Reed makes decision to mine at Meekatharra Gold Project

Similar documents
For personal use only

TUNKILLIA GOLD PROJECT

For personal use only

Bligh Strikes Joint Venture Agreement to develop Bundarra Gold Project in WA

RAMELIUS APPROVES VIVIEN GOLD MINE

For personal use only

For personal use only

Investor Presentation

ASX: MLX OTCQX: MLXEF GR: FG5. Rapidly Expanding Gold Producer + Commodity /Risk Diversification

For personal use only

A New Growth Story in Western Australian Gold

Westgold Resources Limited Australia s Newest Gold pure-play. Denver Gold - September 2016

INDEPENDENCE GROUP NL

ASX ANNOUNCEMENT QUARTERLY REPORT PERIOD ENDED 30 SEPTEMBER 2017 SUMMARY. 31 October ASX Code: HOR. Management

TAMPIA GOLD PROJECT FEASIBILITY STUDY

ASX RELEASE 28 February, Half Year Ended 31 December 2006

For personal use only

AZUMAH MINING LEASES GRANTED

RNI INCREASES GROSVENOR GOLD ORE RESERVES TO 523,000oz

Emerging Producer in the. Murchison Goldfields

For personal use only

For personal use only

RAMELIUS TAKEOVER OFFER FOR EXPLAURUM LTD

For personal use only

Paulsens Project resource soars 41% to 318,000oz as 2012 surplus cashflow forecast hits $35m

ACTIVITIES REPORT FOR THE QUARTER ENDED 30 JUNE 2018

Glencore Finances Matrix into Copper Production Summary

For personal use only

For personal use only

RIU Explorers Fremantle, February 2016 ASX:MLX

West African Resources awards underground mining contract for M1 South to Byrnecut

SARACEN MINERAL HOLDINGS LIMITED QUARTERLY REPORT: DECEMBER Corporate Details: Sustainability

For personal use only

Resource and Investment NL ASX: RNI November 2013 AGM Presentation

For personal use only

12,178gpt intersection at Paulsens

FY18 guidance upgraded as record production sees cash and equivalents rise 22% to A$102m

ASX: MLX OTCQX: MTXXY GR: FG5. 3 for 1 and a bank. Investor Update - October 2014

Dragon Energy Limited

Building a quality gold business. Mark Clark

MEDIA RELEASE. OCEANAGOLD HAILE OPTIMISATION STUDY DELIVERS ENHANCED VALUE (All financial figures in US Dollars unless otherwise stated)

For personal use only

For personal use only

ASX/Media Release INTERMIN SIGNS EXCLUSIVITY DEED FOR POTENTIAL ACQUISITION OF THE COOLGARDIE GOLD PROJECT HIGHLIGHTS

For personal use only

Creating a 400,000 oz Gold Producing Company In 2014

Annual General Meeting

RIU Resources Roundup Sydney 9 May 2012

KBL Mining Limited (ASX: KBL) Investor Presentation October KBL Mining Limited : : Investor Presentation

ASX Announcement $26M CAPITAL RAISING TO POSITION BLACKHAM FOR TRANSITION TO +100,000OZ PER ANNUM GOLD PRODUCER 1

For personal use only

For personal use only

FOCUS MINERALS LIMITED

WODGINA ORE RESERVE COMMENTARY

Doray to Present at ASX Spotlight New York

MEDIA RELEASE OCEANAGOLD UPDATES DIDIPIO NI TECHNICAL REPORT

An Australian gold miner for global investors BMO Conference - February 2018

ABN Interim Financial Report 31 December 2012

Detailed mining study on Malcolm Challenger Project in progress

MERGER PRESENTATION JULY 2018

Makabingui Gold Project

Haoma Mining NL. Dear Sir, ACTIVITIES REPORT FOR THE QUARTER ENDED MARCH 31, 2010 HIGHLIGHTS

For personal use only

GOLD RESERVES INCREASED BY 155% TO 2.15 MILLION OUNCES AT SIMBERI GOLD PROJECT

Metals X Limited Extraordinary General Meeting. 10am - 24 November 2016

For personal use only

LionGold s Bolivia Gold Project delivers a 40% increase in its Mineral Resource estimate to now contain a total of 1.79 million ounces of gold

ASX Announcement. 2 February Company Presentation. felimited.com.au. Australian Securities Exchange Code: FEL

Doray Minerals Limited

Ranking and rating of all explorations targets completed with the 2018 drilling programme underway

A DIVERSIFIED MINER ASX :MLX OTCQX :MTXXY NICKEL DIVISION GOLD DIVISION TIN DIVISION

For personal use only

Media Release (For Immediate Release)

For personal use only

Path to Near Term Gold Production. Diggers & Dealers, Kalgoorlie, 7-9 August 2017

KBL Mining Limited (ASX: KBL) Presentation May 2015 Resources Investment Symposium BROKEN HILL

Results for Announcement to the Market

KINROSS GOLD CORPORATION Q Results Conference Call & Webcast

QUARTERLY ACTIVITY STATEMENT

Positive Pre-Feasibility at Borborema

HANKING GOLD MINING. Diggers & Dealers. August 2016

For personal use only

CRUSADER RESOURCES LIMITED ABN: HALF-YEAR REPORT FOR THE HALF-YEAR ENDED 31 DECEMBER 2012

For personal use only

For personal use only

INTERMIN AND MACPHERSONS AGREE TO MERGE CREATION OF A NEW GOLD COMPANY HORIZON MINERALS LTD

An Australian gold miner for global investors Macquarie Securities Conference - May 2018

Presentation August ASX Code: TNG

but investors are currently concerned about: Cost pressures Skills shortages US$ gold price outlook Australian dollar gold price per ounce

Kingsgate Consolidated NL ACN

For personal use only

An Australian nickel growth company. Investor Presentation March 2019 David Southam, Managing Director

For personal use only

For personal use only

Asia s newest major gold producer Tujuh Bukit Oxide Gold Silver Heap Leach

For personal use only

For personal use only

For personal use only

Investor Update - June 2012

A$37M INSTITUTIONAL PLACEMENT TO ACCELERATE EXPLORATION PROGRAMS AT WESTRALIA AND CAMERON WELL AND EXTINGUISH JUPITER LIFE OF MINE ROYALTY OBLIGATION

Transcription:

Level 1, 672 Murray St West Perth WA 6005 Locked Bag 8 West Perth WA 6872 Tel: + 61 8 9322 1182 Fax: + 61 8 9321 0556 ASX RELEASE 27 February 2012 Reed makes decision to mine at Meekatharra Gold Project HIGHLIGHTS Bankable Feasibility Study for Meekatharra Gold Project completed. Reed Board makes decision to mine, subject to equity and debt financing arrangements. Stage 1 (95,000 oz pa) is a low-risk multiple open pit mine plan, targeting first gold in DecQ 2012. Direct Construction, Pre-commissioning Mining and Owners Costs A$35.5m Emerging Australian gold producer Reed Resources Ltd (ASX: RDR) (the Company or Reed Resources ), announces the Bankable Feasibility Study (BFS) for the Meekatharra Gold Project has been completed. Subject to finalisation of debt and equity financing arrangements, the Board has resolved to commence Project execution which would see gold production scheduled in the December quarter of this year. The Meekatharra Gold Project has a number of key advantages, including: Existing 3 Mtpa (oxide) processing facilities and infrastructure Low capital expenditure A large reserve and resource base with significant exploration potential The completion of the BFS and the decision to mine together represent a significant milestone for the Company, as Reed Resources continues its focus on bringing the Meekatharra Gold Project into production. Gold production is planned to proceed in three stages: Stage 1 - to commence immediately equity funding arrangements are settled. It is a low-risk start-up which the Company anticipates will become a considerably larger project in future years. Stage 1 will focus on production of 2.0 Mt @ 2.0 g/t Au for 134,000 oz over 19 months from the Bluebird, Whangamata, Batavia and Surprise open pits, all within a six kilometre radius of the mill at Yaloginda. Stage 2 presently projected to commence in early 2014 and to include production from eight existing and identified reserves at Yaloginda and Paddy s Flat (6 Mt @ 1.7 g/t Au for 328,000 oz).

Geotechnical, hydrological, metallurgical, and environmental studies are in progress and are planned to be completed before the end of the third quarter of CY2012. A BFS-level evaluation is anticipated to be completed before the end of the first quarter of CY2013. Stage 3 - currently under continuing evaluation and is anticipated to supplement the Stage 2 open pits with ore from the Paddy s Flat Underground reserve (2 Mt @ 3.6 g/t Au for 225,000 oz). A BFSlevel evaluation is anticipated to be completed by second quarter of CY 2013. Reed Resources has also budgeted during these early stages to be actively exploring its numerous Brownfield and Greenfield targets at Meekatharra to further enhance both its resources and reserves to continue life of Project into subsequent staged developments. Table 1. Stage 1 Summary target operational statistics Annual production rate 95,000 oz per annum 1.65 Mtpa @ 1.77g/t (recovered) Total planned recovered ounces in Stage 1 134,200 oz (after mill recovery of 94%) Direct construction cost A$24.1 million Pre-commissioning mining and owners costs A$11.4 million Average cash cost (C1) A$1,076/oz Stage 1 duration 21 months (mining)/19 months (milling) Stage 1 inventory (@A$1300/oz) 2.2 Mt @ 2.0g/t (Mining Stocks) 0.17 Mt @ 0.8g/t (Low Grade Stocks) Average strip ratio 7.8:1 Reed Resources Managing Director, Mr Christopher Reed said: The completion of the BFS and the decision to commence operations are significant achievements, and a reflection of the hard work by our technical team since Reed Resources acquired the Meekatharra Gold Project. With strong gold prices and appropriate finance structuring, the economic viability of the Project is robust. The BFS uses live tendered prices, providing solid confidence in cost inputs. The execution strategy and schedule have been finalised and assuming prompt completion of the required financing arrangements, we are looking forward to pouring gold before the end of the calendar year. Our work in sourcing the equity and debt funding required to restart operations at Meekatharra is well advanced Mr Reed concluded. Project Execution and Progress The Project Execution methodology for the re-commencement of gold production at Meekatharra is in place. Key operational staff have been appointed (ASX Announcement 11 January 2012), and further operational staff will commence in the coming months. In line with the Project execution strategy, the Company is now ready to award key contracts to enable plant refurbishment, accommodation upgrade and associated infrastructure works to commence once the equity funding package is in place.

Risk Management To mitigate technical risk, Reed Resources will execute the Project in three distinct stages. Later decisions to commence Stages 2 and 3 respectively will be based on Bankable Feasibility Studies using prevailing live tendered prices and achievable gold prices. Financing The Company projects that aggregate funding required to commence gold production at the Meekatharra Gold Project, until positive net cash flow is achieved, to be around A$45million. Net cashflow generated during the 19 months of Stage 1 milling is projected to be around A$66 million (using a A$1520 price floor). The Company proposes to use a 50% Participating Forward structure for price protection, essentially selling half of production as forward delivery contracts over this period and purchasing put options for the balance of Stage 1 production. In this manner the Company will shelter its risk against any unexpected gold price downturn whilst retaining significant upside participation. It should be noted that as at 30 June 2011 the Company has carried forward losses of A$51m, which translates to the Company not being in a taxable position until at least Stage 2 of the Meekatharra Gold Project. The commitment to proceed with Stage 1 is subject to finalisation of funding arrangements. The company is in advanced negotiations with respect to an equity funding package and has short-listed several project financiers in relation to debt funding. The Company anticipates being in a position very soon to advise the market of the structuring of the proposed financing arrangements. The Company is being advised by Bligh Capital and Noah s Rule in relation to its funding requirements for the Meekatharra Gold Project. For further information please contact: Chris Reed Reed Resources Ltd T: +61 89322 1182 E: chris@reedresources.com John Gardner MAGNUS Investor Relations T: +61 8 9212 0101 / +61 413 355 997 E: jgardner@magnus.net.au COMPETENT PERSONS STATEMENT Geological aspects of this report have been compiled by Mr Craig Fawcett (MAIMM), a full time employee of Reed Resources Ltd. Mr Fawcett has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which is being reported on to qualify as a Competent Person as defined in the Code for Reporting of Mineral Resources and Ore Reserves (2004). Mr Fawcett consents to the inclusion in this report of the matters in the form and context in which it appears.

APPENDIX A: SUPPORTING IMAGES AND ORE RESERVE/MINERAL RESOURCE STATEMENTS Plan of Meekatharra Gold Project, Murchison Region WA

Plan of Yaloginda Area, Meekatharra Gold Project (Above) and Bluebird Pit (below)

Batavia Pit (Left) and Whangamata (Right) Surprise Pit

Bluebird Mill, Yaloginda Bluebird Camp, Yaloginda

Table 2. Summary of Current Ore Reserves Type Project Reserve Classification Tonnes Gold Grade (g/t) Total Ounces Open Pit Bluebird Probable 1,410,000 1.9 87,000 Prohibition Probable 1,110,000 2.7 96,000 Mickey Doolan Probable 3,312,000 1.1 121,700 Maid Marion Probable 192,100 1.4 8,650 South Junction Probable 97,000 1.5 4,500 Surprise Probable 136,000 3.0 13,000 Batavia Probable 200,000 2.4 14,000 Whangamata Probable 258,962 1.43 11,900 GNH Probable 880,342 1.26 33,600 Aladdin Probable 383,700 1.7 21,450 Jack Ryan Probable 222,500 3.1 21,800 Callisto Probable 72,500 3.1 7,200 Rand Probable 100,000 2.4 7,600 South Emu Probable 91,100 4.7 13,900 TOTT Probable 505,000 1.8 29,400 Sub-Total Probable 8,971,204 1.7 491,700 Underground Prohibition Probable 1,325,260 2.4 104,100 Vivian/Consols Probable 256,500 7.7 63,600 Fatts/Mudlode Probable 380,000 4.7 57,200 South Emu Probable 249,700 4.3 34,200 Sub-Total Probable 2,211,460 3.6 259,100 Meekatharra TOTAL 11,182,664 2.1 750,800

Table 3. Summary of Current Mineral Resources Project Resource Classification Tonnes Gold Grade (g/t) Total Ounces Meekatharra North Indicated 749,200 1.4 34,200 Inferred 19,600 1.4 900 Sub-Total 768,800 1.4 35,100 Paddy's Flat Indicated 23,096,700 1.6 1,175,276 Inferred 11,610,000 1.6 580,853 Sub-Total 34,706,700 1.6 1,756,128 Yaloginda Indicated 10,049,000 1.7 563,603 Inferred 6,291,000 1.7 346,877 Sub-Total 16,340,000 1.7 910,480 Nannine Indicated 611,000 1.6 30,900 Inferred 243,000 1.6 12,700 Sub-Total 854,000 1.6 43,600 Reedys Indicated 2,740,000 3.1 276,410 Inferred 3,688,000 2.4 289,359 Sub-Total 6,428,000 2.7 565,760 TOTAL Indicated 37,245,900 1.7 2,080,380 Inferred 21,851,600 1.8 1,230,689 TOTAL 59,097,500 1.7 3,311,068

About Reed Resources Reed Resources Ltd (ASX: RDR, OTC: RDRUY) is an emerging Western Australian gold producer focused on bringing its flagship Meekatharra Gold Project into production in the second half of 2012. Reed Resources wholly owned Meekatharra Gold Project is located in the prolific Murchison region of Western Australia and has a current JORC resource of 3.31 Moz and existing infrastructure including the 3 Mtpa Bluebird processing plant. Reed Resources other projects include: Mount Marion: High-grade lithium project located 40km south of Kalgoorlie in JV with Mineral Resources Limited (ASX: MIN) and set to be the World s second biggest lithium concentrate operation. Currently under construction. Barrambie: Definitive Feasibility Study completed on the production 6300t of vanadium per annum. Currently in approvals process and evaluating recovery of titanium and iron as coproducts. Comet Vale: Evaluating recommencement of high-grade underground gold production, currently on care & maintenance. JORC resource of 186,000 oz at 10.8 g/t Au. Mount Finnerty: Iron ore JV with Cliffs Natural Resources and nickel farm-in with Barranco Resources NL. Reed Resources American Depositary Receipts (ADR s) trade under the code RDRUY (CUSIP Number: 758254106). Each Reed Resources ADR is equivalent to 10 ordinary shares of Reed Resources as traded on the ASX. The Bank of New York Mellon is the depository bank. Website: www.reedresources.com