Corporate Update. June 2013

Similar documents
First Quarter 2012 Results

AGNICO-EAGLE MINES LIMITED. Corporate Update. May 2012

Corporate Update New York August 2013

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416)

How Life of Mine and Budgets are Developed Toronto February 14, 2014 agnicoeagle.com

JEFFERIES 10 TH ANNUAL GLOBAL INDUSTRIALS CONFERENCE

ANNUAL GENERAL MEETING APRIL 28, 2017

BAML GLOBAL METALS, MINING & STEEL CONFERENCE 2015 MAY 2015

CORPORATE UPDATE. November 2014

DENVER GOLD FORUM. September 2014

For further information: Investor Relations (416)

Agnico-Eagle Mines Limited Corporate Update May 2010

SECOND QUARTER 2016 RESULTS JULY 28, 2016

A $100 per ounce decline in the gold price would reduce the reserves by approximately 3.3% or 310,000 ounces.

THE OSISKO ACQUISITION A Low Risk, Accretive Transaction. North America. April 2014

THIRD QUARTER 2015 RESULTS OCTOBER 29, 2015

Agnico-Eagle Mines Limited Corporate Update September 2010

14MAR Management s Discussion and Analysis (Prepared in accordance with United States GAAP) for the year ended December 31, 2013

BMO GLOBAL METALS & MINING CONFERENCE FEBRUARY 29, 2016

AGNICO EAGLE MINES LTD

Forward Looking Statements

FIRST QUARTER 2018 RESULTS

AGNICO EAGLE MINES LTD

Exploration Projects September 30, 2014

BMO CAPITAL MARKETS 27 TH GLOBAL METALS & MINING CONFERENCE

AGNICO EAGLE MINES LTD

RAYMOND JAMES 39 TH ANNUAL INSTITUTIONAL INVESTORS CONFERENCE

AGNICO EAGLE MINES, LTD MEXICO. Chihuahua, Chih. Sept 13 rd, 2012.

(All amounts expressed in U.S. dollars unless otherwise noted)

The Meadowbank and Meliadine Experience Mining and Exploring North of 60

Second Quarter 2018 Results

(All amounts expressed in U.S. dollars unless otherwise noted)

CORPORATE UPDATE AUGUST 2016

Third Quarter 2018 Results

BANK OF AMERICA MERRILL LYNCH 22 ND ANNUAL CANADA MINING EVENT SEPTEMBER 2016

Agnico-Eagle Mines Limited Annual General Meeting May 12, 2006

BANK OF AMERICA MERRILL LYNCH GLOBAL METALS, MINING & STEEL CONFERENCE

(All amounts expressed in U.S. dollars ( $ or US$ ) unless otherwise noted)

(All amounts expressed in U.S. dollars ("$" or "US$") unless otherwise noted)

HBM. Creating Sustainable Value through High Quality Long Life Deposits

TSX: IMG NYSE: IAG IAMGOLD REPORTS 2013 RESERVES OF 10.1 MILLION OUNCES AND MEASURED AND INDICATED RESOURCES OF 23

AGNICO EAGLE MINES LTD

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C Form 6-K

Agnico-Eagle Mines Limited. Meliadine & Meadowbank. June 28 th, 2011

AGNICO EAGLE MINES LTD

(All amounts expressed in U.S. dollars ( $ or US$ ) unless otherwise noted)

BANK OF AMERICA MERRILL LYNCH GLOBAL METALS, MINING & STEEL CONFERENCE May 2017

NEWS RELEASE GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE

25OCT Second Quarter Report 2017

(All amounts expressed in U.S. dollars unless otherwise noted)

Q Conference Call August 15, 2012 HBM

DENVER GOLD FORUM September 2017

Q4 and Year End 2012 Conference Call. ArgonautGold.com

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C Form 6-K

PRUDENTAND DISCIPLINED

Bank of America Merrill Lynch 2014 Global Metals, Mining & Steel Conference

Allied Nevada Announces Improved Mine Plan and Economics for Hycroft Mill Expansion With 77% IRR and $2.7 Billion NPV

AGNICO EAGLE MINES LTD

First Quarter 2018 Results April 26, 2018

2018 TD SECURITIES MINING CONFERENCE JANUARY 17, 2018

Detour Gold Reports Fourth Quarter and Full-Year 2014 Results and Year-end 2014 Mineral Reserve and Resource Estimates

Marigold Life of Mine Plan

Hudbay Announces 2016 Production Guidance and Capital and Exploration Expenditure Forecasts

Denver Gold Forum September 25, 2018

Alio Gold Reports Second Quarter 2018 Results

Forward Looking Statement

Boto Gold Project Feasibility Study Conference Call

Coeur Announces Initial Reserve Estimate and Reserve-Based Mine Plan for Silvertip Mine

TAHOE REVISES 2017 GUIDANCE FOR GOLD OPERATIONS AND PROVIDES UPDATED RESERVES AND RESOURCES AT TIMMINS WEST

Second Quarter 2013 Earnings Conference Call

Q Conference Call November 2, 2012 HBM

Q PRESENTATION

NEWS RELEASE. Coeur Reports Second Quarter 2014 Results

Spanish Mountain Gold Announces Results of New PEA for the First Zone

Skouries Update March 2018

Q Earnings Review

Investor and Analyst Tour September 30, 2014

TSX:AR CORPORATE PRESENTATION

Investor and Analyst Tour Welcome May 8 th 2017

Q4 and FY 2018 Earnings Review

September 15, 2016 News Release SILVER STANDARD PROVIDES MARIGOLD FIVE-YEAR OUTLOOK

Kişladağ Update March 2018

Renmark Presentation Toronto

MCEWEN MINING ANNOUNCES RECORD RESOURCE ESTIMATE AT THE SAN JOSÉ MINE IN ARGENTINA

Saramacca Reserve Declaration

CANADA S INTERMEDIATE GOLD PRODUCER

KINROSS GOLD CORPORATION Q Results Conference Call & Webcast

MCEWEN MINING ANNOUNCES UPDATED RESERVE & RESOURCE ESTIMATE AT THE SAN JOSÉ MINE IN ARGENTINA

AGNICO EAGLE TO ACQUIRE CAYDEN RESOURCES

Coeur Files Technical Report for Kensington Mine

RBC Capital Markets Underground Mining Technical Session Ernest Mast President & COO October 22, 2015

All-in Sustaining Costs ($/oz)

Eldorado Gold Reports Results of Technical Studies

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia

SECOND QUARTER 2018 RESULTS. August 10, 2018

Forward Looking Statement

Q May 2, 2013 HBM

STRATEGY. DISCIPLINE. EXECUTION. FEBRUARY 15, 2013 FOURTH QUARTER CONFERENCE CALL

YEAR END 2016 CONFERENCE CALL. February 24, 2017

YEAR END 2015 CONFERENCE CALL

Transcription:

Corporate Update June 2013

FORWARD LOOKING STATEMENTS The information in this document has been prepared as at June 5, 2013. Certain statements contained in this document constitute forwardlooking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward looking information under the provisions of Canadian provincial securities laws. When used in this document, the words anticipate, expect, estimate, forecast, will, planned, and similar expressions are intended to identify forward-looking statements or information. Such statements include without limitation: statements regarding timing and amounts of capital expenditures and other assumptions; estimates of future reserves, resources, mineral production, optimization efforts and sales; estimates of mine life; estimates of future internal rates of return, mining costs, cash costs, minesite costs and other expenses; estimates of future capital expenditures and other cash needs, and expectations as to the funding thereof; statements and information as to the projected development of certain ore deposits, including estimates of exploration, development and production and other capital costs, and estimates of the timing of such exploration, development and production or decisions with respect to such exploration, development and production; estimates of reserves and resources, and statements and information regarding anticipated future exploration; the anticipated timing of events with respect to the Company s mine sites and statements and information regarding the sufficiency of the Company s cash resources. Such statements and information reflect the Company s views as at the date of this document and are subject to certain risks, uncertainties and assumptions, and undue reliance should not be placed on such statements and information. Many factors, known and unknown could cause the actual results to be materially different from those expressed or implied by such forward looking statements and information. Such risks include, but are not limited to: the volatility of prices of gold and other metals; uncertainty of mineral reserves, mineral resources, mineral grades and mineral recovery estimates; uncertainty of future production, capital expenditures, and other costs; currency fluctuations; financing of additional capital requirements; cost of exploration and development programs; mining risks; community protests; risks associated with foreign operations; governmental and environmental regulation; the volatility of the Company s stock price; and risks associated with the Company s byproduct metal derivative strategies. For a more detailed discussion of such risks and other factors that may affect the Company s ability to achieve the expectations set forth in the forward-looking statements contained in this document, see the Company s Annual Report on Form 20-F for the year ended December 31, 2012, as well as the Company s other filings with the Canadian Securities Administrators and the U.S. Securities and Exchange Commission. The Company does not intend, and does not assume any obligation, to update these forward-looking statements and information. Alain Blackburn, a Qualified Person and the Company s Senior Vice-President, Exploration, reviewed the technical information disclosed herein. For a detailed breakdown of the Company s reserve and resource position see the February 13, 2013 press release on the Company s website. That press release also lists the Qualified Persons for each project. agnicoeagle.com 2

NOTES TO INVESTORS Note Regarding the Use of Non-GAAP Financial Measures This document presents estimates of future total cash cost per ounce and minesite cost per tonne that are not recognized measures under United States generally accepted accounting principles ( US GAAP ). This data may not be comparable to data presented by other gold producers. These future estimates are based upon the total cash costs per ounce and minesite costs per tonne that the Company expects to incur to mine gold at the applicable projects and do not include production costs attributable to accretion expense and other asset retirement costs, which will vary over time as each project is developed and mined. It is therefore not practicable to reconcile these forward-looking non- GAAP financial measures to the most comparable GAAP measure. A reconciliation of the Company s total cash cost per ounce and minesite cost per tonne to the most comparable financial measures calculated and presented in accordance with US GAAP for the Company s historical results of operations is set forth in the notes to the financial statements included in the Company s Annual Information Form and Annual Report on Form 20-F, for the year ended December 31, 2012, as well as the Company s other filings with the Canadian Securities Administrators and the SEC. Note Regarding Production Guidance The gold production guidance is based on the Company s mineral reserves but includes contingencies and assumes metal prices and foreign exchange rates that are different from those used in the reserve estimates. These factors and others mean that the gold production guidance presented in this disclosure does not reconcile exactly with the production models used to support these mineral reserves. agnicoeagle.com 3

KEY OPERATING HIGHLIGHTS Q1 2013 Production and costs on track; Goldex and La India startup ahead of schedule Q1 2013 gold production of 236,975 oz at a total cash cost of $740/oz as expected Quarterly cash flows from operations of $146 million ($0.80 per share) Goldex to produce ahead of schedule - expected to provide 15,000 oz gold in Q4, 2013 La India to begin commissioning in late Q4, 2013, ahead of schedule; Commercial production expected in Q1, 2014 Kittila mill maintenance to take longer than expected production to resume in late June 2013 Production guidance unchanged at 990,000 oz agnicoeagle.com 4

OPERATING RESULTS First quarter production and costs in line with expectations Q1 2013 2013 Forecast Production (Gold oz) Total Cash Cost ($/oz) Operating Margin ($, 000 s) Midpoint of Production Estimate (Gold oz) LaRonde 39,073 $718 $33,295 177,000 Kittila 43,145 $624 $44,956 150,000 Lapa 26,868 $680 $21,788 97,000 Pinos Altos 1 46,071 $300 $53,827 191,000 Meadowbank 81,818 $1,069 $36,503 360,000 Goldex 15,000 Total 236,975 $740 $190,369 990,000 Q1 2013 Revenue by Metal Q1 2013 Total Operating Margin $190M Pinos Altos 28% Base Metals 3% Silver 8% Gold 89% Kittila 24% Meadowbank 19% 1. Pinos Altos figures include Creston Mascota. Lapa 11% LaRonde 17% agnicoeagle.com 5

Q1 2013 FINANCIAL RESULTS Strong operating quarter in line with expectations All amounts are in US$, unless otherwise indicated Q1 2013 Revenues (millions) $420.4 $472.9 Earnings (millions) $23.9 $78.5 Earnings per share (basic) $0.14 $0.46 Cash provided by operating activities (millions) $146.1 $196.5 Payable Production Gold (ounces) 236,975 227,792 Silver (ounces in thousands) 1,251 1,215 Zinc (tonnes) 8,239 12,978 Copper (tonnes) 1,082 1,326 Q1 2012 Total cash costs ($/oz) $740 $594 agnicoeagle.com 6

FINANCIAL POSITION Expecting to generate free cash flow in 2013 ALL AMOUNTS ARE IN US$, unless otherwise indicated Mar. 31, 2013 CASH AND CASH EQUIVALENTS (millions) $264 LONG TERM DEBT (millions) $800 AVAILABLE CREDIT FACILITIES $1.2 Billion COMMON SHARES OUTSTANDING, BASIC (Q1 13 Weighted average, millions) 172.3 COMMON SHARES OUTSTANDING, FULLY DILUTED (Q1 13 Weighted average, millions) 172.6 Long-Term Debt Maturities 2017 2020 2022 2024 Notes Outstanding (millions) $115 $360 $225 $100 Coupon 6.13% 6.67% 5.93% 5.02% agnicoeagle.com 7

MODERATE, ACHIEVABLE PRODUCTION GROWTH Low political risk, mining-friendly jurisdictions Payable Gold Production Profile (oz) 1,300,000 1,100,000 900,000 700,000 500,000 300,000 100,000 2008A 2009A 2010A 2011A 2012A 2013E 2014E 2015E Actual Estimate agnicoeagle.com 8

DISCIPLINED CAPITAL ALLOCATION Well positioned to fund growth plans and dividends Capital Expenditures (US$ 000 s) $1,200,000 $1,000,000 $800,000 $600,000 $400,000 * Illustrative Ongoing Re-Investment Estimate for projects not yet approved ~ $350M $200,000 $0 2008A 2009A 2010A 2011A 2012A 2013E 2014 2015 Actual Sustaining Capital and Capitalized Exploration ~ $250M Estimate * 2013E Development capital includes approximately $180M on Goldex and La India agnicoeagle.com 9

OPERATIONS

LARONDE Ramp up at lower mine on track Q1 2013 production of 39,073 oz gold at total cash costs per ounce of $718 Additional cooling capacity expected to be installed in 4Q 2013 Positive for operating flexibility and production Approximately 60% of ore in Q1 2013 sourced from deeper mine Value of ore per tonne approximately 50% higher over life mine versus 2012 $240M Cash Operating Margin P&P GOLD RESERVES (million oz) 4.2 AVERAGE GOLD RESERVE GRADE (g/t) 4.5 Indicated resource (million oz) (5.4 M tonnes @ 1.88 g/t) Inferred resource (million oz) (11.9 M tonnes @ 3.73 g/t) 0.3 1.4 Estimated LOM (years) 14 2013 exploration budget (LaRonde & regional) $2M See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources. $160M $80M $0M 2010 2011 2012 agnicoeagle.com 11

LAPA Continues to deliver steady operating results Q1 2013 production of 26,868 oz gold at total cash costs per ounce of $680 Optimization led to increased mill throughput on a year over year basis Ongoing exploration could extend the mine life beyond 2016 P&P GOLD RESERVES (million oz) 0.4 AVERAGE GOLD RESERVE GRADE (g/t) 6.0 Indicated resource (million oz) (1.1 M tonnes @ 4.08 g/t) Inferred resource (million oz) (0.9 M tonnes @ 6.69 g/t) 0.2 0.2 Estimated LOM (years) 3 $120M Cash Operating Margin 2013 exploration budget $3M See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources. $80M $40M $0M 2010 2011 2012 agnicoeagle.com 12

KITTILA Record quarterly recoveries of 92%; Scheduled maintenance to take longer than planned Q1 2013 production of 43,145 oz gold at total cash costs per ounce of $624 Scheduled maintenance for Q2 2013 now extended to include complete relining of the autoclave production anticipated to resume late June Expected to reduce 2013 production by 10,000 to 15,000 oz and increase total cash costs for the Company by $10/oz P&P GOLD RESERVES (million oz) 4.8 AVERAGE GOLD RESERVE GRADE (g/t) 4.5 Indicated resource (million oz) (7.8 M tonnes @ 2.65 g/t) Inferred resource (million oz) (19.0 M tonnes @ 3.88 g/t) 0.7 2.4 Estimated LOM (years) 26 $240M Cash Operating Margin 2013 exploration budget $7M See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources. $160M $80M $0M 2010 2011 2012 agnicoeagle.com 13

MEXICO PINOS ALTOS & CRESTON MASCOTA Creston Mascota leaching resumes ahead of schedule. Q1 2013 production of 46,071 oz gold at total cash cost of US$300/oz* Leaching resumed on the Phase 2 pad at Creston Mascota in March 2013, one month ahead of schedule. Production at Creston Mascota expected to ramp up gradually through year-end Shaft sinking proceeding on time and on budget P&P GOLD RESERVES (million oz) 2.7 AVERAGE GOLD RESERVE GRADE (g/t) 2.2 Indicated resource (million oz) (17.9 M tonnes @ 1.52 g/t) Inferred resource (million oz) (24.6 M tonnes @ 1.19 g/t) 0.9 0.9 Estimated LOM (years) 16 $320M $240M $160M Cash Operating Margin 2013 exploration budget $9M See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources. *Total cash costs per ounce of gold produced and minesite costs per tonne for the Creston Mascota deposit at Pinos Altos are excluded in Q1 2013 due to suspension of heap leach operations effective October 1, 2012. $80M $0M 2010 2011 2012 agnicoeagle.com 14

MEADOWBANK Record quarterly mill throughput Q1 2013 production of 81,818 oz gold at a total cash cost of $1,069/oz. Record quarterly throughput of 11,320 tpd Production expected to be higher in H2 2013 due to higher anticipated grades P&P GOLD RESERVES (million oz) 2.3 AVERAGE GOLD RESERVE GRADE (g/t) 2.8 Measured & Indicated resource (million oz) (10.3 M tonnes @ 2.49 g/t) Inferred resource (million oz) (3.6 M tonnes @ 3.81 g/t) 0.8 0.4 Estimated LOM (years) 6 $320M $240M Cash Operating Margin 2013 exploration budget $4M See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources. $160M $80M $0M 2010 2011 2012 agnicoeagle.com 15

DEVELOPMENT

LA INDIA Commissioning expected to start by year-end 2013 Construction proceeding well and on budget Commercial production expected in 1Q 2014, one quarter ahead of schedule Estimated annual gold production of approx. 90 koz @ average total cash costs of approx. $500/oz Open pit, heap leach mine, with stripping ratio of 1:1 PROBABLE GOLD RESERVES (million oz) 0.8 AVERAGE GOLD RESERVE GRADE (g/t) 0.7 Indicated gold resource (million oz) (43.2 M tonnes @ 0.4 g/t) Inferred gold resource (million oz) (81 M tonnes @ 0.4 g/t) 0.6 1.0 Estimated LOM (years) 8 See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources. agnicoeagle.com 17

GOLDEX Initial production expected in Q4 2013 Expected 2013 production - 15,000 oz, two quarters ahead of schedule Initial focus on the M & E satellite zones GEZ remains suspended Technical studies are underway on several other satellite zones with results expected by year-end P&P GOLD RESERVES (million oz) 0.35 AVERAGE GOLD RESERVE GRADE (g/t) 1.6 Measured & Indicated gold resource (million oz) (27.2 M tonnes @ 1.8 g/t) Inferred gold resource (million oz) (34.6 M tonnes @ 1.5 g/t) 1.6 1.7 Estimated LOM (years) 4 See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources. agnicoeagle.com 18

MELIADINE Permitting underway; Road construction complete 2012 exploration resulted in significant new resources, primarily at Normeg $31 million exploration program for 2013 Drilling restarted in March 9 rigs / 90,000 m drilling planned Portal cover will be installed this year to allow restart of exploration ramp Updated technical study expected in 2014 P&P GOLD RESERVES (million oz) 3.0 AVERAGE GOLD RESERVE GRADE (g/t) 7.0 Indicated gold resource (million oz) (17.2 M tonnes @ 3.9 g/t) Inferred gold resource (million oz) (14.8 M tonnes @ 6.2 g/t) 2.2 2.9 2013 exploration budget $31M See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources. 19

SOUND BUSINESS CONTINUES TO DELIVER No change in strategy or focus AEM continues to be among industry leaders in per share reserves, production, cash flows and dividends Meaningful near-term production growth driven by LaRonde, La India and Goldex, with manageable, fully funded capex Solid, achievable production and cost guidance 22% production growth 2013 2015 at stable costs Business generating strong cash flows in regions of low political risk Allocated to dividends, exploration and investing in strategic assets AEM-NYSE XAU Spot Gold 15-Year Indexed Price Performance 1500% 1000% 500% 12/31/1997 5/18/2000 10/10/2002 3/01/2005 7/19/2007 12/03/2009 4/23/2012 0% agnicoeagle.com 20

APPENDIX

COST EFFECTIVE EXPLORATION REFLECTS SUCCESSFUL M&A STRATEGY Significant exploration results at acquired properties 9,000 +5644 koz +3085 koz Mined 6,000 +3161 koz +1105 koz Proven & Probable Measured & Indicated Inferred 3,000 +1097 koz 0 Kittila '05 Kittila '12 Pinos Altos '06 Pinos Altos '12 Meadow bank '07 Meadow bank '12 Meliadine '10 Meliadine '12 La India '11 La India '12 $200 $150 Purchase Cost per Oz Discovery Cost per Oz $173 $121 $186 $100 $50 $0 $54 $43 $48 $18 $27 $26 $10 Kittila Pinos Altos Meadowbank Meliadine La India Note: The terms measured resources, indicated resources and inferred resources are not recognized under the SEC guidelines. Detailed information can be found in the February 13, 2013 press release. agnicoeagle.com 22

OPERATING METRICS LaRonde 7,500tpd 7,000tpd 6,500tpd 6,000tpd 5,500tpd 5,000tpd 4,500tpd LaRonde - Ore milled ('000 tonnes) LaRonde - Minesite costs per tonne (C$) $140/t $120/t $100/t $80/t $60/t $40/t $20/t 4,000tpd Lapa 1,900tpd 1,850tpd 1,800tpd 1,750tpd 1,700tpd 1,650tpd 1,600tpd 1,550tpd 1,500tpd 1,450tpd 1,400tpd Q1 11 Q2 11 Q3 11 Q4 11 Q1 12 Q2 12 Q3 12 Q4 12 Q1 13 Lapa - Ore milled ('000 tonnes) Lapa - Minesite costs per tonne (C$) Q1 11 Q2 11 Q3 11 Q4 11 Q1 12 Q2 12 Q3 12 Q4 12 Q1 13 $0/t $170/t $150/t $130/t $110/t $90/t $70/t $50/t agnicoeagle.com 23

OPERATING METRICS Kittila 4,000tpd 3,500tpd 3,000tpd 2,500tpd 2,000tpd 1,500tpd 1,000tpd 500tpd 0tpd Kittila - Ore milled('000 tonnes) Kittila - Minesite costs per tonne (EUR) Q1 11 Q2 11 Q3 11 Q4 11 Q1 12 Q2 12 Q3 12 Q4 12 Q1 13 90/t 80/t 70/t 60/t 50/t 40/t Pinos Altos Meadowbank 5,400tpd $60/t 12,000tpd $140/t 5,200tpd $50/t 10,000tpd $120/t 5,000tpd $40/t 8,000tpd $100/t 4,800tpd 4,600tpd $30/t 6,000tpd $80/t $60/t 4,400tpd $20/t 4,000tpd $40/t 4,200tpd $10/t 2,000tpd $20/t 4,000tpd $0/t 0tpd $0/t Q1 11 Q2 11 Q3 11 Q4 11 Q1 12 Q2 12 Q3 12 Q4 12 Q1 13 Q1 11 Q2 11 Q3 11 Q4 11 Q1 12 Q2 12 Q3 12 Q4 12 Q1 13 Pinos Altos - Ore milled ('000 tonnes) Pinos Altos - Minesite costs per tonne (USD$) Meadowbank - Ore milled ('000 tonnes) Meadowbank - Minesite costs per tonne (C$) agnicoeagle.com 24

GOLD AND SILVER RESERVES AND RESOURCES December 31, 2012 Gold Tonnes (000 s) Gold (g/t) Gold (ounces) (000 s) Silver Tonnes (000 s) Silver (g/t) Silver (ounces) (000 s) Proven 13,836 3.13 1,394 Proven 9,390 47.30 14,281 Probable 170,300 3.16 17,286 Probable 57,536 43.93 81,256 Total Reserves 184,136 3.16 18,681 Total Reserves 66,926 44.40 95,537 Measured & Indicated 140,995 1.79 8,104 Measured & Indicated 23,379 31.95 24,015 Inferred 199,503 1.90 12,159 Inferred 36,479 20.66 24,228 See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources. Reserves are not a subset of resources. agnicoeagle.com 25

COPPER, ZINC AND LEAD RESERVES AND RESOURCES December 31, 2012 Copper Tonnes (000 s) Copper (%) Copper (tonnes) Zinc Tonnes (000 s) Zinc (%) Zinc (tonnes) Lead Tonnes (000 s) Lead (%) Lead (tonnes) Proven 6,323 0.30 18,744 Proven 6,323 1.06 67,211 Proven 6,323 0.12 7,738 Probable 22,462 0.24 53,835 Probable 22,462 0.68 152,973 Probable 22,462 0.05 10,304 Total Reserves 28,786 0.25 72,580 Total Reserves 28,786 0.76 220,184 Total Reserves 28,786 0.06 18,042 Indicated 5,432 0.12 6,644 Indicated 5,432 1.50 81,551 Indicated 5,432 0.15 8,071 Inferred 11,887 0.25 29,317 Inferred 11,887 0.58 69,048 Inferred 11,887 0.05 5,375 See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources. Reserves are not a subset of resources. agnicoeagle.com 26

NOTES TO INVESTORS REGARDING THE USE OF RESOURCES Cautionary Note to Investors Concerning Estimates of Measured and Indicated Resources This document uses the terms measured resources and indicated resources. We advise investors that while those terms are recognized and required by Canadian regulations, the SEC does not recognize them. Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into reserves. Cautionary Note to Investors Concerning Estimates of Inferred Resources This document also uses the term inferred resources. We advise investors that while this term is recognized and required by Canadian regulations, the SEC does not recognize it. Inferred resources have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. Scientific and Technical Data Agnico-Eagle Mines Limited is reporting mineral resource and reserve estimates in accordance with the CIM guidelines for the estimation, classification and reporting of resources and reserves. Cautionary Note To U.S. Investors The SEC permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. Agnico-Eagle uses certain terms in this press release, such as measured, indicated, and inferred, and resources that the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC. U.S. investors are urged to consider closely the disclosure in our Form 20-F, which may be obtained from us, or from the SEC s website at: http://sec.gov/edgar.shtml. A final or bankable feasibility study is required to meet the requirements to designate reserves under Industry Guide 7. Estimates for all properties were calculated using historic three-year average metals prices and foreign exchange rates in accordance with the SEC Industry Guide 7. Industry Guide 7 requires the use of prices that reflect current economic conditions at the time of reserve determination, which the Staff of the SEC has interpreted to mean historic three-year average prices. The assumptions used for the mineral reserves and resources estimates at the Lapa, Meadowbank and Creston Mascota mines and the Goldex and Meliadine projects reported by the Company on February 13, 2013 are based on three-year average prices for the period ending December 31, 2012 of $1,490 per ounce gold, $29.00 per ounce silver, $0.95 per pound zinc, $3.67 per pound copper, $1.00 per pound lead and C$/US$, US$/Euro and MXP/US$ exchange rates of 1.00, 1.34 and 12.75, respectively. The assumptions used for the mineral reserves and resources estimates at the LaRonde, Pinos Altos and Kittila mines and the La India and Tarachi projects reported by the Company on February 13, 2013 were based on three-year average prices for the period ending June 30, 2012 of $1,345 per ounce gold, $25.00 per ounce silver, $0.95 per pound zinc, $3.49 per pound copper, $0.99 per pound lead and C$/US$, US$/Euro and MXP/US$ exchange rates of 1.00, 1.30 and 13.00, respectively. The Canadian Securities Administrators National Instrument 43-101 ( NI 43-101 ) requires mining companies to disclose reserves and resources using the subcategories of proven reserves, probable reserves, measured resources, indicated resources and inferred resources. Mineral resources that are not mineral reserves do not have demonstrated economic viability. agnicoeagle.com 27

NOTES TO INVESTORS REGARDING THE USE OF RESOURCES A mineral reserve is the economically mineable part of a measured or indicated mineral resource demonstrated by at least a preliminary feasibility study. This study must include adequate information on mining, processing, metallurgical, economic and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified. A mineral reserve includes diluting materials and allows for losses that may occur when the material is mined. A proven mineral reserve is the economically mineable part of a measured mineral resource demonstrated by at least a preliminary feasibility study. A probable mineral reserve is the economically mineable part of an indicated, and in some circumstances, a measured mineral resource demonstrated by at least a preliminary feasibility study. A mineral resource is a concentration or occurrence of natural, solid, inorganic material, or natural solid fossilized organic material including base and precious metals in or on the Earth s crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics and continuity of a mineral resource are known, estimated or interpreted from specific geological evidence and knowledge. A measured mineral resource is that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters, to support production planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity. An indicated mineral resource is that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters, to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed. An inferred mineral resource is that part of a mineral resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. Mineral resources which are not mineral reserves do not have demonstrated economic viability. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. A Feasibility Study is a comprehensive technical and economic study of the selected development option for a mineral project that includes appropriately detailed assessments of realistically assumed mining, processing, metallurgical, economic, marketing, legal, environmental, social and governmental considerations together with any other relevant operational factors and detailed financial analysis, that are necessary to demonstrate at the time of reporting that extraction is reasonably justified (economically mineable). The results of the study may reasonably serve as the basis for a final decision by a proponent or financial institution to proceed with, or finance, the development of the project. The confidence level of the study will be higher than that of a Pre-Feasibility Study. The effective date for all of the Company s mineral resource and reserve estimates in this press release is December 31, 2012. Additional information about each of the mineral projects that is required by NI 43-101, sections 3.2 and 3.3 and paragraphs 3.4 (a), (c) and (d) can be found in the Technical Reports referred to above, which may be found at www.sedar.com. Other important operating information can be found in the Company s Form 20-F and this news release dated February 13, 2013. Alain Blackburn, a Qualified Person and the Company s Senior Vice-President, Exploration, reviewed the technical information disclosed herein. agnicoeagle.com 28

agnicoeagle.com Trading Symbol: AEM on TSX & NYSE Investor Relations: 416-847-8665 info@agnicoeagle.com