6.0 MONITORING AND CONTINGENCY PLANS

ENVIRONMENTAL ASSESSMENT CERTIFICATE TEMPLATE

ENVIRONMENTAL ASSESSMENT CERTIFICATE AMENDMENT TEMPLATE

SCHEDULE B. TABLE OF CONDITIONS FOR A SECTION 10(1)(B) EXEMPTION ORDER Progress Energy Lily Dam

BURNCO AGGREGATE PROJECT SCHEDULE B TABLE OF CONDITIONS FOR AN ENVIRONMENTAL ASSESSMENT CERTIFICATE

ENVIRONMENTAL ASSESSMENT ACT SECTION 9 NOTICE OF APPROVAL TO PROCEED WITH THE UNDERTAKING

Order in Council Decret

ENBRIDGE ENERGY LIMITED PARTNERSHIP SPECIAL USE PERMIT

Decision by Richard Dent, a reporter appointed by the Scottish Ministers

M 328 DEPOSITED. October 13, /2017 B.C.REG.

Wastewater Treatment Project

Guidelines for Management of Contaminated Sites in Nova Scotia

CONDITIONS OF ENVIRONMENTAL IMPACT ASSESSMENT APPROVAL Proposed Modifications to the Petitcodiac River Causeway

CEQA ENVIRONMENTAL REVIEW GUIDELINES

NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES

CERTIFICATE OC-56. IN THE MATTER OF the National Energy Board Act (NEB Act) and the regulations made thereunder; and

To: All Oil and Gas Pipeline Companies under the National Energy Board (Board) All Interested Parties.

NATIONAL WETLAND MITIGATION BANKING STUDY Model Banking Instrument

District of Maple Ridge Telecommunication Antenna Structures Siting Protocols (V2)

Re: Canada Gazette, Part I, February 27, 2014, Consultation on Amendments to Industry Canada s Antenna Tower Siting Procedures (DGSO )

MILLENNIUM COAL PTY LTD MILLENNIUM EXPANSION PROJECT EPBC NO 2009/4821 JUNE 2016

Public Notice. Proposed anchor structures, dredging, and discharge at the Enbridge Line 5 pipeline in the Straits of Mackinac, Michigan

Bundaberg State Development Area. Draft Development Scheme

Flood Risk Management Plan for the NORTH WESTERN River Basin (UoM01)

Name. Address. City, State, Zip. Telephone #

Strategic Environmental Assessment

ARTICLE 2 ADMINISTRATIVE PROVISIONS

Britannia Village Flood Control Project

CERTIFICATE OC-063. IN THE MATTER OF the National Energy Board Act (NEB Act) and the regulations made thereunder; and

Step 07. Closure. Summary of Step 7: Closure. Plan for Closure and Post-Closure in an Integrated Manner

INTERAGENCY COORDINATION AGREEMENT ON WETLAND MITIGATION BANKING WITHIN THE REGULATORY BOUNDARIES OF CHICAGO DISTRICT, CORPS OF ENGINEERS January 1997

Content Copy Of Original

Spinifex Ridge Molybdenum Project

Flood Risk Management Plan for the BALLYTEIGUE BANNOW River Basin (UoM13)

CITY OF SASKATOON COUNCIL POLICY

CYNGOR SIR POWYS COUNTY COUNCIL. CABINET EXECUTIVE 18 th September Flood Risk Management Plan (FRMP)

Kent Breeze Corporation and MacLeod Windmill Project Inc. c/o Suncor Energy Services Inc North Sheridan Way Mississauga, Ontario L5K 1A8

CONTENT COPY OF ORIGINAL. 194 County Road 17 Township of Champlain, United Counties of Prescott and Russell

Gov's Planning Estimates Project Title Rank Fund Project Requests for State Funds

Contractor Guidelines

Renewable Energy Action Team Mitigation Account Memorandum of Agreement with the National Fish and Wildlife Foundation. Frequently Asked Questions

Assessing and Dealing with Environmental Liabilities of Local Governments. LGANT 2014 Dennis Kefalas, P. Eng. SAO City of Yellowknife

Proposed Changes to the National Energy Board Electricity Regulations 1

EBRD s Environmental & Social (E&S) Risk Management Procedures for Insurance

3.07 Ontario Parks Program

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach

Environment and Natural Resources Trust Fund Proposal

1 The Oil and Gas Conservation Regulations (AR 151/71) are amended by this Regulation.

PROJECT AGREEMENT FOR THE QUEBEC LITHIUM SPODUMENE MINE IN QUEBEC

Yukon Mine Site and Reclamation Closure Policy Financial and Technical Guidelines

METRO VANCOUVER REGIONAL DISTRICT FILMING REGULATIONS

DAEN SUBJECT: South San Francisco Bay Shoreline, Santa Clara County, California

CHECKLIST FOR CONSTRUCTION STAGING PLAN IN CORAL GABLES

Policy and Process Review for Mine Reclamation Security

Enbridge Pipelines Line 5 HDD of St. Clair Project Progress Report as of February 12, 2018

Upper Tukituki Flood Control Scheme. Asset Management Plan. October 2017 HBRC Plan Number 4559 HBRC Report Number AM 15-04

Joint Lincolnshire Flood Risk and Drainage Management Strategy: Draft v.6.0:consultation Draft, : Annexes A-F

Annexure 7 Compliance Schedule for Relevant Development Consent Conditions for Calga Sand Quarry Activities during 2011

Petroleum and Geothermal Energy Resources (Environment) Regulations 2012

Tri-State Montrose-Nucla-Cahone Transmission Line Improvement Project. Plan of Development

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP) WALLACIA

Agriculture and Agri-Food Canada s Guide on the Environmental Assessment of Policy, Plan and Program Proposals - Strategic Environmental Assessments

REPUBLIC OF TURKEY FOURTH EXPORT FINANCE INTERMEDIARY LOAN (EFIL IV) (LOAN NUMBER )

Ministère du Tourisme, de la Culture et du Sport

APPLICATION FORM BMP 2: Tree and shrub planting

Edmonton to Hardisty Pipeline Project - Certificate OC-062 and Order XO-E A3V9D6 Adobe Pg 4

Report. Banksia Woodland Rehabilitation - Age 7

Department of Legislative Services

NOVA SCOTIA PENSION AGENCY

RE: An Environmental Assessment for the Lakeview Waterfront Connection. Proponents: Credit Valley Co~se rvat ion and the Region of Peel

Site-Specific Health and Safety Agreement

Subject: Research Authorization for Provincial Parks and Conservation Reserves. Section Parks & Protected Areas Policy Number PM 2.

(Total No. of pages including blank pages = 8)

Conservation Commission Procedures Standard Flow Chart - NOT

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT

In-Lieu Fee Program Instrument Outline For Proposed In-Lieu Fee Programs in the States of Kansas and Missouri

Government Decree on Flood Risk Management 659/2010

PE-CONS 3619/3/01 REV 3

STORMWATER MANAGEMENT FUND Department of Environmental Services

Appendix C Council Resource Consents and CLCLR Information

SENATE, No. 806 STATE OF NEW JERSEY. 217th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2016 SESSION

Aberfeldy and Pitlochry (Potentially Vulnerable Area 08/03) Local Plan District Local authority Main catchment Tay Perth and Kinross Council River Tay

2.2 Native Tree Planting

A. These rules and regulations are promulgated pursuant to the authority conferred by R.I. Gen. Laws

PART A: THE PALESTINIAN ENVIRONMENTAL ASSESSMENT POLICY. A policy to establish an environmental assessment process in Palestine

CITY OF PALM DESERT COMPREHENSIVE GENERAL PLAN

Governor Harry W. Nice Memorial Bridge Improvement Project. Charles County Commissioners Presentation September 1, 2009

SCHEDULE 9 FEDERAL REQUIREMENTS

RISK AND OPPORTUNITY ASSESSMENT GUIDE RISK CRITERIA

Presentation for the Wilsonia Community June 7, 2014

Financial statements (Unaudited) The Nova Scotia Highland Village Society. March 31, 2017

Newmont Boddington Gold Pty Ltd

Deer River Wind Farm 16-F-0267 APPENDIX B

THE RIVER STOUR (KENT) INTERNAL DRAINAGE BOARD. Policy Statement on Water Level and Flood Risk Management

MINISTRY OF NATURAL RESOURCES

CODE OF PRACTICE FOR WORKS AFFECTING THE CANAL & RIVER TRUST

STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND, AND WATER

EROSION & SEDIMENT POLLUTION CONTROL (E&SPC) PLAN REVIEW APPLICATION

COMMUNITY CERTIFICATIONS

PLEDGE OF ALLEGIANCE Mayor Cox led the attendees in the Pledge of Allegiance to the United States of America.

Transcription:

Environmental Assessment Approval Approval Date: /fp,,1 ( &, 1 2o l'( Project Name: Money Point Quarry Expansion Project Proponent Name: Dexter Construction Company Limited Bay Road Valley, Victoria County, Nova Scotia Money Point Quarry Expansion Project (the "Project"), proposed by: Dexter Construction Company Limited (the "Approval Holder'') in Bay Road Valley, Victoria County, Nova Scotia is approved pursuant to Section 40 of the Environment Act and Section 13( 1 )(b) of the Environmental Assessment Regulations. This Approval is subject to the following conditions and obtaining all other necessary approvals, permits or authorizations required by municipal, provincial and federal acts, regulations and bylaws before commencing work on the Project. It is the responsibility of the Approval Holder to ensure that all such approvals, permits or authorizations are obtained before commencing work on the Project. This Environmental Assessment Approval is based upon the review of the conceptual design, environmental baseline information, impact predictions, and mitigation presented in the Registration Document. Terms and Conditions for Environmental Assessment Approval 1.0 General Approval 1.1 The Environmental Assessment Approval for the Project is limited to the Project as described in the Registration Document. Any proposal by the Approval Holder for expansion, modification or relocation of any aspect of the Project from that proposed in the Registration Document shall be submitted to the Environmental Assessment Branch for review and may require an environmental assessment (EA). 1.2 The Approval Holder shall, within two years of the date of issuance of this approval, commence work on the Project unless granted a written extension by the Minister. 1.3 The Approval Holder shall provide written notification to Nova Scotia Environment (the Department) of the planned commencement date of the Project, at a minimum 30 calendar days prior to the commencement. Page 1 of6

1.4 The Approval Holder shall not transfer, sell, lease, assign or otherwise dispose of this Approval without the written consent of the Minister. The sale of a controlling interest of a business or a transfer of the approval from a parent company to a subsidiary or an affiliate is deemed to be a transfer requiring consent. 1.5 The Approval Holder shall update and/or revise any of the mitigation, management and/or monitoring plans and programs required in this Approval to reflect the progressive development of the Project at a schedule acceptable to or upon request by the 2.0 Surface Water Resources 2.1 The Approval Holder shall not undertake any Project related activities within 30 metres of a watercourse unless otherwise authorized in writing by the No development or removal of vegetation within this 30 metre buffer is permitted unless otherwise authorized in writing by the 2.2 The Approval Holder, as part of the application for the Part V Approval under the Environment Act, shall submit an erosion and sedimentation control plan to the Department for review. The Approval Holder shall implement the plan once the plan is deemed acceptable by the 2.3 The Approval Holder, as part of the application for the Part V Approval under the Environment Act, shall submit a surface water monitoring plan including sampling locations, monitoring frequencies and parameters to the Department for review. The Approval Holder shall implement the plan once the plan is deemed acceptable by the 2.4 The Approval Holder, as part of the application for the Part V Approval under the Environment Act, shall submit a stormwater management plan to the Department for review. Design criteria shall recognize increased likelihood of more intense precipitation events in coming decades. The Approval Holder shall implement the plan once the plan is deemed acceptable by the 2.5 At the request of the Department, the Approval Holder shall implement, in consultation with the Department, a plan to manage any exposed acid generating material and associated drainage. 2.6 The Approval Holder shall make necessary modifications to the plans and/or operations as a result of Project activities, monitoring and/or as required by the Page 2 of 6

3.0 Wetlands 3.1 The Approval Holder shall not undertake any Project related activities within 30 metres of a wetland unless otherwise authorized in writing by the 4.0 Groundwater Resources 4.1 The Approval Holder, as part of the application for the Part V Approval under the Environment Act, shall submit a groundwater monitoring plan including the location of monitoring wells, monitoring frequencies and monitoring parameters to the Department for review. This plan shall be designed to evaluate potential impacts to both groundwater levels and groundwater quality. The Approval Holder shall implement the plan once the plan is deemed acceptable by the Based on the results of the monitoring plan, the Approval Holder shall make necessary modifications to mitigation plans and/or Project operations to prevent unacceptable environmental effects, as authorized and required by the 4.2 The Approval Holder shall not undertake any blasting or excavation activities within 800 metres of two Victoria County water supply test wells. 4.3 The Approval Holder shall replace, at their expense, any water supply which has been lost or damaged as a result of Project operations as authorized and required by the 4.4 The Approval Holder shall not excavate within 0.5 meters of the measured maximum annual water table level unless otherwise authorized in writing by the 5.0 Flora and Fauna 5.1 Prior to commencement of the Project, the Approval Holder shall provide Nova Scotia Department of Natural Resources (DNR), Wildlife Division with digital way points and shape files revealing precise locations for species listed under the Species at Risk Act and/or Endangered Species Act as well as all S 1, S2 and S3 listed species under the Atlantic Canada Conservation Data Center, identified during field work within the area of the Project. The date of the above noted field data shall also be provided to DNR. The Approval Holder shall provide written notification to the Department that the files have been provided to DNR. 5.2 Prior to the commencement of the Project, the Approval Holder shall develop in consultation with DNR, Wildlife Division, a wildlife management plan to address the following points. The Approval Holder shall implement the plan once it is deemed acceptable by the Department: Page 3 of 6

a) a monitoring and management plan for bicknell's thrush (Catharus bicknelli), common nighthawks ( Chordeiles minor), and bats species. b) measures to protect bank swallows (Riparia riparia) during the breeding season;and c) measures to manage non-native (alien invasive) plant species. 5.3 The Approval Holder shall clear vegetation outside of the breeding season for most bird species (April 15 to August 15), unless otherwise authorized in writing by the Vegetation clearing shall be recorded in a daily log that shall be available for review by the Department indicating the date and time of the clearing operation and the contractor. 6.0 Air Quality and Noise 6.1 The Approval Holder, as part of the application for the Part V approval under the Environment Act, shall provide for review and approval, an updated blasting plan. The plan shall include an updated pre-blast survey for structures and water wells within 800 metres of the point of the planned blast area, a detailed blast monitoring plan, and a full blast damage response policy. 6.2 At the request of the Department, the Approval Holder shall develop and implement an air quality and/or dust monitoring plan. This plan shall include, but not be limited to, sampling locations, parameters, monitoring methods, protocols and frequency. Based on the results of the monitoring plans as proposed, the Approval Holder shall make necessary modifications to mitigation plans and/or operations as required by the 6.3 At the request of the Department, the Approval Holder shall monitor noise levels. Based on the results of monitoring plans proposed, the Approval Holder shall make necessary modifications to mitigation plans and/or operations as required by the 7.0 Archaeological and Heritage Resources 7.1 The Approval Holder shall cease work and contact the Special Places Coordinator, Nova Scotia Department of Communities, Culture and Heritage (CCH) immediately upon discovery of an archaeological site or artifact unearthed during any phase of the Project. If the find is of certain or possible Mi'kmaq origin, the Approval Holder shall also contact the appropriate Mi'kmaq representatives as advised by CCH. Page 4 of 6

8.0 Public Engagement 8.1 The Approval Holder, as part of the application for the Part V Approval under the Environment Act, shall develop a complaint resolution plan to address all concerns associated with the Project. The Approval Holder shall appoint a contact person designated to deal with complaints, and shall provide the contact information to the The Approval Holder shall implement the plan for the duration of the Project, once the plan is deemed acceptable by the 8.2 At the request of the Department, the Approval Holder shall develop and implement a plan for the formation and operation of a Community Liaison Committee (CLC) including terms of reference, which meets the Department's Guide for the Formation and Operation of a Community Liaison Committee. The Approval Holder shall operate the CLC for the duration of the Project or until released in writing by the 8.3 Six months prior to the quarry excavation and/or clearing becoming visible to surrounding communities, The Approval Holder shall submit a plan to mitigate visual impacts of the project to the The Approval Holder shall implement the plan over the lifetime of the Project once it is deemed acceptable by the 8.4 The Approval Holder shall correct, at their expense, any loss or damage to the Canadian Broadcasting Corporation (CBC) radio tower as a result of Project operations as authorized and required by the 8.5 The Approval Holder shall obtain written consent from the CBC demonstrating the final site plan is acceptable to both parties. 9.0 Engagement with the Mi'kmaq of Nova Scotia 9.1 At the request of the Department, the Approval Holder shall develop and implement a Mi'kmaq Communication Plan for the Project, which will include a process for communicating Project details and seeking input from the Mi'kmaq community. 10.0 Contingency Plans 10.1 The Approval Holder, as part of the application for the Part V Approval under the Environment Act, shall develop a contingency plan which meets the Department's Contingency Planning Guidelines. The plan shall address accidental occurrences including but not limited to: spills of hydrocarbons or other hazardous materials, failure of erosion and sediment control measures, fires, and vehicular collisions. The Approval Holder shall implement the plan over the lifetime of the Project. Page 5 of 6

10.2 The contingency plan shall be kept on site at all times during operation and made available to the Department upon request. 10.3 Refuelling shall not be conducted within 30 metres of any surface water resource, unless otherwise authorized in writing by the 11.0 Rehabilitation 11.1 The Approval Holder, as part of the application for the Part V Approval under the Environment Act, shall submit to the Department for review, a preliminary rehabilitation plan that includes progressive rehabilitation, details of future land use, and consideration for wildlife movement through reclaimed areas. The Approval Holder shall implement the plan once the plan is deemed acceptable by the 11.2 This Approval is subject to progressive rehabilitation at the existing Project site being completed as required by the 11.3 Project operations shall be completed and reclaimed as required by the 11.4 Re-vegetation shall be limited to the use of native species, unless otherwise authorized in writing by the lain ankin, MLA Minister of Environment Page 6 of 6