INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Similar documents
INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

6 Report No.: JSDSC1361 1

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. Energy and Extractive Industries Transparency and Accountability

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Report No.: ISDSA13978

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS)

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247. Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Report No.: ISDSA13476

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6132. Date ISDS Prepared/Updated: 05/16/2011 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Report No.: ISDSA Date ISDS Prepared/Updated: 12-Jan-2016

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

6 Report No.: JSDSC1O15

Report No.: ISDSA13781

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE. I. Basic Information Date prepared/updated: 05/10/2012 Report No.: Telecom

IBRD: ($m.) support the development of municipal infrastructure to provide quality local services.

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2649. Date ISDS Prepared/Updated: 06/26/2009 I. BASIC INFORMATION. A. Basic Project Data

Financing (In USD Million) Financing Source

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING. Parent Project ID:

Decision The decision review meeting, held on November 26, 2012 authorized the team to continue with appraisal and negotiation.

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1616. Date ISDS Prepared/Updated: 10/06/2005 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2486. Date ISDS Prepared/Updated: 09/18/2006 I. BASIC INFORMATION. A. Basic Project Data

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET

InfoShop. Integrated Safeguards Data Sheet (Updated) Date ISDS Prepared/Updated: 09/06/

Public Disclosure Authorized. Report No.:AC634. Project ID: P Project: Health Transition Project. TTL: Enis Baris

Public Disclosure Authorized. Loan/Credit amount($m): I IDA: 5.00 Board Date: September 7, 2004 Other financing amounts by source:

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE. I. Basic Information Date prepared/updated: 12/13/2006

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

EAST ASIA AND PACIFIC. Indonesia

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA1417

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 87961

AFRICA. Investment Project Financing P Federal Ministry of Finance

World Bank Environmental. and Social Policy for Investment Project Financing

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619. Project Name. Parent Project Name. Region. Country.

Combined Project Information Documents / Integrated Safeguards Datasheet (PID/ISDS)

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Environmental Assessment

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA5305. Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Safeguard Policies: A Quick View Tbilisi. The World Bank Europe & Central Asia Region

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC4566. Date ISDS Prepared/Updated: 10/02/2009 I. BASIC INFORMATION. A. Basic Project Data

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Integrated Safeguards Data Sheet (Initial)

World Bank Safeguard Policies: An Overview

Tanzania Health Sector Development APL II Region

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

EAST ASIA AND PACIFIC. Investment Project Financing P People's Republic of China

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Report No.: ISDSA1083

Environmental and Social Directive for Investment Project Financing. Bank Access to Information Policy Designation Public

Project Information Document/ Identification/Concept Stage (PID)

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Status: Lending Sector: Banking (100%) Theme: State enterprise/bank restructuring and privatization (P)

This goal will also be achieved by supporting on-going efforts from donors in the following fields:

GEF Focal Area: Sector:

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name. Region. Country

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project

The World Bank FOR OFFICIAL USE ONLY INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT APPRAISAL DOCUMENT ON A PROPOSED CREDIT

REPUBLIC OF TURKEY FOURTH EXPORT FINANCE INTERMEDIARY LOAN (EFIL IV) (LOAN NUMBER )

FOR OFFICIAL USE ONLY

INTEGRATED SAFEGUARDS DATA SHEET

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 24-Feb-2015 Date ISDS Approved/Disclosed: 13-Mar-2015 I. BASIC INFORMATION A. Basic Project Data Country: Kyrgyz Republic Project ID: P151416 Project Name: Urban Development Project (P151416) Task Team Kremena M. Ionkova,Paula Restrepo Cadavid Leader(s): Estimated 01-Dec-2015 Appraisal Date: Managing Unit: GSURR Estimated Board Date: Lending Instrument: Report.: ISDSC12275 15-Mar-2016 Investment Project Financing Sector(s): Sub-national government administration (25%), Urban Transport (25%), Solid waste management (25%), General water, sanitation and flo od protection sector (25%) Theme(s): City-wide Infrastructure and Service Delivery (90%), Other public sector governance (10%) Financing (In USD Million) Total Project Cost: 13.20 Total Bank Financing: 12.00 Financing Gap: 0.00 Financing Source Amount BORROWER/RECIPIENT 1.20 International Development Association (IDA) 6.60 IDA Grant 5.40 Total 13.20 Environmental B - Partial Assessment Category: Is this a Repeater project? B. Project Objectives The PDO of the proposed project is to improve (i) access and quality of municipal services and (ii) the energy efficiency of urban infrastructure in participating municipalities. This will be achieved through mobilizing financial resources (i) to improve access and quality of municipal services such

as water supply, sanitation, solid waste management, and municipal roads, (ii) to improve the energy efficiency of existing urban infrastructure such as municipal social infrastructure buildings (i.e. schools, etc.), street lights and municipal mechanical equipment, and (iii) to strengthen the capacity of participating municipalities and utilities to plan and deliver local services. C. Project Description The Proposed Project will consist of the following components: Component A: Urban Development. The project will finance investments aimed at improving service provision in participating municipalities. The project is expected to focus on 3-4 cities. The selection of these cities will be made in consultation with Government and sector stakeholders. The selection criteria for investments within each city will be defined during project preparation but special attention will be made to assure the coverage of poor and underserved urban areas such as vostroiki. Technical supervision for the development of the above mentioned investments will also be financed through this component. Designs and associated safeguards documents will be prepared with support from ECADev Trust Fund mobilized for this purpose. The activities of this component will be carried out under two separate sub-components: Sub-component A1: Municipal Services - expected to finance sub-projects for the upgrading and/or expansion of municipal infrastructure in the areas of water supply, sanitation, solid waste management, basic social infrastructure and municipal roads, and Sub-component A2: Energy Efficient Municipal Infrastructure - will focus on improving the energy efficiency of municipal infrastructure in participating municipalities. It is expected to include investments such as switching to more energy efficient street lighting options and reducing the energy intensity of existing water and sanitation networks. In addition this sub-component will include a pilot aimed at improving the energy efficiency of public buildings through building retrofit - such as schools and health centers. Investments made under this component will yield not only energy savings but will contribute to the reduction of GHG emissions and mitigation of Climate Change. This sub-component is expected to be financed partially through resources allocated to the Kyrgyz Republic under the Climate Change mitigation window of the Global Environmental Facility (GEF). Component B: Institutional Strengthening. This component will finance (i) the procurement and installation of financial management and planning tools required to improve the managerial capacity of municipalities and to reduce commercial losses by utilities and; (ii) targeted technical assistance to municipalities and utilities towards improving their technical and managerial capacities. Institutional support funds under this component could potentially be available to more municipalities than those that will undertake investments under Component A. Component C: Implementation Support. This component will finance incremental costs of the implementing agency, and will include: (i) contracting of local experts to assist the implementation unit and participating municipalities in the implementation of the project investment programs; (ii) the maintenance of the Monitoring and Evaluation System M&E, created under the BOUIP project, to continuously monitor and evaluate the performance and results of the project; (iii) the project related operating costs of the implementing unit including consulting fees, in-country travel expenditure and mandatory contributions to the Kyrgyz Social Fund; (iv) training of staff and other persons associated with project implementation; and (v) annual audit of project accounts. D. Project location and salient physical characteristics relevant to the safeguard analysis (if known) The project is nationwide in scope but the physical investments will be undertaken in 3-4 cities. All these will be implemented on public land and within existing rights of way.

The proposed UDP is expected to contribute to Climate Change mitigation through theenergy Efficiency sub-component A2. This subcomponent is expected to yield energy savings and contribute to the reduction of GHG emissions through the implementation of a pilot to improve the Energy Efficiency of municipal infrastructure. In addition, a parallel activity, financed through a GFDRR Trust Fund, will be developed during project preparation and is expected to contribute to the better integration of disaster risk reduction in urban planning. Finally, when feasible, investment subproject will be screened to identify potential climate change and disaster risks and integrate appropriate resilience measures. E. Borrowers Institutional Capacity for Safeguard Policies The Community Development and Investment Agency (ARIS) would be responsible for project preparation and implementation given its long experience with Bank-financed operations, capacity in following Bank procurement, financial management and safeguard procedures. ARIS has built a positive track record in safeguards monitoring and compliance throughout the implementation of Bishkek and Osh Urban Infrastructure Project (BOUIP) and the earlier Small Towns Infrastructure and Capacity Building Project. UDP is expected to become effective shortly after BOUIP reaches its Closing date, which will ensure continuity of implementation capacity for UDP. ARIS will carry out project implementation in close cooperation with the participating municipalities and key counterparts and will be responsible for managing the implementation of the project, including the preparation of detailed design and engineering studies, tender documents, as well as procurement, technical and financial supervision of contract implementation, financial management and accounting of project accounts, continuous monitoring and evaluation M&E, control of safeguard compliance as well as routine communications with the World Bank. F. Environmental and Social Safeguards Specialists on the Team Asli Gurkan (GSURR) Cesar Niculescu (GENDR) II. SAFEGUARD POLICIES THAT MIGHT APPLY Safeguard Policies Environmental Assessment OP/BP 4.01 Triggered? Explanation (Optional) Yes Effective measures have been put in place under the BOUIP to address and closely monitor the safeguards issues. An Environmental Management Framework (EMF) will be prepared and disclosed prior to appraisal. Each investment to be financed under the project will be reviewed for safeguard risks in line with the OP4.01. For sub-projects where designs are completed prior to appraisal, site-specific Environmental Management Plans (EMPs) will be prepared by ARIS and disclosed also prior to appraisal. The Project is expected to have limited negative environmental and social impacts, as physical works will be undertaken to only construct/ rehabilitate local facilities. Its only minor impact will be temporary nuisances resulting from construction activities, which will be mitigated by including into the work contracts specific measures to be taken by

contractors and close supervision of compliance by ARIS. Natural Habitats OP/BP 4.04 The conflict filter will be applied. Specifically, the PIU will explain to beneficiaries and the public the benefits from the project; apply clear criteria for the selection of sub-projects; disseminate grievance redress standards and measures; carry out targeted conflict assessments in some geographic areas. Forests OP/BP 4.36 Pest Management OP 4.09 Physical Cultural Resources OP/BP 4.11 Indigenous Peoples OP/BP 4.10 Involuntary Resettlement OP/ BP 4.12 Yes The environmental screening process will screen for the presence of physical cultural resources. In addition, chance find procedures will be included in all works contracts. Indigenous Peoples' as per OP 4.10 are not present in the project area. Resettlement Policy Framework (RPF) will be prepared and disclosed prior to appraisal. For subprojects where designs are completed prior to appraisal, if the implementation of investments may result in the involuntary acquisition of land and the related impacts as detailed by OP 4.12RAPs will be prepared also prior to appraisal. For all other subprojects, RAPs will be prepared as needed during UDP implementation. Safety of Dams OP/BP 4.37 TBD Determination whether OP/BP 4.27 is triggered will be made prior to Appraisal, following the identification of sub-project locations and types, and reflected in the Appraisal stage ISDS. Projects on International Waterways OP/BP 7.50 Yes The project will support activities that could take place on trans-boundary waterways as defined in OP 7.50. (i.e. in the basins of the Chui and Syr-Darya rivers, respectively), Nevertheless, it is anticipated that investments will not (i) cause appreciable harm to the other riparian as it will not adversely change the quality or quantity of water flows, and (ii) it will not be appreciably harmed by the other riparian possible water use. Further, the project aims to improve efficiency of water use and to substantially reduce municipalities high water consumption rates. Project investments

III. Projects in Disputed Areas OP/ BP 7.60 SAFEGUARD PREPARATION PLAN are expected to support the rehabilitation, improvement or minor additions or minor expansions of existing schemes and not affect the rights of other users. The Team will therefore seek an exemption from the OP 7.50 riparian notification requirement. A. Tentative target date for preparing the PAD Stage ISDS: 01-v-2015 B. Time frame for launching and completing the safeguard-related studies that may be needed. The specific studies and their timing 1 should be specified in the PAD-stage ISDS: The preparation of the EMF and RPF will start in April 2015 and be completed by June, 30 2015. The EMF and RPF will be disclosed prior to appraisal (December 2015). Some of the investments under UDP will be designed prior to appraisal, along with site specific EMPs and RAPs (if needed). The preparation of such EMPs and RAPs will commence in August and be completed by vember 2015, and disclosed prior to appraisal (December 2015). IV. APPROVALS Task Team Leader(s): Name: Kremena M. Ionkova,Paula Restrepo Cadavid Approved By: Safeguards Advisor: Name: Date: Practice Manager/ Manager: Name: Date: 1 Reminder: The Bank's Disclosure Policy requires that safeguard-related documents be disclosed before appraisal (i) at the InfoShop and (ii) in country, at publicly accessible locations and in a form and language that are accessible to potentially affected persons.