Residential tariff increases and restructuring for MYPD3 explained. Brochure

Similar documents
MYPD3 Application Gauteng January 2013

GUIDELINE DOCUMENT TO MUNICIPALITIES ON THE DESIGN OF A DOMESTIC INCLINING BLOCK RATE TARIFF

THE 2010/11 TARIFF ADJUSTMENT. Standard schedule of Tariffs

MYPD3 Application January 2013

CONSULTATION PAPER ON THE REVIEW OF INCLINING BLOCK TARIFFS FOR ELECTRICITY DISTRIBUTORS

NATIONAL ENERGY REGULATOR OF SOUTH AFRICA

NATIONAL ENERGY REGULATOR OF SOUTH AFRICA. Electricity Subcommittee Public Hearing 3 June 2010

SWARTLAND MUNICIPALITY

Eskom Revenue Application. Multi Year Price Determination. 2010/11 to 2012/13 (MYPD 2)

Eskom 2018/19 Revenue Application

ANNEXURE 1. Consultation Paper

ANNEXURE 1. Consultation Paper

A study into approaches to minimise the impact of electricity price increases on the poor

Approved New Tariffs & Rates for City of Johannesburg Effective 1 July 2011 Principally Residential / Domestic Tariffs Prepared 30 th August 2011

AMEU CONVENTION 2010 MUNICIPAL TARIFF CHALLENGES

COMPANY OVERVIEW ABOUT PEC METERING. Background

NATIONAL ENERGY REGULATOR OF SOUTH AFRICA

AMEU Convention Tuesday 28 SEPTEMBER 2010 Stellenbosch

THE TRADE-OFFS BETWEEN PRO-POOR AND COST- REFLECTIVE TARIFFS IN SOUTH AFRICA: A REGULATORY PERSPECTIVE

Eskom 2018/19 Revenue Application

SALGA Position on Eskom Revenue Proposal 2018/19 Cllr M. Mfikoe Nhlanhla L Ngidi Lonwabo Magida 16 November 2017

Eskom s Draft Application to NERSA for Price. Increase in 2008/9

PRESS STATEMENT SPEECH BY THE ERB BOARD ACTING CHAIRMAN PROF. FRANCIS YAMBA ON THE ZESCO APPLICATION TO VARY ELECTRICITY TARIFFS

Demystifying Tariff Setting The tariff conundrum Lower rates now, blackouts later?

Eskom 2018/19 Revenue Application

NATIONAL ENERGY REGULATOR. Eskom s Regulatory Clearing Account (RCA) Application Third Multi-Year Price Determination (MYPD3) Year 1 (2013/14)

PRESENTATION AT NERSA PUBLIC HEARINGS FOR ESKOM S MYPD3 RCA FOR YEAR 5 RONALD CHAUKE 14 JANUARY 2019

Eskom 2018/19 Revenue Application. Closing remarks

ESKOM S CONNECTION CHARGES METHODOLOGY

Eskom Regulatory Clearing Account (RCA) year 5 of MYPD 3. Public Hearings- Port Elizabeth Date: 16 January 2019

Update on the Energy Conservation Scheme (ECS) proposed by the DME and Eskom. by Chris Yelland CEng Managing editor EE Publishers

Tariffs and Tariff Design Promoting Access to the Poor

NERSA to consider public opinion on the ESKOM proposed revenue application multi-year price determination 2013/14 to 2017/18 (MYPD 3)

ESKOM One Year Application 2018/19

MYPD 3 (Year 2013/14) Regulatory Clearing Account Submission to NERSA

A Rational Price Path for South Africa

(011) (fax) Department:

CENTLEC HOUSEHOLD TARIFFS: 2017/2018 versus 2016/2017

Your EAC bill contains a great deal of useful Information. The purpose of these explanatory notes is to help you to improve your understanding of the

THE NEGATIVE IMPACT OF

Low-Income Customers and Role of the Regulator in Energy Affordability

Department of Energy South Africa

Presentation to NERSA on ESKOM tariff application 5 February 2016

Energy and Climate Change Programme P O Box 106 Office Tel: (+27) (0) Fax:

Eskom Revenue Application. Multi-Year Price Determination (MYPD 4) FY2019/ /22

BUSA presentation to NERSA on Eskom s RCA Application Multi Year Price Determination (MYPD3) Year 1 (2013/2014) 5 February 2016

Public Hearing Presenter: D Matsheketsheke Designation: CFO (act) Date: 9 June 2011

COSATU CONGRESS OF SOUTH AFRICAN TRADE UNIONS COSATU COMMENT ON ESKOM S MYPD3 FOR THE YEAR 2, 3, 4

TARIFF AND GOVERNANCE ASSESSMENT

Draft Eskom 2018/19 Revenue Application

MYPD 3 (Year 2014/15) Regulatory Clearing Account Submission to NERSA

NATIONAL ENERGY REGULATOR. Eskom MYPD2 Regulatory Clearing Account (RCA) and RCA Balance THE DECISION

DESIGN OF ESKOM DISTRIBUTION SERVICE INCENTIVE SCHEME FOR MYPD2 (2010/ /13) (IDMS no: 47217v1)

Electricity Savings Calculations- Based on Actual Bills

CEDERBERG 2011/2012 TARIFF APPLICATION

SETSOTO LOCALL MUNICIPALITY

MYPD Methodology Eskom Response to Consultation Paper

Direction To ESB Public Electricity Supplier On Electricity Tariff Charges for 2003

THEEWATERSKLOOF MUNICIPALITY TARIFF POLICY

Brochure on Eskom s Policy for granting the benefit of diversity. July 2013

POST-CABINET MEDIA BRIEFING

SANCO FREE STATE PROVINCE

OUTA Presentation to NERSA Eskom s 2018/19 application NOVEMBER 2017

The South African Grid Code. Transmission Tariff Code. Version 9.0

RAINMAKER ENERGY. Comments to 2011 NERSA REFIT Review Tariffs

FY2017/18, Year 5 of MYPD 3 Period

Eskom Holdings SOC Limited: Eskom s revenue application for 2018/19

Eatontown Community Energy Aggregation

Fiscal Policy and Financial Support Schemes for Clean Energy Mini Grids (CEMG)

APPENDIX IV U S E R G U I D E

NOTIFICATION OF DEMAND OR CHANGES TO NOTIFIED MAXIMUM DEMAND (NMD) RULES

Eskom group interim results for the six months ended 30 September 2017

The Impact of Electricity Price Increases and Eskom s Six-Year Capital Investment Programme on the South African Economy

Submission to SALGA and National Treasury

Ghana: Poverty and Social Impact Analysis (PSIA) Electricity Tariffs, June 2010

Schedule of Standard Fees 2018/19

Eskom group annual results for the year ended 31 March 2018

2018 Tariff. Part A CLP 2018 Tariff Package. Part B Frequently Asked Questions on 2018 Tariff. Part C Electricity Tariff

ESKOM s applications for MYPD4 and MYPD3 RCA 2017/18

1.1 Executive Mayor s Report Council Resolutions Executive Summary Operating Expenditure Framework Capital Expenditure 22

NAMA KHOI LOCAL MUNICIPALITY

OREGON Rule 10 GENERAL RULES AND REGULATIONS BILLING Page 1

Economic Development Rate Criteria (Grand Bahama Power Company Grand Bahama, Bahamas)

AFRICAN UTILITY WEEK 2009 At van der Merwe & Louis Fourie

SOLUTION. [?]Adoption by all stakeholders of a vision document for the ESI

EIUG Comment on Eskom s RCA Applications 2014/15, 2015/16, 2016/17

NATIONAL ELECTRICITY TARIFF STUDY. Final Report

INQUIRY INTO THE FUNDING ARANGEMENTS OF HORIZON POWER

NERSA CONSULTATION PAPER: ESKOM MULTI-YEAR PRICE DETERMINATION METHODOLOGY

Provincial Gazette Igazethi Yephondo Provinsiale Koerant

A GUIDE TO UNDERSTANDING YOUR RESIDENTIAL BILL/STATEMENT

2.0 Reference: Application, Volume I, Chapter 2, Consolidated Revenue Requirements and Financial Schedules

Market Monitoring Report. SEQ retail electricity market monitoring: January to March 2018

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of May 20, 2017

ESKOM RCA Applications 2015/ / /18

Value Added Tax and Climate Change Levy explained. For large business customers

CONSULTATION PAPER THE DISCOUNT RATE METHODOLOGY FOR LICENSED ELECTRICITY DISTRIBUTORS PUBLISHED ON 19 SEPTEMBER 2017

Investor Presentation. Cover slide (same as IR cover)

ESKOM TARIFF APPLICATION TO NERSA: MINING SECTOR RESPONSE

TARIFF POLICY GEORGE MUNICIPALITY. 1 P a g e / D R A F T : 2 6 M A R C H A P P R O V E D : 2 7 M A Y

Transcription:

Residential tariff increases and restructuring for MYPD3 explained Brochure November 2012 Residential brochure for MYPD3 changes Page 1

PART 1: ESKOM REVENUE REQUIREMENT Introduction Eskom applies for a price determination or revenue requirement (put simply, a budget) from the National Energy Regulator of South Africa (NERSA) in order to operate normal Eskom business, build new power stations, and diversify the country s energy mix through the encouragement of renewable energy into the market via independent power producers (IPPs). The current Multi-year Price Determination (MYPD2) revenue cycle ends on 31 March 2013. Eskom is proposing a five-year determination for MYPD3, running from 1 April 2013 to 31 March 2018. This is to ensure a more gradual and predictable price path for households, businesses, investors, and the country as a whole. Eskom s MYPD3 application aims to strike a balance between the possible short-term negative effects of increasing electricity prices, the sustainability of the industry, and South Africa s long-term economic and social needs. The submission of this MYPD3 application is the beginning of a public process to address the issues raised in Eskom s application. NERSA is an independent regulator and will follow a process of public consultation prior to making its decision on Eskom s MYPD3 application. Stakeholders are encouraged to participate in this process, give their views, and let them be heard before a decision can be made. Also refer to Eskom s website for more information on Eskom s revenue requirement application. What are the building blocks of Eskom s revenue requirement? Eskom s application for revenue over five years translates into an average price increase of 13% for Eskom needs, plus 3% to support the introduction of independent power producers (IPPs), giving a total of 16%. This is a nominal price increase of 67 cents per kilowatt-hour from the current average of 61 c/kwh in 2012/13 to an estimated average price level of 128 c/kwh in 2017/18. Average price increase for Eskom s revenue application (own needs) 13% Support for the entry of IPPs 3% + = Total price increase of 16% (yoy) The cost components of Eskom s revenue requirement application to NERSA are shown below: Residential brochure for MYPD3 changes Page 2

PART 2: PROPOSAL TO RESTRUCTURE ESKOM S RESIDENTIAL TARIFFS Eskom has three residential tariff categories: Homelight 20A caters for customers with very low consumption (typically indigent). Homelight 60A caters for customers with low to medium/higher usage (typically supplying suburban higher-usage households (can also be applicable to NGOs, government facilities, churches, schools, halls, clinics, and old-age homes) in urban areas with a number of electrical appliances, including a geyser). Homepower range of tariffs catering for higher-consumption residential supplies (typically supplying higher-consumption households with many electrical appliances). These tariffs are all currently on the same inclining block tariff (IBT) structure (a tariff that has rates that increase as you consume more) with four blocks. Reasons for the changes to the residential tariffs: To simplify the tariffs and make them more understandable. To optimise the protection of the poor (limiting the price increase to the poor). To base the tariffs on cost, adjusted with quantifiable subsidies. To ensure that high-usage residential customers pay more cost-reflective prices. What is Eskom s proposal? Eskom is proposing that we have different tariff structures for the different tariff categories discussed above: Homelight 20A: to be a single energy rate lifeline tariff to cater for the poor. This tariff will ensure that the poor are protected against high price increases, with a single-digit increase for the average poor customer. Homelight 60A: a revised IBT with only two blocks Block 1 for consumption up to 600 kwh and Block 2 for any consumption above 600 kwh per month. This tariff will see, on average, a 5% increase indicating that, at lower consumption levels, Eskom has limited the increase. Homepower suite of tariffs; Homepower 1, 2, 3, and 4: a single energy rate plus a fixed network charge based on supply size for higher-consumption supplies. This tariff will see, on average, a 14% increase. (The three tariffs offers can be compared to cell-phone pricing options. Prepaid has no fixed charge, but has high usage charges suitable for low or limited usage whereas customers with a contract have high monthly fixed charges, but the usage rates are lower than prepaid suitable for high usage.) Free Basic Electricity (FBE) FBE will still be applicable to customers who qualify. Eskom is a service provider in this instance and merely implements the FBE based on the criteria set by local government. The change in tariff structures does not discard the FBE portion of qualifying customers. FBE will form part of the first block for the customers on the Homelight 60A tariff, that is, the first 50 kwh of the 600 kwh will be free. Residential brochure for MYPD3 changes Page 3

Homelight 60A versus Homepower 4 Homelight 60A and Homepower 4 are tariffs that cater to the same supply size. Depending on consumption, customers can opt for either tariff. If you consume more than 1 000 kwh per month, then Homepower 4 would be cheaper than Homelight 60A. Currently, customers selecting Homelight 60A can opt for a prepaid meter or to receive a monthly bill. At the moment, however, Eskom is not able to offer Homepower 4 on a prepaid meter, as this tariff has fixed charges, and the Eskom prepaid vending system does not offer fixed charges. The current 2012/13 tariff rates All rates below are inclusive of the environmental levy. The current 2012/13 IBT tariff (applicable to all residential tariffs) IBT Block 1: 50 kwh/month 2012/13 60.83 Block 2: 50 350 kwh/month 75.09 Block 3: > 350 600 kwh/month 111.42 Block 4: > 600 kwh/month 122.21 The proposed new tariffs for Eskom direct residential customers for (excluding VAT) are as follows: Homelight 20A Tariff Homelight 20A 75.58 Homelight 60A Block 1: 600 kwh/month 81.98 Block 2: 600 kwh/month 178.65 Homepower network charge R/account/day Homepower 1 for 25 kva three-phase supplies R3.76 111.90 Homepower 2 for 50 kva three-phase supplies R7.03 111.90 Homepower 3 for > 50 kva and 100 kva threephase supplies R14.51 111.90 Homepower 4 for 16 kva single-phase supplies R2.29 111.90 It should be noted that the above tariffs are proposals to the National Energy Regulator of South Africa (NERSA), and the structure and the increases to be applied will depend on its final decision in February next year. Residential brochure for MYPD3 changes Page 4

For additional information on the Eskom MYPD3 submission, please visit www.eskom.co.za. Impact of the proposed tariff restructuring on the residential tariffs All three residential tariffs will see increases below the average price increase, summarised as follows: The picture below shows the increases per tariff category for all Eskom tariffs. Residential tariffs see the lowest increases. The above graph shows the price increase per tariff category. Urban tariffs will be paying more than the average price increase, as they contribute to subsidising the residential tariffs. Residential brochure for MYPD3 changes Page 5