FBIL MIBOR-OIS Curve 1 Methodology Document Version II

Similar documents
] [ where, C t is the Cash Rate; T t is the Tom Rate; S Value Date is the Spot Settlement Date.

Methodology of Calculation of the Benchmark Certificate of Deposit Curve

Methodology of Calculation of the Benchmark Certificate of Deposit Curve

FBIL - Certificates of Deposit (FBIL - CD) Benchmark

Methodology of Calculation of the Benchmark Treasury Bills Curve

Methodology of Calculation of the Benchmark Treasury Bills Curve

MUMBAI INTER-BANK OVERNIGHT RATE (MIBOR)

METHODOLOGY FOR COMPUTATION OF BENCHMARK FORWARD PREMIA AND MIFOR CURVE SECTION 1: OVERVIEW OF THE INDIAN FX SWAP MARKET

ESTIMATION OF A BENCHMARK CERTIFICATE OF DEPOSIT (CD) CURVE

FBIL. Newsletter FROM CHAIRPERSON S DESK: Section 1: New Developments. Section 2: MARKET WATCH ISSUE:1 MARCH 2019

Repo Market and Market Repo Rate as a Collateralized Benchmark Rate 1

DESIGNING AN UNBIASED REFERENCE RATE 1

Indian Sovereign Yield Curve using Nelson-Siegel-Svensson Model

FIMCIR/ /45. March 1, To, ALL FIMMDA MEMBERS. VALUATION OF INVESTMENTS AS ON 31 st MARCH 2012

ICE Swap Rate is calculated off tradeable quotes from regulated, electronic, multilateral trading venues.

21st February Note On Valuation of State Government Securities & Risk Assessment for trades in such securities

FIMCIR/ /41. March 1, Amended as on September 23, 2013* To, ALL FIMMDA MEMBERS. VALUATION OF INVESTMENTS AS ON 31 st MARCH 2013

Building a Zero Coupon Yield Curve

TO ALL MEMBERS & OTHER INTERESTED PERSONS

FIMCIR/ /60. March 17, To, ALL FIMMDA MEMBERS, VALUATION OF INVESTMENTS AS ON 31 ST MARCH 2008

ASX Bank Bill Swap (BBSW) Conventions- NBBO Rolling Maturity Pool

10T and U10T Eris Standard Invoice Swap Futures: Contract Specifications

GUIDELINES / CLARIFICATIONS FOR VALUATION OF INVESTMENTS

FIMCIR/ /46. March 31, 2015 ALL FIMMDA MEMBERS. Dear All, Re: VALUATION OF INVESTMENTS AS ON 31 st MARCH 2015

Interest Rate Futures Products for Indian Market. By Golaka C Nath

Course Fee : Members : Rs % (service tax) : Non Members : Rs % (service tax) : am to 5.00 pm including lunch break

Bond Market Development in Emerging East Asia

HSBC Mutual Fund - Snapshot of Valuation Policy - Annexure A. Sr. No Type of Instrument Basis of Valuation

Dear All, Re: VALUATION OF INVESTMENTS AS ON 31st MARCH 2014 REVISED

Discounting. Jeroen Kerkhof. 22 September c Copyright VAR Strategies BVBA 1 / 53

Course Fee : Members : Rs % (service tax) : Non Members : Rs % (service tax)

ASX End of Day Bank Accepted Bills (EOD BABs) Calculation Methodology and Definitions

Clearcorp Dealing Systems (India) Limited FACTBOOK 2017

Course Fee : Members : Rs % (service tax) : Non Members : Rs % (service tax) : am to 5.00 pm including lunch break

Course Fee : Members : Rs % (service tax) : Non Members : Rs % (service tax)

Table of contents. Introduction 3. Abbreviations and Terms Scope of the Handbook General Principles Management Control...

Final Terms dated April 11, 2012

How to Use JIBAR Futures to Hedge Against Interest Rate Risk

Operational Guidelines for Reckoning the Market Value of Collateral in Repo/Reverse Repo transactions with RBI

EODBABs Calculation Methodology

Math2UU3*TEST4. Duration of Test: 60 minutes McMaster University, 27 November Last name (PLEASE PRINT): First name (PLEASE PRINT): Student No.

Blueprint for the Hybrid Methodology for the Determination of EURIBOR

Bank of America, N.A. India Branches - Policy on Bank Deposits

Morgan Stanley Finance LLC

Update on the hybrid Euribor methodology

CENTRE DEBT MARKET IN INDIA KNOWLEDGE. Introduction. Which sectors are covered by the Index?

NSE Indices Limited (Formerly known as India Index Services & Products Limited-IISL) NIFTY 50 Futures Index - Methodology Document

Automobile Financial Information

under the Global Debt Issuance Facility

Introduction to Eris Exchange Interest Rate Swap Futures

Subject: Introduction of New Products in Currency Derivatives Segment

BBSW Methodology. 21st May BBSW Methodology 1/9

भ रत य रज़वर ब क RESERVE BANK OF INDIA

Access arrangement. JGN s NSW gas distribution networks. 1 July June [June 2015]

Frequently Asked Questions Amending when Single Name CDS roll to new on-the-run contracts: December 20 1, 2015 Go-Live

VALUING FLOATING RATE BONDS (FRBS)

Eris Interest Rate Swap Futures: 10Y Standard Contract Specifications

Note on Cubic Spline Valuation Methodology

Compounding Swap Vaulation Pratical Guide

Investment Valuation Policy & Procedure

Day-ahead Market Regulations. Nord Pool AS

FIXED INCOME RESEARCH

PRIME ACADEMY PVT LTD

HSBC MUTUAL FUND NOTICE CUM ADDENDUM

Investment Returns and Assumptions Report

TERMS AND CONDITIONS OF THE TIER 3 NOTES

Financial Benchmarks India Pvt. Ltd

Swaption Product and Vaulation

10Y Eris Primary Standard Swap Futures: Contract Specifications

NIFTY AAA Corporate Bond Index. Methodology Document

Centuria Property Funds Limited Unit Pricing Policy

Wholesale Debt Market Segment 5

CCIL All Sovereign Bonds Index (CASBI) Golaka C Nath, Gaurav Yadav and Aparna Vachharajani Introduction

MODIFICATION TO THE TRADING HOURS

Date: 30 November Effective Date: 7 December 2016

Blood Donation - an introduction to your EASY payslip

Chapter 17. The. Value Example. The Standard Error. Example The Short Cut. Classifying and Counting. Chapter 17. The.

Wholesale Debt Market Segment 5

DEBT MARKET. Mark to Market Valuation Rules. July 2016

RMB Currency Futures. Risk Management and Trading Applications

S&P 500 Index (the SPX Index ) and Russell 2000 Index (the RTY Index ) CMS reference index:

FIXED INCOME RESEARCH

Form CT-1040ES Estimated Connecticut Income Tax Payment Coupon for Individuals

Debt Valuation Policy. March 2017

भ रत य रजवर ब क RESERVE BANK OF INDIA RBI/ /117 FMOD.MAOG.No.116/ / November 10, 2016

The Association of Corporate Treasurers

Date: 30 July Effective Date: 30 November 2015

PRIBOR Calculation Methodology. Date: November CZECH FINANCIAL BENCHMARK FACILITY S.R.O. ALL RIGHTS RESERVED.

India Index Services & Products Ltd. NIFTY Multi-Factor Indices Methodology Document

Pricing Supplement. LEGAL & GENERAL GROUP Plc

EUROPEAN COMMISSION Directorate General Internal Market and Services

Wholesale Leased Line Service Level Agreement

Special Executive Report

The 2018 Capitol Hill Challenge Program

Charting Functionality

CONTRACT RULES: ICE FUTURES OVERNIGHT INDEX AVERAGE INDEXED FUTURES CONTRACTS

Amount raised from Primary Market. Turnover in Secondary Market

Comments on POSITION PAPER ON THE EVOLUTION OF ICE LIBOR issued by the ICE Benchmark administration

INTEREST RATE STRUCTURED PRODUCTS

Amount raised from Primary Market. Turnover in Secondary Market

Transcription:

FBIL MIBOR-OIS Curve 1 Methodology Document Version II The FBIL MIBOR-OIS Curve will be constructed on the basis of trades executed in the market. All MIBOR-OIS transactions reported to CCIL upto 5 pm are used for computation of MIBOR-OIS Curve. The Curve will be constructed for 1,, 3, 6, 9, 1, 4, 36, 48 and 60 months Tenors. The OIS Curve will be constructed using the following methodology: 1. The rates will be based on traded data for each Tenor. The minimum threshold criteria for each tenor will be three surviving trades aggregating `75crore in value after removing the outliers calculated using the criteria of +/-3SD. All trades reported and matched at CCIL upto 5 PM will be considered.. The rate for each Tenor will be calculated as the volume weighted average rate of the surviving trades. 3. Rates will be constructed for 1 Month, Month, 3 Month, 6 Month, 9 Month, 1 Year, Year, 3 Year, 4 Year and 5 Year Tenors. 4. Benchmark computation will comprise of two parts shorter tenors comprising of 1 Month, Month, 3 Month and longer tenors comprising of 6 Month, 9 Month, 1 Year, Year, 3 Year, 4 Year and 5 Year Tenors. Computation for longer tenors will be done first given their relative liquidity. 5. Market trades on money market rate basis upto 1 year and trades on semi-annual basis for Tenors more than 1 Year. For consistency of the continuous curve construction, all semi-annual rates will be converted into annualized basis using the formula: Annualized Rate = ((1 + Semi Annual Rate% ) 1) 6. After converting all the traded rates into standardized annualized rates, rates for all missing Tenors (where threshold criteria of 3 surviving trades aggregating ` 75 crore in value is not met) are computed as the previous day's OIS rate of the Tenor plus the average spread over the previous day of the two adjacent Tenors or the nearby Tenor spread as the case may be if minimum traded points are available between 6 Month 1 The document has been prepared by Dr. Golaka C Nath for FBIL. 38

and 5 Year. The spread is based on the standardized rates as mentioned above (Annexure 1). The dataset used herein are the trades from 6 months to 5-year maturity only. 7. Final rates will be disseminated as per the respective market convention for the various Tenors. Y, 3Y, 4Y and 5Y will be shown as Semi-annual Rate after reconverting them from annualized rates to semi-annual rates. 8. If only one traded point is available, then the previous day's OIS rates are repeated for rest of the Tenors keeping only the traded point. 9. If no OIS rates for any Tenor can be calculated on a day due to lack of traded points, then the previous day's OIS rates are repeated. 10. For the purpose of benchmark computation for the shorter tenors (1M, M and 3M), the threshold criteria of 3 surviving trades aggregating `75 crore in value will be adhered to as above, and the rate for each Tenor will be calculated as the volume weighted average rate of the surviving trades. 11. In case traded points are not available, rates will be computed as the previous day's OIS rate of the Tenor plus the average spread over the previous day of the two adjacent Tenors or the nearby Tenor spread as the case may be. The dataset used for this will be trades from 1 Month to 6 Month maturity. (Annexure ) 1. All Rates will be calculated by rounding off upto 4 decimals. The display will be upto decimals. 13. The display format is given in Annexure 3. 14. A brief summary of revision is also available at Annexure 4. The Benchmark FBIL MIBOR-OIS curve for the day will be published by 5.45 PM on all business days excluding Saturday, Sunday and Mumbai Holidays. Reference: OIS Curve A concept on Methodology by Dr. Golaka C Nath 39

Annexure 1: Calculation Process for the Missing Values Using Spread of Adjacent/Nearby Tenor(S) Computation of Missing Rates using Previous day s OIS Rate and Spread for July 18, 017 1 3 4 5 6 7 8 9 10 11 1 A B C D E F G H I Date 17-Jul-17 17-Jul-17 Tenor 6M 9M 1Y Y 3Y 4Y 5Y 6 9 1 4 36 48 60 Disseminated Rates 6.1763 6.1915 6.066 6.171 6.1375 6.189 6.467 =ROUND(((((1+F3%/ =ROUND(((((1+G3%/ =ROUND(((((1+H3%/ 6.1763 6.1915 6.066 )^)-1)*100),4) )^)-1)*100),4) )^)-1)*100),4) Standardized Rates =ROUND(((((1+I3%/ )^)-1)*100),4) 6.0797 6.0461 6.0961 6.151 18-Jul-17 Traded BLANK BLANK 6.15 BLANK BLANK BLANK 6.517 18-Jul-17 18-Jul-17 Standardized to Annual Traded/Comp uted Rate - - 6.15 - - - =C4+(E9- E4) =(D4)+((C10- C4)+(E9- E4))/ 6.15 =(F5)+((E9-E4)+(I9- I5))/ =(G5)+((F10-F5)+(I9- I5))/ =(((1+I6%/)^)- 1)*100 6.3494 =(H5)+((G10-G5)+(I9- I5))/ 6.517 6.18 6.1974 6.1813 6.1956 6.695 =ROUND(((1+F10%)^ =ROUND(((1+G10%)^ =ROUND(((1+H10%)^ 18-Jul-17 Final Rates 6.18 6.1974 6.15 (1/)-1)**100),4) (1/)-1)**100),4) (1/)-1)**100),4) 6.517 6.0886 6.105 6.174 40

Annexure : Calculation Process for the Missing Values Using Adjacent/Nearby Tenor(S) for Shorter Tenors Computation of Missing Rates using Previous day s OIS Rate and Spread for March 7, 018 A B C D E F 1 1M M 3M 6M Date Tenor 1 3 6 3 6-Mar-18 Disseminated Rates 6.506 6.300 6.550 6.776 4 6-Mar-18 Standardised Rates NA NA NA NA 5 7-Mar-18 Traded BLANK 6.956 BLANK 6.53 6 7-Mar-18 Standardised to Annual NA NA NA NA 7 8 9 10 7-Mar-18 Traded/Computed Rate =ROUND(C3+(D7- D3),4) 6.956 6.496 6.306 =ROUND(((E3)+((D7-D3)+(F7- F3))/),4) 6.53 7-Mar-18 Final Rates 6.496 6.956 6.306 6.53 Annexure 3: Display Format for FBIL MIBOR OIS (All rates in %) Date Time 1M M 3M 6M 9M 1Y Y 3Y 4Y 5Y Comments 6-03-18 17:45 6.5 6.3 6.6 6.8 6.39 6.49 6.5 6.65 6.77 6.86 7-03-18 17:45 6.50 6.30 6.3 6.5 6.34 6.46 6.46 6.57 6.67 6.74 41

Annexure 4: Revision to Methodology Sl. Existing provision No. 1 Currently, the benchmark is being published for 7 tenors starting from 6 months upto and including 5 years. The rates for tenors of 1, and 3 months are not published. Revised provision Under the revised methodology, the rates for shorter tenors, viz. 1 month, months and 3 months shall be calculated and published based on the traded data. If sufficient traded data is not available for any tenor, rate for a tenor will be computed as the previous day s OIS rate for the tenor plus the average spread over the previous day of the two adjacent tenors or the nearby tenors as the case may be.. Currently all the missing tenors are interpolated/ extrapolated based on the adjacent tenors or nearby tenors as the case may be, if three traded tenors are available between 6 months and 5 years (Annexure 1 to the existing methodology). If traded data is not available for any tenor (6 months to 5 years tenors), rate will be computed as the previous day s OIS rate for the tenor plus the average spread over the previous day of the two adjacent tenors or the nearby tenors as the case may be if minimum two traded points are available between 6 months and 5 years. 4