GLUCONATE HEALTH LIMITED (A GOVT. OF WEST BENGAL UNDERTAKING) H.O. & R. O.: 2, Durga Charan Doctor Lane, Kolkata - 700 014. SUB. : ELECTRICAL WIRING AT HEAD OFFICE OF GLUCONATE HEALTH LTD. AT 2, DURGACHARAN DOCTOR LANE KOLKATA-700014 Sealed quotations are invited from Reliable, Resourceful, Bonafide and Experienced Electrical contractors for the following job as per the schedule given. TENDER NO. : GHL/ELEC-04/16-17 DATE : 14.01.2017. Last Date and Time of Submission of Quotations : On 21.01.2017 up to 2.00 pm Date and Time of opening of quotations : On 21.01.2017 at 3.00 pm Quotations submitted later than 2.00 pm of 21.01.2017 will not be accepted. Please submit the quotations at the Purchase Dept of our Head Office at 2, Durga Charan Doctor Lane, Kolkata 700 014 within the schedule date and time. Purchase Manager Gluconate Health Ltd.
Name Work of : Supply & fixing of 100A TPN, & BBC along with electrical wiring at Head Office under GHL. Schedule of work Sl. No. Description of Item Qty. Rate (Rs.) Amount (Rs.) 1. Supply & fixing of 415V/AC, 100/125A TPN Busbar Chamber at main supply end. 2. Supply & delivery 1100V gr. unsheathed PVC cable with copper conductor of size 19/0.64 (inch) from CESC s supply end to TPN and TPN to BBC. 3. Supply & delivery of 35 sqmm. A1/Ar/XLPE 3 ½ core 1100 V gr. PVC cable as per IS- 7908 (Part-I) 1988. Make : Havels/Equ-a valiant (from TPN to PDB Panel) 4. Supply of 415V, 6-32A per way TPN MCBDB with SS end sure double door with IP-42/43 protection with four pole isolators with suitable size of copper wire and netural link & provision of earth attachment, including as per load current no of MCB required per BDB (Min 6 Nos. & Max - 12 Nos.) Make : Havells. 5. Distribution wiring in 11KV Gr. 2 X 1.0 sq.mm. single core standard FR, PVC insulated & unsheathed copper wire (approved mk) in suitable size PVC casing capping (Presto make) or equivalent to light/fan call bell point with plano key type switch fixed on sheet, steel fabricated/ PVC switch board with perfex/back lite top cover on wall including necessary connection and making earthing attachment and mending good damage to building work. Make : Havells/ Finolex) (Ref. W/O No. 6. Supply & fixing sheet steel main switch on angle iron frame on wall 100/125A 415V TPN with fuse on L & N Make : Flore (For receiving of CESC s Power) 7. S & F CRC steel/pvc inspection box of the following size flushed in wall by housing the same after cutting bride wall by sharp Chisel including making connection earthing attachment painting & mending good damagest to building work. a) L50 X 100 X 65) mm b) 200 mm X 150 mm X 65 mm c) 250 mm X 200 mm X 65 mm d) 100 mm X 100 X 65 mm 8. S & F 2 module box with outface plate with 2 nos. telephone jack complete. (Ref. w/o No.: 1 No. 25 mtr. 20 mtr. 1No. 120 pts. 1 No. 25 Nos. 20 Nos. 18 Nos. 40 Nos. 20 Nos.
9. S & F 230V, 3 Pin, 15A, Plug socket with 15A piano type switch on sheet metal JB cum switch board with backlite top cover & earthing attachment including S & F sheet metal box of size 150 mm X 100 mm X 65 mm (16 SWG) with 3 mm thick Backlite cover including painting & mending good damage. 10. S & F 240V AC/DC superior type call bell (Anchor/equivalent) make on HW board including S & F JB. 11. S & F 48 AC ceiling fan complete with blade canopy pork rubber, bush including S & F connection wire for down road, upto 30 cm make : Cromton Graves or Equivalent 12. S & F anchor make electronic fan regulator suitable for 1200 mm sweep ceiling for inside existing switch board, with top cover by screw after making housing for regulator knob by cutting top cover including making necy. Connection. (Ref. : 13. S & F MAS LED Tube light fitting 1200 mm with frosted cover of 20 Wt./18 Wt. make Philips. 14. Earthing with 80mm dia G.I. Pipe (Jindal medium) 3.0 mtr. long and 1 X 19 X 8 standard G.I. *Hot Dip) wire wire (4 mtrs. Long) 25 mm dia X 150 mm long galvanized botls, double nuts, doubles washers including socketing at both ends of standards G.I. (Hot dip) wire by crimping socket I thimbles and S & F 40 mm dia G.I. Pipe (ISI medium) protection (3 mtr. long) to be filled with bitumen partly the ground level and partly above grand level to an average depth of 3.65 mtrs. 15. Supply and fixing compression type gland complete with brass gland grassing & rubber ring for dust & moisture proof entry of XLPE armored cable as below. a. 3 ½ core 35 sqmm. b. 3 ½ core 25 sqmm. 16. Finishing the end of following XLPE armored cable by crimping method including supplying and fixing solder less socket (Dowels make) tapes, anticorrosive paste and jointing materials. a. 3 ½ core 35 sqm. b. 3 ½ core 25 sqm. 15 nos. 4 Nos. 10 Nos. 20 Nos. 30 Nos. 2 Nos. 4 Nos. 10 Nos. 3 sets 10 sets For, Gluconate Health Limited Purchase Manager
TERMS & CONDITIONS : 1. INSPECTION OF SITE AND STUDY OF LOCAL CONDITIONS Intending tenderers are required to inspect the site of work with particular reference to location and infrastructural facilities. They are to make a careful study with regard to availability of materials and their sources, labour (skilled and unskilled) and all relevant factors as might affect their rates and prices. A tenderer who submits a tender will be deemed to have inspected the site and make proper study of all relevant factors. No extra payment for mobilisation advance and price escalation will be allowed at any point of time during execution of the work. 2. SUBMISSION OF TENDER The Tenderer is required to carefully study all the TERMS & CONDITIONS and prepare his Tender to comply with all provisions thereof. Submission of a Tender shall be taken as an evidence and confirmation that the Tenderer has acknowledged all the provisions of the Tender Documents and has fully acquainted himself with site conditions and all factors which may influence the preparation of his Tender. Negligence of the Tenderer to observe instructions in preparing his Tender shall be at his own risk and shall not be a ground for securing relief from any error found or discrepancies contained in his Tender or a cause for withdrawal of his Tender after it has been opened. All expenses incurred for site inspection and all activities in the preparation and submission of the Tender shall be borne by the Tenderer. Tenderer should submit the following documents: a) The forwarding letter. b) Constitution of the firm : Name of Partner / Directors, Photostat copy of the constituted power of attorney of the signatory. Original is to be submitted when called upon. Memorandum and Articles of Association Certificate of Incorporation shall also be required whenever applicable. c) Technical proposal and detailed specifications. d) Business terms and conditions. e) Schedule of prices All rates and prices shall be written in figures as well as in words. In case of any discrepancy between the two, words shall prevail over the figures. 3. SCHEDULE OF PRICES The Tenderer shall submit the rate against individual items clearly. The rates against different items should be reasonable and commensurate with one another. Any rate which, in the opinion of the authority accepting tenders, is absolutely high or absolutely low in comparison to the quoted rates of other items, may lead to rejection of the Tender. 4. VALIDITY OF TENDER A Tender submitted shall remain valid for a period of 90 calendar days from the date set for opening of tenders. Any extension of this validity period will be subject to concurrence of the Tenderer.
5. WITHDRAWAL OF TENDER A Tender once submitted shall not be withdrawn within the validity period.however a tenderer may withdraw his tender by writing an application to TENDER INVITING AUTHORITY before the Scheduled opening time of the tenders. 6. OPENING AND PRELIMINARY EXAMINATION OF TENDERS Immediately after the time stupultated for receipt of tenders, all tenders received shall be opened by TENDER INVITING AUTHORITY or his authorised representative in the presence of such tenderers or their authorised representatives as may be present or be represented at the time of opening of tenders. Contents of the individual tenders shall first be examined in a general way as to their conformity and agreement with the tendering requirements. Any tender not conforming to any of the requirements may be disqualified forthwith at the discretion of the authority opening tenders. Tenders not so disqualified shall be subject to detailed scrutiny as there under. 7. ACCEPTANCE OF TENDER Tender will be accepted (for and on behalf of the TENDER INVITING AUTHORITY). He does not bind himself to accept the lowest tender and reserves to himself the right to reject any or all of the tenders received without assigning any reason therefor. The work to be completed within 1 (One) calendar month from the date of work order issued, under the guidance of the Works Manager of the company and the guarantee period from the date of official completion and hand over of the project will be for a span of 12 (Twelve) calendar months. 8. COMPLETION & PENALTY The job must be completed within the stipulated time as per the terms of the tender and work order & the agreement to be signed. The contractor must submit a detail working chart to the company along with the quotation showing the complete details. The relevant drawings are also to be submitted. Penalty: For delay in completion beyond stipulated time, an amount equal to 0.5% of the total value of the order for each day s delay will be deducted from the contractor s bill at the discretion of Gluconate Health Limited. Management of GHL also reserves the right to cancel the order for non completion of work within the stipulated time and get the work done by other parties and debit the difference if any, between tendered and fresh rates to the account of the Tenderer. The security deposit paid will also be forfeited by GHL due to non-fulfillment or non-performance of the contract in part or full. 9. Materials: The tenderer must ensure about the quality of the materials supplied and to be used only after certified by the competent authority of the company. 10. Payment Terms: No advance payment will be made. Payments will be made within 30 days after completion of job against submission of bills properly certified by the competent authority after deducting the security deposit @ 5%. Security deposit will be refunded after completion of Guarantee period which will be not less than one year from the date of the hand over of the project. Purchase Manager Gluconate Health Limited
STATUTORY / MISC. LIABILITIES OF THE CONTRACTOR. 1. Contractor agrees to indemnify the Management (i.e. Principal Employer) that it will be solely and entirely responsible to comply with and abide by all the statutory provision as and when applicable under various labour and Industrial Law enacted by the Government like contract Labour (Regulation & Abolition) Act 1970; payment of wages act 1936, Factories Act 1948; Provident Fund Act 1952; Employees State Insurance Act. Minimum Wages Act, Workmen Compensation Act 1923 & rules with subsequent amendments in force at that time. 2. Contractor s undertakes the responsibility that it shall pay wages to his contractor labour s every month in due time. 3. Contractor shall maintain registers & recorder as required under various labour & industrial laws & the rules made there under as & when applicable. Agency shall furnish these registers & records to the Management when ever asked for. 4. Contractor shall Indemnify GHL against all claims which may be made under the above said acts on accounts of any compensation payable to contractor s labour whether in the employment of contractor or not. Similarly contractor shall ensure that working hours, fixation of wages, working condition are to be followed as stipulated in the license. 5. If under any circumstances what so ever GHL is held responsible in any manner what so ever for payment of compensation to contractor s laborer for default or omission of commission of contractor, then GHL is entitled to be reimbursed by the contractor along with all expenses, costs claims etc. 6. Contract work will be supervised by a technically sound person of the contractor. 7. Contractor shall be fully responsible for the safety of his workmen / employees. In any case, it shall be the sole responsibility of the contractor to per liability / compensation in the event of contractor while working at GHL Premises. 8. Contractor shall strictly follow the prevailing rules and regulations of GHL. Signature of Contractor with seal & date.