SSI Family Bike Park. SSI Parks and Recreation / SSI Electoral Area CX. SharePoint File No.: Prepared By / Date: Dan Ovington / August 22, 2017

Similar documents
Project Charter Ganges Harbour Walk

4. THAT the Mayor and Corporate Officer be authorized to execute all documents related to this matter. REPORT CONCURRENCE.

2017 Citizen Satisfaction Survey Final Report

PROJECT CHARTER: AQUA-FIT PHASE 2 BEAUMONT CONCEPT PLAN AND DETAILED DESIGN VILLE DE / TOWN OF. Community & Protective Services

Parks & Recreation. Mission Statement. Mandates. Expenditure Budget: $35,570,456. Community Development Expenditure Budget: $162,905,334

Implementation Project Development and Review 255

a) The City Manager has established a Roster for the provision of consulting services for a range of Assignments (REOI # ).

Capital Project Approval Request

Management Compensation Framework

Scope of Services. 0.3 Project Administration DRG will provide project administration and monthly invoicing.

[Project Title] Project Scope Statement

Company Name PRELIMINARY PROJECT SCOPE STATEMENT <PROJECT NAME> COMPANY NAME STREET ADDRESS CITY, STATE ZIP CODE DATE

To understand project management, it is important to understand the definition of a project:

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY TRANSPORTATION DEVELOPMENT ACT ARTICLE 3 BICYCLE AND PEDESTRIAN FUNDS

Request for Proposal for Engineering Services. January 10, 2017 Sue Howard Closing Date: January 17,

THE CORPORATION OF THE CITY OF WINDSOR POLICY

Morristown, TN Supplemental Online Survey Results

Date of Issue: January 27, 2017 Closing Date & Time: 4:00 PM, March 3, 2017

CITY OF MOBILE REQUEST FOR PROPOSALS RFP: FOOD AND BEVERAGE CONCESSIONS HERNDON - SAGE PARK/MEDAL OF HONOR PARK

INFORMATION SHEET ON BUILDING USE AT LINCOLN STREET UNITED METHODIST CHURCH

Philip A. Ginsburg, General Manager Dawn Kamalanathan, Planning and Capital Program Director

General Reservation Guidelines Reservation Requests are processed 9:00am to 5:00pm Monday through Friday. Not including University Holidays.

Box Elder County Tourism Tax Advisory Board 2011 Grant Packet

Charlottesville, VA. Supplemental Online Survey Results

COMPLIANCE PROJECT PLAN. (a.k.a. Project Charter)

New Braunfels, TX. Technical Appendices DRAFT 2017

COMMUNITY SERVICES DIVISION Parks & Recreation Department. Chair and Members of the Community and Corporate Services Committee

POLICY PUBLIC USE OF MUNICIPAL FACILITIES

2017 ORPA Outstanding Asset Management Award Nomination

San Francisco County Transportation Authority Prop K/Prop AA Allocation Request Form. Current Prop AA Request:

THREE RIVERS AREA YOUTH SPORTS COMPLEX. Request for PROPOSALS. 333 West Michigan Ave. Three Rivers, Michigan,

CITY OF VANCOUVER ADMINISTRATIVE REPORT

LEAVENWORTH CITY COUNCIL Study Session Agenda City Hall - Council Chambers November 10, :00 a.m.

Auditor General s Office

MANDAN PARK BOARD Special Meeting ANNUAL BUDGET RETREAT July 18, 2018 PARK ADMIN OFFICE

Business Plan Summary

May 24, 2016 Our File: /63238/2 Doc#: V1

FEDERAL LANDS ACCESS PROGRAM PROJECT MEMORANDUM OF AGREEMENT

Community Fundraising Event Guidelines

Five Year Plan (FY17/18 to FY21/22) - Jan

General Risk Management Framework

EVALUATE THE FEASIBILITY OF A PROJECT

Request for Proposals Tri-Town Sports Arena & Field House Feasibility Study

International Finance Corporation s Policy on Social & Environmental Sustainability

Closing the Gap: Investing in Neighborhood Parks

Financial Statements (Together with Independent Auditors Report)

City of Coralville Invitation to Quote Snow/Ice Removal and Parking Space Sweeping 5 th Street On Street Angle Parking

2018 Proposed Budget, Mill Levy & Fees October 15, 2017

ARTICLE 8: BASIC SERVICES

A loyal three made stronger in one. Loyalist Township Strategic Plan ( )

LOW-INCOME HOUSING TAX CREDIT CLOSINGS FOR PHAs AND RAD TRANSACTIONS. June 2015

H 7. Factoring Policy. If you require this policy in a different format please ask a member of staff. Date of Approval March 16 Review Due March 19

TO ALL PARK USE PERMIT APPLICANTS:

Committee of the Whole Report For the Meeting of May 10, Bill Eisenhauer, Head of Engagement RECOMMENDATION EXECUTIVE SUMMARY

PLANNING DEPARTMENT. Town Goals. Goal: Ensure that infrastructure exists for current and future needs identified in the comprehensive plan.

Strategic Plan

POLICY ON THE USE OF PARRAMATTA PARK FOR SEASONAL OR ONGOING BOOKINGS

Develop and implement the City s capital construction programs for parks, trails and other associated infrastructure

MAINE TURNPIKE AUTHORITY. Project Development Process

Responsible Officer Approved by

COPYRIGHTED MATERIAL. Index

Project Customization Guideline July, 2017

Cape Elizabeth Town & School

Objective Milestone Assigned Status Comments 1.1 DEVELOP A WORKING PLAN AND TIMETABLE FOR REFINING THE GIPS GIPS EC

XH-2-1 BUDGET AMENDMENT: SPRINGDALE LIBRARY SITE AND. Dan Kraszewski, Senior Executive Director, Planning Design and

ENVIRONMENTAL ASSESSMENT ACT SECTION 9 NOTICE OF APPROVAL TO PROCEED WITH THE UNDERTAKING

MUNICIPALITY OF BAYHAM MUNICIPAL ALCOHOL POLICY

CITY OF BURBANK FINANCIAL SERVICES DEPARTMENT STAFF REPORT

CHAPTER 11: Economic Development and Sustainability

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT

6.0 MONITORING AND CONTINGENCY PLANS

Introduction. Aim. Respond to a disruptive incident (Incident Management Phase)

SALT SPRING ISLAND FIRE PROTECTION DISTRICT

PMI - Dallas Chapter. Sample Questions. March 22, 2002

SPECIAL EVENTS PROCEDURE

Article 4.8 Maintenance. Article 4.9 Major Maintenance and Repair Reserve Fund.

SUNY Procedure 7554 and Insurance Forms

Planning and Building Table of Contents

PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET

Monroe County Soil & Water Conservation District

ATHLETIC FIELD USE GUIDELINES & APPLICATION

RESOLUTION NO. R Baseline Budget and Schedule, and Approve Gates 5 and 6 for the East Link Extension

Quarterly Status Report

APPLICATION FOR MEMBERSHIP PRIVILEGES

Request for Proposal (RFP) Fire Mitigation Services

Creating the WOW Case Study of a Large Tenant Improvement Project What you are in for Project Management Overview Scope Development-What?

Bisham Parish Council Risk Management Strategy

ASSET MANAGEMENT PLAN. HEMSON C o n s u l t i n g L t d. 30 Saint Patrick Street, Suite 1000 Toronto, ON, M5T 3A3

The National Citizen Survey

VIRGINIA HOME FOR BOYS AND GIRLS AND SUBSIDIARY CONSOLIDATED FINANCIAL STATEMENTS. September 30, 2016 and 2015

GREATER NEWARK CONSERVANCY, INC. Financial Statements. June 30, 2013 and With Independent Auditors Report

Metrolinx-City of Toronto-Toronto Transit Commission Master Agreement for Light Rail Transit Projects

REQUEST FOR PROPOSALS PARKING MANAGEMENT AT THE SYRACUSE HANCOCK INTERNATIONAL AIRPORT

GREATER NEWARK CONSERVANCY, INC.

COMMITTEE PARKS DEVELOPMENT HALF-YEAR REVIEW KEY DECISION NO

BOARD/ADVISORY COMMITTEE REPORT

FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: SEPTEMBER 19, 2001 CMR:354:01

Managing Project Risk DHY

AGENDA ITEM I-1 City Manager's Office

Britannia Village Flood Control Project

Transcription:

LAST UPDATED: Friday, November 03, 2017 Project Charter SSI Family Bike Park Project Name: Department Name / Division Name: Budget / Account Code: SSI Family Bike Park SSI Parks and Recreation / SSI Electoral Area CX. SharePoint File No.: Prepared By / Date: Dan Ovington / August 22, 2017 1. PROJECT BACKGROUND The Salt Spring Bike Club has requested support from PARC, Service Clubs, community members, agencies and businesses to envision, plan and build a family bike park on Salt Spring Island. After consultation with staff and PARC a location has been identified in the treed area at the south east corner of Mouat Park off Seaview Ave. The treed location behind the Artspring upper parking lot is currently unused for recreation activities. A family bike park is a dirt surfaced, outdoor recreation space with technical features professionally designed to facilitate and development bicycle skills among children, youth and adults. Presently there are little to no safe, soft surfaced areas for young kids learning to ride and cycling on some of Salt Spring Island s roads can be considered unsafe for cyclist. There are limited active recreation opportunities for older youth, especially those not interested in team sports. A family style bike park would provide a location to gather all generations to participate in active recreation and promote safe cycling practices. 2. PROJECT PURPOSE The purpose of this project is to provide an active recreation site for bicycle enthusiasts of all ages and abilities as identified in the 2011 Salt Spring Island Parks Systems Master Plan. 3. CRITICAL SUCCESS FACTORS (S.M.A.R.T. Specific, Measureable, Agreed-upon, Realistic, Time-Sensitive) The following criteria will be the major indicators of success to the project: 1. Delivered on-budget 2. Expand park user groups 3. Provide a safe place for all ages to ride and develop cycling skills 4. Additional recreation amenities 5. Small environmental footprint 6. Low annual maintenance costs 7. Delivered on-time. 1

4. SCOPE In Scope Out of Scope Itemized Project Budget: Site assessments (i.e. environmental), terrain analysis (i.e. soil, drainage), preliminary designs and features, construction estimates, contingency. construction, materials, and equipment, construction management, contingency, maintenance equipment, annual maintenance Funding sources estimate fundraising, grants, and what the request is for a local government contribution. Extensive public communications and engagement. Consultation: Current park users, businesses, surrounding residents, potential new park users (SSI Bike Club) Site Assessments: Environmental assessments and approvals as required (Species at risk, natural features, bird survey) Soil and drainage Site Prep: Landscaping- strip top soil and remove from site, remove select trees within the immediate area of construction based on park design, protect existing tree to be retained. Drainage and grading. Provide water supply to drinking fountain, and hose bib. Construction: Detailed designs, cost estimates, request for quote. Communications: Public notification of project status 2

5. PROJECT DELIVERABLES No. List of Project Deliverables Acceptance Criteria (Specific standards, written criteria, etc.) 1 Design Features and Elements 2 Cost Estimates 3 Confirmation of Project Scope (Budget dependent) 4 Detailed Designs 5 Request for Proposals 6 Communication Strategy (for public impact during construction) 7 Construction 6. TIMELINES Milestones, etc. Target Timeline Commission approval of preliminary budget September 2017 Confirmation of Donation Funding September 2017 Application for CWF October 2017 Site assessment October 2017 Consultation November January 17/18 Post RFQ (4 weeks) February 2018 RFP Selection and award March 2018 Site prep April 2018 Construction May 2018 Completion June 2018 Revised Timeline 3

7. BUDGET Cost Explanation Total Budget Estimate Funding Source Donations CWF PARC Site Assessment $2,500 $2,500 (O17) Consultation $1,250 $1,250 (O17) Preliminary Designs $2,500 $2,500 Construction Designs $2,500 $2,500 Site Prep including Grading and Drainage $50,000 $17,000 $33,000 Construction $100,000 $100,000 Annual Maintenance and Repairs $2,500 $2,500 (O18) Total $161,250 Administration Staff Coordination and Commissioning (5%) $8,000 $8,000 Project Contingency (15%) $24,050 $24,050 (CRF) Project Manager $20,000 $20,000 Total $213,300 $150,000 $33,000 $30,300 Note: Class D estimate + or 50%, a preliminary estimate which due to little or no site information indicates the approximate magnitude of costs of the proposed project based on broad i t Legend O17 = PARC 2017 Operating Budget O18 = PARC 2018 Operating Budget CRF = PARC Capital Reserves CWF = Community Works Funds 8. ADDITIONAL ASSUMPTIONS / CONSTRAINTS No. Description 1 Donations and Community Works funds will be available 2 Adequate staff resources will be available to undertake the project Detailed design and key elements have not been confirmed and may impact the original construction 3 budget 4 Environmental assessments have not been completed and may impact budget and or location 5 All work must fit within the existing property boundaries 6 Drainage consideration with a slopped area and a creekside outlet. 7 Existing washroom facilities at Mouats Park are adequate 8 Existing water utility hookup is adequate 9 Potential for tree removal based on designs to efficiently use allocated space 10 Highly publicized project on Salt Spring Island will require public notification to maintain public confidence 11 Favorable weather conditions 4

9. INTERRELATIONSHIPS WITH OTHER PROJECTS / PROGRAMS The primary relationship is between the Parks and Recreation Commission and the visitors/activities held in Mouats Park. The timeline for site prep and construction should take into consideration a number of events including the Shakespeare in the Park, Graffiti Theater performances, disc golf tournaments and other heavily attended park events 10. PROJECT TEAM The following is a description of the roles and responsibilities for the project team. Role Team Member Responsibilities Project Sponsor Robert Lapham Project champion Liaise with CRD Board Senior Manager Project Administrator Project Manager Communications Coordinator Karla Campbell Dan Ovington Contractor Communications Liaise with Project Sponsor Approval of scope and budget changes Manage the project team Attends Commission/Board meetings as required On-going oversight of project Manage the resolution of conflicts (with the team and consultants/contractors, etc Prepare staff reports for Commission and Board meetings Liaise with Senior Manager Overall responsibility for project performance with respect to scope, schedule and budget Prepare and manage all procurement Tender and contract administration Administer construction contracts, progress reports, change orders, payments, etc Conduct project status review meetings with the Project Team and key stakeholders Identify risks to the project and implement mitigation strategy actions Coordinate resources to resolve issues affecting project progress Ensure compliance with policies and procedures Manage all design services and compliance with contracts Manage all design, construction and commissioning of all components to hand-over to Operations Report to Project Administrator on design, project, and contract issues Evaluate engineering proposals and designs and make recommendations Provide constructability review of drawings and specifications Monitor and control the consultants and contractors scope, schedule and budget Ensure that shop drawings are reviewed and issued in a timely manner Prepare/provide input into communication plans Development/production of publications, displays and presentations Support public/stakeholder engagement, liaison, etc 5

11. KEY STAKEHOLDERS Stakeholder How Stakeholder is Affected by/interested in Project Role or Involvement in Decision Making (see legend below) CRD Board SSI Electoral Area Director Parks and Recreation Commission SSI Bike Club Donors SSI Operations Maintenance Staff SSI Administrative Staff Park Visitors Needs to be kept informed of the project and political issues. Commitment and support for project is necessary. Needs to be kept informed of the project and political issues. Commitment and support for project is necessary. Needs to be kept informed of the project. Commitment and support for project is necessary. Key decision maker who makes recommendations to CRD Board for final consideration. Needs to be kept informed of the project and provides input on potential funding/donations and design elements Needs to be kept informed of the project and provides input on donor recognition and design elements Kept informed of the project and provides input on process selections, equipment selections, maintenance issues, daily operational impacts, tree removal and site drainage, etc. Kept informed of the project and provides input on schedules. Receive public comments. Construction may impact parking, regular uses, events and washroom availability. A A, PD A, PD I CRD Building Inspection Building permits; adherence to public building codes A Neighborhood businesses, residents and adjacent property owners. Island Trusts Ensure stakeholder requirements are represented on the project. Group s level of concern can have a HIGH level of impact on the decisions. Commitment and support for project is necessary. Group s level of concern can have a HIGH level of impact on the decision. A, I Tourists Construction may impact parking. Risk of congestion I Special interest groups Other users i.e schools Ensure stakeholder requirements are represented on the project. Group s level of concern can have a HIGH impact on outcomes. Ensure stakeholder requirements are represented on the project. I I Note: For projects that require more substantial stakeholder identification, please refer to the Supplemental section of the CRD Project Management Guide for methods / templates, etc. Please document any addendums in the Addendum Section of this Legend NI = no involvement I = information only C = consulted PD = planning and decision making A = approval rights to say Yes or No to a decision 6

12. COMMUNICATIONS Should any of the following be informed / kept up to data about this project? If yes, ensure that they are documented in the Key Stakeholders section. These groups may want the information to be ready for questions from the public or to plan for future change management, etc. Does the project require any of the following: *If yes, please consult your department s communications expert for direction when preparing the project plan. Internal CRD Politicians Management Teams (i.e. ELT, Corporate Team) Specific senior managers from departments not Involved in the execution of the project. External Public Consultation Advertising in print, radio, television, web, etc. Politically sensitive updates to stakeholders Development of print materials for public consumption Required (yes / no) Y N N Required (yes / no) Y N Y Y 13. RISK IDENTIFICATION No. Risks Identification (Related to scope, schedule, budget, stakeholders, etc.) Likelihood to Occur (low, medium, high) Impact if Occurs (low, medium, high High Level Risk Response Strategy (if applicable) 1 Adequate staffing is available to manage and implement the project Medium High Ensure staffing requirements are met through either employees, contract employees or consultants. 2 Project costs are greater than budgeted High High Need to obtain cost estimates for design elements and key factors. 4 Public opposition Medium High Ensure effective community communication strategy throughout the process. Develop mitigation action strategies to address issues. 5 Assume approvals are received on time and with minimal conditions Low High Ensure approvals are sought early to reduce potential delays/costs. 7

14. SIGNOFF ON PROJECT CHANGES Item Project Administrator Role or Involvement in Project Changes Sponsor (see legend below) Senior General Manager Manager CAO Commission/ Board Project Plan Changes A A I I I I Budget Changes Under $5,000 A I $5,001 to $50,000 A A A C I I $50,001 to $100,000 $100,001 to $200,000 A A A A C I A A A A A I Over $200,001 A A A A A I Doesn t Impact Schedule Critical Path Changes Does Impact Critical Path Scope Changes (that affect budget or schedule) Legend C = consulted I = information only A = approval required A I I A A A I I I Same involvement as noted above 15. SIGNOFF (Signoff provides authorization for the project to proceed.) Position/Title Print Name Signature Date Project Sponsors Senior Manager Project Administrator Robert Lapham SSI Parks and Recreation Commission Karla Campbell Dan Ovington 8