PROJECT PREPARATORY TECHNICAL ASSISTANCE

Similar documents
PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program)

ASIAN DEVELOPMENT BANK

ATTACHED TECHNICAL ASSISTANCE

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Mongolia: Development of State Audit Capacity

ASIAN DEVELOPMENT BANK

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project

ASIAN DEVELOPMENT BANK

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

Technical Assistance to the Islamic Republic of Pakistan for the Developing Social Health Insurance Project

ASIAN DEVELOPMENT BANK TAR:PRC

Institutional Strengthening for Aviation Regulation

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Georgia: Strengthening Domestic Resource Mobilization

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

Mongolia: Developing an Information System for Development Policy and Planning

ASIAN DEVELOPMENT BANK

Republic of the Maldives: Preparing Business Strategy for Port Development

Project Administration Instructions

Policy Coordination and Planning of Border Economic Zones of the People's Republic of China and Viet Nam

ASIAN DEVELOPMENT BANK TAR:INO 35144

India: Preparing for the Ara Canal Water Productivity Improvement Project

INDIA: Preparing the Rajasthan Secondary Towns Development Investment Program

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

People s Republic of China: Supporting the Reform of the Role of the People s Bank of China

Republic of Indonesia: Strengthening National Public Procurement Processes

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

Socialist Republic of Viet Nam: Preparing the Hai Phong Water Supply Project

ASIAN DEVELOPMENT BANK

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

Definitions. Terms of Reference

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2

Technical Assistance Report

Armenia: Infrastructure Sustainability Support Program

Georgia: Preparing the Second Domestic Resource Mobilization Program

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue

Technical Assistance Report

Project Administration Instructions

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

People s Republic of Bangladesh: Rural Infrastructure Maintenance Program

Project Administration Manual. Project Number: Grant Number: GXXXX November Vanuatu: Cyclone Pam School Reconstruction Project

Maldives: Developing the Revenue Administration Management Information System

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK

Evaluation Study. Midterm Review Process. Operations Evaluation Department

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

ASIAN DEVELOPMENT BANK

OPERATIONS MANUAL BANK POLICIES (BP)

DISBURSEMENT-LINKED INDICATORS (FY2014 FY2017)

MFF - Bihar Urban Development Investment Program (Facility Concept)

Republic of the Philippines: Government-Owned and -Controlled Corporations Reform

ASIAN DEVELOPMENT BANK TAR:UZB 36498

Lao People s Democratic Republic: Strengthening the Capacity of the State Audit Organization

Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance Reforms

Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization

ASIAN DEVELOPMENT BANK

Proposed Programmatic Approach, Policy-Based Loan, and Technical Assistance Loan Cambodia: Strengthening Public Financial Management Program

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities

Technical Assistance Report

Concept Paper. Project Number: October Lao People s Democratic Republic: Road Maintenance Project

PROGRAM FIDUCIARY SYSTEMS ASSESSMENT

ASIAN DEVELOPMENT BANK

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and

Multitranche Financing Facility Republic of Uzbekistan: Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program

Technical Assistance Republic of the Philippines: Harmonization and Managing for Results

Republic of Indonesia: Promoting Innovative Financial Inclusion (Financed by ADB Technical Assistance Special Fund)

Duration of Assignment: Approx. 150 working days from January to September 2015

Duration of Assignment: Apprx. 150 working days from January to September 2015

LOAN AGREEMENT (Special Operations) (Higher Education Reform Project) between MONGOLIA. and ASIAN DEVELOPMENT BANK DATED 9 SEPTEMBER 2011

Republic of the Philippines: Preparing the Road Sector Improvement Project

Developing Anti-Money Laundering and Combating the Financing of Terrorism Approaches, Methodologies, and Controls

Viet Nam: Ho Chi Minh City Long Thanh DauGiay Expressway Technical Assistance Project

People's Republic of Bangladesh: Dhaka Chittagong Expressway PPP Design

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH

Guidelines for the Financial Governance and Management of Investment Projects Financed by the Asian Development Bank

Program Implementation Document. Project Number: November PAK: Access to Clean Energy Investment Program

Tuvalu: Outer Island Maritime Infrastructure Project

ASIAN DEVELOPMENT BANK

Cook Islands: Preparing the Infrastructure Development Project (Cofinanced by the Japan Special Fund and Government of New Zealand)

People s Republic of Bangladesh: Updating the Road Master Plan

Socialist Republic of Viet Nam: Preparing the Hue Water Supply Project

Republic of Kazakhstan: Enhancing Insurance Market Efficiency and Outreach

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION

Report and Recommendation of the President to the Board of Directors

Republic of Indonesia: Fiscal Aspect of Social Security Reform

Nauru: Sustainable and Climate-Resilient Connectivity Project

GAMAS means Mongolia Customs Automated Data Processing

Indonesia: Capacity Building in Urban Infrastructure Management Project

Republic of Uzbekistan: Solid Waste Management Improvement Project

Nile Basin Trust Fund Grant Agreement

Transcription:

Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which are a bottleneck of socio-economic growth. The PPTA will help develop a sector development program suitable for ADB financing in terms of technical, financial, economic, institutional, and safeguard dimensions. B. Major Outputs and Activities 2. The objective of the PPTA is for ADB to agree with the Government of Viet Nam on a project design that will help achieve the better quality education services by 2030 through the policy and performance review of the education/secondary education sector, the mid-term budget and expenditure review, and technical, economic, financial, and social due diligence. The PPTA will produce the inception reports, mid-term report, the Project Outline, the draft TA final report, Feasibility Study report, the TA final report, due diligence reports, and the draft Project Administration Manual. The major outputs and activities are summarized in Table A3.1. Table A3.1: Summary of Major Outputs and Activities Expected Major Activities Completion Date Major Outputs A. Inception Mission November 2014 Inception Report B. Midterm Review (PO May 2015 Midterm report/final PO Appraisal) C. Loan and FS factfinding/due July 2015 Draft TA final report, draft FS Diligence report, draft due diligence including FMA/FS Report reports, IPSA, and draft Appraisal GEMAP Expected Completion Date D. Final Review November 2015 Final report, finalized FS report, draft PAM, draft RRP and linked documents, FMA, Detailed Cost Estimates FMA = Financial Management Assessment, FS = feasibility study, GEMAP = gender and ethnic minority action plan, IPSA = Initial Poverty and Social Analysis, PAM = project administration manual, PO = project outline. TA = technical assistance. Source: Asian Development Bank. C. Cost Estimate and Proposed Financing Arrangement 3. The TA is estimated to cost $1,100,000 equivalent, of which $1,000,000 equivalent will be financed on a grant basis by the Japan Fund for Poverty Reduction, and administered by ADB. The government will provide counterpart support in the form counterpart staff, office and housing accommodation, office supplies, secretarial assistance, domestic transportation, provision of office space, communication facilities for consultants, and other in-kind contributions. The detailed cost estimate is presented in Table A3.2. ADB s Technical Assistant Disbursement Handbook 2012 will be applied for the financial management of the TA. Table A3.2: Cost Estimates and Financing Plan ($'000) Item A. Japan Fund for Poverty Reduction a 1. Consultants Total Cost

10 Appendix 3 Item Total Cost a. Remuneration and per diem i. International consultants (23 person-months) 580.0 ii. National consultants (34 person-months) 62.0 b. International and local travel 45.0 c. Reports and communications 15.0 2. Equipment b 25.0 3. Workshops, local training, seminars, and conferences c 100.0 4. Surveys d 70.0 5. Miscellaneous administration and support costs e 15.0 6. Representative for contract negotiations 3.0 7. Contingencies 85.0 Subtotal (A) 1,000.0 B. Government Financing f 1. Office accommodation and transport 50.0 2. Remuneration and per diem of counterpart staff 30.0 3. Others 20.0 Subtotal (B) 100.0 Total 1,100.0 a Financed by the Japan Fund for Poverty Reduction. This amount also includes ADB's administration fee, audit costs, bank charges, and a provision for foreign exchange fluctuations (if any), to the extent that these items are not covered by the interest and investment income earned on this grant, or any additional grant from the Government of Viet Nam. b Equipment Type Quantity Cost ($) Desktop Computers 5 7,500 Notebook Computers 4 8,000 Photo Copier/Printer 1 5,500 Fax machine with scanner 1 1,000 Audio Projector 1 2,000 Screen 1 1,000 c Workshops, training, seminars, and conferences Purpose Venue 3 Project Milestone Workshops (Inception, Midterm, Final) 60,000 1 Policy Consultation Workshop 20,000 1 National Consultation Workshop on Government s Project Detailed Outlines 10,000 1 National Consultation Workshop on Government s Feasibility Study Report 10,000 d Includes costs for field survey to be conducted by the consulting firm. e Includes costs of consumption items. Source: Asian Development Bank estimates. D. Consulting Services 4. ADB will finance 57 person-months (pm) of consulting services including (i) 6 international consultants totaling 23 pm; and 6 national consultants totaling 34 pm for the TA. An international firm will be engaged to provide the international and national consultants in accordance with Guidelines on the Use of Consultants by ADB and its Borrowers (2013, as amended from time to time). The selection and engagement of the international firm will be done through quality and cost-based selection (QCBS) using simplified technical proposal. The QCBS weighting will follow the standard quality-cost ratio of 80:20. Consulting services are summarized at Table A3.3 below, and the outline terms of reference for the project preparatory TA consultants are described in paragraphs 5 to 12.

Appendix 3 11 Table A3.3: Summary of Consulting Services Requirement Positions Person-Months Required International Team Leader / Education Policy Planning and 9 Administration Education Quality Assessment and Control 4 Education Economist / Financial Analyst 3 Procurement Specialist 3 Pro-poor Secondary Education 2 Gender and Ethnic Minority 2 National National Team Leader / Education Policy Planning 11 and Administration Education Quality Assessment and Control 6 Education Economist / Financial Analyst 5 Procurement Specialist 5 Pro-poor Secondary Education 4 Gender and Ethnic Minority Specialist 3 Source: Asian Development Bank staff estimate. 5. Team Leader/Education Policy Planning and Administration (international 9pm, national 11pm). The consultant should have (i) an understanding of the policy framework and targets for secondary education in Viet Nam; (ii) strong management and analytical skills needed to design a feasible and high quality project; (iii) experience in education policy planning and administration including human resource management and quality assurance of schooling, preferably in both developed and developing countries; (iv) good communication and coordination skills required for a participatory approach to project design involving local authorities and donor coordination/co-financing; and (v) a degree in education or other relevant fields from an internationally recognized university. As a team leader, the consultant will have overall responsibility for planning and implementing the TA, and will be primarily responsible for preparing all the required reports. 6. The specialist s tasks will include, but not be limited to, the following: (i) Preparing, in formats satisfactory to the Government and ADB, the inception report, the mid-term report, the draft TA final report, the TA final report, the Project Outline (PO), and the Feasibility Study (FS) report, and the investment report for the Second Secondary Education Sector Development Program (SESDP II) composing a policy reform matrix and a feasibility study report with detailed cost tables for the investment project; (ii) Developing an overall work plan and a participation strategy with major stakeholders, including the counterparts at the national, provincial, district, and school levels, as well as other donor partners; (iii) Proposing monitoring measurement and indicators for the projected impact of the proposed project on subsector performance and poverty reduction; (iv) Assessing the training needs of the local counterparts and organizing workshops for participatory project design and dissemination; (v) Overseeing the preparation of cost estimates for the proposed loan project based on project components in close collaboration with the Executing Agency, relevant ministries and agencies; (vi) Analyzing the constrains and challenges encountered in implementing past and ongoing official development assistance (ODA) projects and proposing remedial measures;

12 Appendix 3 (vii) (viii) (ix) Recommending appropriate loan covenants for compliance with timely project implementation; Preparing the draft implementation plan for the proposed project; and Reviewing the Government s regulations and decrees on nonpublic schools in order to improve accreditation, encourage greater private investment and ensure good quality performance. 7. All the reporting requirements (including those from the national consultants) in formats satisfactory to ADB and the Government (Inception report, draft interim report, interim report, draft TA final report, TA final report, draft PO, PO, draft FS report and FS report) are the responsibility of the international team leader. 8. Education Quality Assessment and Control (international 4pm, national 6pm). The specialist should have (i) in-depth understanding of Viet Nam s secondary education system and of international practices for developing teaching, curriculum, textbooks, and instructional materials; (ii) experiencing and knowledge of national testing and evaluation of student learning outcomes; and (iii) a degree in education or other relevant fields from an internationally recognized university. The education quality and management improvement specialist/team leader will be responsible for the following tasks: (i) overall coordination of the team; (ii) technical review of the feasibility studies of the proposed project; (iii) sector review; (iv) education policy study; (v) development of various project documents including donor matrix, implementation schedule, staff development plan, organizational chart; stakeholder consultations; capacity development plan for the executing agency (EA); (vi) development of baseline survey and monitoring and evaluation indicators; (vii) study of international experiences with Public and Private Partnership (PPP) models in the secondary education sector both for construction and maintenance of education facilities and delivery of secondary education services and assessment of potential implication of PPP model for USE subsector in Viet Nam; (viii) development of recommendation for appropriate loan covenants for compliance; (ix) helping the PMU organize the PPTA workshops; (x) reviewing past/secondary ongoing curriculum revision facilitated by MOET; and (xi) reviewing quality of teacher training provided by the teacher training universities and prepare recommendations for improvement. 9. Education Economist/Financial Analyst (international 3pm, national 5pm). The specialist should have an advanced degree in finance, economics or related field with extensive experience (8 10 years minimum) in education sector and fiduciary assessments. The specialist s tasks will include the following, but not limited to (i) prepare a financial management capacity assessment; (ii) review the government s income and expenditure for secondary education and budgeting policy, procedure, system and capacity for sustainable and effective budget allocation; (iii) undertake fiduciary risk assessment of government mechanisms for fund releases, cash flow managements, financial reporting, internal control, including delineation and mapping of responsibilities between central, provincial government levels for financial management of loan proceeds; (iv) assess the capacity of concerned government agencies for internal control, staffing requirements and skills, accounting hardware, software and training needs; (v) assess the capacity of external auditors to provide timely report in accepted auditing standards; (vi) design a fund flow mechanism and identify appropriate ADB disbursement procedures for the ensuing project based on an assessment of EA/Implementing Agency s capacity, (vii) review the financing plan for the investment component; (viii) assess the likelihood that counterpart funds and/or co-financing will be available; (ix) complete a projection of forward incremental recurrent costs and assess the impact of incremental recurrent costs on the budget of the MOET; (x) identify financial risks; and (xi) prepare summary and detailed cost tables for the Project.

Appendix 3 13 10. Procurement Specialist (international 3pm, national 5pm). The specialist should have extensive experience in procurement in education and related projects, as well as good knowledge of Excel. The specialist s tasks will include the following, but not limited to: (i) prepare procurement plan and procurement capacity assessment of the EA in accordance with ADB Procurement Guidelines (2013, as amended from time to time); (ii) help the EA prepare a plan prior to loan negotiations covering the whole implementation period of procurement activities; (iii) review the inputs and outputs of civil works components in target regions of the past and ongoing ADB-funded projects and identify the constraints and challenges in procurement operations in disadvantaged regions; (iv) collect data and analyze cost norms for civil works and equipment procurement; and (v) prepare a realistic schedule and cost estimates for design, supervision, inspection, and maintenance of proposed civil works. 11. Pro-poor Education Specialist (international 2pm, national 4pm). The specialist should have (i) in-depth understanding of Viet Nam s secondary education system, (ii) general knowledge of national education policies and programs, and (iii) substantial experience in assignments related to the extension of the access to secondary education for poor people. The specialist s tasks will include, but not limited to, the following: (i) conducting research and providing assessments on existing barriers for poor people in accessing education, (ii) identifying potential difficulties in encouraging poor people to go to school, (iii) proposing activities to attract parent s attention to the impacts of education as well as the community s potential involvement in helping poor people to access secondary education. 12. Gender and Ethnic Minority Specialist (international 2pm, national 3pm). The specialist should have (i) in-depth understanding of the socioeconomic status of ethnic minority groups and of gender issues in Viet Nam; and (ii) a degree in sociology, anthropology, gender studies, or other relevant fields from an internationally recognized university. The specialist s tasks will include the following, but not limited to (i) prepare profiles of the project-affected communities in the project sites in terms of household sizes, demographic trends, income sources and levels, occupations, socio-economic conditions as gender and ethnic minority group profiles; (ii) identify the disadvantaged groups as the project beneficiaries; (iii) undertake an initial poverty and social analysis and assess a prospective social impact of the proposed loan project in accordance with Guidelines for Incorporation of Social Dimensions in ADB Operations; (iv) identify challenges and constrains in secondary education in the disadvantaged areas and propose suitable measures for mitigation; (v) develop procedures to assess and a gender action plan based on ADB s Policy on Gender and Development for the Project if necessary; (vi) assess the number of indigenous people and their socioeconomic status using ADB s checklist and Indigenous People Impact Categorization Form, and develop a short indigenous people s development plan based on ADB s Policy on Indigenous People and on Gender and Development, if necessary; (vii) ensuring that GEN project category threshold requirements are satisfied vis-à-vis current guidelines for Gender Mainstreaming Categories; (viii) elaborating the gender issues identified in the IPSA; (ix) collecting the baseline; and (x) developing the specific gender design elements. E. Implementation Arrangements 13. Project Management. MOET will be the EA and will provide the counterpart support including a qualified TA project manager and project staff acceptable to ADB. The Project Management Unit (PMU) will be established in MOET. The equipment to be procured under the PPTA will be turned over to the EA upon the PPTA completion.

14 Appendix 3 14. Financial Management. Disbursements will be done in accordance with ADB s Technical Assistance Disbursement Handbook (2012, as amended from time to time), as amended from time to time). The Government was advised that approval of the TA does not commit ADB to financing any ensuring loan. 15. The proposed TA processing and implementation schedule is listed in Table A3.4. Table A3.4: Technical Assistance Processing and Implementation Schedule Expected Major Milestones Completion Date Reconnaissance Mission November 2013 VP concept clearance and PPTA approval June 2014 Midterm Review/PO Appraisal May 2015 FS Appraisal/TA Final Review/Loan Fact-Finding November 2015 FS Approval February 2016 TA Account Closure April 2016 Source: Asian Development Bank staff estimate. 16. Implementation Period and Reporting Requirements. The Project will be prepared in three phases over 13 months, tentatively from September 2014 to October 2015. The first phase will be 6 months. In month 6, the interim workshop will be organized to discuss and obtain consensus on the basic design and scope of the Project and present the draft PDO. A tripartite meeting is scheduled in the middle of month 5 based on the final PDO and draft FS report. The second phase will be from month 7 to month 10 during TA implementation. Selected national consultants will help PMU collect additional data, finalize cost-tables, and incorporate the inter-ministerial comments to finalize the FS report. In the third phase, the appraisal workshop for the FS report will be organized jointly by the Government and ADB in month 11. The revised FS will be approved by the Government in month 13.