Math 441 Mathematics of Finance Fall Midterm October 24, 2006

Similar documents
Mathematics of Financial Derivatives

Derivatives Questions Question 1 Explain carefully the difference between hedging, speculation, and arbitrage.

Actuarial Society of India EXAMINATIONS

NATIONAL UNIVERSITY OF SINGAPORE DEPARTMENT OF MATHEMATICS SEMESTER 2 EXAMINATION Investment Instruments: Theory and Computation

SOLUTIONS. Solution. The liabilities are deterministic and their value in one year will be $ = $3.542 billion dollars.

Fixed-Income Analysis. Assignment 5

Finance 402: Problem Set 1

Financial Economics 4378 FALL 2013 FINAL EXAM There are 10 questions Total Points 100. Question 1 (10 points)

Cross Currency Swaps. Savill Consulting 1

Derivative Instruments

Financial Mathematics 2009

Lecture 9. Basics on Swaps

Finance 100 Problem Set Bonds

Final Exam. 5. (24 points) Multiple choice questions: in each case, only one answer is correct.

Lecture 2: Swaps. Topics Covered. The concept of a swap

Appendix A Financial Calculations

Measuring Interest Rates. Interest Rates Chapter 4. Continuous Compounding (Page 77) Types of Rates

Mathematics of Financial Derivatives

Mathematics of Financial Derivatives. Zero-coupon rates and bond pricing. Lecture 9. Zero-coupons. Notes. Notes

Financial Market Introduction

MBF1243 Derivatives Prepared by Dr Khairul Anuar

Financial Markets & Risk

Math 373 Test 3 Fall 2013 November 7, 2013

Derivatives Revisions 3 Questions. Hedging Strategies Using Futures

Second Midterm Exam. Portfolio Beta Expected Return X 1 9% Y 2 10% Is there an arbitrage opportunity? If so, what exactly is it?

Math 1324 Finite Mathematics Chapter 4 Finance

LIBOR. 6 exp( 0:1 4=12) + 6 exp( 0:1 10=12) = $103:328 million. The value of the oating-rate bond underlying the swap is

Final Exam. 5. (21 points) Short Questions. Parts (i)-(v) are multiple choice: in each case, only one answer is correct.

ACI THE FINANCIAL MARKETS ASSOCIATION

SOLUTIONS 913,

Measuring Interest Rates

To lock in the future repayment of USD7.8m, we need to enter a one-year forward exchange contract (FEC), but at what rate?

INSTITUTE AND FACULTY OF ACTUARIES EXAMINATION

INSTITUTE OF ACTUARIES OF INDIA

Mortgages & Equivalent Interest

CONTENTS CHAPTER 1 INTEREST RATE MEASUREMENT 1

Financial Markets and Products

Chapter 11: Duration, Convexity and Immunization. Section 11.5: Analysis of Portfolios. Multiple Securities

FIN 684 Fixed-Income Analysis Swaps

Swaps 7.1 MECHANICS OF INTEREST RATE SWAPS LIBOR

Page Points Score Total: 100

Interest Rate Markets

2. Futures and Forward Markets 2.1. Institutions

Fixed Income Securities and Analysis. Lecture 1 October 13, 2014

Manual for SOA Exam FM/CAS Exam 2.

Pricing Options with Mathematical Models

Swaps. Chapter 6. Nature of Swaps. Uses of Swaps: Transforming a Liability (Figure 6.2, page 136) Typical Uses of an Interest Rate Swap

Fixed-Income Analysis. Solutions 5

BOND ANALYTICS. Aditya Vyas IDFC Ltd.

Interest Rate Risk. Chapter 4. Risk Management and Financial Institutions, Chapter 4, Copyright John C. Hull

MFE8812 Bond Portfolio Management

Practice Test Questions. Exam FM: Financial Mathematics Society of Actuaries. Created By: Digital Actuarial Resources

CFAspace. CFA Level I. Provided by APF. Academy of Professional Finance 专业金融学院 FIXED INCOME: Lecturer: Nan Chen

Solutions to Practice Problems

Borrowers Objectives

Manual for SOA Exam FM/CAS Exam 2.

Part III: Swaps. Futures, Swaps & Other Derivatives. Swaps. Previous lecture set: This lecture set -- Parts II & III. Fundamentals

INSTITUTE OF ACTUARIES OF INDIA

B6302 Sample Placement Exam Academic Year

Lecture 2. Agenda: Basic descriptions for derivatives. 1. Standard derivatives Forward Futures Options

Fair Forward Price Interest Rate Parity Interest Rate Derivatives Interest Rate Swap Cross-Currency IRS. Net Present Value.

Homework #1 Suggested Solutions

B6302 B7302 Sample Placement Exam Answer Sheet (answers are indicated in bold)

Financial Mathematics

INTRODUCTION TO FINANCIAL AND ACTUARIAL MATHEMATICS. Marek Šulista, Václav Nýdl, Gregory Moore

Math 147 Section 6.4. Application Example

Interest Rate Risk. Introduction. Asset-Liability Management. Frédéric Délèze

Version A. Problem 1. Let X be the continuous random variable defined by the following pdf: 1 x/2 when 0 x 2, f(x) = 0 otherwise.

Dividend Discount Models

Financial Markets and Products

Floating Rate Notes Valuation and Risk

OPTION VALUATION Fall 2000

Swaps. Bjørn Eraker. January 16, Wisconsin School of Business

Foundations of Finance. Prof. Alex Shapiro

SECTION A: MULTIPLE CHOICE QUESTIONS. 1. All else equal, which of the following would most likely increase the yield to maturity on a debt security?

The Johns Hopkins Carey Business School. Derivatives. Spring Final Exam

Page Points Score Total: 100

SOCIETY OF ACTUARIES FINANCIAL MATHEMATICS. EXAM FM SAMPLE QUESTIONS Financial Economics

Performance Pillar. P1 Performance Operations. 25 May 2011 Wednesday Morning Session

Stat 274 Theory of Interest. Chapters 8 and 9: Term Structure and Interest Rate Sensitivity. Brian Hartman Brigham Young University

Updated June Commonwealth Bank of Australia

Interest Rate Forwards and Swaps

Fundamentals of Futures and Options Markets John C. Hull Eighth Edition

Introduction, Forwards and Futures

QF 101 Revision. Christopher Ting. Christopher Ting. : : : LKCSB 5036

1. Parallel and nonparallel shifts in the yield curve. 2. Factors that drive U.S. Treasury security returns.

Principles of Finance Summer Semester 2009

INTEREST RATE FORWARDS AND FUTURES

PRACTICE PROBLEMS PARK, BAE JUN

5= /

MATH/STAT 2600, Theory of Interest FALL 2014 Toby Kenney

4.7 Compound Interest

Futures and Forward Contracts

NPTEL INDUSTRIAL AND MANAGEMENT ENGINEERING DEPARTMENT, IIT KANPUR QUANTITATIVE FINANCE ASSIGNMENT-5 (2015 JULY-AUG ONLINE COURSE)

CHAPTER 10 SOME LESSONS FROM CAPITAL MARKET HISTORY

HSBC Bank Plc Global Markets MiFID II Ex-ante Costs and Charges Disclosures

Corporate Risk Management

n = Compounding periods( ( how often the interest is added to the principle) I = =

Introduction to Financial Mathematics

MTH302-Business Mathematics and Statistics. Solved Subjective Questions Midterm Examination. From Past Examination also Including New

Transcription:

Math 441 Mathematics of Finance Fall 2006 Name: Midterm October 24, 2006 Instructions: Show all your work for full credit, and box your answers when appropriate. There are 5 questions: the first 4 are each worth 10 points and the last one is worth 15 points. Unless otherwise noted, all risk free rates are per annum with continuous compounding. 1. Company A wishes to borrow 10 million USD. Company B wishes to borrow 12 million AUD (Australian dollars). The current FX (foreign exchange) rate is 1 USD for 1.2 AUD. Company A is offered the following rates per annum: 10% USD, 8 % AUD. Company B is offered the following rates per annum: 9 % USD, 9.5% AUD. Construct a swap where interest payments are exchanged semiannually, through an intermediary bank subject to the following conditions: The bank must bear all of the risk associated to fluctuating exchange rates; the bank must net a profit of 15 basis points at each exchange; the remaining (initial) savings are to be split evenly between A and B. The overall (annual) advantage is (10 8) (9 9.5) = 2.5% to be split between A and B after the bank takes 15 basis points (0.15%) at each exchange for a total of 0.3% annually. So A and B each have a 1.1% annual advantage. Thus A borrows AUD at 8% and enters into a swap, swapping a 8% AUD income stream for a 10 1.1 = 8.9% USD loan with the bank. And B borrows USD at 9% and enters into a swap, swapping a 9% USD income stream for a 9.5 1.1 = 8.4% AUD loan with the bank. 1

2. Consider Bond A which is an 8%-coupon bearing bond maturing in 15 months, with principal $100. Coupons are paid semiannually. Suppose (continuously compounding) spot rates are the following: 3 month is 5.0%, 6 month is 5.1%, 9 month is 5.2%, 12 month is 5.3%, and 15 month is 5.4%. (a) Compute the price and the duration of Bond A. The bond price is B = 4e 0.05 3/12 + 4e 0.052 9/12 + 104e 0.054 15/12 = 105.00 The bond yield y solves 4e y 3/12 + 4e y 9/12 + 104e y 15/12 = 105.00 which implies y = 0.0539. Note that it is close to 5.4% The duration (in years) is then D = 3/12 4e 0.0539 3/12 + 9/12 4e 0.0539 9/12 + 15/12 104e 0.0539 15/12 105 Note that it is close but just below 1.25 years. = 1.18 (b) Suppose the Federal Reserve raises interest rates and this causes yields to increase by 25 basis points across all maturities. Use the duration to estimate the new price of Bond A. The change is bond price is approximately B = DB y = 1.18 105 0.0025 = 0.30 So the new price is approximately 104.70 2

3. The spot price of Google stock is $420. The stock will pay a $10 dividend in 2 months and again in 5 months. The futures price of one share of Google with delivery date in 6 months is $450. You can invest money at a rate of 4.5% and borrow money at a rate of 5% with continuous compounding. Construct an arbitrage opportunity involving one Google share. What is the profit from this opportunity? You want to take a short position now and borrow money to buy the stock. You repay the loan and deliver the stock for the delivery price. There are two ways to do this. Note the stock will pay you dividends of $10 in months 2 and 5. This means you can either borrow the full $420 for 6 months and invest the dividends at the 4.5% rate for 6 2 = 4 and 6 5 = 1 months respectively, or you can borrow 10e 0.05 2/12 = 9.92 for two months, 10e 0.05 5/12 = 9.79 for 5 months and 420 9.92 9.79 for 6 months. First method: the profit (in 6 months) is 450+10e 0.045 (6/12 2/12) +10e 0.045 (6/12 5/12) 420e 0.05 6/12 = 39.56. Second method: the profit (in 6 months) is 450 (420 9.92 9.79)e 0.05 6/12 = 39.58. 3

4. Suppose a financial institution has agreed to pay 6-month LIBOR and receive 7% per annum (with semiannual compounding) on a principal amount of $2 million. The swap has a remaining life of 1.75 years. The 6-month LIBOR rate 3 months ago was 4.5% (with semiannual compounding). Today, the LIBOR rates with continuous compounding for 3-month, 9-month, 15-month, and 21-month maturities are 4%, 4.4%, 4.8%, and 5.1%, respectively. (a) What is the value of this swap today? The swap is long a fixed bond and short a floating bond. The fixed bond is worth (in thousands of dollars) 70e (.04)(.25) + 70e (.044)(.75) + 70e (.048)(1.25) + 2, 700e (.51)(1.75) = 2, 096.20 The floating bond is worth the present value of the principal plus the next interest payment: 2, 045e (.04)(.25) = 2, 024.70 The swap is thus worth about $71, 500. 4

(b) Suppose a zero coupon bond maturing in 24 months with principal $100 is priced at $88. Compute the continuously compounded forward rate between month 9 and month 24. The 9-month zero rate is 4.4% from part (a). The 24 month is computable from this bond: 88 = 100e 2r, so r = 6.39%. The forward rate is (6.39)(2) (4.4)(.75) 1.25 = 7.59%. 5

5. (15 points) The price of Kimberly-Clark stock (KMB) is currently $65. It is predicted that at the end of each of the next 3 months, the price will be either $1 higher or $1 lower than the price at the start of the month. The probability that it will be $1 higher is 60% and that it will be $1 lower is 40%. (a) What is the expected value of the price of KMB in 3 months? What is the standard deviation of the price? Let X be the stock price in 3 months. There are 4 outcomes of stock price. P (X = 62) = 0.4 3 = 0.064, P (X = 64) = 3 0.4 2 0.6 = 0.288, P (X = 66) = 3. 0.4 0.6 2 = 0.432, P (X = 68) = 0.6 3 = 0.216. So E[X] = 0.064 62 + 0.288 64 + 0.432 66 + 0.216 68. And SD(X) = E[X 2 ] E[X] 2 = 4306.24 4303.36 = 1.70 6

(b) Suppose you own a portfolio consisting of 100 shares of KMB and a short position in a futures contract for 100 shares of KMB. The futures contract is for delivery in 3 months at a delivery price of $70. What is the expected value of your portfolio in 3 months? Since you will deliver the stocks for $70 each regardless, your (expected) value is 100 70 = 7000. (c) Assume that the 3 month zero rate is 6% per annum (with continuous compounding). What is the value of the portfolio today assuming KMB does not pay a dividend. The present value of part (b), or alternatively, the value of the stock which is 6500 plus the value of the futures contract which is currently worth 7000e (.06)(.25) 6500 (since you are short the contract), for a total of 7000e (.06)(.25). 7