4288 - MA207 / Design Status = 75-100% / Total Project Cost = $2,918,510 Construction / HPP#251 - MA158, HPP#428 - MA202, HPP#2218 - MA157, HPP#2509 - MA165 / Design Status = Pre 25% / Total Project Cost = $1,500,000 Other Federal Aid Subtotal $ 4,418,510 $,54,808 $ 88,702
Section 1D / Federal Aid Major & State Category Projects Statewide Infrastructure Program Statewide Infrastructure Program Subtotal $ - $ - $ - Statewide HSIP Program 606485 MILLBURY - SUTTON - MEDIAN BARRIER REPLACEMENT ON ROUTE 146, FROM ROUTE 122A TO BOSTON ROAD HSIP $ 1,250,000 $ 1,125,000 $ 125,000 = 2. / STP + HSIP+ SW HSIP Total Project Cost = $5,50,000 Statewide Safe Routes to Schools Program Statewide CMAQ Statewide HSIP Program Subtotal $ 1,250,000 $ 1,125,000 $ 125,000 Statewide Safe Routes to Schools Program Subtotal $ - $ - $ - Statewide CMAQ $ - $ - $ - Funding Split Varies by Funding Source Statewide Transportation Enhancements ADJUSTMENT:Remove Project 60644 WORCESTER - CENTRAL BUSINESS DISTRICT STREETSCAPE IMPROVEMENT STP-TE $ 1,652,015 1,21,612.0 0,40.0 Statewide Transportation Enhancements Subtotal $ 1,652,015 $ 1,21,612 $ 0,40 Design & Construction / Design Status = Pre 25% / STP-TE+HPP Total Project Cost = $7,277,015 Statewide ITS Statewide ITS Subtotal $ - $ - $ - Statewide Interstate Maintenance Program 605588 WORCESTER, WEST BOYLSTON - WORK ON I-190, INCLUDING W-44-124, I- 190 OVER ROUTE 12 & RAMP B NHPP $ 14,17,162 12,885,445.8 1,41,716.2 Construction / Design Status = Pre 25% / Bridge Maintenance + Interstate Maintenance + Stormwater Total Project Cost = $19,05,780 607181 NORTHBOROUGH - MARLBOROUGH - WORK ON I-290 NHPP $ 11,64,08 10,478,774.7 1,164,08. Construction / Design Status = TBD / IM + Stormwater Total Project Cost = $12,055,80 Statewide Interstate Maintenance Program Subtotal $ 25,960,245 $ 2,64,221 $ 2,596,025 Statewide NHS Preservation Program+ Statewide RR Grade Crossings Statewide NHS Preservation Program Subtotal $ - $ - $ - Statewide RR Grade Crossings Subtotal $ - $ - $ - Statewide Stormwater Retrofits 607181 NORTHBOROUGH - MARLBOROUGH - WORK ON I-290 STP-TE $ 412,297 29,87.6 82,459.4 Construction / Design Status = TBD / IM + Stormwater Total Project Cost = $12,055,80
605588 WORCESTER, WEST BOYLSTON - WORK ON I-190, INCLUDING W-44-124, I- 190 OVER ROUTE 12 & RAMP B STP-TE $ 1,24,67 987,709.6 246,927.4 Construction / Design Status = Pre 25% / Bridge Maintenance + Interstate Maintenance + Stormwater Total Project Cost = $19,05,780 Statewide ADA Implementation Plan Other Statewide Items Statewide Stormwater Retrofits Subtotal $ 1,646,94 $ 1,17,547 $ 29,87 Statewide ADA Implementation Plan Subtotal $ - $ - $ - ABP GANS Repayment $ - - - Award Adjustments, Change Orders, Project $ - - - Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and $ - - - Misc. Programs Planning $ - - - Statewide Design and Right of Way $ - - - Statewide Recreational Trails $ - - - Other Statewide Items Subtotal $ - $ - $ - Section 2A / Non-Federal Projects Non Federal Aid Section 2B / Non-Federal Bridge Projects No Projects Programmed NFA $ - $ - Non-Federal Aid Subtotal $ - $ - 100% Non-Federal Section 2B / Non-Federal Bridge Projects 605964 MILLBURY - BRIDGE REPLACEMENT, M-22-020, ROUTE 146 (NB & SB) OVER WEST MAIN STREET NFA $ 11,0,54 $ 11,0,54 = 6.90 / Total Project Cost w/cmaq Funding = $1,647,54 Section 2B / Non-Federal Bridge Projects Subtotal $ 11,0,54 $ 11,0,54 100% Non-Federal 2015 Central Mass MPO TIP Summary Total Federal Funds Non-Federal Funds TIP Section 1: TIP Section 2: Total of All Projects $ 61,175,78 $ 11,0,54 $ 72,506,092 $ 51,861,615 $ 51,861,615 $ 9,14,12 $ 11,0,54 $ 20,644,477 Total Spending in Region Total Federal Spending in Region Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/highway/flaggers/main.aspx
2016 Central Mass MPO Transportation Improvement Program 05/14/2014 Draft Released 06/25/2014 Endorsed Amendment/Adjustment Type MassDOT MassDOT Project ID Project Description MassDOT District Funding Source Total Programmed Funds Federal Funds Non-Federal Funds Additional Information Section 1A / Federal Aid Target Projects HSIP - Highway Safety Improvement Program 604864 606207 WESTBOROUGH - INTERSECTION & SIGNAL IMPROVEMENTS AT ROUTE 9 & LYMAN STREET SPENCER - REHABILITATION ON ROUTE 9 (MAIN STREET), FROM HIGH STREET TO GROVE STREET Construction / TEC Score = 7.9 / Design Status HSIP $ 2,47,120 $ 2,225,808 $ 247,12 = 25% / HSIP+CMAQ Total Project Cost = $6,529,120 HSIP $ 904,800 $ 814,20 $ 90,480 = 5.1 / HSIP + CMAQ + TAP Total Project Cost = $,192,800 HSIP Subtotal $,77,920 $,040,128 $ 7,792 CMAQ - Congestion Mitigation and Air Quality Improvement Program WORCESTER - SIGNAL & INTERSECTION IMPROVEMENTS @ HOLDEN STREET, 60251 DRUMMOND AVENUE & SHORE DRIVE CMAQ $ 900,640 $ 720,512 $ 180,128 Construction / Design Stage = Pre 25% / CMAQ + Statewide CMAQ Total Project Cost = $2,642,44 / Additional funding is provided by the Statewide CMAQ Program 604864 WESTBOROUGH - INTERSECTION & SIGNAL IMPROVEMENTS AT ROUTE 9 & LYMAN STREET CMAQ $ 4,056,000 $,244,800 $ 811,200 Construction / TEC Score = 7.9 / Design Status = 25% / HSIP+CMAQ Total Project Cost = $6,529,120 606207 SPENCER - REHABILITATION ON ROUTE 9 (MAIN STREET), FROM HIGH STREET TO GROVE STREET CMAQ $ 1,872,000 $ 1,497,600 $ 74,400 = 5.1 / HSIP + CMAQ + TAP Total Project Cost = $,192,800 CMAQ Subtotal $ 6,828,640 $ 5,462,912 $ 1,65,728 TAP - Transportation Alternatives Program 606207 SPENCER - REHABILITATION ON ROUTE 9 (MAIN STREET), FROM HIGH STREET TO GROVE STREET TAP $ 416,000 $ 2,800 $ 8,200 = 5.1 / HSIP + CMAQ + TAP Total Project Cost = $,192,800 TAP0 WORCESTER - WRTA STORMWATER MITIGATION TAP $ 156,000 $ 124,800 $ 1,200 PROJECT TO BE DETERMINED $ - $ - $ - TAP Subtotal $ 572,000 $ 457,600 $ 114,400 Construction / TEC Score =.70 / Design Status = TBD / Total Project Cost = $156,000 Non-CMAQ/HSIP/TAP (Other) 60486 60479 BROOKFIELD - RECONSTRUCTION OF ROUTE 148 (FISKDALE ROAD) FROM MOLASSES HILL ROAD TO STURBRIDGE T.L. INCL. WEBBER ROAD WEST BROOKFIELD - RECONSTRUCTION ON ROUTE 9, ROUTE 67 & INTERSECTIONS AT SCHOOL STREET STP $ 2,548,000 $ 2,08,400 $ 509,600 2 STP $ 1,664,000 $ 1,1,200 $ 2,800 Construction / Design Status = Pre 25% / TEC Score = 2.8 / Total Project Cost = $2,548,000 = 6.5 / Total Project Cost = $1,664,000 Non-CMAQ/HSIP/TAP (Other) Subtotal $ 4,212,000 $,69,600 $ 842,400 Section 1A / Fiscal Constraint Analysis Total Federal Aid Target Funds Programmed $ 14,990,560 $ 15,170,796 Total Target $ 180,26 Target Funds Available Total Non-CMAQ/HSIP/TAP (Other) Programmed $ 4,212,000 $ 10,858,4 Max. Non- $ 180,26 Non-CMAQ/HSIP/TAP (Other) A CMAQ/HSIP/TAP
Total HSIP Programmed $,77,920 $ 869,01 Min. HSIP $ (2,508,907) HSIP Minimum Met Total CMAQ Programmed $ 6,828,640 $ 2,715,666 Min. CMAQ $ (4,112,974) CMAQ Minimum Met Total TAP Programmed $ 572,000 $ 727,774 Min. TAP $ 155,774 TAP Minimum Not Met Section 1B / Federal Aid Bridge Projects HSIP, CMAQ, TAP Overprogrammed $ (6,466,107) Statewide Bridge Maintenance Program Statewide Bridge Maintenance Program Subtotal $ - $ - $ - On System On System Subtotal $ - $ - $ - Off-System 60711 DUDLEY - BRIDGE REPLACEMENT, D-12-009, CARPENTER ROAD OVER ABANDONED RR STP-BR-OFF $ 2,05,800 $ 1,844,640 $ 461,160 Project Cost = $2,05,800 6060 RUTLAND - BRIDGE SUPERSTRUCTURE REPLACEMENT, R-14-004, INTERVALE ROAD OVER EAST BRANCH OF WARE RIVER STP-BR-OFF $ 1,814,400 $ 1,451,520 $ 62,880 Project Cost = $1,814,400 604468 WEST BROOKFIELD - BRIDGE REPLACEMENT, W-19-008, WICKABOAG VALLEY ROAD OVER SUCKER BROOK 2 STP-BR-OFF $ 2,76,648 $ 1,901,18 $ 475,0 Construction / Design Status = Pre 25% / Total Project Cost = $2,76,648 Off-System Subtotal $ 6,496,848 $ 5,197,478 $ 1,299,70 Statewide Bridge Inspection Program Statewide Bridge Inspection Program Subtotal $ - $ - $ - Section 1C / Federal Aid Non-Target Projects Other Federal Aid 60489 WORCESTER - STREETSCAPE IMPROVEMENTS AT MAIN STREET & MAYWOOD STREET TI $ 2,285,798 $ 1,828,68 $ 457,160 Construction / TI#177 - MA21 / Design Status = Pre 25% / Total Project Cost = $2,297,798 60489 WORCESTER - STREETSCAPE IMPROVEMENTS AT MAIN STREET & MAYWOOD STREET TI $ 120,000 $ 96,000 $ 24,000 Design / TI#177 - MA21 / Design Status = 25%- PSE / Total Project Cost = $2,297,798 605820 WORCESTER - BLACKSTONE RIVER BIKEWAY (SEGMENT 7), INCLUDING BRIDGE REHAB, W-44-041, MCGRATH BOULEVARD OVER MADISON STREET HPP $ 4,411,942 $,529,554 $ 882,88 Construction / HPP#428 - MA202, HPP#2218 - MA157, HPP#2509 - MA165 & MA006 / Design Status = 25% / Total Project Cost = $4,508,442 605820 WORCESTER - BLACKSTONE RIVER BIKEWAY (SEGMENT 7), INCLUDING BRIDGE REHAB, W-44-041, MCGRATH BOULEVARD OVER MADISON STREET HPP $ 96,500 $ 77,200 $ 19,00 Design (25%-PSE) / HPP#2509 - MA165 / Design Status = 25% / Total Project Cost = $4,508,442 606888 WORCESTER - BLACKSTONE CANAL STREETSCAPE IMPROVEMENTS ON HARDING STREET Sec 129 $ 75,000 $ 588,000 $ 147,000 Construction / MA28 / Design Status = 25% / Total Project Cost = $75,000 60644 WORCESTER - CENTRAL BUSINESS DISTRICT STREETSCAPE IMPROVEMENTS HPP $ 5,625,000 $ 4,500,000 $ 1,125,000 Construction / HPP#4266 - MA185 / Design Status = 25% / Total Project Cost = $7,277,015
605674 STURBRIDGE - GRAND TRUNK TRAIL HPP $ 507,500 $ 406,000 $ 101,500 Construction / HPP#249 - MA162 / Design Status = 25% / Total Project Cost = $507,500 606629 WORCESTER - BLACKSTONE VISITOR CENTER 606629 WORCESTER - BLACKSTONE VISITOR CENTER, BIKEWAY & BRIDGE HPP $ 6,449,200 $ 5,159,60 $ 1,289,840 HPP $ 1,120,000 $ 896,000 $ 224,000 Other Federal Aid Subtotal $ 21,50,940 $ 17,080,752 $ 4,270,188 Construction / HPP#251 - MA158 / Design Status = Pre 25% / Total Project Cost = $7 569 200 Construction / HPP#428 - MA202, HPP#2218 - MA157, HPP#2509 - MA165 & MA006 / Design Status = Pre 25% / Total Project Cost = $7,569,200 Section 1D / Federal Aid Major & State Category Projects Statewide Infrastructure Program Statewide HSIP Program Statewide Safe Routes to Schools Program Statewide Infrastructure Program Subtotal $ - $ - $ - Statewide HSIP Program Subtotal $ - $ - $ - Statewide Safe Routes to Schools Program Subtotal $ - $ - $ - Funding Split Varies by Funding Source Statewide CMAQ 60251 WORCESTER - SIGNAL & INTERSECTION IMPROVEMENTS @ HOLDEN STREET, DRUMMOND AVENUE & SHORE DRIVE CMAQ $ 1,741,794 $ 1,9,45 $ 48,59 Construction / Design Stage = Pre 25% / CMAQ + Statewide CMAQ Total Project Cost = $2,642,44 / Statewide CMAQ $ 1,741,794 $ 1,9,45 $ 48,59 Statewide Transportation Enhancements ADJUSTMENT:Move Project - (FROM 2015) 60644 WORCESTER - CENTRAL BUSINESS DISTRICT STREETSCAPE IMPROVEMENT STP-TE $ 1,652,015 1,21,612.0 0,40.0 Design & Construction / Design Status = Pre 25% / STP-TE+HPP Total Project Cost = $7,277,015 / Moved STP-TE portion of the project from FY 2015 to FY 2016 Statewide ITS Statewide Transportation Enhancements Subtotal $ 1,652,015 $ 1,21,612 $ 0,40 Statewide ITS Subtotal $ - $ - $ - Statewide Interstate Maintenance Program 605592 STURBRIDGE - HOLLAND - INTERSTATE NHPP $ 11,486,592 10,7,92.8 1,148,659.2 MAINTENANCE & RELATED WORK ON I-84 Statewide Interstate Maintenance Program Subtotal $ 11,486,592 $ 10,7,9 $ 1,148,659 Construction / Design Status = Pre 25% / Total Project Cost = $11,486,592 Statewide NHS Preservation Program+ 607176 SHREWSBURY - WESTBOROUGH RESURFACING AND RELATED WORK ON ROUTE 9 60747 WEST BROOKFIELD - BROOKFIELD - RESURFACING & RELATED WORK ON ROUTE 9, FROM SOUTH MAIN STREET WEST BROOKFIELD TO OLD WEST MAIN STREET BROOKFIELD (. MILES) 2/ NHPP $ 11,859,906 9,487,924.8 2,71,981.2 NHPP $,504,88 2,80,906.4 700,976.6 Project Cost = $11,859,906 Project Cost = $,504,88 Statewide NHS Preservation Program Subtotal $ 15,64,789 $ 12,291,81 $,072,958
Statewide RR Grade Crossings Statewide Stormwater Retrofits Statewide ADA Implementation Plan Other Statewide Items Statewide RR Grade Crossings Subtotal $ - $ - $ - Statewide Stormwater Retrofits Subtotal $ - $ - $ - Statewide ADA Implementation Plan Subtotal $ - $ - $ - ABP GANS Repayment $ - - - Award Adjustments, Change Orders, Project $ - - - Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. $ - - - Programs Planning $ - - - Statewide Design and Right of Way $ - - - Statewide Recreational Trails $ - - - Other Statewide Items Subtotal $ - $ - $ - Section 2A / Non-Federal Projects Non Federal Aid Section 2B / Non-Federal Bridge Projects No Projects Programmed NFA $ - $ - Non-Federal Aid Subtotal $ - $ - 100% Non-Federal Section 2B / Non-Federal Bridge Projects No Projects Programmed NFA $ - $ - Section 2B / Non-Federal Bridge Projects Subtotal $ - $ - 100% Non-Federal 2016 Central Mass MPO TIP Summary Total Federal Funds Non-Federal Funds TIP Section 1: TIP Section 2: Total of All Projects $ 7,08,58 $ - $ 7,08,58 $ 59,95,281 $ 59,95,281 $ 1,10,257 $ - $ 1,10,257 Total Spending in Region Total Federal Spending in Region Total Non-Federal Spending in Region Project costs have increased by 4% a year to account for inflation. 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/highway/flaggers/main.aspx