QUARTERLY REPORT APRIL TO JUNE 2014

Similar documents
QUARTERLY REPORT OCTOBER TO DECEMBER 2014

For personal use only

For personal use only

ASX Code: THR THOR MINING PLC LETTER TO SHAREHOLDERS. 19 June 2018

Half-yearly Report For the six months ended 31 December 2018

For personal use only

For personal use only

ASX Code: THR. Date: 14 October Company Announcements Office, ASX Securities Limited, 20, Bridge Street, Sydney, N.S.W. 2000

For personal use only. AGM Presentation. November 2016

VITAL METALS ANNUAL GENERAL MEETING

Hot Chili Raises A$8.1m via Placement

THOR MINING PLC ("Thor" or the "Company") Appendix 3B

INVESTOR PRESENTATION. August 2018

For personal use only

A New Growth Story in Western Australian Gold

Hot Chili Arranges Capital Raising of up to $35.5 Million with Strong Support

OTCQX:CROCF. February. completed % U 3 O 8 Cut Off Grade. contained. repetitions. significant the aim of. Gold retains

ASX Code: THR. Date: 1 December Company Announcements Office, ASX Securities Limited, 20, Bridge Street, Sydney, N.S.W. 2000

QUARTERLY ACTIVITY STATEMENT

For personal use only

For personal use only

Ormonde Mining plc. Interim Results for the Six Months Ended 30 June 2009

For personal use only

For personal use only

MERGER PRESENTATION JULY 2018

For personal use only

Investing in Tin Seminar London 5 th December 2011

Mineral Hill Mine, NSW

The Yamarna Gold Belt: Exploration Upside To Be Funded From Production

Presentation August ASX Code: TNG

QUARTERLY REPORT MARCH 2006

For personal use only

RAMELIUS APPROVES VIVIEN GOLD MINE

KBL Mining Limited (ASX: KBL) Presentation May 2015 Resources Investment Symposium BROKEN HILL

Mithril Resources Ltd

20% Increase in T3 Feasibility Study Plant Throughput to 3Mtpa

For personal use only

Hot Chili and CMP ratify Productora joint infrastructure Memorandum of Understanding

TERRAMIN AUSTRALIA LIMITED. Annual General Meeting

ASX ANNOUNCEMENT 18 SEPTEMBER More High Grade Results at the Zara Gold Project in Eritrea

ASX/Media Release INTERMIN SIGNS EXCLUSIVITY DEED FOR POTENTIAL ACQUISITION OF THE COOLGARDIE GOLD PROJECT HIGHLIGHTS

Specialty Metals Exploration and Development - May 2009

RNI INCREASES GROSVENOR GOLD ORE RESERVES TO 523,000oz

Argent Minerals Limited

Overview. ASX Release Monday 10 December ASX Code: SAU

For personal use only

ASX Announcement Feasibility Progress Report Update September 2013

For personal use only

CINOVEC a globally significant previously mined lithium deposit in the heart of Europe

QUARTERLY ACTIVITIES REPORT

MOD to consolidate 100% of T3 Project including rights to acquire all JV exploration assets

For personal use only

Additional High Grade Copper-Gold Results Confirm Massive Sulphide Mineralisation at Cardross

For personal use only

For personal use only

For personal use only

Shareholder Presentation. Michael Mulroney - Managing Director July 2012

PAGE 1. AGM Presentation. 24 th NOVEMBER

For personal use only

For personal use only

For personal use only

Lepidico Drilling Update: lithium pegmatites intersected in each of three programs

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA

QUARTERLY REPORT For the 3 Months ended 30 September 2014

Quarterly Activities Report

For personal use only

ABN Interim Financial Report 31 December 2017

For personal use only

For personal use only

For personal use only

ASX RELEASE 30 January 2018 ASX Code: POZ. QUARTERLY REPORT Period Ending 31 December Summary:

CONSOLIDATED ZINC LIMITED ACN INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2017

For personal use only

For personal use only

AZUMAH MINING LEASES GRANTED

March 2019 Quarterly Activities Report

For personal use only ABN

SOUTHERNGOLD. Compelling Value in a Unique Gold Explorer. ASX Ticker: SAU

Aeon Metals Limited. Quarterly Report For the three months ending 30 June ASX Announcement 31 July 2018

ASX ANNOUNCEMENT QUARTERLY REPORT PERIOD ENDED 30 SEPTEMBER 2017 SUMMARY. 31 October ASX Code: HOR. Management

Investor Presentation

Sourcing the raw materials of the future. Authier Lithium Project JORC Resource Overview ASX: SYA JULY 2016

SOUTHERNGOLD GOLD PRODUCER. Cannon Mine, Early February 2016 ASX Ticker: SAU

June 2016 Annual Results Webcast

Significant Advance: CSD Snow Peak Mining Asset Sale Agreement

For personal use only

15 June 2018 ASX Code: WCN. Options Exercised

ABN Interim Financial Report 31 December 2012

For personal use only

Haoma Mining NL A.B.N

For personal use only

ASX Release: 31 July 2017 Quarterly Activities Report - for the period ended 30 June 2017

ACTIVITIES REPORT FOR THE QUARTER ENDED 30 JUNE 2018

KBL Mining Limited (ASX: KBL) Investor Presentation October KBL Mining Limited : : Investor Presentation

DRAGON MINING LIMITED An Established Nordic Gold Producer with an Exciting Future RIU Melbourne Resources Round-up 29 September 2011

December 2015 Half Year Results Webcast 25 February 2016

For personal use only

ALLIANCE RESOURCES L I M I T E D

For personal use only

ELEMENTOS. Building a profitable, robust & sustainable Tin mining company. (ASX:ELT) July Renewable energy needs Tin.

Transcription:

QUARTERLY REPORT APRIL TO JUNE 2014 Highlights Outlook for September Quarter 2014 TUNGSTEN & MOLYBDENUM Molyhil NT. Revised ore reserve extends mine life to 6 years Metallurgical testwork confirm ore sorting benefits without impact on recovery or concentrate quality. Finalise testwork on proposed variations to process flow sheet. Revise Definitive Feasibility Study (DFS) to reflect upgraded ore reserve, cost reductions & ore sort upgrade. Continue off-take discussions for balance of concentrate production. Negotiations to secure project finance. THOR MINING PLC Registered Numbers: United Kingdom 05 276 414 Australia 121 117 673 Registered Office: Level 1 32 Richmond Road KESWICK, SA, 5035 Australia Ph: +61 8 7324 1935 Fx: +61 8 8351 5169 Email: corporate@thormining.com Pilot Mountain, Nevada USA. Agreement signed to acquire US project with tungsten resources GOLD Spring Hill NT No work during the quarter Dundas WA No work during the quarter. Sale of base metal rights with gold rights retained. Finalise project acquisition Continued evaluation of potential for profitable production. Aircore drilling program contingent upon available funds. Website: www.thormining.com Enquiries: Mick Billing Executive Chairman Thor Mining PLC +61 8 7324 1935 Colin Aaronson Nominated Advisor Grant Thornton +44 (0) 20 7383 5100 ASX Listings: Shares: THR AIM Listings: Shares: THR Directors: Michael Billing Michael Ashton Gregory Durack Trevor Ireland David Thomas Figure 1: Thor Mining PLC Project Location Map Commenting, Mr Mick Billing, Executive Chairman of Thor Mining, said: Thor s tungsten business made significant steps forward during the June quarter. The upgraded Open Pit Ore Reserve statement for Molyhil potentially sets up the project for a much improved financial outcome in an upgraded DFS due shortly, and is the last significant step before securing project finance. The announced acquisition of the Pilot Mountain project in the USA (subject to necessary approvals and completion) adds significantly to the Thor portfolio. The combined resource inventory, following this acquisition, of >30,000 tonnes tungsten, plus significant upside via drilling known nearby tungsten deposits, would potentially position Thor towards the top end of non-chinese tungsten miners. Page 1 of 5

MOLYHIL TUNGSTEN-MOLYBDENUM PROJECT - NT (100% THOR) Upgraded Ore Reserve Subsequent to the end of the quarter, on 29 July 2014, Thor announced an updated Ore Reserve Statement based upon the Resources Estimate reported to the ASX and AIM on 30 January 2014, and following a re-estimate of costs and metallurgical recovery factors. Mining consultancy, AVCS Pty Ltd, has issued a statement of Open Cut Ore Reserve for the Molyhil deposit of 3.0 million tonnes averaging 0.31% WO 3 & 0.12% Mo, classified as Probable. Table 1: Molyhil Open Cut Ore Reserve Statement Figure 2: Molyhil Project Location map Classification Reserve WO 3 Mo 000 Tonnes Grade % Tonnes Grade % Tonnes Probable 3,000 0.31 9,200 0.12 3,600 Total 3,000 0.31 9,200 0.12 3,600 Notes: Thor Mining PLC holds 100% equity interest in this reserve. Estimates have been rounded to reflect accuracy. All estimates are on a dry tonne basis. The reserve estimate extends to a maximum depth below surface of 150 metres. The statement is derived from the Indicated portion of the resource estimate only, and the Inferred portion is excluded from the calculations. The long-term prices used were US$408/mtu for WO 3 concentrate and US$12.76/lb for Mo concentrate at an exchange rate of US$0.83 to A$1.00. The WO 3 and Mo Processing Recovery post ore sorting used was 85% and 77.8% respectively. Ongoing Optimisation Studies The 2012 Molyhil DFS highlighted that a 7% improvement in revenue factors (or the equivalent) was required to increase the Molyhil ore reserve by 50%, and thus extend the life of the proposed operation from four years to six years. This upgraded ore reserve statement has delivered that result. Additional work continues on testing flotation recovery of the scheelite mineral, as a more simple processing alternative to the gravity process. Results to date confirm that adoption of ore sorting does not adversely impact on recovery and concentrate quality. This work is well advanced and expected to be complete in time for completion of the upgraded DFS in the September quarter. Metal Prices The selling price in Europe of Tungsten APT now sits at US$370/mtu, while the price of Molybdenum Roasted Concentrates has improved by approximately 30% over the past 6 months to US$13.00/lb (Figure 3). Page 2 of 5

PILOT MOUNTAIN PROJECT NEVADA USA (AGREEMENT TO ACQUIRE 100%) On 10 June 2014 Thor announced that subject to due diligence and necessary shareholder and regulatory approvals, an agreement to acquire the Pilot Mountain tungsten project in the United States from Black Fire Minerals Limited¹ ( Black Fire )(ASX: BFE ). Consideration for the acquisition has been agreed between the parties at 418,750,000 ordinary shares in Thor, and which will be subject to a 12 month escrow period. ¹Thor Chairman, Mick Billing is also non-executive chairman of Black Fire Minerals Limited. As part of the acquisition, Thor will also acquire a debt of A$625,000, partially secured against the project, payable by 30 September 2015. The debt was incurred by Black Fire to meet the final payment for the project in March 2014. Highlights Acquisition valued at A$1.675million. Desert Scheelite JORC Resource of 6.8million tonnes @ 0.31% WO 3. Garnet Exploration Target² of 1.5 to 2.0 million tonnes @ 0.35 0.4% WO 3. Gunmetal Exploration Target² of 1.5 to 2.0 million tonnes @ 0.37 0.42% WO 3. Substantial exploration upside with high grade tungsten & copper intercepts to follow up. ²Exploration Targets are conceptual in nature and there has been insufficient exploration to define a Mineral Resource under the JORC Code and it is uncertain if further exploration will result in the determination of a Mineral Resource The Pilot Mountain project is situated in south-western Nevada approximately 200kms south of Reno. It comprises deposits; Desert Scheelite, Gunmetal and Garnet, plus Good Hope. All are in close proximity (~3 kilometres), and have been subjected to low scale mining activities at various times during the 20 th century. At Desert Scheelite, a 2012 JORC-compliant Indicated & Inferred resources have been estimated & reported. At Garnet and Gunmetal mineralisation of similar grade and character has been outlined by drilling to Exploration Target level of estimation. Good Hope comprises some minor historic workings and one drill hole amongst several, which intersected 43m @ 0.41% WO 3, from surface. The Desert Scheelite Indicated + Inferred Resource comprises 6.8 million tonnes @ 0.31% WO 3, 0.17% Copper, and 22.8g/t (grams/tonne) Silver, announced on 10 June 2014. Table 2: Desert Scheelite Resource Estimate Desert Resource WO 3 Ag Cu Scheelite Tonnes Grade % Contained Grade g/t Contained Grade % Contained Indicated 6,090,000 0.31 18,900 24.2 150 0.16 10,000 Inferred 700,000 0.30 2,100 9.1 10 0.24 2,000 Total 6,790,000 0.31 21,000 22.8 160 0.17 12,000 Note: Resource 100% owned by Black Fire Minerals Limited group The due diligence process on the Pilot Mountain project is proceeding and Thor Mining shareholders will be asked to approve the issue of the consideration securities to Black Fire Minerals at a General Meeting of shareholders on 31 st July 2014. The acquisition is also subject to various Black Fire Minerals Limited shareholder approval processes including an independent experts report on the project, which has been commissioned by Black Fire. Exploration and evaluation activities at Pilot Mountain are not scheduled until after the acquisition is finalised. Page 3 of 5

Figure 3: Tungsten & Molybdenum price movements (Metal Pages.com) GOLD SPRING HILL PROJECT - NT (THOR has earned the rights to 80% equity) The Spring Hill gold project is located on pastoral leasehold land approximately 150 km south east of Darwin in Australia s Northern Territory. The location is served by all-weather access and is in close proximity to the sealed arterial Stuart Highway, north south rail, gas pipeline and trunk powerlines. A full background on the project is available on the Thor Mining website. Directors continue to evaluate all opportunities for this project. However prioritising expenditure on other projects has prevented progress of exploration activities at Spring Hill. Figure 4: Spring Hill Project Location map Project Equity Thor holds a 51% equity interest in the Spring Hill Gold project and has the right to complete the 80% acquisition at any time, subject to NT Government consent, through the issue to Western Desert Resources Limited (WDR) of 5 million shares plus shares to the value of A$500,000. Page 4 of 5

DUNDAS PROJECT WA (60% THOR) The Dundas gold project is located approximately 100 kilometres east-south-east of Norseman in Western Australia. The tenements are in close proximity to the sealed arterial Eyre Highway, providing all-weather access to the project area. Within the tenements access is provided by bulldozed tracks. It is also approximately 250 kilometres south of the major regional mining centre of Kalgoorlie. A full background on the project is available on the Thor Mining website. During the quarter, Thor sold its interest in base metals at Dundas, retaining it 60% interest in gold and precious metals. Targets for drilling at Dundas have been identified. However prioritising expenditure on other projects has prevented progress of exploration activities. Figure 5: Dundas Project Location map CORPORATE AND FINANCE Subsequent to the end of the quarter Thor announced a share placement to raise, in aggregate, UK 600,000 (approximately A$1.1million) before expenses from investors introduced by Thor s UK broker VSA Capital. The placement is in two tranches. The initial tranche, pursuant to the Company existing authorities, by way of a placement of 245,800,472 new ordinary shares of 0.01p each in the capital of the Company at a price of 0.1p (AUD0.181cents) per share was completed on 8 th July 2014, with the second tranche, subject to shareholder approval, of 354,199,528 new Ordinary Shares, on the same terms and conditions as the first tranche, scheduled for completion following the General Meeting of shareholders on 31 July 2014. Yours faithfully, THOR MINING PLC Mick Billing Executive Chairman Competent Person s Report The information in this report that relates to exploration results is based on information compiled by Richard Bradey, who holds a BSc in applied geology and an MSc in natural resource management and who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Bradey is an employee of Thor Mining PLC. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Richard Bradey consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Page 5 of 5