Maricopa County DOT. Transportation Asset Management (TAM) Planning. March 1, 2018 DYE MANAGEMENT GROUP, INC.

Similar documents
Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

FY Statewide Capital Investment Strategy... asset management, performance-based strategic direction

Public Works Maintenance STORMWATER AND

Florida Department of Transportation INITIAL TRANSPORTATION ASSET MANAGEMENT PLAN

1.0 CITY OF HOLLYWOOD, FL

COMPASS 2009 DATA ANALYSIS AND REPORTING. Project February 2011

MAINTENANCE DEPARTMENT

Chapter 8: Lifecycle Planning

MPO Staff Report Technical Advisory Committee: April 8, 2015 MPO Executive Board: April 15, 2015

Virginia Department of Transportation

Residential Street Improvement Plan

PCI Definition. Module 1 Part 4: Methodology for Determining Pavement Condition Index (PCI) PCI Scale. Excellent Very Good Good.

House Bill 20 Implementation. House Select Committee on Transportation Planning Tuesday, August 30, 2016, 1:00 P.M. Capitol Extension E2.

PUBLIC WORKS CIP SUPPORT

8 FINANCIAL PLAN AND INVESTMENT STRATEGIES: SUPPLEMENTAL INFORMATION

FINAL REPORT. Prepared for the National Cooperative Highway Research Program (NCHRP) Transportation Research Board of The National Academies

The City of Owen Sound Asset Management Plan

Stephen Gaj Leader, Asset Management Team Office of Asset Management, Pavements, and Construction FHWA

Appendix E: Revenues and Cost Estimates

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.

Chapter 6: Financial Resources

2018 Annual Report. Highway Department Accomplishments

Project 06-06, Phase 2 June 2011

Developing a Transportation Asset Management Plan

2012 Road Program. County Council Workshop July 21, 2011 PUBLIC WORKS DEPARTMENT. We must manage our road assets.

THE ECONOMICS OF PREVENTIVE MAINTENANCE

Tony Mento, P.E. January 2017

Asset Management Plan

Infrastructure Asset Management. Southwest Chula Vista Civic Association April 26, 2007

Initial Transportation Asset Management Plan

Norfolk County Asset Management Plan Roads

Instructions for Completing the Annual Road and Street Finance Report

Highway Engineering-II

Pavement Preservation in Hillsborough County, Florida. Roger Cox, P.E. Department of Public Works Transportation Infrastructure Management

City of Sonoma 2015 Pavement Management Program Update (P-TAP 16) Final Report February 25, 2016 TABLE OF CONTENTS

2040 Long Range Transportation Plan - Needs Assessment: System Preservation Pavement, Bridges, and Transit Costs and Benefits

System Preservation Guide

Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia (804)

NCHRP Consequences of Delayed Maintenance

Webinar 11 August 12, 2014

ANNUAL PERFORMANCE AGREEMENTS BETWEEN THE ROAD AGENCY AND ROAD FUND OR PARENT MINISTRY

Asset Management Plan 2016 Township of King

UCI Legislative Update. May 26, 2016 Julie Brown Local Assistance Division

Alabama Transportation Conference. February 9 th, 2015

Public Services Department 2015 Presentation to El Paso County Board of County Commissioners Jim Reid, Executive Director

County Administrator s Office Department of Transportation & Public Works

RIDOT The Ten Year Plan, Asset Management, and Innovation Moving Ahead in the 21 st Century

City of Glendale, Arizona Pavement Management Program

Hot Springs Bypass Extension TIGER 2017 Application. Benefit-Cost Analysis Methodology Summary

COUNTY ADMINISTRATOR PUBLIC WORKS

MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES

PROGRAM FINANCING FUNDING

VIRGINIA S STATE OF THE STATE ADDRESS

ROADS & TRANSPORTATION TABLE OF CONTENTS

Columbia County Town Hall Meeting District 2 Charter County and Regional Transportation System Sales Surtax

Asset Management Plan Prepared by the Town of Halton Hills

Maintenance Management of Infrastructure Networks: Issues and Modeling Approach

The Three Planning Windows of Asset Management John Murray City of Hamilton May 9 th, 2012 CNAM - Montreal. Hamilton Asset Management Plan

White Paper: Performance-Based Needs Assessment

Asset Management Investment Plan

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO

NON-STATE SYSTEM STREET-AID ALLOCATION (STATE AID TO MUNICIPALITIES POWELL BILL ) N.C. Department of Transportation Financial Management Division

Frequently Asked Questions County Road Maintenance Sales Tax Proposition 403: Your Roads. Your Decision.

STATE AID FINANCE ACCOUNTING MANUAL. For Counties

final plan CDOT's Risk-Based Asset Management Plan Colorado Department of Transportation Cambridge Systematics, Inc. Larry Redd, P.E.

ALABAMA DEPARTMENT OF TRANSPORTATION AGREEMENT FOR THE COOPERATIVE MAINTENANCE OF PUBLIC RIGHT OF WAY WITH REIMBURSEMENT

ENGINEER S REPORT PROPOSED ASSESSMENT FOR CSA-41 AREA ROAD MAINTENANCE AND CAPITAL IMPROVEMENTS

HIGHWAY PROGRAMING, INFORMATION MANAGEMENT EVALUATION METHODS

Developing Optimized Maintenance Work Programs for an Urban Roadway Network using Pavement Management System

LOCAL MAJOR BRIDGE PROGRAM

CITY OF ORINDA. Road and Drainage Repairs Plan. (As Updated in 2016) March 15, 2016

CITY OF ORINDA. Road and Drainage Repairs Plan. (As Updated in 2016) March 15, 2016

12/01/2010 Page 1 of 8

QUAIL ROAD EXIT TOWN HALL MEETING NOVEMBER 4, 2017

Presented by: Christy A. Hall, P.E. Secretary of Transportation

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MATERIALS & WORKMANSHIP PAVEMENT WARRANTY (NEW/RECONSTRUCTED HOT MIX ASPHALT PAVEMENT)

2016 PAVEMENT CONDITION ANNUAL REPORT

10-Year Capital Highway Investment Plan DRAFT

Pavement Management Technical Report

10-Year Capital Highway Investment Plan DRAFT

Building Better Parks: An Asset Management Plan for Parks

MoDOT Dashboard. Measurements of Performance

Railroad-DOT Mitigation Strategies (R16) Resurfacing Agreements

Chapter 12: Programming/Resource Allocation

Revenue Sharing Program Guidelines

Funding Update. House Transportation Subcommittee on Long-Term Infrastructure Planning September 10, 2015, 9:00 A.M. Capitol Extension E2.

Revenue Sharing Program Guidelines

NON-STATE SYSTEM STREET-AID ALLOCATION (POWELL BILL) N.C. Department of Transportation Financial Management Division

Improving Management Presentations

Hosten, Chowdhury, Shekharan, Ayotte, Coggins 1

DEPARTMENT OF PUBLIC WORKS

Stormwater System Development Charges

FY 2011 Continuing Appropriations Act. TIGER Discretionary Grant Program

Maintaining roads Experience with output-based contracts in Argentina

DRAFT C APITAL I MPROVEMENT P LAN C ITY OF G EORGETOWN, TEXAS S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6

Transportation Infrastructure Funding Assessment and Economic Impact Analysis for the Commonwealth of Kentucky

MVMCC CAPITAL IMPROVEMENT PROGRAM (CIP) UPDATE AND ADOPTING A RESOLUTION APPROVING A MVMCC CAPITAL BUDGET ALLOCATION AMENDMENT

STORMWATER MANAGEMENT FUND Department of Environmental Services

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association

Transcription:

Maricopa County DOT Transportation Asset Management (TAM) Planning March 1, 2018 DYE MANAGEMENT GROUP, INC.

Transportation Asset Management (TAM) A strategic and systematic process of operating, maintaining, upgrading, and expanding physical assets effectively throughout their lifecycle. It focuses on business and engineering practices for resource allocation and utilization, with the objective of better decision making based upon quality information and well defined objectives. - AASHTO Standing Committee on Highways, Planning Subcommittee on Asset Management 2

MCDOT Mission Promote quality of life and economic vitality Provide a system that is safe and efficient for all modes of travel Encourage a seamless regional transportation network Protect past and future transportation investments through strategic system preservation 3

MCDOT TAM Goals and Objectives Goal 1 Instill TAM as an integral part of the Department business model to foster adoption. 2 Utilize a risk management framework to identify threats and opportunities for projects and programs. 3 Preserve transportation assets, such as pavement and bridges. 4 Make sure the TAMP influences and is influenced by other plans. 5 Enlist the TAMP to cross Division and Branch processes and unify activities in order to advance Department collaboration. 6 Identify sustainable funding patterns for roads and bridges in order to address needs. 7 Stabilize the "peaks and valleys" of project schedules (design and lettings) to improve project delivery. 8 Improve data quality and knowledge in an effort to progress toward structured, data-driven decision-making processes. 4

TAM Building Blocks TAM Investment Strategies Financial Plan Inventory Condition Performance Targets Lifecycle Costs Risk 5

Asset Management Lifecycle Planning Evaluating Budgeting Reporting Scheduling Performing 6

Asset Inventory and Condition Collect inventory and condition data for a representative sample of MCDOT roadway using strictly controlled data collection methods (210) 0.1-mile survey samples Sample width is generally ROW fence to ROW fence Review of samples to ensure representation of assets Road Strata Centerline Miles 0.1-mile Sections Required for 90/10% Pass/Fail Rate +/-7% Local (minus unpaved) 840.23 70 Collector 647.31 70 Arterial 516.17 70 Total 2,003.71 210 Aggregated MOE for All Roads: +/- 4.04% 7

Data Collection Approach Collect data for 36 roadway assets/features Spreadsheet-based form; tablet-based data collection enabled 8

Defining Asset Condition Data collection process focuses on counting inventory and deficiency Performance-based budget model determines LOS based on range established for each asset 9

LOS Scorecards Model creates scorecards for graphic representation of LOS 10

Performance-Based Budgeting A systematic way to allocate funds Addresses gap between available resources and maintenance needs Quantifies and prioritizes work backlog Provides compelling budget information Effectively communicates impact of doing nothing (delayed maintenance) An approach for achieving near- and longterm asset performance goals 11

Performance-Based Budgeting Compare current condition assessment grades to LOS targets Calculate Level of Effort required to achieve target; aggregated to become annual budget Managers develop annual work plans to achieve targets 12

Performance-Based Budget Output 2015 Statewide LOS-BASED WORK PROGRAM AND BUDGET - MAINTENANCE Annual Budget (For LOS-Rated Assets Only) Group Drainage Roadside Feature Fence Guardrail Impact Attenuators Sweeping Litter Shoulders Unpaved Ditches Channels Pipes & Culverts Current LOS Target LOS B- A A+ C+ C+ C+ Target FY Yrs to Target 1 A 2016 1 B- A 2016 1 B B- A B- 2016 2016 2016 2016 2016 2016 2020 1 1 1 1 1 1 Activity Description LOE Qty Units % Distrib. Factor Annual Work Quantity Units Labor Equipment Materials Expenditure Total 1505 ROUTINE FENCE MAINTENANCE 1,697,986 LIN FT 79.33 1.00 1,375,084 LIN FT 1,652,159 472,779 292,821 2,688 2,420,448 1510 ACCIDENT-CHAIN LINK FENCE REPAIR 1,697,986 LIN FT 2.58 1.00 31,610 LIN FT 118,999 48,185 57,775 477 225,436 1511 ACCIDENT BARBED WIRE FENCE REPAIR 1,697,986 LIN FT 4.37 1.00 53,557 LIN FT 90,520 26,482 14,373 75 131,450 9154 CONTRACT FENCE INSPECTION & MINOR REPA 1,697,986 LIN FT 0.13 1.00 2,324 LIN FT - - - 23,237 23,237 9156 CONTRACT NEW FENCE INSTALLATION 1,697,986 LIN FT 13.58 1.00 235,412 LIN FT 2,878 446-975,297 978,621 100.00 1,864,556 547,892 364,969 1,001,774 3,779,191 1503 ACCIDENT GUARDRAIL REPAIR 1,130,026 LIN FT 10.90 1.00 58,504 LIN FT 701,987 340,740 729,172 1,532 1,773,431 1512 ROUTINE GUARDRAIL REPAIR 1,130,026 LIN FT 85.33 1.00 1,026,129 LIN FT 354,242 100,945 128,903 161 584,251 9153 CONTR GR INSTAL & REPAIR-ADOT FURN MATL 1,130,026 LIN FT 2.59 1.00 31,172 LIN FT - - 336,198 682,493 1,018,691 9155 CONTR GR INSTAL/RPR-CONTRACT FURN MATL 1,130,026 LIN FT 1.18 1.00 14,221 LIN FT 253 112-1,273,714 1,274,079 100.00 1,056,482 441,797 1,194,273 1,957,900 4,650,452 1520 CRASH ATTENR. (GUARDR.) REPAIR-ACCIDENT 8,842 LIN FT 96.82 1.00 8,719 LIN FT 64,475 23,007 548,972 7,651 644,105 1590 OTHER ROADSIDE MAINTENANCE 8,842 LIN FT 3.18 2.00 247 LBR HRS 4,124 2,290 317 1,621 8,352 100.00 68,599 25,297 549,289 9,272 652,457 1507 MECHANICAL SWEEPING 11,145 12-FT LM 48.84 1.00 5,444 12-FT LM 325,994 380,458 1,933 817 709,203 9157 CONTRACT MECHANICAL SWEEPING 11,145 12-FT LM 51.16 1.00 5,701 12-FT LM - - - 190,790 190,790 100.00 325,994 380,458 1,933 191,607 899,992 1501 FULL-WIDTH LITTER PICK-UP 40,895 ACRES 16.01 1.00 6,548 ACRES 86,295 22,335 10,836 754 120,220 1502 SPOT LITTER & DEBRIS PICK-UP 40,895 ACRES 71.77 3.00 88,045 LBR HRS 2,073,061 670,001 9,754 51,166 2,803,982 1535 REMOVAL OF DEAD ANIMALS FROM RDWY{NE 40,895 ACRES 12.22 1.00 4,998 LBR HRS 137,766 35,716 1,284 11,412 186,178 100.00 2,297,122 728,052 21,874 63,332 3,110,380 131 BLADE UNPAVED SHOULDERS 17,101 12-FT LM 93.67 1.45 23,299-77,356 92,029 7,432-176,818 132 REPAIR / REMOVE SHOULDERS 17,101 12-FT LM 6.33 49.00 53,056-468,873 604,934 113,317-1,187,123 100.00 546,229 696,963 120,749-1,363,941 1603 CLEAN CUTS/CHANNELS/DIKES/EMBANK CURB 2,473,952 LIN FT 84.32 1.00 2,085,997 LIN FT 837,056 928,530 120,221 6 1,885,813 1604 MINOR SLIDE REMOVAL 2,473,952 LIN FT 3.79 20.00 1,876,362 SQ FT 2,839,478 2,412,901 - - 5,252,379 1690 OTHER DRAINAGE MAINTENANCE & REPAIR 2,473,952 LIN FT 11.89 0.02 5,883 LBR HRS 147,770 163,346 31,488 648 343,251 100.00 3,824,303 3,504,777 151,709 654 7,481,443 1603 CLEAN CUTS/CHANNELS/DIKES/EMBANK CURB 1,972,667 LIN FT 100.00 1 1,972,667 LIN FT 791,579 878,084 113,690 5 1,783,358 100.00 791,579 878,084 113,690 5 1,783,358 1601 ROUTINE DRAINAGE MAINTENANCE 96,181 EACH 18.22 1 17,522 EACH 556,619 432,233 55,496 2,609 1,046,957 1602 EMERGENCY DRAINAGE MAINTENANCE 96,181 EACH 1.43 1 1,368 EACH 105,068 113,332 9,300-227,700 1690 OTHER DRAINAGE MAINTENANCE & REPAIR 96,181 EACH 0.28 2 535 LBR HRS 13,433 14,849 2,862 59 31,204 9114 CONTRACT HYDRO VACUUM-ST PROV TRF CNT 96,181 EACH 80.08 1 77,024 EACH 14,551 21,734 13 117,749 154,047 100.00 689,671 582,148 67,671 120,417 1,459,908 13

Multi-Year Planning Scenarios Group Current Data 1-Yr Goal 3-Yr Goal 5-Yr Goal Feature Current LOS Current Budget Target LOS Target Budget Target LOS Target Budget Target LOS Target Budget Total Budget 143,649,000 166,631,622 151,756,026 149,181,892 Unallocated Funds 17,000,000 19,500,000 19,500,000 19,500,000 Non-LOS Spending 72,465,373 72,465,373 72,465,373 72,465,373 LOS Spending 54,183,627 74,666,249 59,790,653 57,216,519 Fence 2,774,508 3,779,191 3,109,402 2,975,445 Guardrail B- 3,058,079 A 4,650,452 A 3,588,870 A 3,376,554 Roadside Impact Attenuators Length Requiring Sweeping A+ 663,467 A 652,457 C+ 689,602 A 900,206 A 659,797 A 759,803 A 661,265 A 731,723 Length Requiring Litter Patrol (Phx) B- 312,928 A 449,614 A 358,489 A 340,264 Length Requiring Litter Patrol (non-phx) A+ 1,377,521 C- - C- 290,180 C- 725,117 Shoulders A 1,351,232 1,308,816 1,337,093 1,342,749 Ditch C+ 338,893 B 5,187,493 B 1,955,093 B 1,308,613 Drainage Lined Channels C+ 1,623,039 1,783,358 1,676,479 1,655,103 Pipes & Culverts B- 1,455,676 B- 1,459,908 B- 1,457,087 B- 1,456,522 Alligator Cracks B- 702,743 B- 1,478,879 B- 961,455 B- 857,970 Bleeding 463,416 15,854,291 5,593,708 3,541,591 Paved Surfaces Cracks > 1/4" Cracks < 1/4" C D+ 6,603,889 2,177,664 C C- 3,814,785 3,400,808 C 5,674,188 C- 2,585,379 C 6,046,068 C- 2,422,293 Potholes 1,335,915 A+ 1,631,882 A+ 1,434,571 A+ 1,395,109 Raveling B 5,812,465 B 4,126,374 B 4,706,340 B 4,822,333 14

Work the Plan Evaluate the Work Work is performed and accomplishment data is tracked within the OMS Labor, equipment, material, and accomplishment (e.g., linear feet of guardrail repaired/replaced) reported for each work order Cycle starts over to evaluate LOS and tracking towards LOS targets Ability to display LOS trends over time progress toward goal 15

TAM at MCDOT Phase 1: Establish a Baseline Phase 2: Develop a TAM Roadmap Phase 3: Document TAM Program Details improved processes; updated annually Phase 4: Implementation Cartegraph Operations Management System (OMS) implementation underway 16

Summary Proven TAM processes are the foundation for optimizing asset investment Involves all levels of the organization Having good asset inventory and condition data is critical for success Technology enables TAM to be sustainable Supports improvement Provides data for making more-informed decisions Demonstrates impact of those decisions 17

QUESTIONS DYE MANAGEMENT GROUP, INC.