FIRE RESISTANCE OF A WONDOOR FIRE RATED CURTAIN WITH VARIATIONS TO CONSTRUCTION. P. Bano-Chapman Senior Fire Testing Engineer

Similar documents
FIRE RESISTANCE OF A SLIDING ACCORDION DOOR ASSEMBLY. This report replaces FAR 3847 issued on the 2 April 2012

Pleece&Co LTD. Terms and Conditions +44 (0)

JC PAYNE SPECIALIST SERVICES LIMITED TERMS AND CONDITIONS FOR SERVICE

TERMS AND CONDITIONS OF SALE OF GOODS AND SUPPLY OF SERVICES

Date. Dear TERMS OF ENGAGEMENT FOR (THE "CLIENT") AND ASSOCIATED ENTITIES

CAMIN CARGO CONTROL - TERMS AND CONDITIONS

Terms & Conditions of Business

AMG Australian Marketing Group Pty Ltd Terms & Conditions of Trade

General Terms and Conditions of Sale

JC PAYNE SPECIALIST SERVICES LIMITED TERMS AND CONDITIONS FOR REPAIR AND MAINTENANCE

ANDRA JEWELS LIMITED TERMS & CONDITIONS OF SUPPLY

Fixed-to-Mobile satellite services

TERMS AND CONDITIONS OF SALE. 1.1 the following words and expressions shall have the following meanings unless the context otherwise requires:

Fidelity Guarantee Insurance

Sample Integrated Liability Clauses

STANDARD TRADING CONDITIONS OF MOMART LTD

QCR SERVICES INC. Standard Terms and Conditions

Terms and Conditions for Certification, Assessment Services and TradeMark Licence

2. A quotation remains valid for 30 days from the date it is given. A quotation may be withdrawn by APSL at any time by notice to the Customer.

RENAISSANCE SECURITIES (CYPRUS) LIMITED

TERMS AND CONDITIONS OF TRADE

representatives, successors or permitted assigns.

FIRST NATIONAL BANK BUILDING 332 MINNESOTA STREET, ST. PAUL, MN TENANT MOVE-IN / MOVE-OUT INSTRUCTIONS

SOUTHERN COMMUNICATIONS LIMITED TELEPHONE SYSTEMS - TERMS AND CONDITIONS OF SALE

West City Auto Group Limited Terms & Conditions of Trade Definitions Acceptance Change in Control Price And Payment Delivery Of Works

Olympus Global - Standard Terms and Conditions of Sale (edition May 2010)

Bill Validation: Terms & Conditions

TERMS AND CONDITIONS OF BUSINESS HOLMES CARPETS LTD. The following expressions shall have the following meanings:

Terms & Conditions of Sale

$100 worth of purchases (During Promotion Period)

APPENDIX 3 FAYAIR (STANSTED) LIMITED STANDARD TERMS OF BUSINESS. Aircraft means any aircraft in respect of which the Customer has requested Services;

Wentworth Distributors NZ Ltd Terms & Conditions of Trade Definitions Acceptance Electronic Transactions Act 2002 Change in Control

Brav Norway AS - Business to Business Terms & Conditions. General

JPL Telecom Limited Conditions of Sale. The customer's attention is drawn in particular to the provisions of clause 9.

Conditions: these terms and conditions as amended from time to time in accordance with clause 7.5.

Agency terms and conditions

CENTRALNIC TERMS AND CONDITIONS

Adilyfe Pty Ltd 1046A Dandenong Road Carnegie VIC 3163 Australia TERMS AND CONDITIONS OF SALE

participate in the Program after such modification, you are hereby deemed to have agreed to such modification.

University of Cambridge Standard Terms and Conditions of Sale ( Conditions )

DATA HANDLING AGREEMENT

ICE CLEAR US, INC. RULES

TERMS AND CONDITIONS OF SALE AND/OR HIRE OF PRODUCTS

INTERCONNECTION AGREEMENT FOR NET BILLING FOR RENEWABLE ELECTRICAL GENERATING FACILITIES OF ONE MEGAWATT OR LESS

To : MUFG Bank, Ltd. Yangon Branch

In these Structured Products Terms and Conditions, unless the context requires otherwise:-

Trade Services International Payment Product Terms Version: April 2009

ABA Film Services Ltd. Terms and Conditions of Hire

DREAM BLINDS Terms & Conditions. Right to Cancel or Change Your Order

The Terms and Conditions. VIRGIN MONEY CONCIERGE TERMS AND CONDITIONS (referred to collectively as Conditions )

CAPRICORN REWARDS PROGRAM TERMS AND CONDITIONS

Schedule OLIS-Certified EMR Services

TERMS OF BUSINESS. Any Enquiry or Application will be processed accordance with these Terms which you agree to these Terms.

PENTAXIA LIMITED TERMS AND CONDITIONS OF BUSINESS. 1.1 Definitions. In these Conditions, the following definitions apply:

TERMS OF BUSINESS FOR INTERMEDIARIES

Terms and Conditions. Standard Terms & Conditions of Sale and Supply. Tel: +44 (0)

Project Z Pty Ltd T/A Harbour Glass Terms & Conditions of Trade 17.6 The Seller may license or sub-contract all or any part of its rights and

Fan and Ventilation Ltd, Terms & Conditions

CLINIC & EVENTS General safety and insurance policy Each sailor or clinic attendee participates entirely at their own risk.

Terms & Conditions of Sale

Ullrich Aluminium Co Limited Terms & Conditions of Trade Definitions Acceptance Change in Control 4. Export Contracts 5.

AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION

The cost of a Project as stated in a Proposal or Service Order. An offer by Etch to provide Services to the Client.

Terms and Conditions for Bankers Guarantee

Users Guide for Ac-MINI

The definitions which shall apply to these Terms and Conditions are set out in paragraph 8.

Carbon Trust Standard Logo Style guidelines and Licence terms

7/14/16. Hendry County Purchase Order Terms and Conditions

TERMS & CONDITIONS OF HIRE General Terms

THE SOFTWARE BUREAU LIMITED TERMS OF BUSINESS

Le1 Internet Marketing Ltd

Terms & Conditions of Trade AGA Doors and Windows PPSR PROTECTION 2018

Contract means the contract for the purchase and/or sale and/or hire of the Goods and/or the supply of Services.

COMPOSITE STATEMENT FAX INDEMNITY

Terms and Conditions

SkyAngelGPS Annual Purchase and Services Agreement

STREAMGUYS, Inc. Authorized Streaming Agent Agreement Please complete and fax back entire agreement to us at

CREDIT REFERENCES NAME & ADDRESS PHONE FAX

GENERAL TERMS AND CONDITIONS OF PURCHASE These general terms and conditions of purchase (the GTP ) govern the contractual relationships between:

TERMS AND CONDITIONS FOR UOB VIRTUAL ACCOUNT SERVICE

MERCED COUNTY PLANNING COMMISSION MINUTES FOR MEETING OF FEBRUARY 25, 2015

Storage Terms & Conditions

DISCLAIMER OF LIABILITY AND WARRANTY

AccessHosting.com TERMS OF SERVICE

Reseller Agreement TeraByte Unlimited ( TeraByte )

EMIR Reporting Service

TERMS AND CONDITIONS FOR SALE OF BIOLOGICAL INDICATORS AND TEST SERVICES

POST BID ADDENDUM. Project: LDS Eastview, Mesa, Iona 10 HVAC Project No.: Addendum No.: 2

Steadiform Pty Ltd and any associated entity terms and conditions of trade Definitions Acceptance Price And Payment

Make It Cheaper s Customer Service Team can be reached on freephone

Quest Property Surveys.

Terms and Conditions. Doc ID /v3

2 CONTRACT 3 SPECIFIC ITEMS INCLUDED AND EXCLUDED FROM QUOTE. Balclutha. Cromwell

ACCENTURE PURCHASE ORDER TERMS AND CONDITIONS

Website Terms and Conditions

Kameo Textile Engineering Pty Ltd Terms & Conditions of Trade Definitions

Terms and Conditions for Network Access Pursuant to a Network Access Permit

Road Haulage Association Limited CONDITIONS OF CARRIAGE 1998 Effective 1 September 1998

AA Battery Assist Supply & Fit Terms and Conditions

CITY OF ELMHURST WIRELESS RADIO ALARM LEASE

Transcription:

FAR 3110 FIRE RESISTANCE OF A WONDOOR FIRE RATED CURTAIN WITH VARIATIONS TO CONSTRUCTION Author: P. Bano-Chapman Senior Fire Testing Engineer Reviewer: P. C. R Collier Senior Fire Engineer Contact: BRANZ Limited Moonshine Road Judgeford Private Bag 50908 Porirua City New Zealand Tel: +64 4 237 1170 Fax: +64 4 237 1171 www.branz.co.nz Project Number: FC3110 Date of Issue: 29 November 2007 Review Date: 29 November 2012 Page 1 of 6 Pages

BRANZ's agreement with its Client in relation to this report contains the following terms and conditions in relation to Liability and Indemnification a. Limitation and Liability i. BRANZ undertakes to exercise due care and skill in the performance of the Services and accepts liability to the Client only in cases of proven negligence. ii. Nothing in this Agreement shall exclude or limit BRANZ's liability to a Client for death or personal injury or for fraud or any other matter resulting from BRANZ's negligence for which it would be illegal to exclude or limit its liability. iii. BRANZ is neither an insurer nor a guarantor and disclaims all liability in such capacity. Clients seeking a guarantee against loss or damage should obtain appropriate insurance. iv. Neither BRANZ nor any of its officers, employees, agents or subcontractors shall be liable to the Client nor any third party for any actions taken or not taken on the basis of any Output nor for any incorrect results arising from unclear, erroneous, incomplete, misleading or false information provided to BRANZ. v. BRANZ shall not be liable for any delayed, partial or total non-performance of the Services arising directly or indirectly from any event outside BRANZ's control including failure by the Client to comply with any of its obligations hereunder. vi. The liability of BRANZ in respect of any claim for loss, damage or expense of any nature and howsoever arising shall in no circumstances exceed a total aggregate sum equal to 10 times the amount of the fee paid in respect of the specific service which gives rise to such claim or NZD$50,000 (or its equivalent in local currency), whichever is the lesser. vii. BRANZ shall have no liability for any indirect or consequential loss (including loss of profits). viii. In the event of any claim the Client must give written notice to BRANZ within 30 days of discovery of the facts alleged to justify such claim and, in any case, BRANZ shall be discharged from all liability for all claims for loss, damage or expense unless legal proceedings are commenced in respect of the claim within one year from: The date of performance by BRANZ of the service which gives rise to the claim; or The date when the service should have been completed in the event of any alleged non-performance. b. Indemnification: The Client shall guarantee, hold harmless and indemnify BRANZ and its officers, employees, agents or subcontractors against all claims (actual or threatened) by any third party for loss, damage or expense of whatsoever nature including all legal expenses and related costs and howsoever arising relating to the performance, purported performance or nonperformance, of any Services. c. Without limiting clause b above, the Client shall guarantee, hold harmless and indemnify BRANZ and its officers, employees, agents or subcontractors against all claims (actual or threatened) by any party for loss, damage or expense of whatsoever nature including all legal expenses and related costs arising out of: i. any failure by the Client to provide accurate and sufficient information to BRANZ to perform the Services; ii. any misstatement or misrepresentation of the Outputs, including Public Outputs; iii. any defects in the Products the subject of the Services; or iv. any changes, modifications or alterations to the Products the subject of the Services. Report Number: FAR 3110 Date of Issue: 29 November 2007 Page 2 of 6 Pages

1. CLIENT FIRE RESISTANCE OF A WONDOOR FIRE RATED CURTAIN WITH VARIATIONS TO CONSTRUCTION WonDoor Corporation Gliderol Doors (S) Pte Ltd 1865 South 3480 West No 86 International Road Salt Lake City, UT 84104 Singapore 629176 2. INTRODUCTION This report gives BRANZ s assessment on the fire resistance of the horizontal folding curtain with an increase in panel size up to 8.4 m high x unlimited width but otherwise as tested and assessed in BRANZ assessment report FAR 3064 in accordance with SS489:2001. 3. BACKGROUND In BRANZ assessment report FAR 3064 a WonDoor that was tested in accordance with UL 10B was assessed to SS 489:2001 to achieve a fire resistance of at least 120 minutes Integrity. The assessment is based on UL reports No. R6799-2 Project No. 97NK30045, UL File R6799 Project 07NK04154 and UL letter dated 28 th August 1998 regarding R6799. In Underwriters Laboratories Inc (UL) fire resistance test file No. R6799-2 Project No. 97NK30045 tested a folding curtain door assembly in accordance with UL 10B (NFPA 252, CAN 4-S104) for 180 minutes then subjected it to a hose stream test. The folding curtain door maintained the test criteria for the duration of the fire test and subsequent hose stream test. The sliding door consisted of a double skinned interlinked curtain that folded in on itself (sliding accordion door). The slats were secured together with a hinge arrangement. The sliding door was mounted within a plasterboard frame which in turn was secured to the brick lined specimen frame. The overall size of the test specimen was 3962 mm wide x 3562 mm high. For specific construction details refer to the UL test report File R6799-2 Project 97NK30045 dated 20 th November 1997. In UL File R6799 Project 07NK04154 it was considered that increasing the height to an oversized sliding curtain tested in UL file No. R6799-2 Project No. 97NK30045, would not prejudice its established fire resistance. This is based on drawings supplied to UL with new track details. UL letter dated 28 th August 1998 regarding R6799 Special purpose type fire door assemblies. This letter discusses the labelling of oversize special purpose fire door assemblies including no maximum width limitation to the Won-Door folding curtain design. Report Number: FAR 3110 Date of Issue: 29 November 2007 Page 3 of 6 Pages

4. BASIS OF ASSESSMENT - The assessment does not specifically consider maintenance, durability or serviceability requirements. - The curtain is assessed in the fully closed position. 5. DISCUSSION 5.1 General In BRANZ assessment report FAR 3064 a fire rated curtain by WonDoor was assessed to SS 489:2001 for Integrity of 120 minutes. It is proposed that the WonDoor be increased in size up to a maximum height of 8.4m with an infinite width. 5.2 Increase in width The curtain system consists of modular vertical interlocking slats. It is considered based the fact that the construction details are the same at the leading and trailing edges of the curtain that the WonDoor can be increased in width without prejudice to the fire resistance performance of the doorset. 5.3 Increase in height For the increase in height a number of factors need to be considered. First what is the effect of the expansion of the curtain with increasing height and will the support structure be sufficient to support the weight of the curtain. In the test report on the WonDoor referenced in FAR 3064 the deflection of the curtain at 90 minutes was measured as 38 mm at the centre. The deflection of the curtain was stable from 45 minutes to 90 minutes after which no further deflection measurements were reported. Based on the type of specimen and information in the report it is expected that if the curtain was measured at 120 minutes the deflection is likely to be similar. Using the information from the test it is determined that for an increase in height of up to 8400 mm the deflection of the curtain when taking into account the curvature of the curtain would be 212 mm at the centre and 70 mm at the leading edge. It has been stated by the client that the clearance at the sill of the curtain is at least 15 mm. This indicates that the curtain will become jammed at the sill shortly after the start of the fire test preventing any deflection of the bottom of the leading edge away from the strike. This also means that the curtain resting on the sill this will remove a significant amount of weight off the suspension system. It is stated by the WonDoor supplier that the rollers and support system are designed to carry three times the actual weight of the curtain system. Based on this information and the fact that a significant proportion of the weight of the curtain will be supported by the floor it is considered that the WonDoor curtain would not prejudiced the fire resistance of the doorset before at least 120 minutes if increased in size up to 8.4m. The client has stated that the top of the curtain is effectively locked at the track. During fire exposure the curtain will expand jam at the sill, therefore effectively become fixed at the top and bottom. With no latching mechanism at mid height it is possible that the Report Number: FAR 3110 Date of Issue: 29 November 2007 Page 4 of 6 Pages

leading edge could deflect out of the strike at mid height. To prevent this the depth of the strike must be increased to a minimum of 106 mm. Where the leading edge is engaged in the strike by at least 106 mm. 5.4 Bi-parting doors In UL fire resistance test report File R6799-6 Project 83NK21332 and project 85NK5664 a bi-parting fire door was tested in accordance with UL 10B for up to 3 hours and at the conclusion of the fire test subject to a hose stream test at 45 PSI for 7 minutes and 24 seconds. The tested doorsets were deemed to meet the requirements of the test standard for 3 hours fire endurance. The test report covered a number of fire tests with variations to construction. The main test covered in the report included a fusible link latching mechanism at the meeting edge which locked the meeting edge together when exposed to fire conditions. One of the subsequent tests covered in the test report included reinforcing of the leading posts to replace the fusible link latching mechanism. Based on the test report R6799-6 it is considered that the WonDoor can also be installed with a bi-parting meeting edge as tested and reported in UL report R6799-6 and would achieve at least 120 minutes Integrity if tested in accordance with SS 489:2001 for un-insulated specimen. 5.5 Additional information The test specimen assessed in FAR 3064 was subjected to a fire resistance test in accordance with UL10B for 180 minutes then subjected to the impact and cooling effects of a hose stream at 30 psi for over 7 minutes. The test specimen passed the requirements for both the fire resistance and hose stream tests. The result from the hose stream test indicates that there is a considerable amount of strength left in the test specimen and support structure after 3 hours fire exposure. It also demonstrates that the support structure, leading and trailing edges did not detach under the impact of the hose stream. The test specimen is assessed to SS 489: 2001 for 120 minutes which does not require the application of a hose stream. It is considered based on the additional fire exposure from the UL test and passing the hose stream test the support structure is sufficiently strong to support the increase in curtain height for up to at least 120 minutes. 6. CONCLUSION It is considered that the WonDoor fire curtain assessed in BRANZ assessment report FAR 3064, based on the UL test report File R6799-2 Project 97NK30045 and Project 07NK04154, would not be prejudiced if increased in height up to a maximum height of 8.4m and an infinite increase in width if tested in accordance with SS 489:2001 for an un-insulated specimen and would achieve at least 120 minutes Integrity. It is also considered that the bi-parting meeting edges tested and reported in File R6799-6 Project 83NK21332 and project 85NK5664 can also be included in the above WonDoor fire curtain without prejudice to the Integrity of the doorset before at least 120 minutes. Report Number: FAR 3110 Date of Issue: 29 November 2007 Page 5 of 6 Pages

7. LIMITATIONS This assessment is subject to the completeness and accuracy of the information supplied. Note: this assessment does not cover maintaince or durability but only the fire resistance of the curtain assuming it is closed at the beginning of fire exposure. BRANZ reserves the right to amend or withdraw this assessment if information becomes available which indicates the stated fire performance may not be achieved. Report Number: FAR 3110 Date of Issue: 29 November 2007 Page 6 of 6 Pages