Velocity Files NI Technical Report on SEDAR for the Maiden Inferred Mineral Resource Estimate at Rozino Gold Project, Southeast Bulgaria

Similar documents
Velocity Continues to Expand East Zone Discovery at Rozino Gold Project, Southeast Bulgaria

Velocity Hole RDD-009 Intersects New Zone at Rozino Gold Project, Southeast Bulgaria

Velocity Extends East Zone Discovery at Rozino Gold Project, Southeast Bulgaria

Velocity Announces C$9M Strategic Investment by Atlantic Gold

APRIL Balkan Gold Project

JUNE 2018 Balkan Gold Project

ATLANTIC ANNOUNCES STRATEGIC INVESTMENT IN VELOCITY MINERALS LTD.

HIGHLIGHTS DETAILS. Commenting on the new discovery, Hugh Stuart, President and Director of Orca Gold, said Our aim in Côte 1 O r c a G o l d I n c.

TSX.V:ORG Page 1 of 7. Orca Gold Inc West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: Fax: HIGHLIGHTS

NEWS RELEASE 03/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742

Corvus Gold Announces Maiden Resource for Mother Lode Deposit, Nevada

NEWS RELEASE February 15, 2017

NEWS RELEASE Orca Gold Intersects 13m at 10.19g/t Au and 93.7m at 1.72g/t Au at its Block 14 Gold Project in Sudan

NEWS RELEASE February 13, 2018

NEWS RELEASE. Resources at Galat Sufar South ( GSS ), in-pit and outside current design, continue to increase

AUGUST 2018 Balkan Gold Project

New Drilling Results and Mineral Resource Update for Certej Deposit Gold Resources Increase by 1,570,000 ounces

Trevali Provides Murray Brook Project Update

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia

NEWS RELEASE Orca Gold Intercepts 39m at 2.52 g/t Au in The Republic of The Sudan and 27.7 m at 1.74 g/t Au in Côte d Ivoire

GGX Gold Drill Intercepts Meter of 4.59 g/t Gold and g/t Silver. The COD Vein Greenwood BC

Marlin Gold Closes Acquisition of Commonwealth Silver and Gold and Provides Corporate Update

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416)

Spanish Mountain Gold Announces Results of New PEA for the First Zone

NEWS RELEASE New York AG February 25, 2019 Toronto FR Frankfurt FMV

AGNICO EAGLE TO ACQUIRE CAYDEN RESOURCES

SANDSTORM GOLD ROYALTIES RELEASES HOD MADEN PFS AND INCREASES PRODUCTION GUIDANCE

Northgate Announces Increase in Gold Reserves at its Stawell Gold Mine

MIDWAY ANNOUNCES SIGNIFICANT UPGRADE IN RESOURCE AND 2014 BUDGET INCREASE AT SPRING VALLEY PROJECT, NEVADA

Dalradian Resources Intersects 2.34 m Grading g/t Au and 3.97 m Grading 38 g/t Au and 4 m Grading 7.38 g/t Au at the Curraghinalt Gold Deposit

METALLA ADDS PRODUCING ROYALTY ON PAN AMERICAN SILVER PROPERTY AND ANNOUNCES BROKERED PRIVATE PLACEMENT

Capstone Mining 2017 Production Results and 2018 Operating and Capital Guidance

October 01, 2018 News Release Release #

Prophecy Reports 2.08 Million Tonnes of Indicated Resource Grading: 455 g/t Silver, 3.19% Zinc, 2.18% Lead (594 g/t Ag Eq.) for Pulacayo Project

MCEWEN MINING ANNOUNCES UPDATED RESERVE & RESOURCE ESTIMATE AT THE SAN JOSÉ MINE IN ARGENTINA

Gold Hawk Resources Inc.

Corvus Gold Outlines Mother Lode Project Exploration and Resource Definition/Mine Development Plan

Mako Mining Provides Corporate Update

Trevali significantly increases resources at Santander zinc-lead-silver project in Peru

Cumberland Completes Cannu Gold Resource Estimate, Plans for New Reserves and Continued Exploration in 2007 at Meadowbank Gold Project

Avnel Gold Reports that Indicated Resources Increased 55% to 2 Million Ounces at the Kalana Main Project

Marigold Life of Mine Plan

NEWS RELEASE K92 MINING INC. K92 Mining Discovers High Grade Extension of Kora Deposit in First Completed Exploration Hole

Exploration Projects September 30, 2014

For further information: Investor Relations (416)

Allied Nevada Reports Gold Equivalent Measured & Indicated Resources of 10.3 Million Ounces and Further Inferred Resources of 7.

Northgate Minerals Reports Second Quarter Results

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX: November 12, 2009

SARAMA RESOURCES ANNOUNCES PRIVATE PLACEMENT

National Instrument Standards of Disclosure for Mineral Projects. Table of Contents

MANAGEMENT S DISCUSSION & ANALYSIS QUARTERLY HIGHLIGHTS SEPTEMBER 30, 2017

National Instrument Standards of Disclosure for Mineral Projects. Table of Contents

(PEA) for its project in. anticipated. which are. to produce. Highlights. ounces is now. The 3,500 tpd. After-tax NAV. Guatemala this year,

Ann Mason and the Revival of the Yerington District Nevada, USA. Robert Cann Robert Cinits Tom Watkins December 2014

PRELIMINARY ECONOMIC ASSESSMENT FOR THE COMBINED LOS HELADOS AND JOSEMARIA COPPER/GOLD DEPOSITS NEARING COMPLETION

Detour Gold Reports Fourth Quarter and Full-Year 2014 Results and Year-end 2014 Mineral Reserve and Resource Estimates

MAG Silver Corp. August 14, 2013

November 28, 2018 News Release Release #

March 2016 Prospectors & Developers Conference Toronto, Canada

NEWS RELEASE. Preliminary Economic Assessment of Block 14 Strong Economics at US$1,200/oz

LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD

A $100 per ounce decline in the gold price would reduce the reserves by approximately 3.3% or 310,000 ounces.

Trevali Reports Record Preliminary Q and 2017 Annual Production, and Provides 2018 Production and Cost Guidance

Turquoise Hill files 2016 Oyu Tolgoi Technical Report

HBM. Creating Sustainable Value through High Quality Long Life Deposits

METALLA ANNOUNCES FRIENDLY ACQUISITION OF VALGOLD AND ROYALTY ON THE GARRISON PROJECT

SILVERCORP REPORTS SIGNIFICANT GAIN IN MEASURED AND INDICATED MINERAL RESOURCES AT THE YING SILVER-LEAD-ZINC MINING DISTRICT, HENAN PROVINCE, CHINA

# West Georgia Street, Vancouver, B.C., Canada, V6C 3E8 p: f:

For personal use only

Coeur Files Technical Report for Kensington Mine

JANUARY 2019 Gold in Bulgaria

Nordic Gold Completes 1,234 Ounce First Pour

Forward Looking Statement

NEWS RELEASE TSX: ELD NYSE: EGO May 15, Eldorado to Acquire Integra Gold Corporation

Goldcorp and Teck Combine El Morro and Relincho Projects in Chile

News Release B2Gold Announces Positive Exploration Drill Results from the Fekola Property and Regional Targets in Mali, West Africa

BMO 2012 Global Metals & Mining Conference February 2012

(Please note that all dollar amounts in this news release are expressed in U.S. dollars unless otherwise indicated.)

MCEWEN MINING ANNOUNCES RECORD RESOURCE ESTIMATE AT THE SAN JOSÉ MINE IN ARGENTINA

ENTRÉE GOLD REPORTS ON SECOND QUARTER 2012

The greatest shareholder gains are frequently made at the time of discovery

SANDSTORM GOLD ACQUIRES 2% NSR ROYALTY ON ENDEAVOUR S HOUNDÉ GOLD MINE FROM ACACIA MINING

Fekola Expanded Mine Plan and Mill Expansion Study

For personal use only

Kişladağ Update March 2018

INTERIM QUARTERLY HIGHLIGHTS

Antioquia Gold Announces Preliminary Economic Assessment and Mineral Resource Update for Cisneros Gold Project

METALLA REPORTS FINANCIAL RESULTS FOR THE THIRD QUARTER OF FISCAL 2018

Forward Looking Statement

Caledonia Mining Corporation (TSX: CAL, OTCQX: CALVF, AIM: CMCL) Revised Investment Plan and Production Projections (2015 to 2021)

NEWS RELEASE. Centerra Gold Announces Positive Feasibility Study on the Öksüt Project

SECOND QUARTER 2018 RESULTS. August 10, 2018

Trevali expands high-grade zinc-lead-silver mineralization at Santander Zinc Mine and discovers new Central-Oyon zone

Oracle Mining signs indicative term sheet for US$6.5 million secured convertible loan and up to CAD$20 million future project financing

Orezone Announces Positive Preliminary Economic Assessment

For personal use only

Fortress Enters into Agreement to Acquire the Fruta del Norte Project from Kinross

NEWS RELEASE GREAT PANTHER SILVER REPORTS FOURTH QUARTER AND ANNUAL 2018 PRODUCTION RESULTS AND PROVIDES CORPORATE UPDATE

PRESS RELEASE New Gold Reports Consolidated Reserve & Resource Statements

COLONIAL COAL INTERNATIONAL CORP. Suite Howe Street, Vancouver, British Columbia, Canada, V6C 2T5 Telephone: (604)

Transcription:

NR-18-10 April 5, 2018 Velocity Files NI 43-101 Technical Report on SEDAR for the Maiden Inferred Mineral Resource Estimate at Rozino Gold Project, Southeast Bulgaria Inferred Resource at 0.5g/t gold cut-off grade 17Mt @ 1.15g/t gold for 629,000 ounces Mineralization remains open for expansion Vancouver, British Columbia Velocity Minerals Ltd. (TSXV: VLC) ( Velocity or the Company ) announces that it has filed a NI 43-101 Technical Report on SEDAR (the Report ) entitled NI 43-101 Technical Report; Mineral Resource Estimation for the Rozino Gold Deposit, Republic of Bulgaria, dated 5 April 2018 (effective date March 21, 2018). The Technical Report was written by an independent Qualified Person as defined by National Instrument 43-101 Standards of Disclosure. The Report is available on SEDAR under the Company s profile and is also available on the Company s web site. Inferred Mineral Resource estimates for the Rozino gold deposit ( Rozino or the Project ), based on 2m down-hole composited gold assay grades, are reported for a range of cut off grades (Table 1). Highlights include: 17Mt @ 1.15g/t gold for 629,000 ounces at 0.5g/t cut-off grade; and 8.2Mt @ 1.68g/t gold for 443,000 ounces at 0.8g/t cut-off grade; Estimated resources extend to the base of mineralized drilling at around 190m depth, with around 90% of estimates from depths of less than 110m and less than 1% from below 150m; and The mineralized system remains open for expansion and drill testing is ongoing. Table 1: Inferred Mineral Resource estimates at selected cut-offs, effective date March 1, 2018 (1) Cut Off Grade Tonnes Gold Gold gold g/t million g/t,000 ounces 0.2 45 0.62 897 0.5 17 1.15 629 0.8 8.2 1.68 443 1.0 5.7 2.03 372 1.2 4.2 2.37 320 (1) Mineral resources were estimated by Jonathon Abbott, a member of the Australian Institute of Geoscientists and employee of MPR Geological Consultants Pty Ltd of Perth, Australia. Mr. Abbott is a Qualified Person, as defined by National Instrument 43-101. The Company plans to publish a Preliminary Economic Assessment ( PEA ) in the second half of 2018, which will include an updated Mineral Resource estimate. 1

Resource Estimate Methodology Recoverable resources were estimated for Rozino using Multiple Indicator Kriging (MIK) with block support adjustment, a method that has been demonstrated to provide reliable estimates of recoverable open pit resources in gold deposits of diverse geological styles. The Rozino sampling database includes 186 diamond holes for 29,924m of drilling, of which 86 drill holes (14,289m) completed by Asenovgrad Geoengineering EAD are not included in the resource estimation dataset due to insufficient quality control data. Drilling used in resource estimation total 78 (12,009m) drill holes and comprise 44 drill holes (7,475m) completed by Velocity, 28 drill holes (3,794m) completed by Hereward Ventures Ltd. ( Hereward ), and 6 drill holes (740m) completed by Asia Gold Inc. ( Asia Gold ). The remaining angled drill holes from the database are located outside the mineralized envelope and did not inform the resource estimation. Samples from Velocity s diamond drilling provide 63% of the estimation dataset, with angled diamond holes drilled by Hereward and Asia Gold contributing 32% and 5%, respectively. Estimated resources are constrained within a mineralized envelope interpreted from 2m down-hole composited gold grades and geological logging from diamond drilling and surface trenches. The envelope captures intervals of greater than 0.1 g/t, with the lower boundary reflecting the contact between variably mineralized sedimentary rocks and un-mineralized basement. It covers an area of approximately 780m by 600m. Estimated resources extend to the base of mineralized drilling at around 190m depth, with around 90% of estimates from depths of less than 110m and less than 1% from below 150m. Bulk densities of 2.2, 2.4 and 2.6 tonnes per cubic metre were assigned to completely weathered, transitional and fresh material, respectively, using surfaces representing the base of complete oxidation ( BOCO ) and top of fresh rock ( TOFR ) interpreted by Velocity. Within the resource area the depth to BOCO averages around 7m, with fresh rock occurring at an average depth of around 18m. Quality Assurance / Quality Control The work program at Rozino was designed and is supervised by Stuart A. Mills, CGeol, the Company's Vice- President Exploration, who is responsible for all aspects of the work, including the quality control/quality assurance program. On-site personnel at the project rigorously collect and track samples which are then security sealed and shipped to ALS Global laboratory in Romania. Samples were prepared and analyzed by fire assay using a 30-gram charge in compliance with industry standards. Field duplicate samples, blanks and independent controlled reference material (standards) are included in every batch. Hereward and Asia Gold s diamond core from angled drilling was sampled and analyzed by industry standard methods. The core was generally halved for analysis with a diamond saw over generally 1m intervals, and samples were analyzed for gold by fire assay by commercial laboratories. Information available to demonstrate the reliability of these results includes duplicates and blanks for both data sets and certified reference standards for Asia Gold s drill results. General Notes with Respect to Technical Information The mineral resource disclosed herein has been estimated in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum CIM Definition Standards for Mineral Resources and Mineral Reserves (CIM, 2014). Mineral resources that are not mineral reserves do not have demonstrated economic viability. Any known legal, political, environmental, or other risks that could materially affect the potential development of the Mineral Reserves are detailed below in the section entitled Cautionary Statement Regarding Forward-Looking Information. 2

Qualified Person The technical content of this news release has been approved for disclosure by Jonathon Abbott, a member of the Australian Institute of Geoscientists and employee of MPR Geological Consultants Pty Ltd. Mr. Abbott is a Qualified Person, as defined by National Instrument 43-101. Mr. Abbott is independent of the Company. About the Rozino Gold Project Velocity has been exploring and drilling at Rozino since August 2017, completing 7,300m of diamond drilling in 2017 and publishing a maiden Inferred Mineral Resource Estimate in Q1 2018; 17Mt @ 1.15g/t gold for 629,000 ounces at 0.5g/t cut-off grade with 8.2Mt @ 1.68g/t gold for 443,000 ounces at 0.8g/t cut-off grade. Approximately 90% of estimated resources at depths of less than 110m from surface and less than 1% below 150m from surface. Mineralization remains open for expansion. The Company continues to drill in 2018 with a view to publishing an updated mineral resource estimate and preliminary economic assessment ( PEA ) in Q3 2018, approximately one year after initiating exploration. On completion of the PEA, the Company will exercise its option for a 70% interest in the project and will move forward in joint venture with its Bulgarian partner. About the Balkan Gold Project Velocity formed an Exploration and Mining Alliance ( Alliance ) with Bulgarian operating partner Gorubso Kardzhali A.D. ( Gorubso ) in February 2018. The Alliance is the cornerstone of the Balkan Gold Project. Within the Balkan Gold Project, the Company s portfolio of assets in Bulgaria includes exclusive access to a modern, centrally located CIL plant for processing of material from gold projects in the surrounding area. The Company has negotiated an option to earn a 70% interest in any or all of seven advanced gold projects, including the Rozino Project where drilling is ongoing. In addition, the Company has negotiated an option to earn a 50% interest in the operating Chala Gold Mine. The Alliance area covers all existing and future Gorubso and Velocity projects within an area of 10,400km 2 covering the prospective Eastern Rhodope Gold Mining District in southeastern Bulgaria. The Agreement contemplates the exploration, development, and mining of the various projects within the Alliance area and provides for an option/joint venture mechanism by which Velocity and Gorubso will partner to maximize value for both companies. About Velocity Minerals Ltd. Velocity is a gold exploration and development company focused on eastern Europe. The Company s management and board includes mining industry professionals with over 100 years of combined experience spanning Europe, Asia, and the Americas as employees of major mining companies as well as founders and senior executives of junior to mid-tier public companies. The team's experience includes all aspects of mineral exploration, resource definition, feasibility, finance, mine construction and mine operation as well as a track record in managing publicly listed companies. About Bulgaria Bulgaria is a member of NATO (2004) and a member of the European Union (2007). The local currency (BGN) has been tied to the Euro since 1999 (1.956 BGN/EUR). The country is served by modern European infrastructure including an extensive network of paved roads. Bulgaria boasts an exceptionally low corporate tax rate of only 10%. The country s education system is excellent with good availability of experienced mining professionals in a favourable cost environment. Foreign mining companies are successfully operating in Bulgaria. The country s mining law was established in 1999 and updated in 2011. Mining royalties are low and compare favourably with more established mining countries. 3

On Behalf of the Board of Directors "Keith Henderson" President & CEO For further information, please contact: Keith Henderson Phone: +1-604-484-1233 E-mail: info@velocityminerals.com Web: www.velocityminerals.com Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release does not constitute an offer of sale of any of the above-mentioned securities in the United States. None of the foregoing securities have been and will not be registered under the United States Securities Act of 1933, as amended (the "1933 Act") or any applicable state securities laws and may not be offered or sold in the United States or to, or for the account or benefit of, U.S. persons (as defined in Regulation S under the 1933 Act) or persons in the United States absent registration or an applicable exemption from such registration requirements. This news release does not constitute an offer to sell or the solicitation of an offer to buy nor will there be any sale of the foregoing securities in any jurisdiction in which such offer, solicitation or sale would be unlawful. CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Forward-looking statements include, but are not limited to, statements with respect to: statements related to proposed exploration and development programs at Rozino, grade and tonnage of material and resource estimates and the Alliance. Often, but not always, forward looking statements can be identified by words such as "pro forma", "plans", "expects", "may", "should", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", "believes", "potential" or variations of such words including negative variations thereof, and phrases that refer to certain actions, events or results that may, could, would, might or will occur or be taken or achieved. In making the forward-looking statements in this news release, the Company has applied several material assumptions, including without limitation, that market fundamentals will result in sustained gold demand and prices, the receipt of any necessary permits, licenses and regulatory approvals in connection with the future development of Rozino in a timely manner, the availability of financing on suitable terms for the development, construction and continued operation of Rozino, and the Company s ability to comply with environmental, health and safety laws. Forward looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to differ materially from any future results, performance or achievements expressed or implied by the forward-looking information. Such risks and other factors include, among others, operating and technical difficulties in connection with mineral exploration and development and mine development activities for Rozino, including the geological mapping, prospecting and sampling programs for the project, the fact that the Company s interests in Rozino (Tintyava property) is only an option and there is no guarantee that the interest, if earned, will be certain, actual results of exploration activities, variations to the geological and metallurgical assumptions (including with respect to the size, grade and recoverability of mineral reserves and mineral resources), the timing and amount of estimated future production, costs of production, capital expenditures, the costs and timing of the development of new deposits, the availability of a sufficient supply of water and other materials, requirements for additional capital to fund the Company's business plan, future prices of precious metals, changes in general economic conditions, changes in the financial markets and in the demand and market price for commodities, possible variations in ore grade or recovery rates, possible failures of plants, equipment or processes to operate as anticipated, accidents, labour disputes and other risks of the mining industry, delays in obtaining governmental and regulatory approvals (including of the TSX Venture Exchange), permits or 4

financing or in the completion of development or construction activities, changes in laws, regulations and policies affecting mining operations, hedging practices, currency fluctuations, title disputes or claims limitations on insurance coverage and the timing and possible outcome of pending litigation, environmental issues and liabilities, risks related to joint venture operations, and risks related to the integration of acquisitions, as well as those factors discussed under the heading "Risk Factors" in the Company's annual management's discussion and analysis and other filings of the Company with the Canadian Securities Authorities, copies of which can be found under the Company's profile on the SEDAR website at www.sedar.com. Information concerning mineral reserve and mineral resource estimates also may be considered forward-looking statements, as such information constitutes a prediction of what mineralization might be found to be present if and when a project is actually developed and / or is in production. The actual results or performance by the Company could differ materially from those expressed in, or implied by, any forward-looking statements relating to those matters. Readers are cautioned not to place undue reliance on forward-looking statements. The Company undertakes no obligation to update any of the forward-looking statements in this news release or incorporated by reference herein, except as otherwise required by law. - 30-5