OCEANTEAM SHIPPING ASA

Similar documents
OCEANTEAM SHIPPING ASA

o1 OCEANTEAM SHIPPING ASA Q2 2011

o1 OCEANTEAM SHIPPING ASA Q1 2012

o1 OCEANTEAM SHIPPING ASA Q1 2011

o1 OCEANTEAM SHIPPING ASA Q4 2012

o1 OCEANTEAM SHIPPING ASA Q2 2012

24 October 2006 Subsea 7 Inc. (Oslo Stock Exchange: SUB) today reports the results for the third quarter of 2006.

SUBSEA 7 INC. REPORT FOR THE THIRD QUARTER UNAUDITED. 26 October 2010

SUBSEA 7 INC. REPORT FOR THE SECOND QUARTER AND HALF YEAR UNAUDITED. 27 July 2010

SUBSEA 7 INC. THIRD QUARTER REPORT UNAUDITED. 27 October 2009

Q4 Financial Presentation 2015 DOF ASA

Pareto Securities Oil and offshore Conference Oslo, September 2014 Presented by Atle Jacobsen (CEO)

RISH First Quarter 2018 Bergen 25 May 2018 GC RIEBER SHIPPING

SUBSEA 7 INC. REPORT FOR THE FOURTH QUARTER AND PRELIMINARY YEAR END RESULTS FOR UNAUDITED. 2 February 2010

Presentation of 3Q 2018 results. 07 November 2018

TGS EARNINGS RELEASE 1 st QUARTER RESULTS

ELECTROMAGNETIC GEOSERVICES ASA FIRST QUARTER 2014 RESULTS. CEO, Roar Bekker CFO, Svein Knudsen 8 May 2014

KNOT OFFSHORE PARTNERS LP EARNINGS RELEASE INTERIM RESULTS FOR THE PERIOD ENDED SEPTEMBER 30, 2017

Subsea 7 Inc. Earnings Presentation Quarter Ended 30 September subsea partner of choice.

Presentation Q th July 2017

1Q2012 Results Briefing Analyst & Investor Update 22 February 2012

Presentation of first quarter results Shippingklubben, Oslo, May 31, 2011

Eidesvik Offshore ASA (EIOF)

Eidesvik Offshore ASA

MPC CONTAINER SHIPS INVEST B.V.

Pareto Oil and Offshore Conference CEO Ivar Brandvold

SUBSEA 7 INC. REPORT FOR THE FIRST QUARTER April 2009

Earnings Presentation Fourth Quarter and Full Year March :00 noon UK time

Oslo, 10 September Pareto Securities Oil and Offshore Conference Karl Ronny Klungtvedt, Exec. VP & CFO

EMGS ASA FIRST QUARTER PRESENTATION 2012

Ship Finance International Limited (NYSE: SFL) - Earnings Release. Reports preliminary Q results and quarterly cash dividend of $0.

Presentation of Q results August 23 rd

SEVAN DRILLING ASA INTERIM FINANCIAL REPORT FIRST QUARTER 2011

Magseis ASA Q th August Expanding operational footprint

OCEAN YIELD AS Company Presentation. 20 June 2012

Operating revenues for the year reached NOK mill

GulfMark Offshore, Inc.

American Shipping Company Continues Fleet Expansion.

Quarterly Presentation Q DOF Subsea Group

Siem Offshore Inc. Presentation CEO Idar Hillersøy 2 September 2015

EMGS ASA FIRST QUARTER PRESENTATION 2010

Quarterly Presentation Q DOF Subsea Group

25 April 2007 Siem Offshore Inc. (Oslo Stock Exchange: SIOFF) today reports results for the first quarter 2007.

First half year 2017 Bergen 18 August 2017

The World s Fastest Growing Drilling Contractor. Seadrill Limited. Oslo 2 June 2006

Highlights...3. Consolidated key figures...3. Main events during the third quarter...4. Third quarter financial review...5

PREPARING FOR THE RECOVERY

Deep Sea Supply PLC. Quarter Financial Report

DOLPHIN GROUP A NEW MARINE GEOPHYSICAL COMPANY. COMPANY PRESENTATION SEB EnskildaNordic Seminar 7-9 January 2013 BY: ATLE JACOBSEN, CEO

Conference Call 3Q 2013 results. November 25, 2013

SIEM OFFSHORE INC. REPORT FOR THE FOURTH QUARTER AND FISCAL YEAR 2015

BOURBON First Half 2017 Results: Performance still largely impacted by a continuously challenging Offshore oil and gas services market

DOF ASA Q Presentation. DOF ASA Q Presentation - 1

Swiber Holdings Limited: 2QFY09 Results Briefing

ASL Marine Corporate Presentation 1H FY2013

Sølvtrans Holding ASA Q Oslo, 15 May Roger Halsebakk, CEO Jon Kvalø, CFO

4Q 2018 Fornebu, February 8, 2019 Luis Araujo and Svein Stoknes

7 November Q results

FOURTH QUARTER Recent highlights

Seadrill Partners LLC Conference Call Third Quarter 2013 Results. November 25, 2013

Fred. Olsen Energy ASA

Pareto Oil & Offshore Conference

BOURBON STRATEGIC CONFERENCE. June 25, 2010 Shanghai

2015 ANNUAL RESULTS. March 10, 2016

Fourth Quarter 2017 Results February 21, 2018

GulfMark Offshore, Inc.

Q trading update: continued strong revenue growth and improved EBIT Driven by early cyclical marine site characterisation market

SIEM OFFSHORE INC. REPORT FOR THE FOURTH QUARTER AND FISCAL YEAR 2016

OCEAN YIELD ASA. First Quarter 2017 Results FIRST QUARTER 2017 REPORT

A Different Drilling Contractor

Earnings Presentation Second Quarter July :00 noon UK time

SECOND QUARTER AND FIRST HALF REPORT Financials. Dividend. Outlook

Rogaland på Børs, Stavanger. CFO Esa Ikaheimonen September 7 th, 2011

KNOT OFFSHORE PARTNERS LP EARNINGS RELEASE INTERIM RESULTS FOR THE PERIOD ENDED MARCH 31, 2017

Acergy S.A. Announces Third Quarter Results

Dolphin Group ASA. SEB Nordic Seminar - 8 th January Atle Jacobsen (CEO) & Erik Hokholt (CFO)

Presentation of Q results 9 May 2018

Sea Trucks Group Ltd ( STG ), one of the largest and fastest growing oil and gas marine contractors in West Africa, announces its Q1 results:

Overview over main figures for the Group (for complete figures, see attachment): Profit and Loss Accounts 1. quarter 1. quarter Total

Q Presentation

BOURBON Full Year 2013: Net Income Group share up 174% to 115 million Increased operating margin

SOLSTAD OFFSHORE ASA FINANCIAL REPORT FOR THE 1 ST QUARTER 2009

Fugro HY 2018: strong revenue growth and improved EBIT Continued competitive offshore market conditions

EMGS THIRD QUARTER 2014.

Presentation at Swedbank s Nordic Energy Summit - 20 March Atle Sæbø EVP & CFO

Nordea Markets Shipping & Offshore Seminar

KNOT Offshore Partners LP (Translation of registrant s name into English)

SIEM OFFSHORE INC. REPORT FOR THE FIRST HALF 2008 FINANCIALS

FOURTH QUARTER 2014 REPORT. OCEAN YIELD ASA Fourth Quarter and Preliminary Results 2014

OCEAN YIELD ASA. Second Quarter and First Half Year 2017 Report SECOND QUARTER AND FIRST HALF YEAR 2017 REPORT

1Q 2018 Fornebu, April 27, 2018 Luis Araujo and Svein Stoknes

Your Aquaculture Technology and Service Partner. Q Presentation Oslo - August 20 th, 2015 Trond Williksen, CEO Eirik Børve Monsen, CFO

Fred. Olsen Energy ASA

NOT FOR DISTRIBUTION IN THE US, CANADA OR JAPAN FOR IMMEDIATE RELEASE 3 FEBRUARY 1998

Q Presentation

Fred. Olsen Energy ASA

Presentation Q th May 2015

Competitive export financing within ocean industries

Trading update Q3 2017: low single digit EBIT margin in a stabilising oil and gas market

HALF-YEAR RESULTS 2006 AND UPDATED FULL-YEAR FORECAST

Transcription:

OCEANTEAM SHIPPING ASA An Oslo Stock Exchange listed shipping company Ticker: OTS CEO: Haico Halbesma CFO: Torbjørn Skulstad Q3 presentation Oslo 14th November 2011 1

Agenda Company Overview Financials Market Outlook Tax, Bonds & Loans 2

Oceanteam Shipping i ASA Company Overview 3

Our mission Creating value through: Building and operating a fleet of large and advanced CSVs Providing complex offshore support & vessel solutions Integrating engineering know-how and a pool of special purpose support equipment with our fleet 4

Uniquely flexible North Ocean CSV-series High-end deepwater offshore construction tonnage series Proven quality in the most demanding and advanced deepwater operations Vessel type orders to date: 6 Building and operational economics Configuration flexibility: In-house engineering team provides complex and complete solutions New, enhanced design ready : CSV North Ocean 200 Series 5

The company OCEANTEAM SHIPPING ASA Q3 SHIPPING Ship Owning, Chartering and Management Revenue USD 9.6 mio EBITDA USD 5.6 mio EBITDA margin: 58% ENGINEERING Engineering Services & Design Equipment Solutions Revenue USD 7.1 mio EBITDA USD 1.7 mio EBITDA margin 23% 6

Engineering Oil & Gas Engineering services Renewables Complex Structures Areas of business: Integrated support of Oceanteam Shipping and Client Solutions o Integrated support of Oceanteam Joint Ventures and new investments Third party client projects such as for Chevron, Shell, BP, TAQA etc. Integrated support of equipment pool and related services 7

Engineering Inhouse Design & Engineering Capacity 8

Engineering Equipment Rental & Renewables Offshore Base Deepwater Offshore & Storage Base, Dundee, Scotland, UK High quality storage of equipment & cable Maintenance & repair services Mobilization base Fabrication ISO 14008:2004 ISO 9001:2008 ISO 18001:2007 9

Fleet list & charter status 10

Financialsi 11

Operational highlights Q3 All large CSVs in full operation Improved market conditions for large CSVs Continued improved demand for engineering services Oil & Gas Offshore Renewables Satisfactory equipment utilization as anticipated FOREX fluctuations remain EBITDA development in line with expectations CSV North Ocean 105 hull launched August 12 th Construction of vessel according to plan 12

Financial highlights Q3 EBITDA USD 7.3 million Operating revenues USD 16.7 million Operating PROFIT USD 3.5 million Q3 2011 Q2 2011 EBITDA / Revenue % Shipping 58% 51% EBITDA / Revenue % Engineering 23% 27% FOREX effect positive USD 6 million 13

Subsequent events Q3 CLB Oceanteam Installer sold with small profit Non-core asset Settlement reached with renewables operator on contract dispute Positive effect on provisions Bank loan on CSV Southern Ocean fully converted to USD Exchange rate 1,349 All secured vessel loans now in USD CSV North Ocean series building options remain valid (3x) 14

Key figures Q3 2011 USD 000 Figures in USD million Q3 2011 Q2 2011 Q1 2011 Total operating revenues 16,7 16,3 12,7 Operating costs (6,1) (6,6) (5,6) EBITDA 7,3 6,7 4,4 15

Key figures Q3 2011 USD 000 Segm ent inform ation SHIPPING ENGINEERING TOTAL Q3 TOTAL Q2 2011 2011 Q3 2011 Q2 2011 Q3 2011 Q2 2011 Q3 2011 Q2 2011 Revenue 9 622 9 652 7 116 6 650 16 738 16 302 Operating costs (2 481) (3 020) (3 657) (3 548) (6 137) (6 568) General & Administration (1 542) (1 737) (1 801) (1 322) (3 343) (3 059) EBITDA 5 600 4 895 1 658 1 780 7 258 6 675 EBITDA percentage of revenue 58 % 51 % 23 % 27 % 43 % 41 % 16

P&L report end Q3 2011 USD 000 Figures in USD '000 Q3 2011 Q3 2010 Cum 2011 Cum 2010 Revenue 16 738 12 907 45 735 33 856 Total operating revenues 16 738 12 907 45 735 33 856 Operating costs (6 137) (5 976) (18 317) (16 043) General & administration (3 342) (2 553) (9 043) (6 286) Depreciation (3 782) (2 612) (11 602) (8 103) Write off assets 2 098 Total operating expenses (13 261) (11 141) (36 864) (30 432) Operating profit (loss) 3 477 1 766 8 871 3 424 Net finance (352) (1 858) (9 118) (7 033) Ordinary profit (loss) before taxes 3 125 (92) (247) (3 609) Corporate income tax (185) (141) (348) Net result 2 940 (233) (595) (4 458) 17

Balance sheet Q3 2011 USD 000 Unaudited Unaudited Figures in USD' 000 30.09.2011 31.12.2010 Figures in USD' 000 30.09.2011 31.12.2010 Assets Equity and liabilities Intangible assets 19 756 20 852 Total equity 105 736 102 078 Tangible assets 230 680 226 345 Total non-current liabilities 138 774 141 694 Total non current assets 250 436 247 197 First year instalments 10 757 9 955 Other current liabilities 16 278 16 794 Receivables 11 330 9 824 Total current liabilities 27 035 26 749 Cash and cash equivalents 9 779 13 501 Current assets 21 109 23 325 Total liabilities 165 809 168 443 Total assets 271 545 270 523 Total equity and liabilities 271 545 270 523 Equity percentage 38,9 % 37,7 % 18

Our Market 19

DP2 fleet by age rket data North Ocean Series qualified as H&D Reel Lay / Multiservice Vessel No. of vessels Year built Type Before 1980 1980-89 1990-99 2000-09 2010 2011-13 Total Lay Barge 8 3 9 2 13 35 Reel Lay Vessels 3 8 2 8 4 4 29 Multiservice vessels 1 1 5 10 1 18 Diving Support Vessels 8 34 5 23 15 7 92 ROV Support Vessels 8 7 21 90 20 40 186 Total 28 53 33 140 41 65 360 No. of vessels Year Type 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Lay Barges 13 14 14 15 15 18 20 21 25 30 34 35 35 Reel lay vessels 15 15 16 16 18 21 22 22 26 28 29 29 29 Multiservice 5 6 9 11 12 14 16 17 19 19 19 19 18 Diving Support Vessels 46 48 48 49 53 58 66 73 88 92 92 92 92 ROV Support Vessels 61 64 67 83 96 101 117 134 159 178 184 185 186 Total 140 147 154 174 194 212 241 266 316 348 359 360 360 Fleet growth 5% 4% 13% 12% 9% 14% 11% 19% 10% 3% 0% 0% 20

Harsh & Deepwater pipeline Annual demand growth of about 15% expected to 2015 7,000 6,000 5,000 4,000 H&D pipelines forecast per region Asia Pacific Mediterranean West Africa Latin America North America NW Europe Km 3,000 2,000 1,000 2007 2008 2009 2010 2011 2012 2013 2014 2015 Year installed

Harsh & Deepwater Assuming max life is 35 years; 10 H&D pipelay vessels are needed 60 H&D Pipelay vessel demand & supply balance rs Vessel yea 50 40 30 20 Demand *) Fleet Age max 35 years Age max 30 years 10 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 *)300 days basis Annual demand growth of 19% in period 2010-14 expected Some pipelay pp vessels operating in S&B areas today will be reallocated to H&D areas while others will not due to vessel design and/or contractor capabilities

Harsh & Deepwater Brazil is main market followed by NW Europe and West Africa No. of vessel years 35 30 25 20 15 H&D reel vessel demand per region Asia Pacific Med. & MIE West Africa Latin America North America NW Europe 10 5 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Harsh & Deepwater About 7 new H&D reel lay vessels required 35 H&D reel vessel demand & supply balance Vessel years 30 25 20 15 Demand *) Fleet Age max 35 years Age max 30 years 10 5 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 *)300 days basis Nearly no attrition based on max life of 35 years, but 10 vessels based on 30 years

Harsh & Deepwater Lack of capacity from 2013 even without decommissioning Vessel yea ars 200 180 160 140 120 100 80 60 40 20 H&D support vessel demand d & supply balancea Demand *) Fleet Age max 35 years Age max 30 years 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 *)300 days basis Nearly 30 additional vessels required in 2015 Should expect that t support vessels operating in S&B areas will transfer to H&D areas from 2013

Offshore Renewables Global Offshore Wind Farm export cable demand 4,100km Export cable demand d by year 6,000 Cable length (km m) 5,000 4,000 3,000 2,000 1,000 Probability export forecast Mid-range export forecast Statistical export forecast 316km 0 Protected by Copyright (c) 1986-2011 ODS-Petrodata Ltd. Most of activity increase until 2015 in Southern North Sea 26

Offshore Renewables Global Offshore Wind Farm Inter-array cable demand Inter-array cable demand by year 2,500 1,650km Inter array cable le ength (km) 2,000 1,500 1,000 500 Probability interarray forecast Mid-range interarray forecast Statistical interarray forecast 482km 0 Protected t by Copyright (c) 1986-2011 ODS-Petrodata Pt dt Ltd. Most of activity ty increase until 2015 in Southern North Sea 27

Tax, Bonds & loans 28

Tax planning NORWAY OTS has cconfirmed tax loss to carry forward of USD 144 million (NOK 866 million). The CSV vessels comply with the Norwegian Tonnage Tax regime with approx. 0% tax CSV 101, 104 and 105 are under the NTT regime CSV 102 will be using the deferred tax loss THE NETHERLANDS BV entities have a estimated tax loss to carry forward of EUR 45 million A restructuring t is prepared to further utilize tax losses 29

OTS Bond loan OTS ASA (M NOK) Q4 '10 Q2 '11 Q2 '12 Q2 '13 Q2 '14 Bond loan (400) (400) (400) (400) (400) Call balance (21) (23) (57) (97) (14 1) OTS bonds 30 Outstanding debt (OB) (391) (423) (4 57) (497) (541) Call premium if refinanced before: <19th June 2011: NOK 23 million <19th June 2012: NOK 34 million in addition to previous calls <19th June 2013: NOK 40 million in addition to previous calls <19th June 2014: NOK 44 million in addition to previous calls Interest is currently NIBOR + 4,75% + (1,00 point increase per anniversary) Call 30 banking days before refinance date Number of shares 150.788.378 Warrants Iifb bond dloan is repaid before 19th June 2014, warrant II before 19th June 2014 Warrants I: 148.986.069 Warrants II: 295.996.677 Subscription price NOK 0.10 for both warrants 30

Focus going forward Target market Continued focus on H&D large Construction Support Vessel segment Continued marketing of seamlessly integrated complex operations with CSVs and in-house engineering know-how Continued growth of contract back log and fleet Initiate next construction program of favorable building options: Introduction of the enhanced design of the CSV North Ocean 200 Series CSV North Ocean 200 series new build options secured Consolidate financial platform: Refinance of Oceanteam Shipping ASA bond loan Secure cash flows Reduce risks through joint ventures Reduce exchange rate exposure Maximize deferred tax position 31

Thank you 32

Appendix Oceanteam Shipping ASA Resources 33

Locations / Operations Locations Staff Bergen, Head Office, Norway 4 Amsterdam Office, NL 5 Schiedam Engineering Office, NL 150 Dundee Office, UK 5 Monaco Office Cd Del Carmen Office, Mexico 4 + marine crew 5 + marine crew Total 173 + marine crew 34

Our Fleet CSV Bourbon Oceanteam 101 Built 2007 LoA 127m Beam 27 m Dwt 7.000t Deck 2000m2 Cranes 150t + 100t Ownership 50 % Oceanteam Shipping ASA 50 % Bourbon Offshore Norway AS Backlog Time Charter, BP Angola BV 1/3/2011-31/12/ 2011 Certified CSV North Ocean 102 Built 2009 LoA 137m Beam 27 m Dwt 10.000t Deck 2500m2 Cranes 2 x 100t Deck eq. 7000t flex lay system; 2 x 120t tensioners CSV Southern Ocean Built 2010 LoA 137m Beam 27 m Dwt 10.000t Deck 2500m2 Cranes 250t + 110t CSV North Ocean 105 Delivery Q2 2012 LoA 137m Beam 27 m Dwt 10.000t Deck 2500m2 Cranes 400t + 100t: VPS FSV Mantaraya & FSV Tiburon Build 2006 LoA 33m Beam 8 m Deck 150m2 Speed 25 knots Passengers 75 pob 50 % Oceanteam Shipping ASA Ownership Backlog Certified 50 % J Ray McDermott Norway AS Ownership 50 % Oceanteam Shipping ASA 50 % Bourbon Offshore Norway AS 25 % Oceanteam Shipping ASA 75 % J Ray McDermott Norway AS (fully financed) Time Charter: J Ray McDermott SA Duration: 08/2010 08/2015 + purchase option Backlog Bareboat: Fugro TS Marine Australia Duration: 10/2010 31/12/ 2013 Certified Ownership Backlog Certified Ownership 100 % Oceanteam Shipping ASA Time Charter 5 years upon delivery J Ray McDermott SA + purchase option Backlog Bareboat contract Venezuela Duration: 01/2011 01/2014 Certified

Resources CSV Bourbon Oceanteam 101 Built 2007 LoA 127m Beam 27 m Dwt 7.000t Deck 2000m2 Cranes 150t HC+ 100t AHC Ownership: 50% Oceanteam Shipping ASA / 50% Bourbon Offshore Norway AS Track record: Feb 2007 Sept 2010 BP Angola BV Back log; Shell Brazil Lta 31 December 2010 Time Charter BP Angola BV 1 March 2011 31 December 2011 + options 36

Resources CSV North Ocean 102 Built 2009 LoA 137m Beam 27 m Dwt 10.000t Deck 2500m2 Cranes 2x100t HC Deck equipment 7000t flex lay system 2 x 120t tensioners Ownership: Track record: Back log; 50% Oceanteam Shipping ASA / 50% J Ray McDermott Norway AS ABB - BritNed 20.000t power interconnector installation ABB - StatOilHydro Gjoia Power Cable Installation Time Charter J Ray McDermott SA August 2010 August 2015 37

Resources CSV Southern Ocean Built 2010 LoA 137m Beam 27 m Dwt 10.000t Deck 2500m2 Cranes 1x110t 110t HC 1 x 250t HC Ownership: 50% Oceanteam Shipping ASA / 50% Bourbon Offshore Norway AS Back log; Fugro TS Marine Australia 10 October 2010 31 December 2013 38

Resources CSV North Ocean 105 Delivery Q1 2012 LoA 137m Beam 27 m Dwt 10.000t Deck 2500m2 Cranes 1x400t HC 1 x 100t HC vertical pipelay system Ownership: 25% Oceanteam Shipping ASA / 75% J Ray McDermott Norway AS Back log; Time Charter 5 years upon delivery J Ray McDermott SA 39

Resources FSV Mantaraya + FSV Tiburon Build 2006 LoA 33m Beam 8 m Deck 150m2 Speed 25 knots Passengers 75 pob Ownership: 100% Oceanteam Shipping ASA Back log; 3 year bareboat contract January 2011 January 2014 2 year time charter contract January 2011 January 2013 40

Oceanteam Equipment Pool Equipment Support and Rental Services Horizontal Reel Systems Tensioning Systems Plough Systems Carousels and Cable Storage Jetting Equipment 41

Engineering Inhouse Design & Engineering Capacity 42