2QFY2014 Results Presentation 8 April 2014

Similar documents
3QFY2014 Results Presentation 8 July 2014

Q3 FY2016 Results Presentation July The Company s admission to and listing on the SGX-ST is sponsored by DBS Bank Ltd.

EOC Limited. Corporate Presentation

Content. Business Outlook Financial Highlights

ASL Marine Corporate Presentation 1H FY2013

Proposed amendments to the Memorandum of Perisai in respect of the Proposed Increase in Authorised Share Capital ( Proposed Amendments )

BUMI ARMADA BERHAD. 3Q 2011 Results 21 st November Knots Ahead of the Rest

PACC Offshore Services Holdings Ltd. Corporate Overview SGX-Goldman Marine Oil & Gas Corporate Day 3 March 2017

(formerly known as EOC Limited) 4th Quarter FY2014 and Preliminary Full Year 2014 (FY2014) Unaudited Consolidated Financial Information

PACC Offshore Services Holdings Ltd. Results Presentation Q3 & 9M FY15 Results

PACC Offshore Services Holdings Ltd. Results Presentation Q2 & 1H FY15 Results

` ` PACC Offshore Services Holdings Ltd.

Expanding Horizons, Creating Value. Annual Report2011

TOGETHER WE DELIVER A N N U A L R E P O R T

ABAN LOYD CHILES OFFSHORE LIMITED

1st Quarter FY2017 Unaudited Consolidated Financial Information

FOR IMMEDIATE RELEASE 20 FEBRUARY 2018 PACC OFFSHORE SERVICES HOLDINGS LTD. MEDIA RELEASE

ASL MARINE Corporate Presentation FY2011

EXMAR GENERAL ASSEMBLY 15 th May 2018

2nd Quarter FY2015 Unaudited Consolidated Financial Information

SBM OFFSHORE Q TRADING UPDATE FULL YEAR OUTLOOK CONFIRMED

Unaudited Consolidated Financial Information

Financial Highlights (1)

Perisai Petroleum Teknologi Bhd TP: RM0.24 (-5.7%) Weathering the Storm

` ` PACC Offshore Services Holdings Ltd.

Teekay Offshore Partners Investor Day Presentation. June 18, 2012

projects, the number of projects that achieved initial recognition, the design of the rig building projects.

Unaudited Consolidated Financial Information

o1 OCEANTEAM SHIPPING ASA Q1 2011

Annual General Meeting. 27 April 2018

30 June 2015 Full Year Results Presentation August 2015

Miclyn Express Offshore

Presentation Q th July 2017

o1 OCEANTEAM SHIPPING ASA Q1 2012

Swiber Holdings Limited

ANNOUNCEMENT PROPOSED RENOUNCEABLE NON-UNDERWRITTEN RIGHTS ISSUE OF SHARES DESPATCH OF THE OFFERING CIRCULAR AND ITS ACCOMPANYING DOCUMENTS

PRESS RELEASE RESULTS 2017 Antwerp 29/03/ pm Regulated information

Oslo, 10 September Pareto Securities Oil and Offshore Conference Karl Ronny Klungtvedt, Exec. VP & CFO

Initiating Coverage. Perisai Petroleum Teknologi. Firing on all cylinders. Oil & Gas Bloomberg Ticker: PPT MK Bursa Code: 0047.

HALF-YEAR RESULTS 2006 AND UPDATED FULL-YEAR FORECAST

PART A - EXPLANATORY NOTES PURSUANT TO MALAYSIAN FINANCIAL REPORTING STANDARD ( MFRS ) 134

Q Results Conference Call

SWIBER LAUNCHES 3000MT DERRICK PIPE-LAY BARGE, SWIBER PJW3000

Disclaimer Page 2

o1 OCEANTEAM SHIPPING ASA Q2 2011

Notice on Forward Looking Statements

PETRONAS Group Financial Results Announcement

Buy (Maintained) Signs Offshore Contracts Worth SGD368m

14/11/14. Introduction. Financial Highlights & Review. Business Review. Market Outlook. Strategic Positioning for Sustainable Growth.

Prosafe Q results

SEMBCORP MARINE POSTS 1H 2015 NET PROFIT OF $215 MILLION

Fortress Transportation and Infrastructure Investors LLC. Supplemental Information Third Quarter 2018

PLATT S NGL CONFERENCE

GulfMark Offshore, Inc.

Jadestone Energy Results for the Period Ending December 31, 2017 Reports First Net Profit and Positive Cash Flow From Operations for the Quarter

ROYAL DUTCH SHELL PLC

E.A. TECHNIQUE (M) BERHAD ( W) (Incorporated in Malaysia)

2010 Preliminary Results

2015 Annual General Meeting. October2015

The lower rig building turnover was however partially offset by higher contributions from the ship. conversion/offshore and ship repair sectors which

QUARTERLY IR UPDATES. 3 rd Quarter 2014 Financial Results & Updates. 5 th November Transformation for Success

Q Investor Conference Call. November 11, 2013

Oslo, 6th March DnB NOR Markets Offshore Management Access Conference Karl Ronny Klungtvedt, Exec. Vice President & CFO

UNAUDITED FINANCIAL STATEMENTS AND DIVIDEND ANNOUNCEMENT FOR THE FOURTH QUARTER AND THE YEAR ENDED 31 DECEMBER 2017

OFFSHORE PARTNERS FOURTH QUARTER 2014 EARNINGS PRESENTATION

Third Quarter 2014 Results. November 7, 2014

OCEAN YIELD AS Company Presentation. 20 June 2012

PACC OFFSHORE SERVICES HOLDINGS LTD. MEDIA RELEASE POSH NARROWS LOSSES IN Q2 FY2017

PROPOSED RENOUNCEABLE NON-UNDERWRITTEN RIGHTS ISSUE TO RAISE GROSS PROCEEDS OF US$100.5 MILLION

OCEANTEAM SHIPPING ASA

2QFY2012 RESULTS BRIEFING 15 AUG 2012

Exmar CPS Conference January 2019 London

24 October 2006 Subsea 7 Inc. (Oslo Stock Exchange: SUB) today reports the results for the third quarter of 2006.

o1 OCEANTEAM SHIPPING ASA Q4 2012

MORNING INSIGHT January 25, No of Mines Proven Reserves Ownership Production per month Status

Shelf Drilling Presentation. DnB Conference Oslo

ANALYST BRIEFING. 2Q FYE December 2011 Financial Results & Updates. 18 November E n g i n e e r e d f o r G r o w t h

PACC OFFSHORE SERVICES HOLDINGS LTD. Registration Number: Z

BW OFFSHORE Ltd. Shipowners Experience and Requirements in Procurement and Building process. By Carl K. Arnet, March 2014

CITI GLOBAL ENERGY AND UTILITIES CONFERENCE. Bradley Alexander, Vice President Investor Relations May 15-16, 2018

FY2013 Financial Results

Teekay Tankers. Q Earnings Presentation. February 21, 2019

First Quarter 2014 Results. May 14, 2014

Swiber Holdings Limited: 2QFY09 Results Briefing

Pacific Drilling Announces Second-Quarter 2014 Results Conference call set 9 a.m. Central time Thursday, Aug. 7

Cowen and Company 4th Annual Ultimate Energy Conference. December 2, 20140

Brazil Shareholder visit 2016 Re-shaping Shell to create a world-class investment case

Sembcorp Marine results for second quarter and half year 2018

UNAUDITED FINANCIAL STATEMENTS AND DIVIDEND ANNOUNCEMENT FOR THE THIRD QUARTER AND THE NINE MONTHS ENDED 30 SEPTEMBER 2018

Magseis ASA Q th August Expanding operational footprint

For personal use only

DISCLAIMER NON-SEC COMPLIANT OIL AND GAS RESERVES: CAUTIONARY STATEMENT FOR US INVESTORS

Fourth Quarter 2014 Results. February 17, 2015

Pareto Oil & Offshore Conference

PART A - EXPLANATORY NOTES PURSUANT TO MALAYSIAN FINANCIAL REPORTING STANDARD ( MFRS ) 134

Presentation to bondholders. Restructuring proposal

Dynagas LNG Partners ( DLNG ) 2nd Quarter and Six Months ended June 30, July 2016

Petrobras focus on its strengths Rio de Janeiro October 25, 2017

BW Offshore Q presentation. 26 November 2012

Terry Bonno, SVP Industry and Community Relations March 1, 2017

Transcription:

2QFY2014 Results Presentation 8 April 2014

DISCLAIMER This material includes forward-looking statements prepared by EOC Limited ( Company ). The opinions, forecasts, projections or other statements other than statements of historical fact, including, without limitation, estimates of proved reserves of oil and gas, reserves potential and plans and objectives of management of the Company for financing, are forward-looking statements. Although the Company believes that the expectations reflected in such forward-looking statements are reasonable, it can give no assurance that such expectations will prove to have been correct. All forward looking-statements contained in this presentation are expressly qualified in their entirety by the cautionary statements contained or referred to in this section. Readers should not place undue reliance on forwardlooking statements. Each forward looking statement speaks only as of the date of this presentation. Neither the Company nor any of its subsidiaries and associates undertake any obligation to publicly update or revise any forward-looking statement as a result of new information, future events or other information. In light of these risks, results could differ materially from those stated, implied or inferred from the forward-looking statements contained in this presentation. FIRM FOUNDATIONS 2

2QFY2014 FINANCIAL PERFORMANCE

Operational Review Revenue increased 45% to USD 11.5 million during 2QFY2014, supported by contributions from project management, engineering and procurement services The Group s accommodation vessels securing long term charters: Lewek Conqueror was successfully placed out on a time charter of USD 100 million (as announced on 5 March 2014) Lewek Chancellor was actively marketed during the 2QFY2014 period. Increased contributions from the Production Division: Driven by improved operational activity at both FPSOs, Lewek Emas and Perisai Kamelia (formerly Lewek Arunothai) Lewek Emas is operating in offshore Vietnam, while Perisai Kamelia has been operating in the North Malay Basin, Malaysia Both FPSOs are performing well in the quarter at above 98 percent uptime, with excellent safety performance over the period USD 200 million sale and leaseback of the DP2 pipelay and heavy lift construction vessel, Lewek Champion in February 2014 Reducing debt and strengthening balance sheet As of 28 February 2014, the net gearing for the Group stood at 0.03x Improved financial position for opportunities in the offshore and accommodation sector 4

2QFY2014 FINANCIALS Consolidated Statement of Comprehensive Income for the Group USD 000s 2QFY14 2QFY13 Change 1HFY14 1HFY13 Change Revenue 11,513 7,953 45% 22,593 18,484 22% Gross Profit 5,360 3,571 50% 11,855 9,348 27% Profit before tax 43,935 1,418 n.m. 47,169 2,184 n.m. PATMI 44,046 1,355 n.m. 47,038 2,102 n.m. EPS (US ) 39.70 1.22 n.m. 42.39 1.89 n.m. FIRM FOUNDATIONS 5

Financial Highlights US$ 000 2QFY2013 2QFY2014 Change 1HFY2013 1HFY2014 Change Revenues 7,953 11,513 45% 18,484 22,593 22% Gross profit 3,571 5,360 50% 9,348 11,855 27% Other operating income 1,117 36,659 n.m. (14) 36,238 n.m. Financial income 435 436 0% 875 876 0% Financial expenses (1,712) (1,987) 16% (4,135) (4,060) (2%) Revenues Increased contributions from project management, engineering and procurement services. Other operating income Increased mainly due to gain from recognition of the sale and leaseback of Lewek Champion Share of profit from associated company 156 5,541 n.m. 1,192 6,919 480% Net profit 1,386 44,046 n.m. 2,152 47,071 n.m. Share of profit from associated company Increased due to improved operational activity from underlying FPSO assets 6

CASH FLOW SNAPSHOT USD 000s 2QFY14 2QFY13 1HFY14 1HFY13 Cash flow (used in) from operations Cash flow from (used in) investments Cash flow from (used in) financing Cash at beginning of period (6,729) 8,349 (4,670) 10,663 174,136 (15,124) 175,206 (33,684) (83,456) 7,587 (86,931) 19,349 6,108 3,880 6,454 8,364 Cash at end of period 90,059 4,692 90,059 4,692 FIRM FOUNDATIONS 7

BALANCE SHEET SNAPSHOT Consolidated Statement of Financial Position for the Group USD 000s As at 28 Feb 2014 As at 31 Aug 2013 Change Current Assets 296,270 219,987 35% Non-Current Assets 261,460 329,677 (21%) Current Liabilities 218,609 198,000 10% Non-Current Liabilities 99,232 175,879 (44%) Total Equity 239,933 175,785 36% FIRM FOUNDATIONS 8

KEY FIGURES & RATIOS USD 000s Notes As at 28 Feb 2014 As at 28 Feb 2013 EBITDA 55,483 10,798 EBIT 50,353 5,444 Earnings per share Basic and Diluted (US ) A 42.39 1.89 Weighted average number of shares ( 000) 110,955 110,955 Interest cover ratio (times) B 17.43 3.31 Return on equity C 22.65% 1.36% Notes: A) Net profit / Weighted average number of shares B) EBITDA / Net interest expenses C) Net profit / Average book equity FIRM FOUNDATIONS 9

KEY FIGURES & RATIOS USD 000s Notes As at 28 Feb 2014 As at 31 Aug 2013 Net interest bearing debt D 8,143 178,680 Net tangible assets 239,703 175,588 Debt equity ratio (times) E 0.03 1.02 Current ratio (times) F 1.36 1.11 Notes: D) Interest bearing bank debts less cash and bank balances E) Net interest bearing bank debts / Equity F) Current assets/ Current liabilities FIRM FOUNDATIONS 10

NEED CLARIFICATION? For further information, please contact: Email investor_relations@emasoffshore-cnp.com +65 6590 8028 www.emasoffshore-cnp.com FIRM FOUNDATIONS 11

THANK YOU

EOCL FLEET (APPENDIX)

LEWEK CHAMPION Vessel Specifications Accommodation 358 Overall length 142m Breadth 40m Deck strength 17t / sq.m Thrusters 6 x 2400 kw Crane Heavy Lift 900t Helipad Suitable for Sikorsky S92 Mooring System 8-point Flag Singapore Class Lloyd s Register of Shipping (LRS) Dynamic Positioning DP2 Other Information Accommodation and Lifting Capability for offshore construction, maintenance of oil and gas platforms, and pipe laying Delivered August 2007 FIRM FOUNDATIONS 14

LEWEK CHANCELLOR Vessel Specifications Accommodation 290 men Overall length 91.44m Beam 27.43m Depth 6.71m Draft 4.5m Crane 225 T @ 30 ft radius Helipad Mooring system Flag 15.24 m x 15.24 m (suitable for Sikorsky 61) 8 point Commonwealth of Dominica Class Lloyd's Register of Shipping Other Information Accommodation and Lifting Capability for offshore construction and maintenance of oil and gas platforms Delivered March 2007 FIRM FOUNDATIONS 15

LEWEK CONQUEROR Accommodation Overall length Vessel Specifications 308 men 100m Beam 30.48m Depth 7.29m Draft 4.6m Crane Helipad 250T @ 30m radius 22.2m x 27.5m (suitable for Sikorsky 61) Mooring system 8 point Flag Class Panama ABS Other Information Accommodation and Lifting Capability for offshore construction and maintenance of oil and gas platforms Deployed in Brunei Delivered 2004 FIRM FOUNDATIONS 16

Enterprise 3 Vessel Specifications Overall length 120m Breadth 31.7m Depth Crane 9m 800T @ 27m radius Helipad Sikorsky 61 Mooring system Class 8 point ABS Other Information Accommodation and Lifting Capability for offshore construction and maintenance of oil and gas platforms. Delivered 2008 17

LEWEK EMAS Vessel Specifications Overall length, m 290.4 Breadth, m 50.6 Depth moulded, m 23.8 Gross Tonnage, tons 91,315 Dwt (tropical), tons 168,000 Lightweight, tons 28,992 Storage, bbl 650,000 Other Information Productions, bbl/d 50,000 Provision of an FPSO for Premier Oil as operator for joint-operating-agreement partners of Block 12W Chim Sao Development in Vietnam FPSO capacity of 50,000 bpd, gas processing 89 MMSCFD and Water Injection capacity of 60,000 bpd Gas export through Nam Con Son trunkline First Production in 1QFY2012 FPSO contracted for up to 12 years, including extension options Total revenue from project potentially up to US$1billion inclusive of all options exercised FIRM FOUNDATIONS 18

PERISAI KAMELIA (PREVIOUSLY KNOWN AS LEWEK ARUNOTHAI) Vessel Specifications Overall length, m 285 Breadth, m 40.8 Depth moulded, m 22.2 Gross Tonnage, tons 63,101 Dwt (tropical) 127,540 Lightweight, tons 18,661 Storage, mbbl 725 Export Gas Condensate 180 MMSCFD 6500 bbl / day Other Information Floating, Production, Storage & Offloading unit One of world s largest gas FPSOs Converted at Keppel Shipyard FPSO designed for >97% uptime Commenced first production in North Arthit field, Gulf of Thailand in 2008 FPSO was demobilsed following completion of charter in Thailand in 1HFY12 Perisai Kamelia has commenced its charter contract with Hess Exploration and Production Malaysia B.V., to support a gas production project in Malaysia s North Malay Basin. FIRM FOUNDATIONS 19