Does the Northeast Need Additional Gas Infrastructure and if There is a Need, Can the Infrastructure be Financed, Constructed and Built?

Similar documents
WEEKLY MARKET UPDATE

APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST

Annual Report on Bank of China s Green Bonds. Outstanding BOC Green Bonds

Q I N T E R I M R E P O R T. Brookfield Renewable Partners L.P.

Bank of China Limited Green Bond Management Statement

Trading Date. % Change from Last Week. 53 State Street 12 For further information contact: Jessie Hagger

Portland General Electric Reports 2017 Financial Results and Initiates 2018 Earnings Guidance

ICForecast: Strategic Power Outlook. Q Sample

NEW YORK MEETINGS. January 28, 2015

Final Version October 19, ENERGY EFFICIENCY PLAN TERM SHEET

LGUGC Facts Brief History Vision & Mission

EEI 2014 Financial Conference. November 11-14, 2014

2017 Integrated Resource Plan. Portfolio Development Detail September 8, 2016

2017 Year-End Results Investor Call. February 23, 2018

Energy Ventures Analysis 1901 N. Moore St. Arlington, VA (703)

DFW INTERNATIONAL AIRPORT ADMINISTRATIVE POLICY AND PROCEDURE

STATEMENT ON SSE S APPROACH TO HEDGING 14 November 2018

ISO-NE s CASPR and State RPSs

Renewing Ireland's Energy European Investment Bank

Associated Industries of Massachusetts (AIM) is pleased to provide the following comments to the above mentioned issue.

PG&E Corporation. Christopher P. Johns Senior Vice President and CFO. Lehman Brothers CEO Energy/Power Conference September 2-4, 2008 New York City

Swiss Re Corporate Solutions. Financial Risk Solutions in a changing Energy Market Juerg Trueb, 3. April 2017

Macquarie Infrastructure Corporation Reports First Quarter 2016 Financial Results, Increased Dividend

Wholesale Panel. A Tale of Three (Very Different) Markets

Investor Meetings August 4 12, 2014

BMO 2015 Fixed Income Conference. Todd Stack VP & Treasurer

Building on strengths

Matthew F. Hilzinger Chief Financial Officer

CDM Project Issues and Analysis

portfolio is located primarily in eastern Canada and Washington State.

IN THE MATTER OF THE BOARD S INVESTIGATION OF CAPACITY PROCUREMENT AND TRANSMISSION PLANNING BPU - Docket No. EO

MUNICIPAL BONDS IN TEXAS and THE BOND SALE PROCESS

Understanding Risk and Preparing the RFP

Northeast Utilities Board of Trustees

This memo provides highlights of market performance in October and November.

Platte River Power Authority

Opportunities in Bond Financing

Volatility, risk, and risk-premium in German and Continental power markets

Oil, Gas and Power Prices Have Fallen and Can t Get Up Implications for the Power Industry Municipal Power & Utilities Assembly

Advanced Asset/Liability Management

Climate Bonds Standard Version 3.0

Solar Gr G e r en n Bond n s s Webinar July 2016

Portland General Electric

THE DEPARTMENT OF ENERGY S GRID RESILIENCE PRICING PROPOSAL: A COST ANALYSIS

Generation Retirement Scenario

EX22.2v REPORT FOR ACTION. TransformTO Short-term Strategies Financial Estimates SUMMARY

Global Resilience Risk

SCHEDULE C ELECTRICITY PURCHASE AGREEMENT TERM SHEET TRANSMISSION AND LARGE DISTRIBUTION CONNECTED PROJECTS

Management recommends the following enhancements to these modifications to the provisions for commitment costs:

JOSEPH A. HOLTMAN - ELECTRIC. 1 Q. Please state your name, title, employer and business. 4 Electricity Supply for Consolidated Edison Company of

Estimating Capacity Benefits of the AC Transmission Public Policy Projects

Invest in Public Transportation for a Stronger America

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2011 S 1 SENATE BILL 747. Short Title: Offshore Wind Jobs and Economic Development.

Eversource Energy Reports Third Quarter 2017 Results

MEMORANDUM OF UNDERSTANDING

P3 Financing Stan Ladner, Butler Snow LLP Josh Evans, Bostonia Partners LLC

Exelon Reports Second Quarter 2018 Results

Public Service Enterprise Group

Bank of China Limited Green Bond Management Statement

Ex post payoffs of a tolling agreement for natural-gas-fired generation in Texas

Half Year Results 6 Months Ended 30 June July 2018

ALBERTA MARKET RE-DESIGN CAPACITY MARKET DESIGN AND IMPLEMENTATION

GREEN BOND FRAMEWORK

Value Driven. Exelon Corporation. Sanford C. Bernstein Conference CO2 Emissions Limits and the Power Sector: How Will Utilities Respond?

Volatility, risk, and risk-premium in German and Continental power markets. Stefan Judisch Supply & Trading GmbH 3 rd April 2014

SURGING PIPELINE INFRASTRUCTURE:

Centrica plc Interim Results. for the period ended 30 June 2017

SUMMARY PROSPECTUS. May 1, 2018

FirstEnergy Solutions Files Deactivation Notice for Three Competitive Nuclear Generating Plants in Ohio and Pennsylvania

FP FORESIGHT UK INFRASTRUCTURE INCOME FUND

New Development Bank s 2016 Green Financial Bond Duration Assurance

KEY ELEMENTS OF A SUCCESSFUL CLEAN ENERGY PROJECT: Project Finance. Scott Foster September 14, 2011

4 th Quarter 2008 Earnings Review and 2009 Outlook February 6, 2009

Eversource Energy AGA Financial Forum May 15 17, 2016

Bank of China Limited Sustainability Series Bonds Management Statement

City of Toronto: Issuer Presentation RBC Green Bond Conference, April 10

Advisory for Municipalities and Other Public Awarding Authorities Using Energy Broker Services

P3 Financing. Barney Allison. Peter Luchetti. Alfonso Mendez. Partner, Nossaman LLP. Managing Partner, Table Rock Capital

Sanford C. Bernstein Strategic Decisions Conference AES CORPORATION. Paul Hanrahan President and Chief Executive Officer. May 31,

NECA Fuels Conference Coralie Carter Sculley. September 28, 2016

Independent Auditors Report

Second Quarter & Year-to-Date 2007 Results

SUMMARY PROSPECTUS. May 1, 2018

Green Impact Report. Formosa 1. Introduction. Green Impact: Forecast GIG CARBON RATING: AAA

2019 Integrated Resource Plan (IRP) Public Input Meeting January 24, 2019

Sanford C. Bernstein Strategic Decisions Conference. May 29, 2014

Who Says Financing Has To Be Conventional

Securities-Backed Debt Financing US & Emerging Markets

MEMORANDUM. TO: Barry Fadden, Acting Purchasing Agent; Carl Spector, Executive Director, Boston Air Pollution Control Commission

Fourth Quarter 2017 Update. February 27, 2018

The basics of energy trading. Edgar Wilton

BROOKFIELD RENEWABLE POWER INC. MANAGEMENT S DISCUSSION AND ANALYSIS MARCH 31, 2008

M&A Financing. Presentation to: FEI NE WI Chapter. April 19, 2016

STATE OF NEW HAMPSHIRE BEFORE THE PUBLIC UTILITIES COMMISSION. Docket No. DG 14- Liberty Utilities (EnergyNorth Natural Gas) Corp.

Portland General Electric Company Sheet No SCHEDULE 201 QUALIFYING FACILITY 10 MW or LESS AVOIDED COST POWER PURCHASE INFORMATION

New Jersey Reference Case and Policy Scenario Results

Third Quarter & Year-to-Date 2007 Results

UK ELECTRIC MARKET REFORM APPLICATION TO TEXAS POWER MARKET. Ingmar Sterzing CEIC Seminar April 10, 2013

NYMEX - Annual Strips

Energy Budgeting and Procurement: Securing Stable Energy Prices in Today s Volatile Markets

Transcription:

Does the Northeast Need Additional Gas Infrastructure and if There is a Need, Can the Infrastructure be Financed, Constructed and Built? Valerie Green, Pierce Atwood LLP (Moderator) Boris Brevnov, Liberty Energy Trust James Daly, Eversource Energy Brian Schwabenbauer, TRC Michael Jacobs, Union of Concerned Scientists October 4, 2018 Boston, MA

State of the Energy Infrastructure Time for the Boston Tea Party? Our ships, freight trains, industrial transportation equipment, and power generation run on oil, while the country exports clean, efficient natural gas to overseas countries. Like the Boston Tea Party of old, the US is acting as a colonial state, effectively subsidizing other countries displacement of oil with its natural gas. Time line Tea Act of Parliament 1773 Whale Oil becomes largest fuel oil source 18 th century US drilled oil, Pennsylvania 1859 US becomes net importer 1945 Commercial shale production begins 2005 US becomes a net energy exporter 2022? 1

State of the Infrastructure and Environmental Impact Winter cold spike, along with an unplanned outages at Pilgrim, caused a large spike in demand for heavy oil burning electric generation. Pollution spiked across all major categories. 657% Increase in NOX 140% Increase in CO2 2721% Increase in SO2 Source NE ISO, SIemens 2 2

Renewable Generation Impact: Gas Plant decrease in utilization Source: NE ISO 3 3

Bloomberg New Energy Finance: Gas Plant installed capacity remains stable over time 4

Zero emission storage is a goal, but economics and resiliency requirements continue to favor gas as a storage medium 5

In addition to equity, Liberty has a wide variety of financing options and partners to provide capital for projects Private Activity Bonds (PABs) Payment in Lieu of Taxes (PILOT) 4(a)(2) Private Placement 144A / Reg S Bank Loan Investors: Mainly Life insurance companies in Primary buyers are retail investors, Primary buyers are retail investors, U.S. and some large European large bond funds, property and large bond funds, property and accounts Life Insurance companies (core Commercial bank lenders with project casualty insurance companies, and casualty insurance companies, and demand), Qualified Institutional Buyers crossover buyers that generally buy crossover buyers that generally buy Flexible marketing process, can precircle investors ahead of more formal finance lending programs ( QIBs ), and asset managers taxable bonds taxable bonds marketing Industrial applications, including Eligible Uses: seaports, intercity rail, transit, solid waste disposal, toll roads, airports, Related infrastructure water and wastewater treatment and Any Any Any low income housing Specific authorizations (special cases) Tax Status: Tax-Exempt (subject to the AMT) Tax-Exempt (not subject to the AMT) Taxable Taxable Taxable Maturity: Bridge Loans: 18-24 month tenor As long as 40 years (with amortizing General preference for bullet maturity designed to backstop capital markets Longer maximum maturity Strong Longer maximum maturity Strong structures) up to 15-year Weighted (5 s, 10 s, 30 s) but will accommodate issuance market demand for 30 year and longer market demand for 30 year and longer Average Life ( WAL ) amortizers maturities maturities Term Loans or Mini-Perms : typically Greatest depth inside 30 years; some Certain private accounts would go to 3-7 years, deepest liquidity in the investors would go to 40 40 years shorter tenors Pricing: Fixed rate Fixed rate Fixed rate Fixed rate Floating rate LIBOR (can swap to fixed) Delay Draws: Typically fully funded at close Typically fully funded at close Rate lock up to 9 months and spread lock up to 18 months No, fully funded at close Flexible to address delayed draw Disclosure Requirements: Advantages: Key Considerations: Formal disclosure required of all information pertinent to potential investors, including risk factors of the project Continuing disclosure requirements for ongoing communication to investors Lower interest rate cost Market acceptance of low and noninvestment grade project finance credits Longer maximum maturity Strong market demand for 30 year and longer maturities Tax-exempt bonds are typically callable at par beginning in ten years Market demands continuing disclosure of project status Restrictions on use of proceeds (e.g. reserve size limits) Restrictions on earnings rates for proceeds Formal disclosure required of all information pertinent to potential investors, including risk factors of the project Continuing disclosure requirements for ongoing communication to investors Lower interest rate cost Market acceptance of low and noninvestment grade project finance credits Longer maximum maturity Strong market demand for 30 year and longer maturities Tax-exempt bonds are typically callable at par beginning in ten years Tax analysis required to determine PILOT eligibility Market demands continuing disclosure of project status Restrictions on use of proceeds (e.g. reserve size limits) Restrictions on earnings rates for proceeds Bank Book style, periodic financial disclosures typically required Legal documents typically include a Note Purchase Agreement and Intercreditor Agreement, if applicable Marketing more limited to ~100 accounts on basis of information memorandum and data room Buy-and-hold investors less sensitive to market conditions/volatility. Limited disclosure streamlines documentation Allows for delayed drawdowns Investors do not charge premiums for reduced liquidity, structural complexity, or amortization Efficient marketing format for complex structures/ credits due to diligence period and access to consultants/counsel More limited investor base Asset managers and bond funds are traditionally not part of the investor universe due to the lack of secondary market liquidity More formal disclosure Not reviewed by the SEC, legal disclosure required (risk factors and 10(b)5 legal opinion); Documents to investor include Offering Memorandum, Indenture and Intercreditor Agreement, if applicable Marketing more broad to +5,000 accounts Access to broader investor base, where large 144A/Reg S accounts can drive significant demand and leverage over pricing and terms Ability to support amortizers and bullets Shorter execution period, particularly for more conventional projects (given limited diligence periods and access to consultants/counsel) Ideal for simpler, operational credits of large size Broader disclosure and 10(b)5 opinion required Pricing typically more sensitive to short-term market technicals/liquidity vs. 4(a)(2) or project bank market Premium required for amortized structures No delayed-draw feature; potential negative carry Bank Book style Not reviewed by the SEC, risk factors not required Fastest execution achievable for simpler, operational credits Low cost of unfunded commitment Pre-payable without call premium No ratings required Relatively short tenors Tighter maintenance covenants and more cumbersome documentation Heavily reliant upon relationships with banks 6 6

Massachusetts has the need and the opportunities to lead 7 7

Pierce Atwood Annual Energy Infrastructure Symposium James Daly Vice President Energy Supply October 4, 2018 Safety First and Always

New England s Vulnerability to High Gas and Electricity Prices 2013/14 Polar Vortex increased electricity costs by $3.2Bn 2017/18 winter cold snap increased electricity costs by $1.7Bn Spot prices drive forward market prices Retail electricity rates are about $1Bn/Year higher on average $100 $80 $60 $40 $20 New England vs Marcellus Gas Prices ($/MMBtu) $3.2B Incremental Costs $1.7B $2.5B $0 March-2013 March-2014 March-2015 March-2016 March-2017 March-2018 New England Natural Gas Price Marcellus Natural Gas Price Cold snap makes New England the world s priciest gas market Bloomberg 12.27.17 yet nearby production areas remained one of the lowest cost gas markets Safety First and Always 2

Reliability at Risk Fuel-security risk is the foremost challenge to a reliable power grid in New England ISO-NE, Jan. 18, 2018 ISO-NE: Operational Fuel Security Analysis Despite aggressive renewable energy goals Region faces severe threats to reliability by 2024-25 22 of 23 of the scenarios evaluated resulted in emergency actions 19 of 23 of the scenarios evaluated resulted in rolling blackouts Mystic Power Plant Reliability Agreement Region s fuel security threats leads to Exelon announcing it will retire one of the largest power plants in New England absent a cost-of-service contract ISO-NE will charge electric customers hundreds of millions for this cost-ofservice contract Strategy is likely to be repeated with 1/3 of New England s generating capacity retiring No Long Term Solution In Sight 3 Safety First and Always

Environmental Impact of Cold Snap The incremental emissions from the lack of natural gas during the cold snap is an environmental disaster for meeting New England s GHG goals. +6MM - MA EEA Secretary, Matthew Beaton Jan. 24, 2018 1500 MW 1 Million Tons of Additional Greenhouse Gas Emissions The incremental emissions from increased oil and coalfired power plants nearly exceeding annual emissions limits in 13 days Safety First and Always Equivalent to 6 Million Additional Vehicles The incremental emissions from the cold snap are equivalent to doubling the number of vehicles on our roads Negated the Benefits of 75% of the Solar Power in MA The additional greenhouse gas emissions during the cold snap offset the annual benefits of more than 1,500 MW solar power 4

Natural Gas Complementing Renewables Renewables will meet an increasing portion of our energy needs while natural gas responds to the fluctuations in renewable output and meets winter peak demand Natural Gas Backstops the Variable Output of Natural Gas Meets Winter Renewables Demand Until Storage Is Available At Scale Actual Output vs Plant Capacity (MWs) Winter Peak Demand (MWs) Plant Capacity Natural gas-fired power required Hourly Demand Peak power demand 6-7 PM Sunset at 4:31 PM Actual solar power generated DAYLIGHT HOURS Source: ISO-NE Safety First and Always AUGUST DAYLIGHT HOURS Source: National Renewable Energy Laboratory; randomly selected August day Solar power cannot resolve the region s winter peak demand 5

Paradox of Policies Clean Energy Resources Fluctuating wholesale prices are insufficient to support investment Investors require long-term, stable pricing commitments Cost are declining future prices will be lower cost than today s resources State policies support longterm fixed commitments Reliability Resources Fluctuating wholesale prices are insufficient to support investment Investors require long-term, stable pricing Costs are increasing future prices likely higher than today Policies don t support longterm commitments Safety First and Always 6

Risks to Gas Pipe Investment for Generators Mike Jacobs Union of Concerned Scientists October 4

Legal Framework 40 years of competition amongst generation State authority in policy Tension between state and federal authorities 2

Renewables in 2024 (ISO v States) State RPS laws require ~15% increase by 2024. State contracts for offshore wind currently 1430 MW. 3

4

Wind is greater in winter Windfarms are more productive in winter Annual capacity factor is 48 49%, but 50 60%+ winter The capacity credit of offshore wind in the NYISO and ISO NE markets is significantly higher in winter than in summer; Physics of heavier cold air; 2017 2018 extreme cold described by ISO: winds were frequently stronger than average, which caused extended periods of wind chill temperatures. 5

Estimating the Value of Offshore Wind Along the U.S. Eastern Coast. LBNL 2018 6

Second Annual Energy Infrastructure Symposium October 4, 2018 Boston, MA