Rhode Island Renewable Energy Standard. Instructions for completing Table One and Documenting Information (Revised 8/29/2017)

Similar documents
Rhode Island Renewable Energy Standard. Instructions for completing Table One and Documenting Information (Revised 5/15/2015)

nationalgrid Request For Proposals To Provide NEPOOL-GIS Certificates in Compliance With the Rhode Island Renewable Energy Standard For the Period:

THE NARRAGANSETT ELECTRIC COMPANY RENEWABLE ENERGY GROWTH PROGRAM FOR NON-RESIDENTIAL CUSTOMERS

THE NARRAGANSETT ELECTRIC COMPANY QUALIFYING FACILITIES POWER PURCHASE RATE

The following words and terms shall have the following meanings when used in this Tariff:

Docket No Twenty-First Set of Data Requests of the Division of Public Utilities and Carriers to National Grid February 2, 2018

An Excel Modeling Practice Problem

Docket No Twenty-First Set of Data Requests of the Division of Public Utilities and Carriers to National Grid February 2, 2018

REQUEST FOR PROPOSALS FOR LONG-TERM CONTRACTS FOR CLEAN ENERGY PROJECTS

January 29. Annuities

Lab 6. Microsoft Excel

KEEGAN WERLIN LLP. ATTORNEYS AT LAW 99 HIGH STREET, Suite 2900 BOSTON, MASSACHUSETTS 02110

An Application. Canadian Niagara Power Inc. To Adjust. Electricity Distribution Rates. Effective January 1, 2019 EB

THE NARRAGANSETT ELECTRIC COMPANY RENEWABLE ENERGY GROWTH PROGRAM COST RECOVERY PROVISION

Using the Merger/Exchange Wizard in Morningstar Office

Banner Budget Reallocation Step-by-Step Training Guide. Process Opens March 12 and Closes April 5PM

FY13 Budget Prep New Functionality

RIPUC No Sheet 1 THE NARRAGANSETT ELECTRIC COMPANY RENEWABLE ENERGY GROWTH PROGRAM COST RECOVERY PROVISION

November 12, 2015 SPECIFIED STATE AGENCIES AND ELECTRIC DISTRIBUTION COMPANIES IN CONNECTICUT, MASSACHUSETTS AND RHODE ISLAND

2013 Insurance Premium Tax Return for Life and Health Companies

' Sheet 2 FITCHBURG GAS AND ELECTRIC LIGHT COMPANY 4. Rates Fixed Pricing Option: This pricing option is available to all customers other than GD-3 cu

ACORD Forms Notification Service October 2017 Bulletin

Settlements & Billing. Configuration Guide: Monthly CPM Insufficient Resource Adequacy Resources Allocation (CC 7885) Version 5.

How to set up PERS Rec Spreadsheet. Some limitations of the spreadsheet:

Creating a Rolling Income Statement

ALERT INVESTMENT MANAGER S GUIDE TO GC DIRECT ONBOARDING MAY 02, 2018

AVERAGE, IF, COUNT, SUMIFS, COUNTIFS, MAXIFS, MINIFS, AVERAGEIFS, ROWS, LOGICAL EXPRESSIONS

COMMONWEALTH OF PUERTO RICO COMMISSIONER OF FINANCIAL INSTITUTIONS Instructions for the Legal Reserve Report

BudgetPak User Guide. Lewis & Clark College. October 2016

Midwest Renewable Energy Tracking System Operating Procedures

Settlement and prudential security methodologies. 15 April 2015 Version 1.1

Final Application for New License for Major Water Power Project Existing Dam

Electri Safety, Revised. Related. Submitted. by: Submitted to:

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY SMART PROVISION

REQUEST FOR PROPOSALS FOR LONG-TERM CONTRACTS FOR RENEWABLE ENERGY PROJECTS

Balsam Lake Coalition Interrogatory # 8

more information Upload a contribution file

January 17, National Grid Renewable Energy Standard Procurement Plan Docket No. 3765

Canadian Configurations

MODULE B Working with Formulas and Functions

South Shore, Cape Cod & Martha s Vineyard Territory Page 1 of 26 TERMS AND CONDITIONS COMPETITIVE SUPPLIERS AND COMPETITIVE REA SUPPLIERS

Effective 10/1/17 NEW ENGLAND POWER POOL GENERATION INFORMATION SYSTEM OPERATING RULES

2017 Insurance Premium Tax Return for Life and Health Companies

Pertmaster - Risk Register Module

All About the General Ledger

2018 Insurance Premium Tax Return for Life and Health Companies

CAISO. Settlements & Billing. CRR Hourly Settlement CC 6700

ERCOT Protocols Section 14: Renewable Energy Credit Trading Program

Default Management Reporting System (DMRS) Correcting Event Failures and the Failed Submitted Events Report Job Aid

Chapter Three Contribution Remittance

BEx Analyzer (Business Explorer Analyzer)

QuickBooks. For Evaluation Only. Premier 2015 Level 2. Courseware MasterTrak Accounting Series

PENSION ADMINISTRATION BULLETIN

Section 8 Remitting Contributions

Personal Finance Amortization Table. Name: Period:

ISO Tariff Original Sheet No. 637 ISO TARIFF APPENDIX L. Rate Schedules

Introduction to Basic Excel Functions and Formulae Note: Basic Functions Note: Function Key(s)/Input Description 1. Sum 2. Product

Settlement Statements and Invoices. IESO Training

HandDA program instructions

Amended Solicitation Plan for the Purchase and Sale of Connecticut. Class I Renewable Energy Credits. from Low and Zero Emission Projects

GARKANE ENERGY COOPERATIVE, INC. ELECTRIC SERVICE SCHEDULE SC STATE OF UTAH IMPACT FEES & SERVICE CHARGES

KEEGAN WERLIN LLP ATTORNEYS AT LAW 265 FRANKLIN STREET BOSTON, MASSACHUSETTS May 5, 2017

Introduction to Client Online

GATS Subscriber Group Meeting

Multi Account Manager

LENDER SOFTWARE PRO USER GUIDE

1.12 Date of budget revision submission: Enter the month and year the budget revision was submitted for approval Prepared by: Enter the name of

Calculating Markup: A Merchandising Tool

Master User Manual. Last Updated: August, Released concurrently with CDM v.1.0

Shared: Budget Adjustments Import

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION

February 20, National Grid Renewable Energy Standard Procurement Plan Docket No. 3765

Margin Direct User Guide

What happens if I accidentally overwrite the formulas contained in the yellow columns?

September 21, 2017 VIA HAND DELIVERY & ELECTRONIC MAIL

MARKET PROCEDURE: PRUDENTIAL REQUIREMENTS

Oklahoma State University Office of the Bursar Collection of Funds Procedures

National Grid North America Inc. and Subsidiaries (formerly National Grid Holdings Inc.) Consolidated Financial Statements For the years ended March

2017 Insurance Premium Tax Return for Property and Casualty Companies

Introduction to Bond Markets

Office of Sponsored Research Budget Revision Form Instructions and Field Definitions

Auxiliary Periodic Report Instructions

Learning Plan 3 Chapter 3

Power Purchase Agreements between National Grid and Cape Wind Associates, LLC D.P.U

Detailed Delivery Rules of China Financial Futures Exchange for Treasury Bond Futures Contract

MISSOURI SERVICE AREA

The Process of Modeling

SAS2000. Financial 2. Training Manual

Project your expenses

Property Tax Hands-on Workshop

Enterprise Budgeting V14 R3 Software Release Notes

d/b/a National Grid Schedules of: Ann E. Leary Scott M. McCabe Proposed Tariffs Clean & Marked to Show Changes Book 16 of 17 November 27, 2017

GIS Systems and Renewable Energy Certificate Trading

Determining a Billing Rate

Luly E. Massaro, Commission Clerk March 21, 2019 Public Utilities Commission 89 Jefferson Blvd. Warwick, RI 02888

SUFA RENT MODEL - MONTHLY

Financial year end 2018

Budget Forecast Return 2016 to 2017 (to be completed by all academies)

CONCORD ELECTRIC COMPANY AND EXETER & HAMPTON ELECTRIC COMPANY

Cost Report Desk Review Procedures for the Consolidated and P/FDS Waiver Programs. Year 4 Desk Review Procedures for Cost Reports ending June 30, 2011

Transcription:

Rhode Island Renewable Energy Standard Instructions for completing Table One and Documenting Information (Revised 8/29/2017) The Annual Compliance Filing is being provided as an editable MS Word document. Table One is being provided electronically as a MS Excel spreadsheet. In your signed, hard copy version of the Filing, you may provide a printout of the electronic spreadsheet of Table One referenced above. In addition, you must send the electronic MS Excel spreadsheet version of Table One, along with electronic MS Excel spreadsheets of the quarterly NEPOOL GIS Certificate documentations, and a PDF of the filing including Sections 1, 2, and 3 and any attachments to the RI Public Utilities Commission (Commission) by e-mail at RES.Filings@puc.ri.gov. Table One has two parts. Part One details the Obligated Entity s requirements and purchases for the current Compliance Year, and also incorporates Certificates banked during previous compliance years, if applicable which are detailed and tracked in Part Two. Where Alternative Compliance Payments are required, Part One calculates the obligation after accounting for the use of Banked Compliance, which the Obligated Entity can allocate in Part One, by Electrical Energy Product, if applicable. Part Two of Table One tracks Banked Certificates. Part Two requires the Obligated Entity to enter any available Banked Certificates from the two previous Calendar Years (once two Annual Compliance Filings have been completed, this information can simply be taken from the applicable rows of the previous year s Filing). With this information, and the total number of Banked Certificates allocated in Part One, Part Two calculates: (1) any remaining Banked Certificates from two compliance years ago (now expired), (2) any remaining Banked Certificates from the previous compliance year (still valid for one more year), (3) any surplus in the current year, (4) the amount of that current year surplus available for Banking (by applying the 30% of current year obligation limit), and (5) the ending balance of Banked Certificates. Part One Compliance for the Current Calendar Year In Part One, enter the numbers and/or names for each NEPOOL GIS sub-account for Electrical Energy Products offered for sale in Rhode Island in the applicable Compliance Year (column B), and the total quantity of wholesale electricity (including all applicable losses) sold in satisfaction of each retail product (column C). For Distribution Utilities, please list Standard Offer as a product. In columns F & I enter the quantity of New and Existing, respectively, Renewable Energy Resource Certificates that the Obligated Entity has acquired and now owns for the purpose of Rhode Island RES Annual Compliance in the applicable Compliance Year. In column G, enter the total number of Banked Certificates, by Electrical Energy Product, being applied to the current Compliance Year. It is the responsibility of the Obligated Entity to ensure that the certificates used to satisfy RES obligations, are retired and classified as eligible Rhode Island certificates, and moved from the NEPOOL GIS account My Unsettled Certificates Disposition to NEPOOL GIS account My Settled Certificates Disposition. 1

Each NEPOOL-GIS sub-account must be entered on a separate line in the table, and information must be entered separately on each line in columns B, C, F, G and I. The MS Excel version of Table One will automatically calculate all remaining cells in Part One. The reason for such separate entry is that documentation of the information will consist of quarterly NEPOOL-GIS reports that will separately identify those sub-accounts and show RES-qualified certificates settled in those sub-accounts. However, pursuant to the regulatory definition of Electrical Energy Product, if two or more sub-accounts are identical in their Attributes, then a subtotal line may be entered below the lines for those sub-accounts in the table. Enter the Attributes in the appropriate columns F, G & I, in accordance with the compliance or documentation types identified at the column heads and detailed in the instructions. See below for detailed instructions on specific columns and on documentation of the information entered in columns F & I, as well as Part Two (Banked Compliance). The electronic spreadsheet version of Table One includes formulae for: columns D, E, H and J through M in Part One, and all cells except the first two Banked Certificates balances in Part Two. Column C: Total Electricity Sold in Current Compliance Year for each Electrical Energy Product Enter the total electricity sold in the Compliance Year for each Electrical Energy Product. This amount refers to the total deliveries made at wholesale, including all applicable losses, in satisfaction of the Obligated Entity s retail requirements. The RES regulations in Section 7.5 also provide that Obligated Entities must arrange with the ISO Meter Reader to provide to the Commission final, reconciled values of the Real- Time Load Obligations for each Load Asset in the New England Markets that represents the electricity sold by an Obligated Entity at retail to Rhode Island end-use customers. The Commission utilizes The Narragansett Electric Company s d/b/a National Grid load data to verify against the load data reported by the Obligated Entity. In an effort to minimize discrepancies during the Commission s review of the Annual Compliance Filing, Obligated Entities may contact National Grid to obtain this information or contact the Commission by email at RES.Filings@puc.ri.gov. Column D: Quantity of Renewable Energy Standard to be Satisfied only by New Renewable Energy Resource Certificates Column D calculates the New Renewable Energy Resource Requirement by multiplying Column C by the then-current percentage required by RES Statute and Regulation. Column E: Quantity of Renewable Energy Standard to be Satisfied either by New or Existing Renewable Energy Resource Certificates Column E calculates the New or Existing Renewable Energy Resource Requirement by multiplying Column C by 2%. The 2% New or Existing requirement does not change over time. 2

Column F: Current Compliance Year NEPOOL GIS New Renewable Energy Resource Certificates Enter the quantity, by Product, of New Renewable Energy Resource Certificates from the current Compliance Year. Provide documentation for all New Renewable Energy Resource Certificates as an Attachment 1 to the Filing. That documentation shall consist of two versions of the NEPOOL GIS My Settled Certificates Disposition report (including certificate serial numbers) for each of the four quarters of the applicable Compliance Year (regardless of your sales and certificate activities for a particular quarter), as follows: a. Download each of those reports as an MS Excel file (each with a descriptive filename, including your company name and the quarter), and submit those files to the Commission by e-mail to RES.Filings@puc.ri.gov. Column G: Banked NEPOOL GIS RI New Renewable Energy Resource Certificates Applied to Current Compliance Year Enter the quantity, by Product, of Banked Compliance Certificates to be applied to the current Compliance Year. Refer to Part Two below for specific instructions regarding the sources and documentation for Banked Compliance Certificates. Column H: Total NEPOOL GIS RI New Renewable Energy Resource Certificates Applied to Current Compliance Year Column H calculates the Total NEPOOL GIS RI New Renewable Energy Resource Certificates Applied to Current Compliance Year by adding Column F and Column G. Column I: Current Compliance Year NEPOOL GIS Existing Renewable Energy Resource Certificates Enter the quantity, by Product, of Existing Renewable Energy Resource Certificates from the current Compliance Year. Existing Renewable Energy Resource Certificates may be used to satisfy only the 2% Existing Renewable Energy Requirement. Existing Renewable Energy Resource Certificates above the 2% requirement may neither be applied to the New Renewable Energy Resource requirement nor banked for future compliance. Should an Obligated Entity enter a quantity of Existing Renewable Energy Certificates greater than the 2% requirement, the Table One spreadsheet will automatically limit the quantity of Existing Renewable Energy Resource Certificates used for compliance to no more than 2% of the Obligated Entity s load. For the quantity of Existing Renewable Energy Resource Certificates listed in column I for each Electrical Energy Product in Table One, provide documentation included as Attachment 1 to the Filing. That documentation shall consist of two versions of the NEPOOL GIS My Settled Certificates Disposition report (including certificate serial numbers) for each of the four quarters of the applicable Compliance Year (regardless of your sales and certificate activities for a particular quarter), as follows: 3

a. Download each of those reports as an MS Excel file (each with a descriptive filename, including your company name and the quarter), and submit those files to the Commission by e-mail to RES.Filings@puc.ri.gov. Column J: New Renewable Energy Surplus / (Shortfall) Column J calculates the surplus or shortfall of New Renewable Energy Certificates, taking into account any use of Banked Compliance. Column K: Existing Renewable Energy Surplus / (Shortfall) Column K calculates the surplus or shortfall of Existing Renewable Energy Certificates compared to the New or Existing Requirement (of 2% of Total Electricity Sold) calculated in Column E. This calculation is an intermediary step, as any surplus of New Certificates from Column J will be applied toward the Column K requirement in the event of a shortfall of Existing Renewable Energy Certificates. (see explanation of column L). Column L: Is Current Year Compliant or in Shortfall? Column L compares the New Certificate requirement to the Obligated Entity s Total New Certificates from Column H, and subsequently compares all Existing Certificates plus any surplus New Certificates to the Existing Certificate requirement and indicates with text whether the Obligated Entity is Compliant or has a Shortfall of GIS Certificates. This calculation takes into account the banked certificates designated, by product, in Column G. Column M: Certificate Balance Column M calculates, by Electrical Energy Product, the Obligated Entity s Certificate Balance for the current Compliance Year, after the application of banked certificates. A Shortfall denotes the obligation to make Alternative Compliance Payments (ACP) associated with the number of MWhs shown. ACP payments must be made to the Rhode Island Commerce Corporation and a receipt demonstrating such payments must be included with this Filing. A Surplus denotes Certificates which may be retired as Banked Compliance and used toward RES compliance in either of the two subsequent calendar years. Column O: New REC Voluntary Purchases Enter the amount of voluntary New Renewable Energy Resource Certificates purchased during the current compliance year on behalf of end-use customers for voluntary programs. Voluntary purchases reported must have their own sub-account in the NEPOOL-GIS and this subaccount must be identified in Column B. 4

Column P: Existing REC Voluntary Purchases Enter the amount of voluntary Exiting Renewable Energy Resource Certificates purchased during the current compliance year on behalf of end-use customers for voluntary programs. Voluntary purchases reported must have their own sub-account in the NEPOOL-GIS and this subaccount must be identified in Column B. Part Two Banked Compliance NOTE: All Banked Certificates must fully comply with RES Regulations Section 7.8. This includes, but is not limited to, the requirement that Obligated Entities must retire Banked Certificates in the year they were generated, in order to ensure that such Certificates have not otherwise been, nor will be, sold, retired, claimed or represented as part of electrical energy output or sale, or used to satisfy obligations in jurisdictions other than Rhode Island. Banking applies only to New Renewable Energy Resource Certificates. Existing Renewable Energy Resource Certificates are not eligible for Banking. Row (a): Banked Certificates from Two Compliance Years ago Enter the number of Banked Certificates from Two Compliance Years ago. This is the value in Row (e) from the previous year s Filing, once applicable. Row (b): Banked Certificates from One Compliance Year ago Enter the value in Row (g) from the previous year's Filing, once applicable. Row (c): Banked Certificates Applied Toward Current Year Compliance Row (c) is drawn from the sum of any Banked Certificates applied toward compliance in the current Compliance Year via Column G in Part One of Table One. Row (d): Remaining Banked Certificates from Two Compliance Years ago, now expired This is the remaining balance after taking into account use in the current Compliance Year of unused Banked Certificates from 2 Compliance Years ago. A balance in Row (d) denotes two-year-old Certificates that have not been applied to the current Compliance Year and will therefore expire. Row (e): Remaining Banked Certificates from One Compliance Year ago, still valid This is the balance of unused Banked Certificates from previous Compliance Year. These Certificates are still valid for use in next year's Filing (in next year's Row (a)). Row (f): Current Year Surplus, if applicable As calculated in Part One of Table One. 5

Row (g): Amount of Current Year Surplus Available for Banking Row (g) calculates the lesser of the Current Year Surplus and the maximum amount of Certificates eligible for Banking. The maximum quantity of Certificates eligible for Banking is equal to 30% of the current year's New RES obligation. Banking applies only to New Renewable Energy Resource Certificates. Existing Renewable Energy Resource Certificates are not eligible for Banking. The electronic spreadsheet version of Table One will execute the Row (g) calculation. Row (h): Ending Balance of Still Valid Banked Certificates The Ending Balance is calculated by adding the amount of Current Year Surplus (if applicable) and any Remaining Banked Certificates from one (1) Compliance Year ago. A Note on Alternative Compliance Credits (from Alternative Compliance Payments): Please be aware that an Obligated Entity cannot shift certificates between NEPOOL-GIS sub-accounts after the end of the trading period during which they were settled. However, some of the sub-accounts may be aggregated, as described in the General Instruction, depending on how those sub-account products were defined. Also, although excess New Attributes for a particular Product cannot be shifted to another Product, they can be "banked" for compliance in a future Compliance Year. To obtain Alternative Compliance Credits, you will need to make an Alternative Compliance Payment (ACP) to the RI Commerce Corporation. The ACP should be made no later than June 30 th of each Compliance Year in order for the RI CC to have sufficient time to process the payment and return an ACP Receipt for inclusion in the Obligated Entity s Annual Compliance Filing. Calculating an Obligated Entity s Alternative Compliance Payments: To calculate the amount of the Obligated Entity s ACP, multiply the total of the Obligated Entity s unmet RES Attribute obligation the negative value from Column M in Part One of Table One, if applicable (rounded up to the nearest whole number) by the ACP Rate for the applicable Compliance Year. The ACP Rate for Compliance Year 2016 is $67.00. The ACP Rate is revised and posted by January 31 st of each Compliance Year and is published at http://www.ripuc.org/utilityinfo/res-acprate.pdf Questions concerning wiring instructions should be directed to Kathy O Brien, Accountant, Rhode Island Commerce Corporation, (401) 278-9100, ext. 158 or by email at KOBrien@commerceri.com. The total number of Alternative Compliance Credits applied to the current Compliance Year must also be listed on the Obligated Entity s ACP Receipt from the RI Commerce Corporation. 6

If an Obligated Entity avails itself of the Alternative Compliance Payment option, they must document their ACP by providing as Attachment 2 a copy of their ACP Receipt from the RI Commerce Corporation. 7