ARM: Sustainable Urban Development Investment Program, Tranche 1

Similar documents
ARM: Sustainable Urban Development Investment Program, Tranche 1

Environmental Monitoring Report

Periodic Financing Request Report. Armenia: Sustainable Urban Development Investment Program Tranche 2

Bi-annual Environmental Monitoring Report

Semi-annual Social Safeguards Monitoring Report

Section 3.06 is deleted and the following is substituted therefor:

Land Acquisition and Resettlement Plan Compliance Report. ARM: Sustainable Urban Development Investment Program Tranche 2

North-South Road Corridor Investment Program. Republic of Armenia

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project

Environmental Assessment and Review Framework. Mongolia: Western Regional Road Corridor Investment Program

Islamic Republic of Pakistan National Motorway M-4 (Shorkot-Khanewal Section) Project

PAK: Power Distribution Enhancement Investment Program, Tranche 2

Multitranche Financing Facility Republic of Uzbekistan: Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Environmental Assessment Framework and Guidelines: Experience from the Philippines

CONCLUSION REPORT. M6 INTERSTATE ROAD - Armenia. Complaint SG/E/2017/05. Complaints Mechanism - Complaints Mechanism. m -

Safeguards Monitoring Report

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1

Armenia: Infrastructure Sustainability Support Program

Country Public Financial Management System Assessment. Republic of Armenia: Seismic Safety Improvement Program

LOAN AGREEMENT (Special Operations) (Road Network Upgrading Project) between DEMOCRATIC REPUBLIC OF TIMOR-LESTE. and ASIAN DEVELOPMENT BANK

Bangladesh: Greater Dhaka Sustainable Urban Transport Project

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1)

ARMENIAN TERRITORIAL DEVELOPMENT FUND

PROJECT AGREEMENT. (Low-Carbon District Heating Project in Hohhot in Inner Mongolia Autonomous Region) between ASIAN DEVELOPMENT BANK.

XII. CGIF Environmental and Social Safeguards Policy and Framework 1

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program)

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK

COMPARATIVE ANALYSIS OF DMC LEGAL FRAMEWORK AND ADB SAFEGUARD POLICY STATEMENT BANGLADESH

Viet Nam: Ho Chi Minh City Long Thanh DauGiay Expressway Technical Assistance Project

PROJECT PREPARATORY TECHNICAL ASSISTANCE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

PROJECT PREPARATORY TECHNICAL ASSISTANCE

NORTH-SOUTH ROAD CORRIDOR INVESTMENT PROGRAM TRANCHE 3 (Talin-Lanjik and Lanjik-Gyumri), SUBSECTION 1

PAK: MFF Power Distribution Enhancement Investment Program (Tranche 2)

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

Republic of Uzbekistan: Solid Waste Management Improvement Project

Northeast Asia Power System Interconnection

Updated Facility Administration Manual. Socialist Republic of Viet Nam: Greater Mekong Subregion Ben Luc Long Thanh Expressway Project

0.2 Subject Area National Accounts, Gross Domestic Product 0.3 Responsible Authority, Office, Person, etc.

Ulaanbaatar Urban Services and Ger Areas Development Investment Program

OPERATIONS MANUAL BANK POLICIES (BP)

SECTION 2.1. REAL SECTOR National Accounts

Democratic Socialist Republic of Sri Lanka: Transport Project Preparatory Facility

MFF - Bihar Urban Development Investment Program (Facility Concept)

Land Acquisition and Resettlement

REPUBLIC OF TURKEY FOURTH EXPORT FINANCE INTERMEDIARY LOAN (EFIL IV) (LOAN NUMBER )

Periodic Financing Request Report. India: Kolkata Environmental Improvement Investment Program (Tranche 2)

Report and Recommendation of the President to the Board of Directors

Initial Environmental Examination

CENTRAL BANK OF ARMENIA

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

India: Karnataka Urban Development and Coastal Environmental Management Project

TERMS OF REFERENCES FOR CONSULTANTS I. OBJECTIVE AND PURPOSE OF THE ASSIGNMENT

Multitranche Financing Facility Annual Report 2017

(c) Section 3.07 is deleted and the following is substituted therefor:

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);

PROJECT AGREEMENT. (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK. and

INDIA: Rajasthan State Highway Investment Program

Quality declaration - Indicators of Receivable and Payable Accounts of Merchants (Commercial

Action Plan for Improving Armenia s Business Environment Prepared on the Basis of the Memorandum on Reforms in Doing Business in Armenia

GEO: Sustainable Urban Transport Investment Program, Tranche 2 Tbilisi-Rustavi Urban Road Link (Section-1: km 0 to 4 Tbilisi Phonichala) (Addendum)

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

(Punjab Barrages Improvement Phase-II Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and PROVINCE OF PUNJAB

Consultants have to submit all the construction drawings; within 30 days after finalization of Concept Reports.

Armenia: Infrastructure Sustainability Support Program

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project

Vanuatu: Cyclone Pam Road Reconstruction Project Financed by the Asian Development Fund, Disaster Response Facility, and Global Environment Facility

Loan Agreement OFFIAL DOCUMENTS LOAN NUMBER 8229-AM. (Lifeline Road Network Improvement Project) between REPUBLIC OF ARMENIA. and

THE BOARD OF THE CENTRAL BANK OF THE REPUBLIC OF ARMENIA. ORDINANCE No 158-N On approving Regulation 20/02

Administration and Projects Committee STAFF REPORT June 4, 2015 Page 2 of 2 Attachments A. Letter from Caltrans dated May 15, 2015 Changes from Commit

PROJECT PREPARATORY TECHNICAL ASSISTANCE

FOR OFFICIAL USE ONLY

Country Operations Business Plan. Armenia October 2015

IND: Chhattisgarh State Road Sector Project

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Policy Paper. March Establishing the Project Design Facility

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

People's Republic of Bangladesh: Dhaka Chittagong Expressway PPP Design

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project

Republic of the Maldives: Preparing Business Strategy for Port Development

ON THE STATE REGISTRATION OF LEGAL ENTITIES

LOAN AGREEMENT (Ordinary Operations) (Clean Energy Finance Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and

Multitranche Financing Facility Georgia: Sustainable Urban Transport Investment Program Tranche 3

India: Bihar State Highways Project

ARMENIAN TERRITORIAL DEVELOPMENT FUND FINANCIAL STATEMENTS AND INDEPENDENT AUDITOR'S REPORT. for the year ended 31 December [ YEREVAN May 2016

PAK: MFF Power Distribution Enhancement Investment Program (Tranche 4)

Periodic Financing Request Report. India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2)

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Multitranche Financing Facility Azerbaijan: Water Supply and Sanitation Investment Program Project 2

Nepal: Road Connectivity Sector I Project

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

Section 3.07 is deleted and the following is substituted therefor:

Bi-annual Environmental Monitoring Report. Power Distribution Enhancement Investment Project (PDEIP) Tranche II Multi Tranche Financing Facility (MFF)

Armenia: Women s Entrepreneurship Support Sector Development Program

THE STUDY ON SOLID WASTE MANAGEMENT PLAN FOR IN THE REPUBLIC OF PANAMA

Nepal: Kathmandu Sustainable Urban Transport Project

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH

Semi-Annual Social Safeguards Monitoring Report. SRI: Greater Colombo Wastewater Management Project

Transcription:

Environmental Monitoring Report Bi-annual Report July-December 2011 ARM: Sustainable Urban Development Investment Program, Tranche 1 Project Number: 42417 Loan Number: L2752 May 2013 Prepared by the Yerevan Municipality Yerevan Development Project Implementation Unit

2 ABBREVIATIONS ADB EARF EIA EMP ES GSB IEE PIU RA SNCO SUDIP YM Asian Development Bank environmental assessment and review framework environmental impact assessment environmental management and monitoring plan environmental specialist Government Supervisory Board initial environmental examination project implementation unit Republic of Armenia state non-commercial organization Sustainable Urban Development Investment Program Yerevan Municipality 2

3 Contents I. Introduction... 4 A. Project Description... 4 B. Project Progress... 5 II. Environmental Management... 6 A. Institutional Arrangements of the Project... 6 B. Environmental Safeguards Program... 6 C. Archeological Works Program... 6 D. Grievance Redresses Mechanism... 6 E. Meetings... 6 F. Public Consultation and Complaints... 6 G. Awareness Raising... 7 III. Environmental Monitoring... 7 H. Environmental Monitoring Program... 7 I. Non-compliance Notices... 7 J. Corrective Action Plans... 7 IV. Findings and Recommendations... 7 3

4 I. Introduction A. Project Description 1. The Government of Armenia received a loan on 19 May 2011 from the Asian Development Bank (ADB) to finance the Sustainable Urban Development Investment Program (SUDIP), Tranche 1. The main objective of the Project is to build a new highway to expressway standards that links the existing Shirak Street and Arshakuniats Avenue to the Artashat Highway. 2. The Project comprises the following main components: (i) the construction of a new 6-lane divided road; (ii) the construction of a new bridge over the River Hrazdan; (iii) the construction of an interchange at Argavand highway; (iv) the construction of a round-about at Shirak street; and (v) the construction of road links. The Project locations shown in Figure 1. 4

5 Project 1 - Argavand Highway to Shirak Street Road Link Project 2 Shirak Street to Artashat Highway Road Link Figure 1: Map of Yerevan showing the Project locations 3. In addition to the construction of the road links a part of the loan proceeds will finance project management and capacity building, as well as institutional strengthening. Another part will finance the preparation of the Tranche 2 projects. B. Project Progress 4. This semi-annual environmental monitoring report covers the time period of July-December 2011. No civil works have been implemented during that time period. 5

6 II. Environmental Management A. Institutional Arrangements of the Project 5. The Ministry of Economy of the Republic of Armenia (RA) is the executing agency and the Yerevan Municipality (YM) is the implementing agency of the Project. The Project is monitored by the Government Supervisory Board (GSB). YM through the project implementing unit (PIU) handles day-to-day implementation of the project. B. Environmental Safeguards Program 6. Environmental Safeguards program in accordance to ADB Safeguards and Armenian legislation provisions will be developed and implemented through the establishment of Environmental Safeguards unit. C. Archeological Works Program 7. Archeological works program as a part of the Environmental Safeguards program will be developed and implemented during the design and construction stages of the Project. D. Grievance Redresses Mechanism 8. N/A for the reporting period. E. Meetings 9. No meetings on Environmental Safeguards issues were conducted during the reporting period. F. Public Consultation and Complaints 10. Public consultation devoted to the discussion of environmental impacts of the Project was held as a part of preparation of the draft IEE based on the preliminary design. During the reporting period no public consultation was conducted and no complaints were registered. Further public consultations will be held during preparation of the final IEE document based on the detailed design. 6

7 G. Awareness Raising 11. N/A for the reporting period III. Environmental Monitoring H. Environmental Monitoring Program 12. N/A for the reporting period I. Non-compliance Notices 13. N/A for the reporting period J. Corrective Action Plans 14. N/A for the reporting period IV. Findings and Recommendations 15. N/A for the reporting period 7