School District of Horicon Community Survey Results. Fall 2017

Similar documents
Barneveld School District Community Survey Results. Spring 2017

West Bend School District Community Survey Results. Spring 2018

Freedom Area School District Community Survey Results. Fall 2018

Lake Mills Area School District Community Survey Results. Spring 2018

Beaver Dam Unified School District Community Survey Results. Spring 2016

PROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue

Burlington Area School District Community Survey Results. Winter 2016

Muskego Norway Schools Community Survey Results. Fall 2015

76% The comprehensive solution put forward by the Community Steering Committee addresses a wide variety of needs at the high school:

Sheboygan Area School District Community Survey Results. Spring 2016

Marathon School District Community Survey Results. Spring 2018

DISTRICT HISTORY Referendum ($585,000) Purchase of 10 Acres / Football Field Original junior high building (present old section of MS)

Barnesville Public Schools Proposed Building Program

Bond Amount: $18,470,000. Proposed I&S Tax Rate Increase: $.3180

School District of West De Pere Community Survey Results. Fall 2017

Oakfield School District Community Survey Results. Fall 2018

Barnesville Public Schools Proposed Building Program

SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S

BELLS INDEPENDENT SCHOOL DISTRICT

2017 Bond Program Summary

Gillett School District Community Survey Results. Spring 2018

FREQUENTLY ASKED QUESTIONS (FAQs)

School Referendum Results School Amount Type of Debt Description Arrowhead UHS Failed

OXNARD SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE R OXNARD SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE R

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T

Use of State and District Construction Funds

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

FREQUENTLY ASKED QUESTIONS

Progress Update Identified Needs & Capital Plan

Building and Site Sinking Fund Millage. Election Date: November 7th 2017

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future

Ballot Measures-T Section

$4,701,440 $2,727,355 $2,596,419 $447,703 $11,216,598 $21,689,515

Ballot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure...

Richland School District

REQUEST FOR PROPOSALS CONSTRUCTION MANAGER AS CONSTRUCTOR

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure...

Capital Projects Fund. Board Work Session August 9, 2007

School District of Somerset Community Survey Results. Fall 2015

KIMBERLY AREA SCHOOL DISTRICT

Total Revenues $27,158,867 $1,800,000 $2,400,000 $2,600,000 $3,600,000 $37,558,867

Understanding the Costs: Frequently Asked Questions

FY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL

Facilities Update Construction Progress

APPENDIX A FULL TEXT OF BOND MEASURE

Guaranteed Energy Savings

Local ballot measure: B. Redding School District Bond Measure

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA

Public Presentation Capital Bond November 27, 2017

CH-UH Board of Education Meeting. June 27, 2017

Montville Township Public Schools

LYONS TOWNSHIP HIGH SCHOOL DISTRICT NO. 204 [La Grange, Illinois] Audited Financial Statements And Supplementary Financial Information.

POJOAQUE VALLEY SCHOOL DISTRICT October 12, 2016

PERMANENT IMPROVEMENT LEVY

SPACE UTILIZATION STUDY ANALYSIS November 5, 2013

Page Item 165 Overview 167 Revenue 168 Expenditures 169 Elementary School Allocation 171 Middle School Allocation 173 High School Allocation 175

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

Capital Projects Completed since 1988

Loveland City Schools FY Revenue

Two Ballot Proposals. August 8, 2017

Performance Audit on 2008 and 2013 SPLOST Revenues For the Fiscal Year ended June 30, 2012

Frequently asked questions on the Ridgewood Public School Budget. 2. Why does the Board approve a preliminary budget?

Measure G Quarterly Progress Update

Baldwinsville Central School District. Capital Project Proposal November 9, 2015 Board of Education Meeting

October 4, 2007 Page 1 of 8

SPOTLIGHT FORSYTH COUNTY BOND REFERENDA. Three bonds totaling $430 million. Taxpayers should get the facts. CITY AND COUNTY GOVERNMENT #481

Measure G Quarterly Progress Update

Page Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182

Montclair Public Schools

RESOLUTION 16/17-4 A RESOLUTION OF GREATER ALBANY SCHOOL DISTRICT NO.

Plainedge Public Schools Budget Presentation

ALAMEDA COUNTY REGISTRAR OF VOTERS LIST OF LOCAL MEASURES November 6, 2012 GENERAL ELECTION MEASURE I

SCHOOL BUDGET NEWS. Elmira City School District. May School District Annual Budget Vote and School Board Election May 17, 2016

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

Fort Wayne Community Schools. Capital Projects Planning March 15, 2011

Highlights. The proposed budget for the. Hornell City School District. May 2016

PERRIS ELEMENTARY SCHOOL DISTRICT

Tumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

2019 Capital Projects Plan

Ballot Measures-LL Section

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

JACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY)

Valley Stream UFSD Thirteen Proposed Budget

I. PROJECT DESCRIPTION

Governing Board Bond Update. Measure G Bond Program. for. Solano Community College District

Los Angeles Unified School District Page 1 of 2

Vice President Arthur G. Soto. Board Member Craig B. Miller. Board Member Christina Schratz

Clinton Public Schools Proposed Budget. Maryann O Donnell Superintendent of Schools January 29, 2018

FORECASTING/BUDGETING SDASBO April 26, 2017

BUDGET REPORT FOR THE YEAR ENDING AUGUST 31, 2018

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

$115,492 $2,963,834 $7,464,804 $7,856,304 $8,404,085 $26,804,519

Sheboygan Falls School District Facilities Public Taskforce - Project Report March 29th' 2011

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

Tomah Area School District Community Survey Results. Spring 2015

RECOMMENDATION. c. Approve a total project cost of $3,300,000

LEE COUNTY SCHOOL DISTRICT S CAPITAL PLANNING PROCESS

Transcription:

School District of Horicon Community Survey Results Fall 2017

Survey Summary The survey was conducted in November December of 2017. Residents within the District were mailed a paper survey. Each survey included a unique survey access code for those who preferred to take the survey online. Total responses = 607 (202 paper) Participation rate = 19% Margin of error = +/- 4%

Respondent Information

What is your age? 60% 50% 40% 30% 20% 15% 25% 21% 17% 20% 10% 0% 2% 18-25 26-35 36-45 46-55 56-64 65 and older

In which municipality do you reside? 60% 58% 50% 40% 30% 20% 10% 10% 10% 8% 8% 5% 1% 0%

Is your primary residence in the Horicon School District? 11% 1% 88% Yes No Not sure

Are you an employee of the Horicon School District? 17% 83% Yes (n=105) No (n=502)

Do you have children attending our schools? 37% 63% Yes (n=225) No (n=382)

How would you like to receive information regarding the Horicon School District? Email School mailings School newsletters Facebook/social media Text message PowerSchool Family Access District/school website Dodge County Pionier Attend meetings Beaver Dam Daily Citizen School Board meetings Other 3% 0% 5% 10% 4% 5% 2% 1% 6% 12% 12% 15% 21% 20% 27% 27% 25% 30% 31% 39% 36% 54% 51% 86% 0% 25% 50% 75% 100% Non-Parents (Non-Staff) Parents (Non-Staff)

Financial Background

In 2018, the District will pay off a large portion of the debt that funded past building projects and as a result, the debt portion of the school tax levy will drop. Using a homeowner s analogy, we are about to pay off our home mortgage. This reduction of loan payments will reduce the tax impact of any new referendum-approved spending. The School Board believes this a good time to consider investing in our schools because of our healthy financial situation and historically low interest rates. The District cannot afford to pay for major building projects out of the annual operating budget. If the public chooses to address these needs, the primary way to obtain funding is through a referendum.

What advice would you give the School Board? (Residents Only) 100% 91% 80% 75% 80% 68% 60% 40% 20% 0% Pursue a referendum to update our schools 10% 0% 5% Do nothing at this time 16% 15% 15% 16% 9% Not sure/need more information All Residents Staff Parents (Non-Staff) Non-Parents (Non-Staff)

Replace or Remodel Van Brunt Elementary

A Comprehensive Facility Review of Van Brunt Elementary was completed by Bray Architects. The Review identified a list of safety and security, infrastructure and building system needs, as well as educational and site deficiencies. To read the entire Review, visit the District s website: www.horicon.k12.wi.us. Key findings of the report include: Classroom floors, lighting, ceilings and casework are in need of replacement. Major building systems, including the plumbing, heating/ventilation and electrical, are past their service life and need to be replaced. Air supply to most rooms does not meet current code, and sections of the building are poorly insulated. The school requires significant updates to meet Americans with Disabilities Act (ADA) code compliance. Because of the large number of load-bearing walls, remodeling options are significantly limited. In addition to the infrastructure needs outlined above, the building is larger than what is needed to serve the current and projected student enrollment. The school is more expensive to heat and operate due to its age. Educationally, the school lacks flexible learning and collaboration spaces. The District shares staff between schools. This requires staff to travel back and forth between the schools, sometimes multiple times in one day, which reduces the amount of time spent working with students.

Do you support the District exploring options to update or replace Van Brunt Elementary School? (Residents Only) 100% 94% 84% 77% 80% 68% 60% 40% 20% 13% 20% 10% 4% 5% 2% 11% 12% 0% Yes No Not sure/need more information All Residents Staff Parents (Non-Staff) Non-Parents (Non-Staff)

Replace Van Brunt Elementary

Option I: Rebuild at the current site at an estimated cost of $19.7 million; this would: 1. Renovate 1954 and 1992 sections of the building with: a. Classrooms for early childhood and kindergarten b. Classrooms for music and band c. Gymnasium d. Upgrades to the plumbing, HVAC and electrical systems 2. Build a two-story addition with: a. Classrooms to serve 1st 5th grades b. Flexible spaces for student collaboration and project-based learning c. Cafeteria and kitchen 3. Secure all building entrances 4. Remove the 3-story 1921/1966 building sections (------) and redesign pick-up/drop-off areas and parking 5. Improve the playground Includes a small addition at the junior/senior high school for 6th grade students

Option II: Build a school at the junior/senior high school at an estimated cost of $20.8 million; this would: 1. Build a two-story addition with: a. Classrooms for early childhood - 5th grades b. Flexible spaces for student collaboration and project-based learning c. An elementary library d. Cafeteria and kitchen (the kitchen would prepare food for all students) e. Secured entrance with office f. Dedicated elementary gym 2. Small addition for 6th grade 3. Renovate a space for District offices 4. Improve the site, including a dedicated: a. Parent drop-off/pick-up area b. Bus drop-off/pick-up area c. Elementary playground

Please select ALL option(s) that you would support. (Residents Only) 100% 83% 80% 60% 60% 65% 52% 40% 20% 28% 30% 25% 22% 15% 17% 15% 16% 11% 2% 8% 24% 0% Option II: Build at the junior/senior high school campus Option I: Rebuild at the current site I'm not sure/need more information I do not support either Option I or Option II All Residents Staff Parents (Non-Staff) Non-Parents (Non-Staff)

Remodel Van Brunt Elementary

What priority would you place on updating the building s infrastructure at an estimated cost of up to $8.6 million? (Residents Only) 100% 80% 85% 75% 60% 58% 40% 20% 0% 42% 26% 20% 22% 15% 11% 12% 8% 7% 2% 2% 5% High Medium Low Not sure All Residents Staff Parents (Non-Staff) Non-Parents (Non-Staff) 10%

What priority would you place on updating the 100% classrooms at an estimated cost of up to $3.2 million? (Residents Only) 80% 67% 60% 40% 20% 37% 37% 33% 32% 25% 27% 29% 27% 37% 19% 8% 4% 2% 7% 9% 0% High Medium Low Not sure All Residents Staff Parents (Non-Staff) Non-Parents (Non-Staff)

What priority would you place on addressing 100% security/ada compliance issues at an estimated cost of up to $1.6 million? (Residents Only) 80% 60% 40% 20% 0% 69% 61% 52% 42% 27% 23% 24% 24% 20% 17% 12% 12% 5% 2% 3% High Medium Low Not sure All Residents Staff Parents (Non-Staff) Non-Parents (Non-Staff) 7%

What priority would you place on updating the kitchen and cafeteria at an estimated cost of 100% up to $1 million? (Residents Only) 80% 60% 56% 40% 28% 31% 22% 37% 32% 34% 31% 28% 42% 27% 20% 11% 6% 2% 5% 8% 0% High Medium Low Not sure All Residents Staff Parents (Non-Staff) Non-Parents (Non-Staff)

What priority would you place on High (3), Medium (2), Low (1) Item All Residents Staff Residents Parent Residents (Non-Staff) Non-Parent Residents (Non-Staff) updating the building s infrastructure at an estimated cost of up to $8.6 million? 2.45 2.84 2.69 2.21 addressing security/ada compliance issues at an estimated cost of up to $1.6 million? 2.33 2.58 2.50 2.16 updating the classrooms at an estimated cost of up to $3.2 million? 2.06 2.64 2.18 1.87 updating the kitchen and cafeteria at an estimated cost of up to $1 million? 1.94 2.45 2.03 1.77

Update Horicon Junior/Senior High School

What priority would you place on updating the building s infrastructure at an estimated cost 100% of up to $8.4 million? (Residents Only) 80% 60% 40% 20% 0% 81% 64% 55% 44% 23% 23% 25% 22% 13% 15% 9% 7% 4% 2% 4% High Medium Low Not sure All Residents Staff Parents (Non-Staff) Non-Parents (Non-Staff) 9%

What priority would you place on updating 100% classrooms, labs and equipment at an estimated cost of up to $4.9 million? (Residents Only) 80% 60% 40% 20% 0% 67% 63% 50% 38% 31% 28% 27% 24% 24% 17% 10% 4% 5% 2% 3% High Medium Low Not sure All Residents Staff Parents (Non-Staff) Non-Parents (Non-Staff) 7%

What priority would you place on updating the kitchen and cafeteria at an estimated cost of 100% up to $1.4 million? (Residents Only) 80% 60% 54% 40% 20% 0% 29% 41% 39% 34% 31% 32% 32% 28% 23% 24% 18% 5% 4% 0% High Medium Low Not sure 6% All Residents Staff Parents (Non-Staff) Non-Parents (Non-Staff)

What priority would you place on updating the 100% indoor physical education areas at an estimated cost of up to $1.3 million? (Residents Only) 80% 60% 40% 20% 0% 63% 45% 41% 35% 29% 31% 27% 28% 30% 22% 24% 8% 5% 2% 3% High Medium Low Not sure All Residents Staff Parents (Non-Staff) Non-Parents (Non-Staff) 7%

What priority would you place on improving building security at an estimated cost of up to 100% $1.1 million? (Residents Only) 80% 60% 72% 65% 57% 49% 40% 20% 0% 21% 20% 20% 22% 23% 17% 11% 8% 5% 4% 0% High Medium Low Not sure All Residents Staff Parents (Non-Staff) Non-Parents (Non-Staff) 6%

What priority would you place on High (3), Medium (2), Low (1) Item All Residents Staff Residents Parent Residents (Non-Staff) Non-Parent Residents (Non-Staff) improving building security at an estimated cost of up to $1.1 million? updating the building s infrastructure at an estimated cost of up to $8.4 million? updating classrooms, labs and equipment at an estimated cost of up to $4.9 million? updating the kitchen and cafeteria at an estimated cost of up to $1.4 million? updating the indoor physical education areas at an estimated cost of up to $1.3 million? 2.41 2.64 2.57 2.27 2.42 2.82 2.56 2.24 2.34 2.64 2.54 2.15 1.97 2.35 2.07 1.83 2.03 2.56 2.22 1.80

Funding Support

The cost to address all the needs identified in the survey could exceed $40 million. We realize doing this all at one time is not feasible. Therefore, our goal is to develop a plan to upgrade our schools in phases, based on the community s priorities AND willingness to financially support the projects. The following table shows the tax impact for various referendum amounts. * The projected reduction in tax rates, described in this survey, is reflected in the calculations above.

How much of a tax increase would you support through a referendum, assuming the projects included were acceptable to you? 50% $32 million Non-Parent Residents (Non-Staff) 19% 6% 14% 8% 19% 10% 8% 16% $29 million $26 million Parent Residents (Non- Staff) 43% 7% 16% 8% 3% 7% 9% 7% $23 million $20 million Staff Residents 44% 8% 19% 15% 12% 2% I would only support a smaller referendum All Residents 29% 7% 15% 9% 13% 7% 9% 11% I'm not sure/need more information I would not support any referendum 0% 20% 40% 60% 80% 100%

Additional Projects at the Horicon Junior/Senior High School

Would you support an additional $3.8 million for building an outdoor athletic field? Representing an additional estimated annual tax increase of approximately $51.00 ($4.25 per month)** for each $100,000 of property value. ** The projected tax reduction is being applied to school projects. Therefore, these additional projects would require additional debt and represent a higher tax impact. All Residents Definitely yes Probably yes 21% 36% 57% Yes Undecided 16% Probably no Definitely no 12% 15% 27% No 0% 15% 30% 45% 60% 75%

Would you support an additional $3.8 million for building an outdoor athletic field? Representing an additional estimated annual tax increase of approximately $51.00 ($4.25 per month)** for each $100,000 of property value. ** The projected tax reduction is being applied to school projects. Therefore, these additional projects would require additional debt and represent a higher tax impact. Staff Residents Definitely yes Probably yes 27% 60% 87% Yes Undecided 11% Probably no Definitely no 0% 2% 2% No 0% 15% 30% 45% 60% 75%

Would you support an additional $3.8 million for building an outdoor athletic field? Representing an additional estimated annual tax increase of approximately $51.00 ($4.25 per month)** for each $100,000 of property value. ** The projected tax reduction is being applied to school projects. Therefore, these additional projects would require additional debt and represent a higher tax impact. Parent Residents (Non-Staff) Definitely yes Probably yes 22% 52% 74% Yes Undecided 14% Probably no Definitely no 6% 6% 12% No 0% 15% 30% 45% 60% 75%

Would you support an additional $3.8 million for building an outdoor athletic field? Representing an additional estimated annual tax increase of approximately $51.00 ($4.25 per month)** for each $100,000 of property value. ** The projected tax reduction is being applied to school projects. Therefore, these additional projects would require additional debt and represent a higher tax impact. Non-Parent Residents (Non-Staff) Definitely yes Probably yes 21% 20% 41% Yes Undecided 17% Probably no Definitely no 19% 23% 42% No 0% 15% 30% 45% 60% 75%

Would you support an additional $9 million for building an auditorium? Representing an additional estimated annual tax increase of approximately $122 ($10.17 per month)** for each $100,000 of property value. ** The projected tax reduction is being applied to school projects. Therefore, these additional projects would require additional debt and represent a higher tax impact. All Residents Definitely yes Probably yes 17% 22% 39% Yes Undecided 23% Probably no Definitely no 20% 18% 38% No 0% 15% 30% 45% 60% 75%

Would you support an additional $9 million for building an auditorium? Representing an additional estimated annual tax increase of approximately $122 ($10.17 per month)** for each $100,000 of property value. ** The projected tax reduction is being applied to school projects. Therefore, these additional projects would require additional debt and represent a higher tax impact. Staff Residents Definitely yes Probably yes 27% 54% 81% Yes Undecided 13% Probably no Definitely no 4% 2% 6% No 0% 15% 30% 45% 60% 75%

Would you support an additional $9 million for building an auditorium? Representing an additional estimated annual tax increase of approximately $122 ($10.17 per month)** for each $100,000 of property value. ** The projected tax reduction is being applied to school projects. Therefore, these additional projects would require additional debt and represent a higher tax impact. Parent Residents (Non-Staff) Definitely yes Probably yes 22% 33% 55% Yes Undecided 21% Probably no Definitely no 9% 15% 24% No 0% 15% 30% 45% 60% 75%

Would you support an additional $9 million for building an auditorium? Representing an additional estimated annual tax increase of approximately $122 ($10.17 per month)** for each $100,000 of property value. ** The projected tax reduction is being applied to school projects. Therefore, these additional projects would require additional debt and represent a higher tax impact. Non-Parent Residents (Non-Staff) Definitely yes Probably yes 10% 11% 21% Yes Undecided 26% Probably no Definitely no 26% 27% 53% No 0% 15% 30% 45% 60% 75%

Thank you!