RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for:

Similar documents
Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions

NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO

OAK CREEK CONDOMINIUMS

CONTENTS 1.0 INTRODUCTION... 1

CONTENTS. Greens at Lochmere Cary, NC

Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA. Prepared by:

CONTENTS. Riverwatch Gloucester, VA

DRAFT For Review SETTLERS POINTE LEXINGTON, SC. Prepared for: SETTLERS POINTE HOMEOWNERS ASSOCIATION. Prepared by:

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

Level 3 Reserve Study without a Site a Site Visit Visit

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2

VILLAGE AT LAKE CHELAN

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

CONTENTS. Twisted Creek Townhomes Holly Springs, NC

CONTENTS. Sparger Springs Townhomes Durham, NC

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by:

FOR BOARD REVIEW CARRBORO, NC. Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. Prepared by:

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC.

RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO

What are Capital Reserves?

Update With Site Visit

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by:


REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager

JULIAN POND KERNERSVILLE, NC. Prepared for: JULIAN POND HOMEOWNERS ASSOCIATION & CAS, INC. Prepared by:

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number:

REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM CHESAPEAKE BAY MANAGEMENT. Community Management by: Ms. Kimberly Marston

Cottonwoods at Vine. Reserve Study. October 2012

Brookwood Homeowners Association, Inc.

FIR RIDGE II CONDOMINIUM

Reserve Analysis Report

WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT?

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM

CONTENTS 1.0 INTRODUCTION... 1

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012

Reserve Analysis Report

PROFESSIONAL RESERVE STUDY

CITY OF FORT PIERCE BUILDING DEPARTMENT

RESERVE STUDY. Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION. Prepared by: 22 MONUMENT SQUARE PORTLAND, MAINE (800) , EXT 111

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by:

WYLIE, TX. Date of Investigation: February 6, 2018 Investigator: Phillip Nieman, P.E. Reviewed By: David H. Dotson, P.E., R.S.

LEVEL 3 RESERVE STUDY UPDATE For TUKWILA HOMEOWNERS ASSOCIATION, INC.

RESERVE STUDY ANNUAL REPORT

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844)

CAPITAL RESERVE STUDY

REPLACEMENT RESERVE REPORT FY 2016

PROFESSIONAL RESERVE STUDY

Reserve Analysis Report

PROFESSIONAL RESERVE STUDY

ASHLAND COCKEYSVILLE, MD Prepared for: WPM REAL ESTATE GROUP, LLC AND ASHLAND HOMEOWNERS ASSOCIATION. Prepared by:

NCAHMA Spring Underwriting Forum April 7-8, 2010 Physical Needs Assessments

Reserve Analysis Report

DRAFT FOR BOARD REVIEW

THE RETREAT AT RIVER PARK PLACE

- RS. D e sig n atio n

The Ford Plantation - POA Revised August 17, THE FORD10 EXECUTIVE SUMMARY

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC.

REPLACEMENT RESERVE REPORT FY 2016

PROFESSIONAL RESERVE STUDY

ALAMEDA ISLES PROPOSED BUDGET FACT SHEET

Reserve Analysis Report

REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES ROCKTOWN REALTY. Community Management by: Bernard Hamann

Sun Peak Master Association

VÜxx~Ëá Xwzx tà fàéçç cé Çà géãç{éåxá

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2

Quail Ridge THCA W. 17 th Ave Lakewood, CO 80224

PROFESSIONAL RESERVE STUDY

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of:

PROFESSIONAL RESERVE STUDY

REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

SAMPLE. Prepared for: SAMPLE HOMEOWNERS ASSOCIATION. Prepared by:

Off to College? First Apartment? First House? Not So Fast!

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016

TIMBERLAKE COMMUNITY ASSOCIATION

RESERVE STUDY SPECIALISTS

THE BOULDERS AT LA RESERVE CONDOMINIUM ASSOCIATION INDEX TO REVIEWED FINANCIAL STATEMENTS December 31, 2017 and 2016

Common Component Inventory and Capital Expenditure Planning

Report Dated November 17, Updates November 26, 2012 Reserve Study for Fiscal Year Prepared By WALLA SERVICES

CAPE GEORGE COLONY CLUB MARINA RESERVES

Educational & Performing Arts Center: Downriver Campus

Update With Site-Visit Reserve Study

BUDGET APPROVED. GENERAL EXPENSES (158 Units)

TANGLEWOOD HILLS CONDOMINIUM

PROFESSIONAL RESERVE STUDY

Arizona Nevada Texas Utah New Mexico

Meadowlake Village 7410 Breda Dr. Baytown, TX Prepared for:

MILL CREEK CONDOMINIUMS RESERVE STUDY

PROFESSIONAL RESERVE STUDY

Pemberley at Robinsons Grove

REPLACEMENT RESERVE REPORT FY 2017 TOWNE SQUARE MASTER ASSOCIATION

OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 POSTON & COMPANY. Community Management by: Melissa Blocker, Property Manager

1515 Heritage Dr., Ste. 102 McKinney, TX (office) Firm Registration No. F

Ashleigh Commons Condominiums Association, Inc.

Subject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH)

Transcription:

RESERVESTUDYUPDATE Dallas, GA Prepared for: THE VILLAS AT BLACKBERRY RUN HOME OWNERS ASSOCIATION, INC. Carl Swanson-President Prepared by: CRITERIUM-CARUSO ENGINEERS 1065 POWERS PLACE, SUITE B ALPHARETTA, GA 30004 (770) 740-9720 Project No. 16-6157 July 27, 2016 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY... 3 2.0 INTRODUCTION... 3 2.1 ABOUT THE PROJECT... 3 2.2 COMMON AREAS... 4 2.3 AREAS THAT ARE SPECIFICALLY EXCLUDED... 4 2.4 INSPECTION AND INTERVIEWS... 4 Page 1

2.5 PLANS AND PROPOSALS... 4 2.6 PURPOSE... 4 2.7 REPORT BASIS... 4 2.8 FOCUS... 5 2.9 RESPONSIBILITY STATEMENT... 5 2.10 RECOMMENDATIONS AND COMMENTS STATEMENT... 5 3.0 PROPERTY DESCRIPTION... 5 3.1 BUILDINGS... 5 3.2 OTHER FACILITIES... 6 3.3 ACCESS AND PARKING... 6 4.0 CONCLUSIONS... 6 5.0 FUTURE CAPITAL IMPROVEMENTS/MAINTENANCE... 6 6.0 RESERVE FUND BUDGET... 7 Villas at Blackberry Run 2016 Update Final Page 2

1.0 EXECUTIVE SUMMARY Based upon the information provided to us, and our own estimates of costs and useful lives of capital assets, the existing Reserve Fund with the current annual contributions will be adequate over the next 20 years but will not be adequate to fund the reasonably expected capital expenditures over the entire 30 year life of this study. The table in Section 6.0 summarizes our recommendations for the Reserve Study funding based upon the desires of the community. Escalation of contributions to the reserve study have been eliminated and a level funding plan has been developed and is shown as Alternative 1 in the table in Section 6.0 of this report and in the Appendix to this report. Contributions are based upon the previous 2015 reserve study update with some modifications. A threshold amount of $ 21,000 has been established by the Association in this baseline funding model. This threshold was established by the Association to address unplanned/unanticipated capital expenses. According to a 2016 reserve fund regulation promulgated by the Association, reserve funds will need to be replaced according to the guidelines of this regulation. The input assumptions are noted in the Reserve Study update and are based upon the information given to us by Carl Swanson, President of the Association and information provided during our 2015 update. 1.1 Project Identification Name: Homeowners Association, Inc. Homeowners Association owns a clubhouse along with other common grounds and facilities. Number of homes: 78 Approximate date construction started: 2005 through 2009 2.0 INTRODUCTION 2.1 About the Project Criterium-Caruso Engineers has been retained by the Association to perform an update to our 2015 Reserve Study update for the common facilities at this location. No site review was performed for this update. Villas at Blackberry Run 2016 Update Final Page 3

2.2 Common areas Clubhouse exterior and interior, including mechanical, electrical, and plumbing systems, asphalt parking lot, retaining walls, sidewalks, landscaped grounds, fences, entrances, exterior lighting, entry signage, custom street and traffic signs, and drainage structures. 2.3 Areas that are specifically excluded Private residences. 2.4 Inspection and Interviews Performed by: Date performed: NA NA 2.5 Plans and Proposals 2.6 Purpose 2.7 Report Basis Individuals interviewed for this update regarding this property: Carl Swanson of the Association These individuals and the Board of Directors provided information in regard to the facilities and finances of the Association. Plans Reviewed: Final plats Proposals Reviewed:None Other drawings made available: None Original documentation made available: Declaration of Covenants The purpose of this report is to incorporate changes to the 2015 reserve study update for the common areas of this facility. Based upon our previous reviews and new information provided by the Association, we have developed an inventory of the existing major components and projected estimated future expected useful lives for each of these components This report is based on our previous examination of the common and limited common areas that were accessible on this project. Villas at Blackberry Run 2016 Update Final Page 4

All measurements or quantities are approximate. Any quantities are based upon field measurements when plans of the buildings or site are not provided to us. 2.8 Focus Please keep in mind that our previous review of this facility focused on changes to the condition of the structural, mechanical and functional conditions of the common areas. Information provided by the representatives of the association regarding financial, physical, quantity or historical issues will be deemed reliable by Criterium-Caruso Engineers. The reserve study will be a reflection of the information provided to us and assembled for the association s use. An independent audit or verification of the information provided to us is beyond the scope of this study. The purpose of this study is not to perform an audit, quality/forensic analyses or to perform background checks of historical records. This study relies on data provided to us by the client, his representative, his contractors and/or his management company. 2.9 Responsibility Statement As Professional Engineers, it is our responsibility to evaluate available evidence relevant to the purpose of this inspection. We are not, however, responsible for conditions that could not be seen or were not within the scope of our service at the time of the inspection. Compliance with any specifications, except as expressly noted, legal, or code compliance is specifically excluded. This is not an environmental scan. No review of construction documents is included herein, and no comments are made regarding conformance or non-conformance to plans and specifications. No guarantee or warranty as to future life, performance, or need for repair of any item inspected is intended or implied. 2.10 Recommendations and Comments Statement The recommendations and comments included in this report are based on the experience of Criterium-Caruso Engineers. Any costs or other comments contained herein do not necessarily infer that subcontracts, quotes or opinions of other professionals were solicited or obtained. Estimated costs are based upon Building Construction Cost Data published by RS Means and others and our general knowledge of the construction industry in this area. 3.0 PROPERTY DESCRIPTION 3.1 Buildings There is a one-story clubhouse building with an exterior deck constructed near the entrance to the neighborhood. Villas at Blackberry Run 2016 Update Final Page 5

3.2 Other Facilities 3.3 Access and Parking 4.0 CONCLUSIONS Other facilities on this property include an asphalt parking lot and common grounds. The neighborhood is accessed from Blackberry Run Trail and is located in the Seven Hills Development in Dallas, Georgia. There is parking in the lot adjacent to the clubhouse. We recommend that this report and the conditions presented be updated and verified periodically. This updating may identify additional concerns which may have developed during this time period which, if planned for early enough, may be coordinated into current funding budgets with the least impact on the individual homeowners. This report has been prepared in strict confidence with you as our client. No reproduction or re-use will be undertaken with any third party without your express written consent or oral consent. 5.0 FUTURE CAPITAL IMPROVEMENTS/MAINTENANCE The following table summarizes the maintenance and upgrade items recommended for this facility over the next 30 years. The purpose of this plan is to assist you in organizing the work that we have recommended for the next 30 years. Costs are developed through our own experience and obtained from published cost indexes such as Means Construction Cost Data and Whitestone Building Maintenance and Repair Cost Reference. These costs are our professional opinion only and are not a guarantee that construction costs will not vary from the estimates. Useful life information is obtained from published information provided by the Federal National Mortgage Association (FNMA), other authoritative sources, and our own experience. This information lists national averages for component useful lives. The following cost estimates are provided to give you a "range of magnitude" understanding of the costs of the recommended repairs. Many different variables, such as season, locale, and inflation, for example, affect the final cost of any project. The cost of labor, materials, equipment and the means, methods and procedures for the work are volatile and affected by many outside factors such as market conditions. Consultation with a competent contractor capable of performing this work will provide you with a much more precise estimate. Villas at Blackberry Run 2016 Update Final Page 6

Preventative Maintenance: Associations should establish a preventative maintenance schedule so that components are maintained properly and will attain their design useful lives. Lack of proper maintenance could shorten the useful lives of components requiring additional costs. Villas at Blackberry Run 2016 Update Final Page 7

Reserve Study LS-Lump Sum; Allow-Allowance; SY-Square Yard; SF-Square Foot;EA-Each SITE 7/27/2016 Remaining Useful life Unit Projected Capital ItemTo Be Replaced Action life (Years) Quantity Price Unit Total Cost Notes 1 Asphalt parking lot Sealcoat, restripe, repair 2 6 800 $1.53 SY $1,224 sealcoated around 2012 2 Asphalt parking lot Replace/overlay 14 25 800 $15.30 SY $12,240 3 Lawn irrigation systems Maintenance/repairs 1 1 1 $3,000.00 LS $3,000 Allowance per Association 4 Lawn irrigation systems Maintenance/repairs 7 4 1 $3,000.00 LS $3,000 5 Lawn irrigation systems Upgrades/repairs 0 30 1 $4,162.00 LS $4,162 6 Lawn irrigation systems Upgrades/repairs 1 30 1 $5,000.00 LS $5,000 7 Stone entrance monument & columns Repoint, repair 5 15 1 $1,530.00 LS $1,530 8 Wood fencing - all Stain/paint 0 4 325 $4.66 LF $1,515 Painted around 2012, to be painted again in 2016 9 Wood fencing - all Replace 15 25 325 $20.00 LF $6,500 10 Concrete sidewalks Repair/replace 5 5 1 $1,500.00 LS $1,500 11 Corrugated metal drainage pipe and inlets Repair/replace 30 40 12 Modular retaining wall Repair/replace 30 40 Behind clubhouse 13 Railing/fence at modular retaining wall Included in 5 14 Railing/fence at modular retaining wall Included in 6 Installed in 2010/2011 15 Custom street and traffic signs Paint, repair Master Association Responsibility 16 Custom street and traffic signs Replace Master Association Responsibility 17 ID sign at entrance monument Replace 10 20 1 $1,326.00 EA $1,326 18 Clubhouse sign Replace 5 15 1 $1,224.00 EA $1,224 19 Site electrical Repair 9 10 1 $3,060.00 LS $3,060 20 Landscaping Replacement Allowance 0 3 1 $4,080.00 LS $4,080 2016 update final Criterium-Caruso Engineers Component Inventory Summary

Reserve Study LS-Lump Sum; Allow-Allowance; SY-Square Yard; SF-Square Foot;EA-Each 21 Landscaping upgrades Upgrade 1 30 1 $8,160.00 LS $8,160 22 Grading and erosion control Repair,grade,protect 9 11 1 $8,900.00 LS $8,900 Drainage improvement on North side completed 23 24 CLUBHOUSE 25 7/27/2016 Remaining Useful life Unit Projected Capital ItemTo Be Replaced Action life (Years) Quantity Price Unit Total Cost Notes 26 Structure Repair/replace 40 50 27 Roofing-asphalt shingles Replace 5 20 3000 $3.24 SF $9,720 28 Metal roofing (over deck) Repair/paint 5 15 1 $1,020.00 LS $1,020 29 Gutters and downspouts Replace 10 20 1 $2,040.00 LS $2,040 30 Exterior Repair/paint 8 8 1 $3,774.00 LS $3,774 Painted 2015/2016 31 Exterior deck (composite decking) Repair/replace 19 25 750 $22.44 SF $16,830 Repaired/Replaced in 2010/2011 32 Exterior deck railing (wood & comp. matl) Repair/replace 19 25 1 $3,570.00 LS $3,570 33 Electric furnaces Replace 5 15 2 $2,040.00 EA $4,080 34 Electric water heater Replace 5 15 1 $612.00 EA $612 40 gal,2006 35 HVAC condenser Replace 5 15 1 $3,060.00 EA $3,060 2 ton, 2006 36 HVAC condenser Replace 5 15 1 $4,080.00 EA $4,080 3 ton, 2006 37 Security System Upgrade/replace 5 15 1 $714.00 LS $714 38 Fire alarm system Replace detectors 5 15 1 $510.00 LS $510 39 Emergency lighting Replace 1 10 1 $510.00 LS $510 40 Electrical Panels, switches Repair/replace 20 30 1 $5,100.00 LS $5,100 41 Plumbing Fixtures Repair/replace 5 15 1 $2,040.00 LS $2,040 2016 update final Criterium-Caruso Engineers Component Inventory Summary

Reserve Study LS-Lump Sum; Allow-Allowance; SY-Square Yard; SF-Square Foot;EA-Each 42 Fitness Equipment Repair/replace 5 15 1 $5,100.00 LS $5,100 43 TV in fitness room Replace 1 10 1 $612.00 LS $612 44 Doors, windows and hardware Repair/replace 10 20 1 $2,040.00 LS $2,040 45 Fans Replace 1 10 1 $700.00 LS $700 Replacement of exterior porch fans 46 Fireplace (ventless) Repair/replace 10 20 1 $3,060.00 LS $3,060 47 Bathroom remodeling Remodel/paint 1 10 2 $408.00 EA $816 7/27/2016 Remaining Useful life Unit Projected Capital ItemTo Be Replaced Action life (Years) Quantity Price Unit Total Cost Notes 48 Interior remodeling Remodel/paint 0 10 1 $3,060.00 LS $3,060 Wood floor 49 Club room Floor Replace 9 20 1 $8,721.00 LS $8,721 50 Interior furniture Replace 1 15 1 $20,200.00 LS $20,200 51 Interior carpet Replace 1 10 100 $30.60 SY $3,060 52 Porch and deck furniture Replace 10 20 1 $5,712.00 LS $5,712 53 TV and sound system in clubroom Replace 1 10 1 $700.00 LS $700 54 kitchen remodeling Remodel 1 10 1 $1,020.00 LS $1,020 55 Kitchen appliances Replace 4 15 1 $2,550.00 LS $2,550 56 Kitchen warming oven Upgrade 1 10 1 $1,500.00 LS $1,500 57 Gas grille Replace 4 10 1 $1,020.00 LS $1,020 58 Front porch decorative concrete Repair/replace 20 30 1 $5,000.00 LS $5,000 2016 update final Criterium-Caruso Engineers Component Inventory Summary

Reserve Study LS-Lump Sum; Allow-Allowance; SY-Square Yard; SF-Square Foot;EA-Each 7/27/2016 Remaining Useful life Unit Projected Capital ItemTo Be Replaced Action life ( Years ) Quantity Price Unit Total Cost Notes TOTALS $188,952 Costs are + or - 10 %; Costs are based upon published costs. 2016 update final Criterium-Caruso Engineers Component Inventory Summary

Reserve Study LS-Lump Sum; Allow-Allowance; SY-Square Yard; SF-Square Foot;EA-Each Quantities are based upon readily available information and are only used to provide approximate estimates of costs. The quantities are approximate and should not be used for any other purposes. Reserve study is based on a 20 year projection of non-annual maintenance The cost estimates are provided to give you a "range of magnitude" understanding of the costs of the recommended repairs. Many different variables, such as season, locale and inflation affect the final cost of any project. Costs and other comments contained in this report do not necessarily infer that subcontracts, quotes or opinions of other professionals were solicited or obtained. Estimated costs are based upon published Building Construction Cost Data and our general knowledge of the construction industry in this area. Useful life information is obtained from published information provided by Federal National Mortgage Association (FNMA), other authoritative sources and our own experience. This information lists national averages for component useful llives. 2016 update final Criterium-Caruso Engineers Component Inventory Summary

6.0 RESERVE FUND BUDGET Type of Funding The intent of this study is to assist the Association in developing Maintenance and Reserve Funds which are of sufficient size to cover anticipated repairs/replacements of various system components within this facility during the next 30 years. The Reserve Study update is based upon a 30-year projection of non-annual maintenance and capital improvements. This study provides a limited level of service including component inventory, life and valuation estimates, fund status, and funding plan. Based upon the information provided to us, and our own estimates of costs and useful lives of capital assets, the existing Reserve Fund with the current annual contributions will be adequate over the next 20 years but will not be adequate to fund the reasonably expected capital expenditures over the entire 30 year life of this study. The following table summarizes our recommendations for the Reserve Study funding based upon the desires of the community. Escalation of contributions to the reserve study have been eliminated and a level funding plan has been developed and is shown as Alternative 1 in the table below and in the Appendix to this report. Contributions are based upon the previous 2015 reserve study update with some modifications and a threshold amount of $ 21,000 has been established by the Association in this baseline funding model. This threshold was established by the Association to address unplanned/unanticipated capital expenses. According to a 2016 reserve fund regulation promulgated by the Association, reserve funds will need to be replaced according to the guidelines of this regulation. Special Assessments Annual Contribution to the Reserve Fund Currently Funded level NA $ 10,764 $ 138 Annual contribution to the Reserve Fund per unit Villas at Blackberry Run 2016 Update Final Page 7

Level Funding-Alt. #1 represents level funding with no escalation or special assessments, and a baseline threshold for the fund that would not drop below $ 21,000 (See Appendix A) NA $ 14,400 $ 184.62 Previous Escalating Annual Contribution-Alt. #4 as shown in the 2015 reserve study update with a baseline threshold for the fund that would not drop below $0. (See Appendix B). NA $ 10,764 in 2016 through 2018; $10,951 in 2019 through 2021; $11,138 in 2022 through 2024; then escalating 5% per year thereafter until 2030. $ 138 in 2016 through 2018; $ 140.40 in 2019 through 2021; $142.80 in 2022 through 2024; then escalating 5% per year thereafter until 2030. The updated Reserve Study in the Appendix is provided for your use and review. Our study is based upon a baseline-funding concept and we attempt to maintain a positive balance in the reserve fund over the period of the study. Inflation Rate Note: Unless the inflation rate is specified by the client, we use an inflation rate that is based upon the current increase in the consumer price index for all urban consumers over the past year. The rate used is noted in the financial input page of the reserve study and is used over the entire duration of the study. We make no forecast of the inflation rate over periods beyond the current year. Any significant change in the rate of inflation in subsequent years will have a significant impact on the outcome of this study. The client should make his own forecast of future inflation rates. Significant changes in the inflation rate would warrant an update of this study. RESERVE STUDY TABLE OF CONTENTS: Component Inventory Summary: (included after the Future Capital Improvements/Maintenance section of the report) Villas at Blackberry Run 2016 Update Final Page 8

This section lists an inventory of reserve study components along with an estimated remaining life, established design useful life, actions to be completed, quantities where applicable, unit cost for the action noted and the projected total cost in current dollars. This section may also note particulars of the components, responsibility in multi-use associations and shared costs where applicable. Information below is included in Reserve Fund Appendix or Appendices of the report Input Financial: This section lists the particulars of the property such as number of units, age of property, base dates, beginning reserve fund balance, inflation rate used and estimated rate of return on invested funds. This section also notes the particulars of any existing reserve fund contribution levels and planned special assessments. Most of the information on this sheet is provided to the reserve fund preparer by the Association or the Association s management company. Alternative funding: This section of the report outlines alternatives when the existing funding level is inadequate. These represent our recommendations for funding the reserves. Alternative 1 represents level funding with no escalation or special assessments, and a baseline threshold for the fund that would not drop below $ 21,000 Yearly Funding sheets: Yearly funding tables are provided for current and all alternative funding recommendations. These tables summarize the beginning reserve fund balance, revenues, special assessments, investment earnings, and capital expenditures by year. The tables note the estimated reserve fund balance at the end of each year. Graphs: The graphs after each yearly funding sheet graphically represent the information in the yearly funding tables. No portion of the graphs for the alternative funding recommendations should drop below zero. Annual Replacement Cost Expense: This table notes the year of occurrence for each anticipated action with item description for each inventoried reserve item and the estimated cost in inflated dollars. The bottom of the table summarizes the total anticipated costs for each year of the study in inflated dollars. Summary Reserve Balance: The chart and graph on these sheets graphically summarizes the year end balances in the reserve fund for each recommended funding alternative. The chart on this sheet lists the funding year, estimated yearly capital expenditures (inflated) and the ending reserve fund balances for each recommended funding alternative. Villas at Blackberry Run 2016 Update Final Page 9

APPENDIX A: 2016 UPDATED RESERVE FUND Villas at Blackberry Run 2016 Update Final Appendix A

Reserve Study Worksheet Organization: 33 Shoal Creek Way General Information: 7/27/2016 Dallas, GA # of Units... 78 Beginning Reserve Fund balance Age of Buildings As of date: 10 Site Inspection Date... Base Dates for Reserve Study: Base Year... 6/24/2015 2016 $129,492 Year Month Day 2016 6 1 Base Month... 1 01-Jun-16 Base Day... Investment Rate of Return on Reserve Funds (%) Inflation Rate (%) (See Note below) Additional amount to be contributed this year 0.04% 2.00 % $10,563.00 Existing Reserve Fund Contribution Levels Total/Month Total Annual Per Unit/Month Per Unit/Year Current Reserve Fund Contribution: $897$11.50 $10,764 $138.00 Current Planned Special Assessment:N/A Year Planned Total Annual Per Unit/Month N/A N/A Per Unit/Year N/A Requested information for the shaded entries were provided by the Association or the Property Manager * notes information that was not provided by the Association or the Property manager Inflation Rate Note: Unless the inflation rate is specified by the client, we use an inflation rate that is based upon the current increase in the consumer price index for all urban consumers over the past year. This rate is used over the entire duration of the study. We make no forecast of the inflation rate over periods beyond the current year. Any significant change in the rate of inflation in subsequent years will have a significant inpact on the outcome of this study. The client should make his own forecast of future inflation rates. Significant changes in the inflation rate would warrant an update of this study. 2016 update final Criterium-Caruso Engineers Appendix-Financial Input Worksheet Page 11

7/27/2016 Reserve Study Alternative Funding Contribution Recommendations Alternative 1, Recommendation Based on Level Funding, no escalation or special assessments, and a baseline threshold for th Alternative 1, Reserve Fund Contribution: Total/Month $1,200 Total/Annual $14,400 Per Unit/Month $15.38 Per Unit/Year $184.62 Page 12

2016 update final Criterium Caruso Engineers Appendix-Alternative Funding Recommendations Dallas, GA 7/27/2016 Current Funding Level Reserve Fund Worksheet Projected Years Beginning Year 1 2 3 4 5 6 7 8 9 10 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Beginning Month/Day Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $129,492 $127,284 $91,897 $98,302 $101,589 $106,888 $78,828 $85,028 $92,379 $95,547 $10,563 $10,764 $10,764 $10,764 $10,764 $10,764 $10,764 $10,764 $10,764 $10,764 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $46 $33 $35 $37 $38 $28 $31 $33 $34 $28 $12,817 $46,184 $4,395 $7,513 $5,504 $38,853 $4,595 $3,446 $7,630 $29,592 $127,284 $91,897 $98,302 $101,589 $106,888 $78,828 $85,028 $92,379 $95,547 $76,747 Projected Years Beginning Year 11 12 13 14 15 16 17 18 19 20 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Beginning Month/Day Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Beginning Reserve Fund Balance: Revenue: Special Assessments: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $76,747 $64,693 $60,660 $64,352 $75,143 $66,820 $57,309 $33,094 $43,874 $48,828 $10,764 $10,764 $10,764 $10,764 $10,764 $10,764 $10,764 $10,764 $10,764 $10,764 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $23 $22 $23 $27 $24 $21 $12 $16 $18 $6 $22,842 $14,819 $7,095 $0 $19,111 $20,296 $34,990 $0 $5,827 $42,262 $64,693 $60,660 $64,352 $75,143 $66,820 $57,309 $33,094 $43,874 $48,828 $17,337 Projected Years Beginning Year 21 22 23 24 25 26 27 28 29 30 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 Beginning Month/Day Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Beginning Reserve Fund Balance: $17,337 ($46,596) ($55,532) ($44,768) ($34,004) ($39,950) ($47,593) ($38,877) ($28,113) ($19,986) Page 13

Revenue: Special Assessments: Investment Earnings: Capital Expenditures: Ending Reserve Balance: 2016 update final Criterium-Caruso Engineers $10,764 $10,764 $10,764 $10,764 $10,764 $10,764 $10,764 $10,764 $10,764 $10,764 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $74,696 $19,701 $0 $0 $16,709 $18,408 $2,048 $0 $2,637 $20,921 ($46,596) ($55,532) ($44,768) ($34,004) ($39,950) ($47,593) ($38,877) ($28,113) ($19,986) ($30,144) Appendix-Current Funding Projection Reserve Study 7/27/2016 CURRENTLY FUNDED LEVELS Current Reserve Balance: $129,492 Annual Contribution: $10,764 Per Month Amount: $897.00 Per Unit Monthly Amount: $11.50 Special Assessment Amount: Year of Special Assessment Projected Annual Funding and Expenditures: Year: N/A N/A 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 End of Year Reserve Fund Balance $127,284 $91,897 $98,302 $101,589 $106,888 $78,828 $85,028 $92,379 $95,547 $76,747 $64,693 $60,660 $64,352 $75,143 $66,820 $57,309 Capital Expenditures: $12,817 $46,184 $4,395 $7,513 $5,504 $38,853 $4,595 $3,446 $7,630 $29,592 $22,842 $14,819 $7,095 $0 $19,111 $20,296 Total Revenue (all sources) $10,609 $10,797 $10,799 $10,801 $10,802 $10,792 $10,795 $10,797 $10,798 $10,792 $10,787 $10,786 $10,787 $10,791 $10,788 $10,785 Year: End of Year Reserve Fund Balance $33,094 $43,874 $48,828 $17,337 -$46,596 -$55,532 -$44,768 -$34,004 -$39,950 -$47,593 -$38,877 -$28,113 -$19,986 - $30,144 Page 14

Capital Expenditures: $34,990 $0 $5,827 $42,262 $74,696 $19,701 $0 $0 $16,709 $18,408 $2,048 $0 $2,637 $20,921 Total Revenue (all sources) $10,776 $10,780 $10,782 $10,770 $10,764 $10,764 $10,764 $10,764 $10,764 $10,764 $10,764 $10,764 $10,764 $10,764 2016 update final Criterium-Caruso Engineers $150,000 Appendix-Chart-Current Funding CURRENTLYFUNDEDLEVEL $100,000 $50,000 $0 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 - $ 50,000 -$100,000 Funding Years Page 15

2016 update final Graph Current funding Dallas, GA 7/27/2016 Alternative 1, Recommendation Based on Level Funding, no escalation or special assessments, and a baseline threshold for the fund that would not drop below $ 21,000. Reserve Fund Worksheet Projected Years Beginning Year 1 2 3 4 5 6 7 8 9 10 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Beginning Month/Day Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Beginning Reserve Fund Balance: Revenue: Investment Earnings: Capital Expenditures: Ending Reserve Balance: Projected Years Beginning Year $129,492 $127,284 $95,535 $105,578 $112,505 $121,445 $97,028 $106,871 $117,868 $124,682 $10,563 $14,400 $14,400 $14,400 $14,400 $14,400 $14,400 $14,400 $14,400 $14,400 $46 $34 $38 $40 $44 $35 $38 $42 $45 $39 $12,817 $46,184 $4,395 $7,513 $5,504 $38,853 $4,595 $3,446 $7,630 $29,592 $127,284 $95,535 $105,578 $112,505 $121,445 $97,028 $106,871 $117,868 $124,682 $109,530 11 12 13 14 15 16 17 18 19 20 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Beginning Month/Day Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Beginning Reserve Fund Balance: Revenue: Investment Earnings: Capital Expenditures: Ending Reserve Balance: Projected Years Beginning Year $109,530 $101,125 $100,742 $108,086 $122,530 $117,861 $112,006 $91,449 $105,887 $114,501 $14,400 $14,400 $14,400 $14,400 $14,400 $14,400 $14,400 $14,400 $14,400 $14,400 $36 $36 $39 $44 $42 $40 $33 $38 $41 $31 $22,842 $14,819 $7,095 $0 $19,111 $20,296 $34,990 $0 $5,827 $42,262 $101,125 $100,742 $108,086 $122,530 $117,861 $112,006 $91,449 $105,887 $114,501 $86,670 21 22 23 24 25 26 27 28 29 30 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 Beginning Month/Day Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Beginning Reserve Fund Balance: $86,670 $26,383 $21,090 $35,503 $49,921 $47,629 $43,637 $56,009 $70,434 $82,227 Page 16

Revenue: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $14,400 $14,400 $14,400 $14,400 $14,400 $14,400 $14,400 $14,400 $14,400 $14,400 $9 $8 $13 $18 $17 $16 $20 $25 $30 $27 $74,696 $19,701 $0 $0 $16,709 $18,408 $2,048 $0 $2,637 $20,921 $26,383 $21,090 $35,503 $49,921 $47,629 $43,637 $56,009 $70,434 $82,227 $75,733 2016 update final Criterium-Caruso Engineers Appendix-Alternative Funding 1 Reserve Study 7/27/2016 Alternative 1, Recommendation Based on Level Funding, no escalation or special assessments, and a baseline threshold for the fund that would not drop below $ 21,000. Current Reserve Balance: $129,492 Annual Contribution: $14,400 Per Month Amount: $1,200.00 Per Unit Monthly Amount: $15.38 Projected Annual Funding and Expenditures: Year: 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 End of Year Reserve Fund Balance $127,284 $95,535 $105,578 $112,505 $121,445 $97,028 $106,871 $117,868 $124,682 $109,530 $101,125 $100,742 $108,086 $122,530 $117,861 $112,006 Capital Expenditures: $12,817 $46,184 $4,395 $7,513 $5,504 $38,853 $4,595 $3,446 $7,630 $29,592 $22,842 $14,819 $7,095 $0 $19,111 $20,296 Total Revenue (all sources) $10,609 $14,434 $14,438 $14,440 $14,444 $14,435 $14,438 $14,442 $14,445 $14,439 $14,436 $14,436 $14,439 $14,444 $14,442 $14,440 Page 17

Year: 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 End of Year Reserve Fund Balance $91,449 $105,887 $114,501 $86,670 $26,383 $21,090 $35,503 $49,921 $47,629 $43,637 $56,009 $70,434 $82,227 $75,733 Capital Expenditures: $34,990 $0 $5,827 $42,262 $74,696 $19,701 $0 $0 $16,709 $18,408 $2,048 $0 $2,637 $20,921 Total Revenue (all sources) $14,433 $14,438 $14,441 $14,431 $14,409 $14,408 $14,413 $14,418 $14,417 $14,416 $14,420 $14,425 $14,430 $14,427 2016 update final Criterium-Caruso Engineers Appendix-Chart-Alternative 1 Funding Alternative 1, Recommendation Based on Level Funding, no escalation or special assessments, and a baseline threshold for the fund that would not drop below $ 21,000. Page 18

$140,000 $120,000 $100,000 $80,000 $60,000 $40,000 $20,000 $0 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 Funding Years 2016 update final Graph Alt 1 Page 19

Reserve Study 7/27/2016 Annual Replacement Cost Expense For Capital ItemsAdjusted For Inflation Inflation factor 1.0200 1.0404 1.0612 1.0824 1.1041 1.1262 1.1487 1.1717 1.1951 1.2190 1.2434 1.2682 1.2936 1.3195 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 ITEM DESCRIPTION ACTION YEAR> ACTION 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 1 Asphalt parking lot Sealcoat, restripe, repair $1,273 $1,434 $1,615 2 Asphalt parking lot Replace/overlay $16,150 3 Lawn irrigation systems Maintenance/repairs $3,060 $3,121 $3,184 4 Lawn irrigation systems Maintenance/repairs $3,446 $3,730 5 Lawn irrigation systems Upgrades/repairs $4,162 6 Lawn irrigation systems Upgrades/repairs $5,100 7 Stone entrance monument & columns Repoint, repair $1,689 8 Wood fencing - all Stain/paint $1,515 $1,639 $1,774 $1,921 9 Wood fencing - all Replace 10 Concrete sidewalks Repair/replace $1,656 $1,828 11 Corrugated metal drainage pipe and inlets Repair/replace 12 Modular retaining wall Repair/replace 13 Railing/fence at modular retaining wall Included in 5 14 Railing/fence at modular retaining wall Included in 6 15 Custom street and traffic signs Paint, repair 16 Custom street and traffic signs Replace 17 ID sign at entrance monument Replace $1,616 18 Clubhouse sign Replace $1,351 19 Site electrical Repair $3,657 20 Landscaping Replacement Allowance $4,080 $4,330 $4,595 $4,876 $5,174 21 Landscaping upgrades Upgrade $8,323 22 Grading and erosion control Repair,grade,protect $10,636 23 24 CLUBHOUSE 25 26 Structure Repair/replace 27 Roofing-asphalt shingles Replace $10,732 28 Metal roofing (over deck) Repair/paint $1,126 Annual Replacement Costs (Inflated)

Reserve Study 7/27/2016 Annual Replacement Cost Expense For Capital ItemsAdjusted For Inflation Inflation factor 1.0200 1.0404 1.0612 1.0824 1.1041 1.1262 1.1487 1.1717 1.1951 1.2190 1.2434 1.2682 1.2936 1.3195 29 Gutters and downspouts Replace $2,487 30 Exterior Repair/paint $4,422 31 Exterior deck (composite decking) Repair/replace 32 Exterior deck railing (wood & comp. matl) Repair/replace 2016 update final Criterium-Caruso Engineers ITEM DESCRIPTION ACTION YEAR> ACTION 33 Electric furnaces Replace $4,505 34 Electric water heater Replace $676 35 HVAC condenser Replace $3,378 36 HVAC condenser Replace $4,505 37 Security System Upgrade/replace $788 38 Fire alarm system Replace detectors $563 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 39 Emergency lighting Replace $520 $634 40 Electrical Panels, switches Repair/replace 41 Plumbing Fixtures Repair/replace $2,252 42 Fitness Equipment Repair/replace $5,631 43 TV in fitness room Replace $624 $761 44 Doors, windows and hardware Repair/replace $2,487 45 Fans Replace $714 $870 46 Fireplace (ventless) Repair/replace $3,730 47 Bathroom remodeling Remodel/paint $832 $1,015 48 Interior remodeling Remodel/paint $3,060 $3,730 49 Club room Floor Replace $10,422 50 Interior furniture Replace $20,604 51 Interior carpet Replace $3,121 $3,805 52 Porch and deck furniture Replace $6,963 53 TV and sound system in clubroom Replace $714 $870 54 kitchen remodeling Remodel $1,040 $1,268 55 Kitchen appliances Replace $2,760 Annual Replacement Costs (Inflated)

Reserve Study 7/27/2016 Annual Replacement Cost Expense For Capital ItemsAdjusted For Inflation Inflation factor 1.0200 1.0404 1.0612 1.0824 1.1041 1.1262 1.1487 1.1717 1.1951 1.2190 1.2434 1.2682 1.2936 1.3195 56 Kitchen warming oven Upgrade $1,530 $1,865 57 Gas grille Replace $1,104 $1,346 58 Front porch decorative concrete Repair/replace 2016 update final Criterium-Caruso Engineers ITEM DESCRIPTION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 ACTION YEAR> 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 ACTION Total Costs adjusted for inflation $482,889 $12,817 $46,184 $4,395 $7,513 $5,504 $38,853 $4,595 $3,446 $7,630 $29,592 $22,842 $14,819 $7,095 $19,111 Inflation Rate 2.00 % Year of Replacement 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Annual Replacement Costs (Inflated)

Reserve Study 7/27/2016 Annual Replacement Cost Expense For Capital ItemsAdjusted For Inflation Inflation factor 1.0200 1.0404 1.0612 1.0824 1.1041 1.1262 1.1487 1.1717 1.1951 1.2190 1.2434 1.2682 1.2936 1.3195 2016 update final Criterium-Caruso Engineers Annual Replacement Costs (Inflated)

Reserve Study Annual Replacement Cost Expense For Capital ItemsAdjusted For Inflation Inflation factor 1.3459 1.3728 1.4002 1.4282 1.4568 1.4859 1.5157 1.5460 1.5769 1.6084 1.6406 1.6734 1.7069 1.7410 1.7758 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 ITEM DESCRIPTION ACTION YEAR> ACTION 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 1 Asphalt parking lot Sealcoat, restripe, repair $1,819 $2,048 2 Asphalt parking lot Replace/overlay 3 Lawn irrigation systems Maintenance/repairs 4 Lawn irrigation systems Maintenance/repairs $4,038 $4,370 5 Lawn irrigation systems Upgrades/repairs 6 Lawn irrigation systems Upgrades/repairs 7 Stone entrance monument & columns Repoint, repair $2,273 8 Wood fencing - all Stain/paint $2,079 $2,250 $2,436 $2,637 9 Wood fencing - all Replace $8,748 10 Concrete sidewalks Repair/replace $2,019 $2,229 $2,461 11 Corrugated metal drainage pipe and inlets Repair/replace 12 Modular retaining wall Repair/replace 13 Railing/fence at modular retaining wall Included in 5 14 Railing/fence at modular retaining wall Included in 6 15 Custom street and traffic signs Paint, repair 16 Custom street and traffic signs Replace 17 ID sign at entrance monument Replace 18 Clubhouse sign Replace $1,819 19 Site electrical Repair $4,458 $5,434 20 Landscaping Replacement Allowance $5,491 $5,827 $6,184 $6,562 21 Landscaping upgrades Upgrade 22 Grading and erosion control Repair,grade,protect $13,225 23 24 CLUBHOUSE 25 26 Structure Repair/replace 27 Roofing-asphalt shingles Replace $15,947 28 Metal roofing (over deck) Repair/paint $1,516 Annual Replacement Costs (Inflated)

Reserve Study Annual Replacement Cost Expense For Capital ItemsAdjusted For Inflation Inflation factor 1.3459 1.3728 1.4002 1.4282 1.4568 1.4859 1.5157 1.5460 1.5769 1.6084 1.6406 1.6734 1.7069 1.7410 1.7758 29 Gutters and downspouts Replace 30 Exterior Repair/paint $5,181 $6,070 31 Exterior deck (composite decking) Repair/replace $24,518 32 Exterior deck railing (wood & comp. matl) Repair/replace $5,201 2016 update final Criterium-Caruso Engineers ITEM DESCRIPTION ACTION YEAR> ACTION 33 Electric furnaces Replace $6,063 34 Electric water heater Replace $909 35 HVAC condenser Replace $4,547 36 HVAC condenser Replace $6,063 37 Security System Upgrade/replace $1,061 38 Fire alarm system Replace detectors $758 39 Emergency lighting Replace $773 40 Electrical Panels, switches Repair/replace $7,578 41 Plumbing Fixtures Repair/replace $3,031 42 Fitness Equipment Repair/replace $7,578 43 TV in fitness room Replace $928 44 Doors, windows and hardware Repair/replace 45 Fans Replace $1,061 46 Fireplace (ventless) Repair/replace 47 Bathroom remodeling Remodel/paint $1,237 48 Interior remodeling Remodel/paint $4,547 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 49 Club room Floor Replace $15,487 50 Interior furniture Replace $27,730 51 Interior carpet Replace $4,638 52 Porch and deck furniture Replace 53 TV and sound system in clubroom Replace $1,061 54 kitchen remodeling Remodel $1,546 55 Kitchen appliances Replace $3,715 Annual Replacement Costs (Inflated)

Reserve Study Annual Replacement Cost Expense For Capital ItemsAdjusted For Inflation Inflation factor 1.3459 1.3728 1.4002 1.4282 1.4568 1.4859 1.5157 1.5460 1.5769 1.6084 1.6406 1.6734 1.7069 1.7410 1.7758 56 Kitchen warming oven Upgrade $2,273 57 Gas grille Replace $1,641 58 Front porch decorative concrete Repair/replace $7,430 2016 update final Criterium-Caruso Engineers ITEM DESCRIPTION ACTION YEAR> ACTION 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 Total Costs adjusted for inflation Inflation Rate 2.00 % Year of Replacement $482,889 $20,296 $34,990 $5,827 $42,262 $74,696 $19,701 $16,709 $18,408 $2,048 $2,637 $20,921 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 Annual Replacement Costs (Inflated)

Reserve Study Annual Replacement Cost Expense For Capital ItemsAdjusted For Inflation Inflation factor 1.3459 1.3728 1.4002 1.4282 1.4568 1.4859 1.5157 1.5460 1.5769 1.6084 1.6406 1.6734 1.7069 1.7410 1.7758 2016 update final Criterium-Caruso Engineers Annual Replacement Costs (Inflated)

7/27/2016 Summary of Year End Reserve Balances for Alternative Funding Recommendations Yearly 2016 update final Funding Year Expenditures Alternative 1, Year (inflated) Recommendation Based on Level Funding, no escalation 1 2016 $12,817 or special assessments, and a 2 2017 $46,184 baseline threshold for the 3 2018 $4,395 fund that would not drop 4 2019 $7,513 below $ 21,000. 5 2020 $5,504 $127,284 6 2021 $38,853 $95,535 7 2022 $4,595 $105,578 8 2023 $3,446 $112,505 9 2024 $7,630 $121,445 10 2025 $29,592 $97,028 11 2026 $22,842 $106,871 12 2027 $14,819 $117,868 13 2028 $7,095 $124,682 14 2029 $0 $109,530 15 2030 $19,111 $101,125 16 2031 $20,296 $100,742 17 2032 $34,990 $108,086 18 2033 $0 $122,530 19 2034 $5,827 $117,861 20 2035 $42,262 $112,006 21 2036 $74,696 $91,449 22 2037 $19,701 $105,887 23 2038 $0 $114,501 24 2039 $0 $86,670 25 2040 $16,709 $26,383 26 2041 $18,408 $21,090 27 2042 $2,048 $35,503 28 2043 $0 $49,921 29 2044 $2,637 30 2045 $20,921 $47,629 $43,637

$56,009 $70,434 Criterium-Caruso Engineers $82,227 $75,733 Appendix-Reserve Balance Summary for Alternative Funding Recommendations ALTERNATIVEFUNDINGSUMMARY Funding Years

Alt 1 Graph Summary Reserve Balance 8/1/2016

APPENDIX B: 2015 UPDATE: ESCALATING RESERVE FUND CONTRIBUTION Villas at Blackberry Run 2016 Update Final Appendix B

Reserve Study LS-Lump Sum; Allow-Allowance; SY-Square Yard; SF-Square Foot;EA-Each SITE 7/14/2015 RemaininUseful life Unit Projected Capital ItemTo Be Replaced Action life (Years) Quantity Price Unit Total Cost Notes 1 Asphalt parking lot Sealcoat, restripe, repair 3 6 800 $1.50 SY $1,200 sealcoated around 2012 2 Asphalt parking lot Replace/overlay 15 25 800 $15.00 SY $12,000 3 Lawn irrigation systems Repair/upgrade 2 20 1 $8,000.00 LS $8,000 Allowance per Association 4 Stone entrance monument & columns Repoint, repair 6 15 1 $1,500.00 LS $1,500 5 Wood fencing - entrance Stain/paint 3 6 1 $1,125.00 LS $1,125 Painted around 2012 6 Wood fencing - entrance Replace 16 25 1 $5,000.00 LS $5,000 7 Concrete sidewalks Repair/replace 6 15 1 $5,000.00 LS $5,000 8 Corrugated metal drainage pipe and inlets Repair/replace 31 40 9 Modular retaining wall Repair/replace 31 40 Behind clubhouse 10 Railing/fence at modular retaining wall Repair/paint 3 8 1 $750.00 LS $750 11 Railing/fence at modular retaining wall Replace 16 25 1 $2,500.00 LS $2,500 Installed in 2010/2011 12 Custom street and traffic signs Paint, repair 6 15 1 $1,000.00 LS $1,000 13 Custom street and traffic signs Replace 21 30 1 $5,700.00 LS $5,700 14 ID sign at entrance monument Replace 11 20 1 $1,300.00 EA $1,300 15 Clubhouse sign Replace 6 15 1 $1,200.00 EA $1,200 16 Site electrical Repair 10 10 1 $3,000.00 LS $3,000 17 Landscaping Replacement Allowance 1 5 1 $4,000.00 LS $4,000 18 Landscaping upgrades Upgrade 2 15 1 $8,000.00 LS $8,000 19 Grading and erosion control Repair,grade,protect 0 15 1 $14,600.00 LS $14,600 Drainage improvement on North side 20 2015 update Final alt 4 Criterium-Caruso Engineers Component Inventory Summary

Reserve Study LS-Lump Sum; Allow-Allowance; SY-Square Yard; SF-Square Foot;EA-Each 21 CLUBHOUSE 22 23 Structure Repair/replace 41 50 7/14/2015 RemaininUseful life Unit Projected Capital ItemTo Be Replaced Action life (Years) Quantity Price Unit Total Cost Notes 24 Roofing-asphalt shingles Replace 6 15 3000 $2.75 SF $8,250 25 Metal roofing (over deck) Repair/paint 6 15 1 $1,000.00 LS $1,000 26 Gutters and downspouts Replace 11 20 1 $2,000.00 LS $2,000 27 Exterior Repair/paint 0 8 1 $3,700.00 LS $3,700 28 Exterior deck (composite decking) Repair/replace 20 25 750 $22.00 SF $16,500 Repaired/Replaced in 2010/2011 29 Exterior deck railing (wood & comp. matl) Repair/replace 20 25 1 $3,500.00 LS $3,500 30 Electric furnaces Replace 6 15 2 $2,000.00 EA $4,000 31 Electric water heater Replace 6 15 1 $600.00 EA $600 40 gal,2006 32 HVAC condenser Replace 6 15 1 $3,000.00 EA $3,000 2 ton, 2006 33 HVAC condenser Replace 6 15 1 $4,000.00 EA $4,000 3 ton, 2006 34 Security System Upgrade/replace 6 15 1 $700.00 LS $700 35 Fire alarm system Replace detectors 6 15 1 $500.00 LS $500 36 Emergency lighting Replace 2 10 1 $500.00 LS $500 37 Electrical Panels, switches Repair/replace 21 30 1 $5,000.00 LS $5,000 38 Plumbing Fixtures Repair/replace 6 15 1 $2,000.00 LS $2,000 39 Fitness Equipment Repair/replace 6 15 1 $5,000.00 LS $5,000 40 TV in fitness room Replace 1 10 1 $600.00 LS $600 41 Doors, windows and hardware Repair/replace 11 20 1 $2,000.00 LS $2,000 2015 update Final alt 4 Criterium-Caruso Engineers Component Inventory Summary

Reserve Study LS-Lump Sum; Allow-Allowance; SY-Square Yard; SF-Square Foot;EA-Each 42 Fireplace (ventless) Repair/replace 11 20 1 $3,000.00 LS $3,000 43 Bathroom remodeling Remodel/paint 1 10 2 $400.00 EA $800 44 Interior remodeling Remodel/paint 1 10 1 $3,000.00 LS $3,000 45 Club room Floor Replace 10 20 1 $8,550.00 LS $8,550 Wood floor 46 Interior furniture Replace 2 15 1 $15,000.00 LS $15,000 47 Interior carpet Replace 3 10 100 $30.00 SY $3,000 7/14/2015 Remainin Useful life Unit Projected Capital ItemTo Be Replaced Action life (Years) Quantity Price Unit Total Cost Notes 48 Porch and deck furniture Replace 11 20 1 $5,600.00 LS $5,600 49 TV and sound system in clubroom Replace 5 10 1 $1,200.00 LS $1,200 50 kitchen remodeling Remodel 1 10 1 $1,000.00 LS $1,000 51 Kitchen appliances Replace 5 15 1 $2,500.00 LS $2,500 52 Gas grille Replace 5 10 1 $1,000.00 LS $1,000 53 54 2015 update Final alt 4 Criterium-Caruso Engineers Component Inventory Summary

Reserve Study LS-Lump Sum; Allow-Allowance; SY-Square Yard; SF-Square Foot;EA-Each 7/14/2015 Remainin Useful life Unit Projected Capital ItemTo Be Replaced Action life ( Years ) Quantity Price Unit Total Cost Notes TOTALS $183,375 Costs are + or - 10 %; Costs are based upon published costs. 2015 update Final alt 4 Criterium-Caruso Engineers Component Inventory Summary

Reserve Study LS-Lump Sum; Allow-Allowance; SY-Square Yard; SF-Square Foot;EA-Each Quantities are based upon readily available information and are only used to provide approximate estimates of costs. The quantities are approximate and should not be used for any other purposes. Reserve study is based on a 20 year projection of non-annual maintenance The cost estimates are provided to give you a "range of magnitude" understanding of the costs of the recommended repairs. Many different variables, such as season, locale and inflation affect the final cost of any project. Costs and other comments contained in this report do not necessarily infer that subcontracts, quotes or opinions of other professionals were solicited or obtained. Estimated costs are based upon published Building Construction Cost Data and our general knowledge of the construction industry in this area. Useful life information is obtained from published information provided by Federal National Mortgage Association (FNMA), other authoritative sources and our own experience. This information lists national averages for component useful llives. 2015 update Final alt 4 Criterium-Caruso Engineers Component Inventory Summary

7/14/2015 Reserve Study Alternative Funding Contribution Recommendations Alternative 1, Recommendation Based on Level Funding, No Special Assessment Alternative 1, Reserve Fund Contribution: Total/Month N/A Total/Annual N/A Per Unit/Month N/A Per Unit/Year N/A Alternative 4, Recommendation Based on Escalating Annual Contribution Alternative 4, Reserve Fund Contribution: % Annual Total/ Total/ Per Unit/ Per Unit/ % Annual Total/ Total Per Unit/ Per Unit/ Escalation Month Annual Month Year Escalation Month Annual Month Year Year Year 2015 0.00% $860 $10,321 $11.03 $132.32 2035 0.00% $1,371 $16,456 $17.58 $210.98 2016 4.29% $897 $10,764 $11.50 $138.00 2036 0.00% $1,371 $16,456 $17.58 $210.98 2017 0.00% $897 $10,764 $11.50 $138.00 2037 0.00% $1,371 $16,456 $17.58 $210.98 2018 0.00% $897 $10,764 $11.50 $138.00 2038 0.00% $1,371 $16,456 $17.58 $210.98 2019 1.74% $913 $10,951 $11.70 $140.40 2039 0.00% $1,371 $16,456 $17.58 $210.98 2020 0.00% $913 $10,951 $11.70 $140.40 2040 0.00% $1,371 $16,456 $17.58 $210.98 2021 0.00% $913 $10,951 $11.70 $140.40 2041 0.00% $1,371 $16,456 $17.58 $210.98 2022 1.71% $928 $11,138 $11.90 $142.80 2042 0.00% $1,371 $16,456 $17.58 $210.98 2023 0.00% $928 $11,138 $11.90 $142.80 2043 0.00% $1,371 $16,456 $17.58 $210.98 2024 0.00% $928 $11,138 $11.90 $142.80 2044 0.00% $1,371 $16,456 $17.58 $210.98 2025 5.00% $975 $11,695 $12.49 $149.94 2026 5.00% $1,023 $12,280 $13.12 $157.44 2027 5.00% $1,075 $12,894 $13.78 $165.31 2028 5.00% $1,128 $13,539 $14.46 $173.57 2029 5.00% $1,185 $14,216 $15.19 $182.25 2030 5.00% $1,244 $14,926 $15.95 $191.36 2031 5.00% $1,306 $15,673 $16.74 $200.93 2032 5.00% $1,371 $16,456 $17.58 $210.98 2033 0.00% $1,371 $16,456 $17.58 $210.98 2034 0.00% $1,371 $16,456 $17.58 $210.98 Alternative 3, Recommendation Based on Level Funding with Special Assessment(s) Total/Month Total/Annual Per Unit/Month Per Unit/Year

Alternative 3, Reserve Fund Contribution: N/A N/A N/A N/A Year Total/Month Total/Annual Per Unit/Month Per Unit/Year Special Assessment #1: N/A N/A N/A N/A N/A Special Assessment #2: N/A N/A N/A N/A N/A 2015 update Final alt 4 Criterium Caruso Engineers Appendix-Alternative Funding Recommendations Dallas, GA 7/14/2015 Alternative 4, Recommendation Based On Escalating Funding Level Reserve Fund Worksheet Projected Years Beginning Year 1 2 3 4 5 6 7 8 9 10 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Beginning Month/Day Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Beginning Reserve Fund Balance: Revenue: Investment Earnings: Capital Expenditures: Ending Reserve Balance: Projected Years Beginning Year $117,505 $105,806 $107,020 $85,042 $89,391 $100,378 $106,179 $70,138 $81,305 $88,140 $6,563 $10,764 $10,764 $10,764 $10,951 $10,951 $10,951 $11,138 $11,138 $11,138 $38 $39 $31 $32 $36 $38 $25 $29 $32 $35 $18,300 $9,588 $32,773 $6,447 $0 $5,189 $47,017 $0 $4,335 $2,779 $105,806 $107,020 $85,042 $89,391 $100,378 $106,179 $70,138 $81,305 $88,140 $96,534 11 12 13 14 15 16 17 18 19 20 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Beginning Month/Day Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Jan 1 Beginning Reserve Fund Balance: Revenue: Investment Earnings: Capital Expenditures: Ending Reserve Balance: $96,534 $94,184 $76,589 $88,881 $98,574 $112,830 $85,897 $80,733 $65,007 $81,493 $11,695 $12,280 $12,894 $13,539 $14,216 $14,926 $15,673 $16,456 $16,456 $16,456 $34 $28 $32 $35 $41 $31 $29 $23 $29 $35 $14,079 $29,903 $634 $3,881 $0 $41,890 $20,866 $32,206 $0 $1,093 $94,184 $76,589 $88,881 $98,574 $112,830 $85,897 $80,733 $65,007 $81,493 $96,891