PRESENTATION BY OPW TO JOINT OIREACHTAS COMMITTEE ON CULTURE, HERITAGE, AND THE GAELTACHT

Similar documents
Lower Lee (Cork City) Flood Relief Scheme (Including Blackpool and Ballyvolane)

IRISH FLOOD PREVENTION PROGRAMME Example of integrating climate change adaptation into projects

Flood Risk Management in Ireland. The National CFRAM Programme & overview of the Capital Works Programme. Click to add text

Flood Risk Management Business Plan 2013

Shannon Flood Risk State Agency Co-ordination Working Group - Open Days on Work Programme

Engineers Ireland Annual Conference

Flood Insurance Bill 2016

2018 PREPARING FOR A CHANGING CLIMATE AND MANAGING THE RISING FLOOD RISK

FLOOD RISK MANAGEMENT IN IRELAND

Flood Risk Management Plan for the BALLYTEIGUE BANNOW River Basin (UoM13)

Comptroller and Auditor General Special Report. Strategic Planning for Flood Risk Management

DRAFT APPROPRIATE ASSESSMENT SCREENING REPORT

Flood Risk Management Plan for the NORTH WESTERN River Basin (UoM01)

Lowestoft Flood Risk Management Project

Flood Risk Management

Glasgow City centre (Potentially Vulnerable Area 11/16) Local Plan District Local authority Main catchment Clyde and Loch Lomond Glasgow City Council

Arbroath (Potentially Vulnerable Area 07/07) Local Plan District Local authority Main catchment Tay Estuary and Montrose Basin Angus Council Brothock

DRAFT STRATEGIC ENVIRONMENTAL ASSESSMENT SCREENING REPORT. Climate Change Sectoral Adaptation Plan for Flood Risk Management ( )

Planning and Flood Risk

Acknowledgements. Legal Disclaimer. Copyright

Public Accounts Committee 11 October The Office of Public Works Chairman s Opening Statement

Unique ID: (from PFRA database) Location: Bridgetown, Co. Clare. Stage 1: Desktop Review

HRPP 358. Adapting flood risk management for an uncertain future: Flood management planning on the thames estuary. D. Ramsbottom & T.

STATUTORY INSTRUMENTS. S.I. No. 122 of EUROPEAN COMMUNITIES (ASSESSMENT AND MANAGEMENT OF FLOOD RISKS) REGULATIONS 2010.

Kirkwall (Potentially Vulnerable Area 03/05) Local Plan District Local authority Main catchment Orkney Orkney Islands Council Orkney coastal Backgroun

Flood Risk Management

Objectives of this Briefing

National Flood Risk Management Plan. CFRAM Programme

Nairn Central (Potentially Vulnerable Area 01/18) Local authority Main catchment The Highland Council Moray coastal Background This Potentially Vulner

Alyth (Potentially Vulnerable Area 08/04) Local Plan District Local authority Main catchment Tay Perth and Kinross Council Alyth Burn (River Tay) Back

Elgin (Potentially Vulnerable Area 05/05) Local Planning District Local authority Main catchment Findhorn, Nairn and Speyside The Moray Council River

Strategic Flood Risk Assessment

Flood Risk Management Planning in Scotland: Arrangements for February 2012

Broad-Scale Assessment of Urban Flood Risk Mark G. E. Adamson 1

Committee Brief Public Accounts Committee Vote 13 Office of Public Works Appropriation Account 2017

Aberfeldy and Pitlochry (Potentially Vulnerable Area 08/03) Local Plan District Local authority Main catchment Tay Perth and Kinross Council River Tay

Information document for the post of Senior Executive Scientist (Integrated Catchment Management)

Joint Lincolnshire Flood Risk and Drainage Management Strategy: Draft v.6.0:consultation Draft, : Annexes A-F

Comhairle Baile Cheanntair~ Nás na Ríogh

Implementation processes for the Flood Risk Management (Scotland) Act 2009

VULNERABILITY AND RISK ASSESSMENT FOR THE PFRA IN IRELAND

Clyde south - Port Glasgow to Inchinnan (Potentially Vulnerable Area 11/09) Local Plan District Clyde and Loch Lomond Local authority Inverclyde Counc

RIVER LUGG INTERNAL DRAINAGE BOARD. Statement on Water Level and Flood Risk Management

The AIR Inland Flood Model for Great Britian

Service Level Agreement between Department of Environment, Community and Local Government and Housing Finance Agency plc.

CORK BUSINESS ASSOCIATION

STRATEGIC FLOOD RISK ASSESSMENT

Role Reporting accountabilities Other accountabilities Subordinates Managerial functions Competencies Contacts

Derry City & Strabane District Council 17th July 2015, 3pm.

Creetown (Potentially Vulnerable Area 14/17) Local Plan District Local authority Main catchment Dumfries and Galloway Solway Moneypool Burn Council Ba

WEIGHTING THE PERCEIVED IMPORTANCE OF MINIMISING ECONOMIC, SOCIAL AND ENVIRONMENTAL/ CULTURAL RISKS IN FLOOD RISK MANAGEMENT

Ellon (Potentially Vulnerable Area 06/12) Local Plan District North East Local authority Aberdeenshire Council Main catchment River Ythan, Buchan coas

Operations Directorate Privacy Notice. Kerry County Council Comhairle Contae Chiarraí

Strategic Flood Risk Assessment

FOR TO THE GAELTACHT LOCAL AREA PLAN MARCH 2013

Information document for the post of Assistant Environmental Scientist (Integrated Catchment Management)

Unique ID: (from PFRA database) Location: Nenagh, Co. Tipperary. Stage 1: Desktop Review

Fort William (Potentially Vulnerable Area 01/25) Local authority Main catchment The Highland Council Appin coastal Background This Potentially Vulnera

Luncarty, Stanley, Bankfoot, Dunkeld and Birnam (Potentially Vulnerable Area 08/08) Local Plan District Local authority Main catchment Tay Perth and K

1. Call to Order The Presiding Officer calls the statutory public meeting to order and leads those present in a moment of contemplation.

Appeal by Lloyds Bank PLC

Oban (Potentially Vulnerable Area 01/31) Local authority Main catchment Argyll and Bute Council Knapdale coastal Background This Potentially Vulnerabl

Newton Stewart (Potentially Vulnerable Area 14/12) Local Plan District Local authority Main catchment Dumfries and Galloway Solway River Cree Council

PLANNING FOR SAFE AND SUSTAINABLE COMMUNITIES

THE EU FLOODS DIRECTIVE:

COASTAL GROUPS IN ENGLAND THE ENVIRONMENT AGENCY STRATEGIC OVERVIEW OF SEA FLOODING AND COASTAL EROSION RISK MANAGEMENT MARCH 2008

Job Specification for Climate Action Regional Co- Ordinator

LOCAL FLOOD RISK STRATEGY EMYR WILLIAMS PEMBROKESHIRE COUNTY COUNCIL

achieving results in the public sector Kāpiti Coast District Council Financial Investigation of a Kāpiti Coast Unitary April 2013

Eddleston, Peebles, Innerleithen, Selkirk, Stow and Galashiels (Potentially Vulnerable Area 13/04) Local Plan District Local authority Main catchment

Irish Water 2019 Revenue Control

Bone Bolango, Indonesia

Office of the Revenue Commissioners. Irish Language Scheme. Under Section 15 of the. Official Languages Act 2003

Flood Risk Assessment Cobh Town Plan Cobh Town Development Plan Volume 2: Strategic Flood Risk Assessment

Caol and Inverlochy (Potentially Vulnerable Area 01/24) Local Plan District Highland and Argyll Local authority The Highland Council Main catchment Fo

REASONS AND CONSIDERATIONS. In coming to its decision, the Board had regard, inter alia, to:

Shropshire Local Flood Risk Management Strategy. Summary for Consultation. July 2014

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS

Lowestoft. Summary 2016 FLOOD RISK MANAGEMENT. Mike Page

Isle of Arran (Potentially Vulnerable Area 12/08) Local Plan District Local authority Main catchment Brodick to Kilmory Ayrshire North Ayrshire Counci

EU FLOODS DIRECTIVE: SHARING A METHODICAL PROCESS TO IMPROVE FLOOD RISK MANAGEMENT

Clyde catchment - Motherwell to Lesmahagow (Potentially Vulnerable Area 11/17/2) Local Plan District Clyde and Loch Lomond Local authority North Lanar

Citizens Summary. Implementation of Ireland s. ERDF funded Southern & Eastern Regional Operational Programme

River Findhorn (Potentially Vulnerable Area 05/07) Local Planning District Local authority Main catchment Findhorn, Nairn and The Highland Council, Ri

Hillfoots Villages (Potentially Vulnerable Area 09/04) Local Plan District Forth Local authority Clackmannanshire Council, Stirling Council Main catch

State Airports (Shannon Group) Bill Regulatory Impact Analysis

CITY OF WINCHESTER KENTUCKY/PLANNING & COMMUNITY DEVELOPMENT REQUEST FOR PROPOSAL COMPREHENSIVE PLAN UPDATE

Strategic Asset Management Policy

Dunblane and Bridge of Allan (Potentially Vulnerable Area 09/03) Local Plan District Local authority Main catchment Forth Stirling Council Allan Water

Flood Risk Management in England

Task 2: Strengthen the regional capacity and cooperation towards data and knowledge sharing on risks.)

Understanding the potential for private sector investment in natural capital lessons from the Spey catchment

Strategic Flood Risk Assessment. SFRA Report

Problem Overview. Key Flood extent for present day 1% (or 1 in 100) chance flood event. Dinas Powys. Barry Industrial Area.

CLIMATE CHANGE SECTORAL ADAPTATION PLAN FLOOD RISK MANAGEMENT

Peter Brett Associates. Assessing Flood Risk and River Modelling Doulton Brook Development, West Midlands

Frequently Asked Questions

Dornoch (Potentially Vulnerable Area 01/07) Local Plan District Highland and Argyll Local authority The Highland Council Main catchment Dornoch coasta

DROUGHT RISK, SCIENCE AND MANAGEMENT: WATER GOVERNANCE: AUSTRALIAN EXPERIENCE

IDENTIFYING THE PREFERRED OPTION COMPLEX DECISION-MAKING FOR LARGE PROJECTS

Transcription:

PRESENTATION BY OPW TO JOINT OIREACHTAS COMMITTEE ON CULTURE, HERITAGE, AND THE GAELTACHT THE LOWER LEE (CORK CITY) FLOOD RELIEF SCHEME The first image shown here is the proposed view at Merchant s Quay from the Scheme, and the second one is Patrick Street during the flood on February 4 th 2014.

Introduction Thank you Chairman, Deputies and Senators for inviting us here today to outline the proposed Lower Lee (Cork City) Flood Relief Scheme. Cork City has a long history of flooding and this Scheme will provide protection, against Tidal and River flooding, to about 2100 properties, including 900 homes and will extend from Inniscarra dam to the City centre (Figure 1). While many options were considered in the development of this scheme by the OPW, which has extensive expertise and knowledge in the areas of flood risk management and conservation, in partnership with Cork City and County Councils, the scheme presented here today is the only technically viable AND cost beneficial option to provide the required standard of protection to Cork. The current estimated whole life cost is 140m and the project represents the largest flood relief project proposed in Ireland. It has been estimated that the damages caused in the 2009 river flood and 2014 tidal flood amounted to 90m and 40m respectively. Substantial stakeholder and Public Consultation has taken place on this project. Work on this project determined that the solution requires optimised use of the existing hydro-electric dams for flood storage and flood defences downstream. In line with international best practice the standard of protection provided by the scheme is the 1 in 100 year flood from the River Lee and the 1 in 200 year flood from the Tide. Statutory Process The Scheme is being progressed under the Arterial Drainage Acts and the statutory process is ongoing. The formal public consultation (Public Exhibition) of the scheme commenced last December and is being progressed in close partnership with both Cork City and County Councils. Page 1 of 23

Figure 1: Maps showing locations of properties to be defended by scheme. Page 2 of 23

Outline of the Scheme (Images on pages 5, 6, 7 and 8 refer) The following are key points to note: Over 20m is being invested in the repair of the historic quay walls, many of which are at risk of collapse as occurred at Grenville Place in the 2009 flood. Over 400 heritage structures will be protected The detailed design team includes a Grade 1 Conservation Architect to ensure that the protection of cultural heritage will be considered appropriately. The proposed defence height along the majority of the quays is 2 feet or less (Figure 2) with the highest quay wall height of 4 feet above finished ground level (Figure 3). This cannot reasonably be described as high and will not limit views or enjoyment of the river Over three-quarters of the quay walls will have an element of open railing below guarding height. (Figure 2) Over 1km of new river side walkways will be provided which will enhance connectivity with the River (Figures 3 & 4) An experienced urban public realm landscape architect is part of the detailed design team, whose remit is to ensure that the defences are integrated unobtrusively into enhanced public spaces. Existing unattractive concrete upstands and railings will be replaced with new architecturally designed railings. (Figure 2) Taking account of feedback received at Exhibition stage, the proposed scheme is being changed on quays which have original historic railings. At Sullivan s Quay and North Mall, demountable barriers are proposed so that the existing railings can be retained in their current form thus ensuring that there is no heritage impact. (Figure 5) The mail elements of the scheme are: A Flood Forecasting System, using forecast rainfall Enhanced Operation of Hydroelectric Dams during Flood Events Washlands Upstream of the City Flow Control on the South Channel Flood Defences Ancillary works The scheme is adaptable to provide greater protection in the future in response to Climate Change. Page 3 of 23

Support for the Scheme The scheme has the support of the vast majority of the elected representatives of both local authorities, key stakeholders like Cork Chamber of Commerce and the Cork Business Association who together represent over nine hundred members in Cork City, and The Irish National Flood Forum. Page 4 of 23

Figure 2: Existing and Proposed view at Penrose s Quay (Note: the design of the Posts in the railing will evolve in the Detailed design phase, but the essential features of the proposed railing, (visually open or transparent, and low defence height) remain) Page 5 of 23

Figure 3: Existing and Proposed views at Bachelors Quay Page 6 of 23

Figure 4: Existing and Proposed cross sectional views at Bachelors Quay Page 7 of 23

Figure 5: Proposed offset Demountable flood defence at North Mall. Page 8 of 23

Save Cork City (SCC) alternative proposals SCC has proposed an alternative solution which tries to solve Cork s flooding problem by dealing independently with the fluvial (river) and tidal problems. SCC has proposed a tidal barrier at Little Island, which would only address the tidal flooding problem. This barrier is not considered viable for a variety of reasons including impacting negatively on highly sensitive EU designated environmental sites in Cork Harbour. The location proposed by SCC has limited ability to cope with the likely future impacts of climate change. SCC recently commissioned HR Wallingford to prepare a Cost Estimate Report of its proposal. The report is therefore only a high level cost estimate of the SCC proposal and it notes that further study will be needed to develop the design for a barrier and refine the cost estimate. In response to public interest at Exhibition stage, OPW instructed its consultants to examine further the costs and issues around the provision of a tidal barrier at a number of locations around Cork Harbour including that proposed by SCC. In preparing this study, Arup has drawn on the expertise of its relevant international experts, undertaken detailed harbour modelling and liaised with key stakeholders such as the Port of Cork Company. This study includes a detailed analysis of barrier costs for the scale of barrier likely to be required as well as analysing the cost estimate for the SCC proposal. It is currently being finalised. We believe that the HR Wallingford cost estimate is an underestimate of the true cost of a tidal barrier. In terms of upstream measures to address river floods, SCC has advocated Natural Flood Management (NFM) and/or improved use of the dams. However, all scientific evidence confirms that NFM measures cannot significantly reduce peak flows in large flood events in large catchments. Work undertaken by OPW s consultants has confirmed this is the case in Cork. It is noteworthy that the HR Wallingford report arrived at a similar conclusion. The OPW scheme incorporates optimised use of the dams to reduce peak flows. In developing the scheme, new operational rules have been developed in close collaboration with ESB (owners of the dams), making use of state of the art modelling techniques which account for the real world constraints and ensure that the rules are robust and provide a reliable solution. The storage capacity benefits of the dams are optimised in the scheme, in line with the operational rules, but some low level defences are still required. Page 9 of 23

Integrated Approach Cork City Council will shortly be launching a planning application for the Morrison s Island Public Realm and Flood Defence Scheme, the flood defence element of which is the first phase of the Cork City flood relief project. The Morrison s Island project is representative of the approach and standard which the wider scheme will deliver. With high quality visual aids supporting this application, the public will be able to clearly see the unobtrusive and enhanced quaysides that will be created. (Figure 6) Figure 6: Morrison s Island Public Realm improvement incorporating Flood Defences (Note: proposals for this area are evolving and being finalised prior to submission for Planning Permission in November. Possible proposed view on left, existing view, from Google Maps, on right) Page 10 of 23

Conclusion In conclusion, the OPW is fully satisfied that the planning, development and design process for the proposed Cork City flood relief scheme has been rigorous and of the highest professional standard, we have considered all of the potential alternatives, and have determined that the only technically viable and cost beneficial solution is the Scheme as exhibited. This integrated and holistic scheme will substantially free the people of Cork from the worry and stress of living with flood risk and it will remove barriers to future investment and help to reinvigorate the city centre. The OPW and Cork City Council would be concerned about further delays to this project amid continued exposure of Cork City residents and businesses to flood risk and so the Commissioners of Public Works intend to submit the Scheme to the Minister for Public Expenditure and Reform for approval in the shortest possible timeframe. Page 11 of 23

Appendix: Further information is included or referred to on the following pages as follows. OPW as Lead agency in Flood Risk Management in Ireland... 13 Exhibition of Proposed Flood Relief Scheme... 14 Public Information Day no. 1 17 th July 2013... 15 Public Information Day no. 2, 29 th July 2014... 15 Further illustrations from the Lower Lee Project.... 16 Examples of Previous Flood Relief Schemes Implemented by OPW.... 21 Page 12 of 23

OPW as Lead agency in Flood Risk Management in Ireland In 2004, the Government, following a wide-ranging Inter-Departmental review of national flood risk management policy, approved the Report of the Flood Policy Review Group. The recommendations of the Report included: Appointment of the OPW as lead agency for delivery of flood risk management policy. This includes close liaison with a range of local authorities, organisations and stakeholders that also have responsibilities for managing flood risk We would note also: OPW has a long track record in successfully implementing arterial drainage scheme and flood relief schemes. OPW have appointed highly experienced and competent consultants to prepare and deliver this project. Page 13 of 23

Exhibition of Proposed Lower Lee Flood Relief Scheme Information about the Scheme is available on the project website, http://www.lowerleefrs.ie/. Among other information, the website includes all information which was part of the recent Exhibition of the scheme under the Arterial Drainage Acts, which stared in December 2016. The information relating to the exhibition of the Scheme which is available on the website is as follows. Information Drawings and Photomontages Environmental Impact Statement (EIS) Other Exhibition Documents (Included here are documents that were available at the Exhibition, including the posters that were on display, a brochure about the Scheme, and Project Reports and Presentations. The other documents mentioned above are also available to download from this web page. Website Address http://www.lowerleefrs.ie/index.php/site/map (This is an interactive map where people can look at their own area and click on a box to open up documents relating to their own area) http://www.lowerleefrs.ie/index.php/site/environmental On this page the EIS is available to download as three components, the Non Technical Summary, the Main Report, and the Appendices. All individual Chapters are also available to download individually. http://www.lowerleefrs.ie/index.php/site/otherexhibitiondocs Page 14 of 23

Public Information Day no. 1 17 th July 2013 A first Public information day for the Lower Lee Project was held in July 2013. At this event the public were invited to attend and make their views and comments on the flooding and related issues and possible solutions known to the project's design and environmental teams. Information that was available to the public at this event is available on the project website at the address, http://www.lowerleefrs.ie/index.php/site/news, under the heading Lower Lee Public Information Day No. 1. Public Information Day no. 2, 29 th July 2014 The second Public Information day for the Lower Lee Project was held in July 2014. The purpose of this event was to provide an update on the identification of engineering measures for the Lower Lee from Innsicarra Dam downstream to and through Cork City, and to seek the views of the Public on the engineering measures that were being identified as the emerging preferred option. Members of the design teams were in attendance to respond to queries from the public. Information that was available to the Public on that day is available on the project website at the address, http://www.lowerleefrs.ie/index.php/site/news, under the heading Lower Lee Public Information Day No. 2 Page 15 of 23

Further illustrations from the Lower Lee Project. Illustration used by OPW in previous presentations dealing with the following issues are shown on the following pages. The area in the city to benefit from the protection to be provided by the scheme An indication of the distribution of railings and parapet walls to be used in the scheme, as well as the existing situation. Illustration of the Concept design for the new Railing to be used throughout the city An indication of the Phased approach to be taken to the Construction of the Scheme Page 16 of 23

Page 17 of 23

Page 18 of 23

This design will evolve during the detailed design of the project, but the open nature of the railing will be preserved. Page 19 of 23

Page 20 of 23

Examples of Previous Flood Relief Schemes Implemented by OPW. OPW Flood Relief Schemes WORK All flood relief schemes are composed of components and principles which are well established and have been successfully implemented in various places around the country OPW has a track record of implementing schemes that perform as intended As the Lead Authority in Flood Risk Management in Ireland, OPW is also prepared to consider and implement, as appropriate, new technologies, such as in Fermoy, and in the Lower Lee Scheme with the planned use of Forecast Rainfall in the flood forecasting system Examples of completed schemes are in Fermoy, Mallow, Kilkenny, Clonmel and Waterford all of which have performed to design standard in the serious flood events of recent years Page 21 of 23

FERMOY December 2015 Page 22 of 23

CLONMEL Flood event February 2014 (showing the flood well outside the normal bank) Page 23 of 23