MCEWEN MINING ANNOUNCES RECORD RESOURCE ESTIMATE AT THE SAN JOSÉ MINE IN ARGENTINA

Similar documents
MCEWEN MINING ANNOUNCES UPDATED RESERVE & RESOURCE ESTIMATE AT THE SAN JOSÉ MINE IN ARGENTINA

McEWEN MINING REPORTS 2015 FIRST QUARTER OPERATING & FINANCIAL RESULTS

MCEWEN MINING PROVIDES FIRST QUARTER 2012 OPERATIONAL AND DEVELOPMENT UPDATE

MCEWEN MINING REPORTS 2017 FULL YEAR AND Q4 RESULTS

MCEWEN MINING REPORTS 2015 FULL YEAR AND Q4 RESULTS

MCEWEN MINING ANNOUNCES UPDATED PRELIMINARY ECONOMIC ASSESSMENT FOR THE LOS AZULES COPPER PROJECT (All Dollar Amounts in US Dollars)

MCEWEN MINING ANNOUNCES Q OPERATING & FINANCIAL RESULTS

McEWEN MINING ANNOUNCES POSITIVE FEASIBILTY STUDY FOR EL GALLO PHASE II, MEXICO

COPPER SHINES BRIGHTLY FOR MCEWEN MINING - ENHANCED ECONOMICS OF LOS AZULES

MCEWEN MINING INTERSECTS 53.9 g/t GOLD OVER 8.3 m AT THE FROOME FOOTWALL

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416)

A $100 per ounce decline in the gold price would reduce the reserves by approximately 3.3% or 310,000 ounces.

MIDWAY ANNOUNCES SIGNIFICANT UPGRADE IN RESOURCE AND 2014 BUDGET INCREASE AT SPRING VALLEY PROJECT, NEVADA

MCEWEN MINING UPDATES POSITIVE FEASIBILITY STUDY FOR GOLD BAR MINE, NEVADA

Detour Gold Reports Fourth Quarter and Full-Year 2014 Results and Year-end 2014 Mineral Reserve and Resource Estimates

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia

AGM MAY 28, x

PRESS RELEASE New Gold Reports Consolidated Reserve & Resource Statements

First Quarter 2012 Results

RBC Capital Markets Underground Mining Technical Session Ernest Mast President & COO October 22, 2015

Exploration Projects September 30, 2014

GOLDEN MINERALS REPORTS FIRST QUARTER 2018 RESULTS

FNV. Forward-Looking Statements

Detour Gold Reports 2017 Fourth Quarter and Year-End Results

Detour Gold Updates Life of Mine Plan for Detour Lake

Spanish Mountain Gold Announces Results of New PEA for the First Zone

AGNICO-EAGLE MINES LIMITED. Corporate Update. May 2012

New Drilling Results and Mineral Resource Update for Certej Deposit Gold Resources Increase by 1,570,000 ounces

For Immediate Release Date: July 4, 2017 # ORVANA PROVIDES UPDATE ON DON MARIO OPERATION; ANNOUNCES US$11.3 MILLION DEBT FINANCING

NEWS RELEASE GREAT PANTHER SILVER REPORTS FOURTH QUARTER AND ANNUAL 2018 PRODUCTION RESULTS AND PROVIDES CORPORATE UPDATE

(PEA) for its project in. anticipated. which are. to produce. Highlights. ounces is now. The 3,500 tpd. After-tax NAV. Guatemala this year,

Gold Hawk Resources Inc.

SILVERCORP REPORTS SIGNIFICANT GAIN IN MEASURED AND INDICATED MINERAL RESOURCES AT THE YING SILVER-LEAD-ZINC MINING DISTRICT, HENAN PROVINCE, CHINA

1. Production numbers are considered approximate because monthly production has not been reconciled yet for November 2017.

ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) or 1 (866)

Q Earnings Review

Alio Gold Reports Second Quarter 2018 Results

Hudbay Announces 2016 Production Guidance and Capital and Exploration Expenditure Forecasts

Q4 and FY 2018 Earnings Review

SILVER PRODUCER STRENGTH UPSIDE PRIMARY SILVER PRODUCER. Primary Silver Producer 57% Ag, 33% Au, 10% Pb-Zn

PRUDENTAND DISCIPLINED

ABITIBI ROYALTIES ANNOUNCES RESERVE & RESOURCE UPDATE

HBM. Creating Sustainable Value through High Quality Long Life Deposits

Corporate Update. June 2013

NEWS RELEASE GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE

TSX:AR CORPORATE PRESENTATION

ANNUAL GENERAL MEETING APRIL 28, 2017

Q Earnings Review

Q Conference Call August 15, 2012 HBM

For further information: Investor Relations (416)

Detour Gold Reports Third Quarter 2018 Results

SECOND QUARTER 2018 RESULTS. August 10, 2018

SIERRA METALS INCREASES MINERAL RESERVE ESTIMATE BY 83% FOR ITS BOLIVAR MINE, MEXICO

Coeur Announces Initial Reserve Estimate and Reserve-Based Mine Plan for Silvertip Mine

NEWS RELEASE GREAT PANTHER SILVER REPORTS FOURTH QUARTER AND ANNUAL 2017 PRODUCTION RESULTS AND PROVIDES 2018 OUTLOOK

Allied Nevada Reports Gold Equivalent Measured & Indicated Resources of 10.3 Million Ounces and Further Inferred Resources of 7.

PRESS RELEASE FOR IMMEDIATE RELEASE May 13, 2016

September 15, 2016 News Release SILVER STANDARD PROVIDES MARIGOLD FIVE-YEAR OUTLOOK

Prophecy Reports 2.08 Million Tonnes of Indicated Resource Grading: 455 g/t Silver, 3.19% Zinc, 2.18% Lead (594 g/t Ag Eq.) for Pulacayo Project

NEWS RELEASE GREAT PANTHER SILVER REPORTS THIRD QUARTER 2018 PRODUCTION RESULTS AND PROVIDES CORPORATE UPDATE

GGX Gold Drill Intercepts Meter of 4.59 g/t Gold and g/t Silver. The COD Vein Greenwood BC

SILVER PRODUCER STRENGTH UPSIDE PRIMARY SILVER PRODUCER. Primary Silver Producer 55% Ag, 36% Au, 9% Pb-Zn

NEWS RELEASE 03/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742

Coeur Reports Year-End 2014 Mineral Reserves and Resources

SILVERCORP REPORTS Q1 RESULTS: NET INCOME UP 73%, CASH FLOWS FROM OPERATIONS UP 52% TO US$20.2 MILLION

Q4 and Year End 2012 Conference Call. ArgonautGold.com

Pretivm Reports Third Quarter 2018 Results

NEWS RELEASE New York AG February 25, 2019 Toronto FR Frankfurt FMV

Q Conference Call November 2, 2012 HBM

NOVEMBER NYSE American: PZG

Hudbay Announces Updated Technical Report for Constancia and Provides Annual Reserve and Resource Update

Allied Nevada Announces Improved Mine Plan and Economics for Hycroft Mill Expansion With 77% IRR and $2.7 Billion NPV

SANDSTORM GOLD ROYALTIES ANNOUNCES 2018 SECOND QUARTER RESULTS

Mako Mining Provides Corporate Update

PRELIMINARY ECONOMIC ASSESSMENT FOR THE COMBINED LOS HELADOS AND JOSEMARIA COPPER/GOLD DEPOSITS NEARING COMPLETION

AVINO SILVER & GOLD MINES LTD.

YEAR END 2016 CONFERENCE CALL. February 24, 2017

Marigold Life of Mine Plan

Capstone Mining 2017 Production Results and 2018 Operating and Capital Guidance

Cumberland Completes Cannu Gold Resource Estimate, Plans for New Reserves and Continued Exploration in 2007 at Meadowbank Gold Project

# West Georgia Street, Vancouver, B.C., Canada, V6C 3E8 p: f:

MAG Silver Corp. August 14, 2013

Minera Alamos Enters Option Agreement to Acquire Guadalupe de Los Reyes Advanced Stage Gold-Silver Project in Mexico from Vista Gold

Coeur Provides Updated Palmarejo Mine Plan

Coeur Files Technical Report for Kensington Mine

YEAR END 2015 CONFERENCE CALL

Avnel Gold Reports that Indicated Resources Increased 55% to 2 Million Ounces at the Kalana Main Project

Prophecy Signs Toll Milling LOI to Produce Zinc-Silver and Lead- Silver Concentrates from Pulacayo Project, Bolivia

Bank of America Merrill Lynch 2014 Global Metals, Mining & Steel Conference

METALLA ANNOUNCES FRIENDLY ACQUISITION OF VALGOLD AND ROYALTY ON THE GARRISON PROJECT

SILVER PRODUCER PROFITABLE GROWTH PROFITABLE PRIMARY SILVER PRODUCER. Primary Silver Producer 63% Ag, 27% Au, 10% Pb-Zn

Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019

Q Results Webcast & Conference Call

October 25, Third Quarter Conference Call

Nordic Gold Completes 1,234 Ounce First Pour

2014 First Quarter Highlights

OSISKO UPDATES CANADIAN MALARTIC MINE PLAN

METALLA ADDS PRODUCING ROYALTY ON PAN AMERICAN SILVER PROPERTY AND ANNOUNCES BROKERED PRIVATE PLACEMENT

ABITIBI ROYALTIES ANNOUNCES RESERVE & RESOURCE UPDATE ROYALTY PRODUCTION SCHEDULE

Exeter Secures Second Water Source Outlines Pathway for First Stage Development of Caspiche Oxides

Transcription:

MCEWEN MINING ANNOUNCES RECORD RESOURCE ESTIMATE AT THE SAN JOSÉ MINE IN ARGENTINA TORONTO, ONTARIO - (March 18, 2013) - (NYSE: MUX) (TSX: MUX) is pleased to announce that year-end 2012 mineral resource and reserve estimates and the grades for both gold and silver have increased from 2011 for the San José mine (49% owned by McEwen Mining). Of particular interest, the mineral resource estimates have increased to a record level. The mineral reserve and resource estimates were calculated using US$1,200 per ounce gold and US$20 per ounce silver. The estimates were independently audited by P&E Mining Consultants Inc. San José Mine Resources & Reserves Highlights (100% Basis) Inferred gold and silver resources up 61% and 44%, respectively, to 497,400 ounces gold and 32.1 million ounces silver, contained in 2.1 million tonnes. Gold grades increased by 39% to 7.37 gpt and silver grades increased by 24% to 476 gpt. Proven and gold and silver reserves up 7% and 20% respectively, to 367,100 ounces gold and 26.8 million ounces silver, contained in 1.8 million tonnes. Gold grades increased by 1% to 6.44 gpt and silver grades increased by 14% to 470 gpt. and Indicated gold silver resources down 5% to 991,200 ounces gold while silver resources decreased marginally to 68.3 million ounces silver, contained in 4.4 million tonnes. Gold grades increased by 1% to 7.03 gpt and silver grades increased by 6% to 484 gpt. San José is a world class mine that continues to get better with each passing year. I would like to congratulate the team at the mine and our partners, Hochschild Mining Plc, for conducting a very successful exploration program in 2012, stated Rob McEwen, Chief Owner. SAN JOSÉ MINE BIGGER & HIGHER GRADE! The San José mine is one of the highest-grade precious metal mines in the Americas. In 2012, more than 84,000 ounces of gold and 5.85 million ounces of silver were extracted, which was a new record for the mine (see Figure 3). Production attributable to McEwen Mining for 2012 was 48,876 ounces of gold and 2.92 million ounces of silver. Net of this production, total reserves increased by 7% for gold and 20% for silver, to an estimated 1.8 million tonnes at a grade of 6.44 gpt gold and 470 gpt silver, for a total of 367,100 ounces of gold and 26.8 million ounces of silver. In addition to replacing reserves, the exploration program in 2012 was focused on identifying new veins and also extensions of current zones. With the largest exploration program in the mine s history, Inferred resources were expanded by 61% for gold and 44% for silver versus 2011. It is also important to note that the grade of the Inferred resources has materially increased by 39% for gold and 24% for silver. Inferred resources now total 2.1 million tonnes at a grade of 7.37 gpt gold and 476 gpt silver, for a total of 497,400 ounces of gold and 32.1 million ounces of silver. and Indicated resources were down slightly versus 2011. The reason for the decrease was due to drilling being focused on resource expansion rather than infill for resource upgrading. and Indicated resource categories now total 4.4 million tonnes at a grade of 7.03 gpt gold and 484 gpt silver, for a total of 991,200 ounces of Page 1

gold and 68.3 million ounces of silver. The San José mine is owned and operated by Minera Santa Cruz S.A., a joint venture owned 51% by Hochschild Mining Plc and 49% by EXPLORATION IN 2013 The 2013 exploration budget for the San José mine is US$8 million. The goal is to complete 39,250 meters of diamond drilling. The majority of this drilling will be targeting new resources located south-east of the mine area. The balance of the drilling will be for infill drilling designed to convert a portion of the Inferred resources to the and Indicated resource categories. Table 1 - dited San José Mineral Resource Estimate, December 31, 2012 1,289 8.15 559 337.8 23.17 Indicated 3,098 6.56 453 653.4 45.12 and Indicated 4,387 7.03 484 991.2 68.29 Inferred 2,099 7.37 476 497.4 32.12 Notes: (1) Represents 100% of the resources. has a 49% attributable interest in the San José property. (2) Mineral resources, which are not mineral reserves, do not have demonstrated economic viability. (3) Mineral resources are reported inclusive of mineral reserves. (4) The quantity and grade of reported Inferred resources are uncertain in nature and there has been insufficient exploration to classify these Inferred resources as or Indicated, and it is uncertain if further exploration will result in upgrading them to an Indicated or category. (5) Mineral Resources were estimated by Hochschild Mining Plc using the CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions. P&E Mining Consultants Inc have audited the resource estimates and found that they meet both the requirements for Canadian disclosure under NI 43-101 and the Joint Ore Reserves Committee of the stralian Institute of Mining and Metallurgy ( JORC ). (6) Resource estimations utilized inverse distance and ordinary kirging methods depending upon data density. (7) Metal prices used were $1200/oz for and $20/oz for. (8) Resources were defined at a cut-off grade of 213 g/t Eq, which is equivalent to a cut-off value of $92.88/tonne. The cut-off value was increased from $88.31/tonne used for the December 31, 2011 estimate reflecting higher operating costs due to local inflation. Table 2 - dited Mineral Reserve Estimate, December 31, 2012 Proven 830 6.73 470 179.6 12.54 942 6.19 471 187.5 14.26 1,772 6.44 470 367.1 26.80 Proven and Notes: (1) Represents 100% of the reserves. has a 49% attributable interest in the San José property. (2) Metal prices used were $1200/oz for and $20/oz for (same as for resources). (3) Reserves were defined at a cut-off $92.88/tonne, which is the same cutoff value used for resources. The cut-off value is based on historical January to November 2012 geologic, mining, plant and mine administration variable and fixed cost, and December 2012 estimated costs. P&E considers these costs to reasonable as a basis for estimating mineral reserves. (4) Average internal dilution was 8%. Average mining and geotechnical dilution was 27%. (5) Mineral Reserves were estimated by Hochschild Mining Plc using the CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions. P&E Mining Consultants Inc have audited the reserve estimates and found that they meet the requirements for disclosure as reserves under NI 43-101 and the Joint Ore Reserves Committee of the stralian Institute of Mining and Metallurgy ( JORC ) as well as the US Securities and Exchange Commission Industry Guide 7. Page 2

Table 3 Comparison of San José Mine Reserve Estimates (100% Basis) December 31, 2012 Reserve Estimate December 31, 2011 Reserve Estimate Proven 830 6.73 470 179.6 12.54 942 6.19 471 187.5 Proven & 1,772 6.44 470 367.1 Proven 805 6.99 475 181 12.29 14.26 876 5.79 354 163 9.97 26.80 Proven & 1,681 6.36 412 344 22.26 Table 4 Comparison of San José Mine Resource Estimates (100% Basis) December 31, 2012 Resource Estimate December 31, 2011 Resource Estimate 1,289 8.15 559 337.8 23.17 1,155 8.21 560 305 20.80 Indicated 3,098 6.56 453 653.4 45.12 Indicated 3,513 6.53 423 738 47.78 & Indicated 4,387 7.03 484 991.2 68.29 & Indicated 4,668 6.95 457 1043 68.58 Inferred 2,099 7.37 476 497.4 32.12 Inferred 1,813 5.30 384 309 22.38 Page 3

Figure 1 Historical Mineral Resource Estimates (100% Basis) Page 4

Figure 2 Historical Mineral Reserve Estimates (100% Basis) Page 5

Figure 3 Historical Production of Gold Equivalent Ounces (100% Basis) ABOUT MCEWEN MINING (www.mcewenmining.com) The goal of McEwen Mining is to qualify for inclusion in the S&P 500 by 2015 by creating a high growth gold producer focused in the Americas. McEwen Mining's principal assets consist of the San José mine in Santa Cruz, Argentina (49% interest); the El Gallo complex in Sinaloa, Mexico; the Gold Bar project in Nevada, US; the Los Azules project in San Juan, Argentina and a large portfolio of exploration properties in Argentina, Mexico and Nevada. McEwen Mining has 296,024,859 shares issued and outstanding. Rob McEwen, Chairman, President and Chief Owner, owns 25% of the shares of the Company (assuming all outstanding Exchangeable Shares are exchanged for an equivalent amount of Common Shares). As of December 31, 2012, McEwen Mining had cash and liquid assets of approximately US$79 million and is debt free. Page 6

RELIABILITY OF INFORMATION Minera Santa Cruz S.A., the owner of the San José mine, is responsible for and has supplied to the Company all reported results from the San José mine. McEwen Mining s joint venture partner, a subsidiary of Hochschild Mining plc, and its affiliates other than MSC do not accept responsibility for the use of project data or the adequacy or accuracy of this release. Although the Company has independently verified reserve and resource estimates, as the Company is not the operator of the San José mine, there can be no assurance that production information reported to the Company by MSC is accurate, the Company has not independently verified such information and readers are therefore cautioned regarding the extent to which they should rely upon such information. TECHNICAL INFORMATION The technical content of this news release has been reviewed and approved by Eugene Puritch, P. Eng., President of P&E Mining Consultants Inc. Under the direction of Mr. Puritch, Al Hayden, P. Eng., James L. Pearson, P. Eng., and Fred H. Brown, CPG, P.Geo. performed an independent audit of the December 31, 2012 resource and reserve estimates. Each of the foregoing is a Qualified Person and independent of the Corporation, in each case, within the meaning of Canadian National Instrument 43-101 (NI 43-101). Each of the Qualified Persons visited the site on February 23rd and 24th, 2013, where resource modeling techniques were reviewed, the drill hole database was inspected and independent drill core samples were collected for verification of and grades. Site visit data review and sampling revealed no issues of concern regarding the resource estimate. For additional information about the San José Mine, see the technical report dated gust 15, 2012 titled "Technical Report on the San José Silver-Gold Mine, Santa Cruz, Argentina" prepared by Eugene J. Puritch, P.Eng., Alfred S. Hayden, P.Eng., James L. Pearson, P.Eng, Fred H. Brown, CPG, P.Geo., and David Burga, P.Geo. all of P&E Mining Consultants Inc. and each a "Qualified Person" and "independent" of McEwen Mining, in each case, within the meaning of NI 43-101. The foregoing news release and technical report are available under the Corporation s profile on SEDAR (www.sedar.com). CAUTIONARY NOTE TO US INVESTORS McEwen Mining prepares its resource estimates in accordance with standards of the Canadian Institute of Mining, Metallurgy and Petroleum referred to in Canadian National Instrument 43-101 (NI 43-101). These standards are different from the standards generally permitted in reports filed with the SEC. Under NI 43-101, McEwen Mining reports measured, indicated and inferred resources, measurements, which are generally not permitted in filings made with the SEC. The estimation of measured resources and indicated resources involve greater uncertainty as to their existence and economic feasibility than the estimation of proven and probable reserves. U.S. investors are cautioned not to assume that any part of measured or indicated resources will ever be converted into economically mineable reserves. The estimation of inferred resources involves far greater uncertainty as to their existence and economic viability than the estimation of other categories of resources. CAUTION CONCERNING FORWARD-LOOKING STATEMENTS This press release contains certain forward-looking statements and information, including "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. The forward-looking statements and information expressed, as at the date of this press release, 's (the "Company") estimates, forecasts, projections, expectations or beliefs as to future events and results. Forward-looking statements and information are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic, political and competitive uncertainties, risks and contingencies, and there can be no assurance that such statements and information will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements and information. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward-looking statements and information include, but are not limited to, risks related to the cost of transferring or otherwise allocating funds between operating jurisdictions, factors associated with fluctuations in the market price of precious metals, mining industry risks, political, economic, social and security Page 7

risks associated with foreign operations, risks associated with the construction and permitting of mining operations and commencement of production and the projected costs thereof, risks related to litigation, property title, the state of the capital markets, environmental risks and hazards, uncertainty as to calculation of mineral resources and reserves and other risks. Readers should not place undue reliance on forward-looking statements or information included herein, which speak only as of the date hereof. The Company undertakes no obligation to reissue or update forward-looking statements or information as a result of new information or events after the date hereof except as may be required by law. See McEwen Mining's Annual Report on Form 10-K for the fiscal year ended December 31, 2012 and other filings with the Securities and Exchange Commission, under the caption "Risk Factors", for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information regarding the Company. All forward-looking statements and information made in this news release are qualified by this cautionary statement. The NYSE and TSX have not reviewed and do not accept responsibility for the adequacy or accuracy of the contents of this news release, which has been prepared by management of For further information contact: Jenya Meshcheryakova Investor Relations Tel: (647) 258-0395 ext 410 Toll Free: (866) 441-0690 Fax: (647) 258-0408 Mailing Address 181 Bay Street Suite 4750 Toronto, ON M5J 2T3 PO box 792 E-mail: info@mcewenmining.com Facebook: facebook.com/mcewenrob Twitter: twitter.com/mcewenmining Store: mcewenmining.com/store Page 8