The Franks Design Grup, PC ADDENDUM #1 1.1 PROJECT INFORMATION A. Prject Name: Precius Peple Learning Center HVAC Equipment Replacement Prject. B. Owner: Precius Peple Daycare, Inc. C. Architect: The Franks Design Grup, P. C. D. Architect Prject Number: 170901. E. Date f Addendum: 21 March 2019. 1.2 NOTICE TO BIDDERS A. This Addendum is issued t all registered plan hlders pursuant t the Instructins t Bidders and Cnditins f the Cntract. This Addendum serves t clarify, revise, and supersede infrmatin in the Prject Manual, Drawings, and previusly issued Addenda. Prtins f the Addendum affecting the Cntract Dcuments will be incrprated int the Cntract by enumeratin f the Addendum in the Owner/Cntractr Agreement. B. The Bidder shall acknwledge receipt f this Addendum in the apprpriate space n the Bid Frm. C. The date fr receipt f bids is unchanged by this Addendum, and will still be: 1. 26 March 2019; 2:00 lcal time D. This addendum cntains the fllwing infrmatin: 1. Written infrmatin, Drawing and Specificatins mdificatins a. Addendum. 3 sheets 8 ½ x 11 2. Infrmatinal attachments: a. Pre-Bid Sign-in sheet, meeting minutes 4 sheets 8 ½ x 11 Ttal: 7 sheets 8 ½ x 11 The Franks Design Grup, P.C. 410 First Street Glenwd, Iwa 51534 Ph 712-527-3996 fax 712-823-0434
1.3 GENERAL PROJECT INFORMATION A. Planhlders List: The planhlders list is publicly available and cntinuusly updated at the website f A&D Technical Supply: adtechsupply.cm. B. Cntact infrmatin fr the ffices f the Architect are as fllws: Attn: Peter G. Franks AIA, NCARB The Franks Design Grup, PC; 410 First St., Glenwd, Iwa 51534 Telephne: (712) 527-3996 FAX: (712) 823-0434 Email: pete@franksdesigngrup.cm 1.4 ATTACHMENTS A. This Addendum includes the fllwing attached Dcuments, which are issued as Available Infrmatin and d nt cnstitute a mdificatin t the Prcurement and Cntracting Dcuments. Mdificatins t the Prcurement and Cntracting Dcuments are issued by written Addendum nly. a. Sign-in sheet frm Pre-Bid Meeting cnducted 14 March 2019 1 page. b. Meeting Minutes frm Pre-Bid Meeting cnducted 14 March 2019 3 pages. 1.5 RFI Questins received frm prspective bidders: A. EL296 furnace with AC at 1800 cfm r greater require a return air base. 1. Respnse: General Nte 1 n ME 1.0 indicates t install per manufacturer s requirements. Prvide equipment as required. B. I am unsure abut what is required in the clseut submittals fr clseut submittals fr Field reprt: pest cntrl inspectin 1. Respnse: Given the limited scpe f wrk and the areas affected by the wrk, this requirement des nt apply t this prject. C. Submissin f Bids Frm: I am a sle prprietr, nt a crpratin. Please advise what is required n the bid submissin frm. 1. Respnse: Fr a sle prprietr bidder: a. Subparagraph 1.7.F Witness may be signed by any individual. b. Subparagraph 1.G. Attest may be signed by any individual. c. Subparagraph 1.7.H By shuld be the written name f the Attest signatry. d. Subparagraph 1.7.I Title may be left blank. PPLC HVAC Addendum #1 - Page 2
e. Subparagraph 1.7.N Crprate Seal may be left blank. 1.6 REVISIONS TO DIVISION 00 PROCUREMENT REQUIREMENTS AND CONTRACTING REQUIREMENTS A. DOCUMENT 003113 - PRELIMINARY SCHEDULE, (nt reissued). 1. Subparagraph 1.1-B-1.g (Clse f perid fr bidder s submissin f questins, and requests fr clarificatin): a. Add 120 befre Calendar Days frm ntice t prceed B. DOCUMENT 004113 BID FORM, (nt reissued). 1. Subparagraph 1.6-A-2 (Cmpetitive Negtiatin Selectin Criteria Frm): a. Delete subparagraph 2 in its entirety. Bidders may strike the text n the bid frm. C. DOCUMENT 017700 CLOSEOUT PROCEDURES, (nt reissued). 1. Subparagraph 1.3-B Clseut Submittals; Field Reprt: fr pest cntrl inspectin. a. Delete subparagraph in its entirety. 1.7 REVISIONS TO DRAWING SHEETS A. Nne at this time. ---- END OF ADDENDUM #1 --- PPLC HVAC Addendum #1 - Page 3
The Franks Design Grup, PC Meeting Minutes Meeting Date: 03/14/2019 Minutes Date: 03/21/2019 Prject: Lenx, Iwa Meeting Lcatin: At prject lcatin 805 Hme Avenue; Lenx Iwa 50851 Meeting Participants: Pete Franks The Franks Design Grup, P.C.; Daniel Carruther - Carruther s Plumbing/HVAC; Ben Petersen Camblin Mechanical; Jeremy Runds Suthern Iwa Cuncil f Gvernments Re: Pre-Bid Meeting Pete Franks cnducted the meeting at 10:00 AM at the Precius Peple Learning Center 805 Hme Avenue in Lenx, Iwa. The meeting was nt required but recmmended t prime bidders and subcntractrs. Bids will nly be accepted frm prime bidders represented n the pre-bid Meeting sign-in sheet. Pete thanked all attendees fr being present at the meeting. Pete explained that everyne s time is valuable and wuld try t make gd use f the time this mrning. Pete infrmed all attendees that the sign-in sheet is available. He asked that all attendees sign in and cmplete all infrmatin requested n the sign-in sheet. Pete explained t the bidders that all infrmatin will be distributed thrugh A & D Technical Supply t make it all equitable t the bidders. Agenda fr this meeting is included in the prject manual #002513 Pre-Bid Meetings. The Franks Design Grup has cpies f Request fr Interpretatin frms & will take any questins in writing using these frms. Depending n the nature f the request The Franks Design Grup will respnd prir t the cnclusin f the meetings and/r include respnse via addendum. At the time f the meeting, n written questins were received. Instructins t bidders was published and psted via Master Builders f Iwa Bidders Qualificatins: AIA A-701 included in the prject manual and as mdified by #002213 Supplementary Instructins t Bidders
Bnds: Bnds must be prperly licensed under the laws gverning their trades and be able t btain required insurance and bnds. Cntractrs must able t cmply with and furnish required pst bid infrmatin described in AIA A-701. Supplementary instructins t bidders article 7 perfrmance bnd and payment bnd in an amunt equal t 100% f the cntract sum. Supplementary cnditins includes limits and includes builders all risk insurance. Bid Frm bid guarantee cash, check, r bid bnd in the amunt f 5% f the base bid amunt AIA A-701 instructins t bidders bid submittal checklist. ntice f award. Dcuments available via A&D Technical Supply in Omaha and are viewable at several lcatins listed in the invitatin t bid and elsewhere in the prject manual. Drawings and images are available fr viewing at A&D s nline plan rm. Iwa Chapter 26 revisins are enfrced here. Paper plans must be back 14 days frm bid. Access t prject website can be fund at http://adtechsupply.cm/. There is n prject website. AIA A-701 Instructins t Bidders, Sectin 3.2 describes the prcess fr requesting interpretatin. This is further described in #00210 Supplementary Instructins t Bidders. Requests must be made in writing using the Request fr Interpretatin frm included in the prject manual and bund directly after the supplementary instructins t bidders. Bidder's Substitutin Request/Prir Apprval Request. #002600 Prcurement Substitutin Prcedures utlines prcedures. Bidders are t use the frm included in #002600 Substitutin Prcedures. Addendum #1 will include infrmatinal cntent frm the pre-bid meeting and respnses t requests fr interpretatin r substitutin requests received during tday prir t 5:00 pm Mnday 3/18/19. Cntracting Requirements Agreement: AIA dcument A101 2007 standard frm f agreement between wner and cntractr where the basis f payment is a stipulated sum and the general cnditins. AIA dcument A-201 general cnditins f the cntract fr cnstructin 2007 versin. The prject manual including the federal requirements related t CDBG: required cntract prvisins Required Cntract Language and prevailing wage determinatin. Cnstructin Dcuments: Scpe f Wrk. Temprary Facilities. Use f Site. 2019-03-14 PPLC HVAC Replacement Prject Pre-Bid Meeting Minutes
Wrk Restrictins. Alternates, Allwances, and Unit Prices. Substitutins Fllwing Award. Separate cntracts: There are n ther cntracts currently. Schedule: Prject Schedule. See sectin 003113 Preliminary Schedule fr mre infrmatin Cntract Time Duratin will be included in Addendum #01. Liquidated damages - The wrk shall be cmpleted within the time limits stated in the cntract dcuments. Liquidated damages in the amunt f $100.00 per day shall be assessed t the cntractr fr each calendar day that the wrk prceeds n the prject beynd the specified cmpletin date(s), excepting authrized extensin theref. A site/facility visit r walkthrugh was cnducted. Questins frm bidders were taken: Questin: Is a jb trailer n the site allwed? Answer: Yes. The meeting was cncluded at 11:10 PM. - End f Minutes - The preceding utlines ur understanding f the issues discussed and the decisins reached. If yu feel that any pints have been inaccurately recrded r mitted please feel free t cntact us. Respectfully Submitted, Peter G. Franks, AIA, NCARB LEED Accredited Prfessinal 2019-03-14 PPLC HVAC Replacement Prject Pre-Bid Meeting Minutes