Simsbury. Challenges Capitol Region Natural Hazards Mitigation Plan Update - Page 356

Similar documents
Truckloads (at 25 tons/truck) of building debris 90

Avon. Challenges. Estimated Damages from 100- Year Flood

Challenges. Estimated Damages from 100-Year Flood

East Hartford. Challenges

Existing Strategies. Challenges

Capitol Region Natural Hazards Mitigation Plan Update EXECUTIVE SUMMARY

Village of Blue Mounds Annex

Town of Montrose Annex

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

9.10 HEIDELBERG TOWNSHIP

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

5.0 Town of Berlin Annex

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

SECTION V THE LOCAL MITIGATION STRATEGY BLUEPRINT

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

9.2 ALBURTIS BOROUGH. This section presents the jurisdictional annex for Alburtis Borough. A. HAZARD MITIGATION PLAN POINT OF CONTACT

Michael Taylor, PE, CFM Project Manager, AECOM August 25, 2015

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

ANNEX B: TOWN OF BLUE RIVER

Natural Hazards Mitigation Plan Kankakee County, Illinois Executive Summary

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality

9.24 WEISENBERG TOWNSHIP

ASFPM Partnerships for Statewide Mitigation Actions. Alicia Williams GIS and HMP Section Manager, Amec Foster Wheeler June 2016

Flood Insurance THE TOPIC OCTOBER 2012

CAPABILITY ASSESSMENT

CHAPTER THREE Natural Hazard Mitigation Strategy

Hazard Mitigation Planning

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

REQUEST FOR PROPOSALS. Planning in Water s Way: Flood Resilient Economic Development Strategy for the I-86 Innovation Corridor

Hurricane SANDY DR-4086-NJ

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

Volusia County Floodplain Management Plan 2012

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT. MUNICIPAL PROFILE

A Flood Mitigation Plan for the Non-Tidal N.J. Section of the Delaware River Basin. Warren County Planning Workshop (2 nd Meeting) March 7, 2007

9.46 NAZARETH BOROUGH

Natural Hazards Mitigation Plan. Executive Summary

Multi-Jurisdictional Hazard Mitigation Plan. Data Collection Questionnaire. For Local Governments

FEMA FLOOD MAPS Public Works Department Stormwater Management Division March 6, 2018

Dade County Natural Hazard Mitigation Plan

HAZARD MITIGATION PLAN POINT OF CONTACT. MUNICIPAL PROFILE

Justification for Floodplain Regulatory Standards in Illinois

Mitigation Action Plan Alamance County

Planning Process---Requirement 201.6(b): An open public involvement process is essential to the development of an effective plan.

G318 Local Mitigation Planning Workshop. Module 2: Risk Assessment. Visual 2.0

Priority Ranking. Timeframe. Faribault County Blue Earth, Bricelyn, Delavan, Easton, Elmore, Frost, Kiester, Minnesota Lake, Walters, Wells, Winnebago

9.8 FOUNTAIN HILL BOROUGH

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

New Jersey Department of Environmental Protection. Five-Year Floodplain Management Work Plan

City of Sea Isle City Department of Construction and Zoning Physical Location: 4501 Park Road (rear entrance)

Floodplain Development Permit Application

Flood Risk Outreach Tools for Georgia Communities. GAFM 10 th Annual Conference Presented By: Jarrett Mattli

Name Title/ Department Address Telephone Fax

Floodplain Management Plan

EXECUTIVE SUMMARY. Greater Greenburgh Planning Area Planning Process

9.36 TOWN OF VAN BUREN

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

Stoddard County Natural Hazard Mitigation Plan-Five Year Update SECTION 3

Planning Process---Requirement 201.6(b): An open public involvement process is essential to the development of an effective plan.

HAZARD MITIGATION PLAN POINT OF CONTACT. MUNICIPAL PROFILE

T-318. Hazard Mitigation Section TDEM Recovery, Mitigation, and Standards

Location: Tampa, Florida March 6, 2013

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

in coordination with Peoria County, Planning and Zoning Department

10/23/2014. Presented by: Erike Young, MPPA, CSP, ARM-E. Public Sector Disaster Planning/Emergency Response

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

9.35 VILLAGE OF TULLY

Delaware River Basin Commission s Role in Flood Loss Reduction Efforts

COMMUNITY SUMMARY LINN COUNTY MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN CITY OF LISBON

Stormwater Utility Fund Delivery of Services

STORMWATER MANAGEMENT FUND Department of Environmental Services

BACKGROUND ANNUAL PROGRESS REPORT DEVELOPMENT ADOPTION OF THE H-GAC HAZARD MITIGATION PLAN/UPDATES MISSION STATEMENT

SOUTH CENTRAL REGION MULTI-JURISDICTION HAZARD MITIGATION PLAN. Advisory Committee Meeting September 12, 2012

History of Floodplain Management in Ascension Parish

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

APPENDIX H TOWN OF FARMVILLE. Hazard Rankings. Status of Mitigation Actions. Building Permit Data. Future Land Use Map. Critical Facilities Map

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

Community Incentives for Nature-Based Flood Solutions

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

Federal Flood Insurance Changes (National Flood Insurance Program NFIP)

Floodplain Management Legal Issues. Making the Case for a No Adverse Impact Approach

City of Ocean City Permit and Application Process Quality Improvement

Flood Risk Products. New Techniques for Identifying and Communicating Flood Risk

Floodplain Management 101. Mississippi Emergency Management Agency Floodplain Management Bureau

Modernization, FEMA is Recognizing the connection between damage reduction and

CITY OF PLANTATION ENGINEERING DEPARTMENT INTEROFFICE MEMORANDUM NO

Aquidneck Island Resilience Strategy Issue Paper 4. Issue: RESIDENTIAL FLOODING

Cumberland County, NJ. Risk MAP Project Status Update April 22, 2013

9.11 BETHLEHEM TOWNSHIP

Integrating Hazard Mitigation and Comprehensive Planning Workshop

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

FLOODPLAIN MANAGEMENT PLAN 2015 ANNUAL PROGRESS REPORT

SECTION 6: MITIGATION STRATEGIES

Floodplain Management Annual Conference Atlanta, Georgia April 2017

A.) HAZARD MITIGATION PLAN POINT OF CONTACT

Hazard Mitigation Grants. Technical Assistance Session Middlesex County, NJ December 7, 2011

National Capitol Region HAZUS User Group Call

10/5/2015. What Makes a Sound Floodplain Management Program? What are the Flood Problems in your Community?

9.15 MACUNGIE BOROUGH

Transcription:

Simsbury Simsbury is a suburban community of about 23,600 located in the western portion of the Capitol Region. Its land area encompasses 33.9 square miles. Elevation in town generally ranges from about 150 to 500 feet above sea level. Most of Simsbury contributes to the Farmington River Watershed, although a very small portion in the southeast drains to the Park River Watershed. Watercourses in town include the Farmington River and Bissell, Grimes, Hop, King Philip, Nod, Minister, Munnisunk, Owens, Saxton, Second, and Still Brooks. Principal industries include agriculture, insurance offices, non-electric blast initiation systems, polypropylene fiber manufacturing, and safety and detonating fuse making. The main transportation routes through town are north-south state routes 10/202 and 167, and east-west state routes 185, 309 and 315. Challenges While Simsbury has been pro-active in assuring that new land-use developments are not placed in floodplains or wetlands, and the Town has worked to preserve open space in the floodplain, flooding is a significant challenge for Simsbury. The Town has several areas of repetitive loses involving at least eleven properties and resulting in claims of over $389,000. Overall, the National Flood Insurance Program (NFIP) has paid 100 claims in Simsbury totaling over $526,615 to-date. For homes with repetitive loses, the Town is utilizing the Everbridge notification system. The Towns Social Services Department maintains a listing of elderly, frail and disabled persons so that notification and contact can be made in flooding and loss of power events. The Town is carefully reviewing renovation/reconstruction plans for homes in repetitive lose areas in order to assure that flood proofing is accomplished and that utility/heating facilities are located above the 100 year flood level. Also, there are a number of important roads that in recent years have been overtopped by flood waters, with resulting limitations to travel by emergency vehicles and access to the Town s Emergency Shelter. In two flood events (Hurricane Irene and Storm Sandy), certain critical access roads were blocked. Route 185 was closed at East Weatogue Street, severing a major east/west transportation artery. Route 315 was closed, isolating the Tariffville Village area and preventing those residents access to the Town emergency shelter. Town Forest Road flooding blocked access/egress to the Town Public Works Campus. Riverside Road flooding blocked emergency vehicle access to the neighborhood. Solutions for some of these roads, such as Route 185 and Riverside Road are accomplishable by raising road elevations above the 100 year flood level. However, the environmental and cost implications in raising Route 315, suggest that a secondary emergency shelter site be established at the Tariffville Elementary School. Access improvements on Town Forest Road can be accomplished, but at a large expense. Work involves raising the road above the 100 year flood level and replacing two large culverts and associated drainage. CRCOG used FEMA s Hazus-MH model to analyze the risks that the Town of Simsbury might face from a major flood. The model estimates that economic losses to the town including residential and commercial damage and business interruptions due to a flood having a 1% chance of occurring any given year (the 100-year flood) would be over $102 million. The impacts of such a flood are summarized below: 2014-2019 Capitol Region Natural Hazards Mitigation Plan Update - Page 356

Estimated Damages from 100- Year Flood Households Displaced 347 People Needing Shelter 604 Buildings at Least Moderately Damaged 135 Total Estimated Economic Losses $102,150,000 Total Residential Building & Content Losses $50,940,000 Total Commercial, Industrial & Other Building & Content Losses $50,880,000 Total Business Interruption Losses $330,000 Losses from strong hurricanes would also be significant. The model estimates that economic losses to the town including residential and commercial damage and business interruptions due to a Category 3 hurricane such as the 1938 Hurricane would be nearly $89 million. The impacts of such a storm are summarized below: Estimated Damages from a 1938 Strength Hurricane Households Displaced 11 People Needing Shelter 1 Buildings at Least Moderately Damaged 512 Buildings Completely Damaged 21 Total Estimated Economic Losses $88,800,000 Total Residential Building Losses $74,170,000 Total Commercial, Industrial & Other Building Losses $7,550,000 Total Business Interruption Losses $7,070,000 Total Debris Generated 44,301 tons Truckloads (at 25 tons/truck) of building debris 259 According to information from the Connecticut Department of Emergency Management and Homeland Security, the three federally declared natural disasters of 2011 resulted in total expenses to the municipality and other local agencies of over $3.8 million. These expenses include debris and snow removal, emergency protective measures and repairs to damaged infrastructure and buildings but do not include damages experienced by private citizens and businesses. Storm Alfred, by far, wreaked the most havoc on the town. During Storm Alfred, the municipality experienced extreme costs in excess of $3.6 million in order to clear downed trees, operate emergency shelters, and clear roads. Snow storms have been found to be the most costly events, with widespread community impacts. A comprehensive, fully founded, and utility coordinated tree trimming/removal program is urgently needed to address the issue of downed trees from damaging overhead utilities. 2011 Disasters Damage Amounts Eligible for 75% Reimbursement Under FEMA Public Assistance Program Applicant: 100% of Amount Eligible for 75% Reimbursement Town & Other Agencies Total Damages Eligible (i.e., Fire Districts, Schools, DR-4023-CT DR-4046-CT for Public Assistance and Private Non-Profit DR-1958-CT Irene Severe Weather Due to 2011 Disasters Agencies) 2011 Snow August 2011 Oct 2011 (Alfred) Town of Simsbury $75,635.26 $60,224.55 $3,557,624.88 $3,693,484.69 Simsbury Other $107,978.10 $107,978.10 Simsbury Total $75,635.26 $60,224.55 $3,665,602.98 $3,801,462.79 2014-2019 Capitol Region Natural Hazards Mitigation Plan Update - Page 357

Goals, Objectives and Strategies GOAL: REDUCE THE POTENTIAL FOR LOSS OF LIFE AND PROPERTY AS A RESULT OF FLOODING Objective 1: Incorporate natural hazard mitigation strategies into new/existing projects. (The following mitigation measures which were identified in the 2008 Plan are proposed to be continued in the 2014-2019 Plan Update) 1.1 Continue to implement regulations prohibiting net flow increase from new development. Lead: Planning, Engineering This is an established practice of the Town. As applications for development are received by the Town, they are routinely reviewed for their conformance to flood plain regulations. Town inspectors ensure the developments are constructed in conformance with approved plans and regulations. Potential Funding Source: General funds. 1.2 Implement recommended regulations that result from study of impervious coverage in various areas of town. Lead: Planning, Engineering The Town undertook a low impact development study and developed stormwater design guidelines, a development checklist and proposed regulations in 2011. As development proposals are submitted they will continue to be reviewed in accordance with approved guidelines and regulations. Potential Funding Source: General funds Objective 2: Correct undersized drainage systems in repetitively flooded areas. 2.1 Upgrade culverts associated with Bissell Brook on Fire Town Road. Lead: Public Works, Administration This project identified in the 2008 Plan was completed prior to the 2014-2019 Update 2.2 Upgrade culverts associated with Stratton Brook on Town Forest and Stratton Brook Roads. Lead: Public Works, Administration 2014-2019 Capitol Region Natural Hazards Mitigation Plan Update - Page 358

Priority: Medium This project which was identified in the 2008 Plan was not completed and is proposed to be included in the 2014-2019 Plan Update. This work is identified in the Town s Capital Improvements Program. Potential Funding Sources: Bonding and State Aid Timeframe: Completion is anticipated by end of 2015 Objective 3: Ensure the protection of private properties at greatest risk. 3.1 Explore participation in the Community Rating System. Lead: Emergency Management, Planning This project which was identified in the 2008 Plan was not completed and is proposed to be included in the 2014-2019 Plan Update 3.2 Pursue acquisition of parcels with potential for development along or within 100-year floodplain to preserve as open space. Lead: Planning, Administration This project, identified in the 2008 Plan, was completed prior to the 2014-2019 Plan Update. Connecticut DEEP acquired land in the floodplain on Eno Place adjacent to the Simsbury Game Management Area. GOAL: REDUCE THE POTENTIAL FOR LOSS OF LIFE AND PROPERTY AS A RESULT OF WINTER STORMS Objective 1: Continue to trim/remove hazard trees. (The following mitigation measures which were identified in the 2008 Plan are proposed to be continued in the 2014-2019 Plan Update) 1.1 Maintain relationship with CL&P - currently CL&P serves on local public safety committee. Lead: Public Safety Committee : Bi-monthly meetings 2014-2019 Capitol Region Natural Hazards Mitigation Plan Update - Page 359

1.2 Continue local tree maintenance work. Lead: Public Works, Administration (Note: Additional funding is needed.) 1.3 Maintain informal agreements with local contractors for emergency debris removal work Lead: Public Works Objective 2: Provide planning and equipment for traffic rerouting. 2.1 Purchase mechanical signs. Lead: Police, Emergency Management, Administration This project identified in the 2008 Plan was completed prior to the 2014-2019 Plan Update 2.2 Maintain mutual aid agreements with neighboring communities. Lead: Emergency Management Objective 3: Minimize risks vulnerable to populations as a result of power failure. 3.1 Maintain special needs population list. Lead: Social Services 2014-2019 Capitol Region Natural Hazards Mitigation Plan Update - Page 360

: annual updates are anticipated. 3.2 Work with convalescent and day care centers to plan for evacuations. Lead: Emergency Management : annual outreach is anticipated. 3.3 Work with CREPC to obtain funding to purchase generators for shelters. Lead: Emergency Management 3.4 Equip a secondary shelter at Tariffville School. Lead: Emergency Management This project is proposed as a new initiative to be included in the 2014-2019 Plan Update. This project is identified in the Town s Capital Improvements Program. FEMA grant funding was awarded in the fall of 2013. and grants Timeframe: Installation to be completed in 2014 GOAL: REDUCE THE POTENTIAL FOR LOSS OF LIFE AND PROPERTY AS A RESULT OF WIND Objective 1: Continue to trim/remove hazard trees. (Note: This is the same as Objective 1 from Goal 2 above.) (The following mitigation measures which were identified in the 2008 Plan are proposed to be continued in the 2014-2019 Plan Update) 1.1 Maintain relationship with CL&P - currently CL&P serves on local public safety committee. Lead: Public Safety Committee : Bi-monthly meetings 2014-2019 Capitol Region Natural Hazards Mitigation Plan Update - Page 361

1.2 Continue local tree maintenance work. Lead: Public Works, Administration (Note: Additional funding is needed.) 1.3 Maintain informal agreements with local contractors for emergency debris removal work Lead: Public Works Objective 2: Provide planning and equipment for traffic rerouting. (Note: This is the same as Objective 2 from Goal 2 above.) 2.1 Purchase mechanical signs. Lead: Police, Emergency Management, Administration This project identified in the 2008 Plan was completed prior to the 2013/14 Update 2.2 Maintain mutual aid agreements with neighboring communities. Lead: Emergency Management Objective 3: Coordinate back-up communications. Strategic Action: 3.1 Continue to implement upgrades to fire, police and town-wide communications systems. Lead: Emergency Management, Administration 2014-2019 Capitol Region Natural Hazards Mitigation Plan Update - Page 362

: Upgrades to be considered annually during the budget process. THE FOLLOWING ADDITIONAL GOAL, OBJECTIVES AND MITIGATION ACTIONS ARE PROPOSED TO BE INCLUDED IN THE 2014-2019 PLAN UPDATE: GOAL: IMPROVE ACCESS DURING FLOOD EVENTS Objective 1: Raise road elevations to assure access 1.1 Raise Riverside Road near Drake Hill Bridge Lead: Public Works, Engineering Potential Funding Sources: Bonding and State Aid Timeframe: 2016-2018 1.2 Raise Route 185 near East Weatogue Street Lead: Public Works, Engineering Potential Funding Sources: Bonding and State Aid Timeframe: 2016-2018 Objective 2: Co-ordinate efforts with Connecticut DOT 2.1 Coordinate with Connecticut DOT for Route 185 work. Lead: Public Works, Administration Timeframe: 2015-2018 2014-2019 Capitol Region Natural Hazards Mitigation Plan Update - Page 363

Map 48: Simsbury Population Density, Dams and Flood Zones 2014-2019 Capitol Region Natural Hazards Mitigation Plan Update - Page 364

Map 49: Simsbury Flood Plains, Repetitive Loss Areas, Dams and Important Facilities 2014-2019 Capitol Region Natural Hazards Mitigation Plan Update - Page 365