Project Agreement OFFICIAL DOCUMENTS. Public Disclosure Authorized LOAN NUMBER 8457-CN. Public Disclosure Authorized. (Zhengzhou Urban Rail Project)

Loan Agreement. (Shandong Ecological Afforestation Project) between PEOPLE S REPUBLIC OF CHINA. and

PEOPLE S REPUBLIC OF CHINA

Project Agreement. (Zanzibar Basic Education Improvement Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and

Project Agreement LOAN NUMBER CN. (Second Liuzhou Environment Management Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

(Taunsa Barrage Emergency Rehabilitation and Modernization Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT.

(Punjab Barrages Improvement Phase-II Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and PROVINCE OF PUNJAB

Tamil Nadu Project Agreement

Project Agreement CONFORMED COPY LOAN NUMBER CHA. (Hubei Shiman Highway Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Project Agreement. (Integrated Modern Agriculture Development Project) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT GANSU PROVINCE

Project Agreement OFFICIAL DOCUMENTS LOAN NUMBER 8391-UA. Second Urban Infrastructure Project (Urban Infrastructure Project - 2) between

Loan Agreement DMIUMTS OFFICIAL LOAN NUMBER 8131-CN PEOPLE'S REPUBLIC OF CHINA INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Restated and Amended Project Agreement

Project Agreement. (WEST AFRICA REGIONAL FISHERIES PROGRAM REPUBLIC OF LIBERIA (Phase I)) between INTERNATIONAL DEVELOPMENT ASSOCIATION.

OFFICIAL DOCUMENTS. Project Agreement LOAN NUMBER 8655-YF. (Additional Financing for Corridor X Highway Project) between

OFFICIAL DOCUMENTS. H. E. Jean Gustave Sanon Minister of Economy and Finance Ministry of Economy and Finance Ouagadougou Burkina Faso.

Project Agreement. (Energy Efficiency Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

ARAB REPUBLIC OF EGYPT

Project Agreement. (Shanghai Urban Environment Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and SHANGHAI MUNICIPALITY

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Project Agreement. Public Disclosure Authorized OFFICIAL DOCUMENTS LOAN NUMBER 7792-IN. Public Disclosure Authorized

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Global Environment Facility Trust Fund Grant Agreement

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Project Agreement. (West Beka a Emergency Water Supply Project) between

INTERNATIONAL DEVELOPMENT ASSOCIATION

OFFMCAL. olrakdocuments,

(Real Estate Cadastre and Registration Project Additional Financing) between. FORMER YUGOSLAV REPUBLIC OF MACEDONIA (the Borrower) and

HAINAN Project Agreement

Project Agreement REPUBLIKA SRPSKA CREDIT NUMBER 4912-BA. (Additional Financing for Health Sector Enhancement Project) between

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and

Haiti Education for All Multi-donor Trust Fund Grant Agreement

Loan Agreement. (Additional Financing for Laguna de Bay Institutional Strengthening and Community Participation Project) between

Loan Agreement. Public Disclosure Authorized LOAN NUMBER 1961 TUN. Public Disclosure Authorized. (Fourth Education Project)

Project Agreement CONFORMED COPY CREDIT NUMBER 4191-TA. (Financial Sector Support Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION.

OFFICIAL DOCUMENTS ZW4

Loan Agreement. (Alma Electricity Transmission Project) between JOINT STOCK COMPANY KAZAKHSTAN ELECTRICITY GRID OPERATING COMPANY.

Financing Agreement. (Additional Financing for Village Communities Support Program (Phase I)) between REPUBLIC OF GUINEA. and

Project Agreement. (Orissa Socio-Economic Development Program) among INTERNATIONAL DEVELOPMENT ASSOCIATION. and

Project Agreement. (Private Sector Development Support Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and

Financing Agreement OFFICIAL OCUMENTS. Public Disclosure Authorized CREDIT NUMBER 5152-UZ. Public Disclosure Authorized

Southern African Power Market Program Project Agreement. (Mozambique Component Mozambique-Malawi Transmission Interconnection Project) between

CONFORMED COPY FOR PUBLIC DISCLOSURE

Project Agreement. (Indonesia Infrastructure Finance Facility Project) among INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT.

, Honorable Tendai Biti Minister of Finance Ministry of Finance

OFFICIAL MDTF-HRI GRANT NUMBER TF between REPUBLIC OF CAMEROON. and

Project Agreement DOCUMENTS. Public Disclosure Authorized LOAN NUMBER PE. Public Disclosure Authorized. (Lima Metropolitan Development Project)

RS Project Agreement. (Second Local Initiatives (Microfinance) Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and REPUBLIKA SRPSKA

Loan Agreement. (National Pension Administration Technical Assistance Project) between ARGENTINE REPUBLIC. and

Multi Donor Trust Fund for the Zimbabwe Reconstruction Fund Project Agreement

Loan Agreement. (Industrial Finance Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and

OFFICIAL DOCUMENTS. Project Agreement. Public Disclosure Authorized. GRANT NUMBER D336-GN CREDIT NUMBER 6261-GN Public Disclosure Authorized

Development Credit Agreement. (Basic Health Project) between BOSNIA AND HERZEGOVINA. and INTERNATIONAL DEVELOPMENT ASSOCIATION

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Global Environment Facility Grant Agreement

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

IDOCUMENTS. Loan Agreement OFFICIAL LOAN NUMBER 8354-CO. (Access with Quality to Higher Education Project-ACCES II-SOP Phase 2) between

Regional Project Agreement

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Project Agreement. Public Disclosure Authorized OFFICIAL LOAN NUMBER 1878 PAN DOCUMENPS. Public Disclosure Authorized

Project Agreement. OffICIAL OCUMENTS I LOAN NUMBER 8121-ID. Jakarta Urgent Flood Mitigation Project (Jakarta Emergency Dredging Initiative) between

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Project Agreement. Public Disclosure Authorized CREDIT NUMBER /. 67IN LOAN NUMBER 4 IN. Public Disclosure Authorized

Ebola Recovery and Reconstruction Trust Fund Grant Agreement

Global Environment Facility Trust Fund Grant Agreement

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 2224 BR. Public Disclosure Authorized. (Third Feeder Roads Project)

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement. (Institutional Development and Agriculture Strengthening Project) between MONTENEGRO. and

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1674 PA. Public Disclosure Authorized

PROJECT AGREEMENT. (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK. and

Project Agreement NUMBER 1878 PAN 1)0CUMP. 'OFFI uloan. Public Disclosure Authorized. Public Disclosure Authorized. (Colon Urban Development Project)

CONFORMED COPY LOAN NUMBER 4043 IND LOAN NUMBER 4043 IND

Loan Agreement. (Additional Financing for the Rural Poverty Reduction Project - Rio Grande do Norte) between

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1419 PA. Public Disclosure Authorized. (Industrial Credit Project)

DOCUMENTS OFFICIAL. Financing Agroement. Public Disclosure Authorized CREDIT NUMBER 6122-GH. Public Disclosure Authorized

Loan Agreement. (Low-Income Sanitation Technical Assistance Project) between FEDERATIVE REPUBLIC OF BRAZIL. and

Loan Agreement. (Xiaolangdi Multipurpose Project: Stage II) between PEOPLE S REPUBLIC OF CHINA. and

Nile Basin Trust Fund Grant Agreement

Project Agreement OFFICIAL DOCUMENTS. Public Disclosure Authorized. Public Disclosure Authorized CREDIT NUMBER 5127-UG

Financing Agreement OFFICIM. DOCUMENTS1 CREDIT NUMBER 5283-IN. (Low Income Housing Finance Project) between INDIA. and

Project Agreement. Public Disclosure Authorized CREDIT NUMBER 1482 UV. Public Disclosure Authorized

(Health Sector Strengthening and Modernization Project) between REPUBLIC OF COSTA RICA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Development Credit Agreement

Loan Agreement OFFICIAL 90CUMENTS1. Public Disclosure Authorized LOAN NUMBER 8263-GE. Public Disclosure Authorized

Development Financing Agreement

Project Agreement CREDIT NUMBER 3991 MOZ. (Beira Railway Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and

Loan Agreement (Real Estate Management Project)

INTERNATIONAL DEVELOPMENT ASSOCIATION

Loan Agreement. Public Disclosure Authorized LOAN NUMBER 3771 BUL. Public Disclosure Authorized. (Agricultural Development Project)

Project Agreement. (Agricultural and Rural Market Development Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and BANQUE NATIONALE DU RWANDA

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Loan Agreement. (Indonesia Infrastructure Finance Facility Project) between REPUBLIC OF INDONESIA. and

CONFORMED COPY LOAN NUMBER 3717 PE LOAN NUMBER 3717 PE

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Development Credit Agreement

Republic of Senegal: Advance Agreement for the Preparation of the Proposed Casamance Development Pole Project Project Preparation Advance No.

Development Credit Agreement. (Provincial Health Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL DEVELOPMENT ASSOCIATION

Transcription:

Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7918-CN Public Disclosure Authorized Liaoning Project Agreement (Liaoning and Shandong Technical and Vocational Education and Training Project) Public Disclosure Authorized between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT and Public Disclosure Authorized LIAONING PROVINCE Dated August 9, 2010

PROJECT AGREEMENT AGREEMENT dated August 9, 2010, ( Project Agreement ) entered into between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT ( Bank ) and LIAONING PROVINCE ( Liaoning ) ( Project Implementing Entity ) in connection with the Loan Agreement ( Loan Agreement ) of the same date between PEOPLE S REPUBLIC OF CHINA ( Borrower ) and the Bank. The Bank and Liaoning hereby agree as follows: ARTICLE I GENERAL CONDITIONS; DEFINITIONS 1.01. The General Conditions (as defined in the Appendix to the Loan Agreement) constitute an integral part of this Agreement. 1.02. Unless the context requires otherwise, the capitalized terms used in the Project Agreement have the meanings ascribed to them in the Loan Agreement or the General Conditions. ARTICLE II PROJECT 2.01. Liaoning declares its commitment to the objectives of the Project. To this end, Liaoning shall: (a) carry out, and cause its Respective Selected Schools to carry out, Parts 1 and 2 of the Project in accordance with the provisions of Article V of the General Conditions, as well as the respective Project Implementation Plan; and (b) provide, or cause to be provided, promptly as needed, the funds, facilities, services and other resources required for its Respective Parts of the Project. 2.02. Without limitation upon the provisions of Section 2.01 of this Agreement, and except as the Bank, Liaoning shall otherwise agree, Liaoning shall carry out, and shall cause to be carried out, Parts 1 and 2 of the Project in accordance with the provisions of the Schedule to this Agreement. ARTICLE III REPRESENTATIVE; ADDRESSES 3.01. The Representative of Liaoning is its Governor or Vice Governor or such other person or persons as said Governor or Vice Governor shall designate in writing, and Liaoning shall furnish to the Bank sufficient evidence of the authority and the authenticated specimen signature of each such person.

2 3.02. The Bank s Address is: 3.03. Liaoning s Address is: International Bank for Reconstruction and Development 1818 H Street, N.W. Washington, D.C. 20433 United States of America Cable: Telex: Facsimile: INTBAFRAD 248423(MCI) or 1-202-477-6391 Washington, D.C. 64145(MCI) Liaoning Provincial Finance Bureau 103 North Nanjing Street, Heping District Shenyang, Liaoning Province People s Republic of China Facsimile: 86-24-228-25995 AGREED at Beijing, People s Republic of China, as of the day and year first above written. INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT By /s/ Klaus Rohland Authorized Representative LIAONING PROVINCE By /s/ Xu Weiguo Authorized Representative

3 SCHEDULE Execution Of The Project Section I. Implementation Arrangements A. Project Management 1. Liaoning shall maintain, and cause to be maintained, for purposes of carrying out its Respective Parts of the Project, the following organizations, with terms of reference, staffing and other resources acceptable to the Bank, throughout the period of implementation of its Respective Parts of the Project: (a) (b) (c) A Project Steering Committee ( PSC ) led by a Vice Governor, which committee is responsible for: providing guidance in overall Project implementation; facilitating inter-agency coordination; assisting in the dissemination and sharing of lessons learnt from Project implementation; coordinating cross-sectoral policy issues related to technical and vocational education and training; and supervising Project implementation, including representatives from provincial finance bureau, provincial development and reform committee, provincial education bureau, and other related bureaus. A Project Management Office ( PMO ), established within the Urban Construction Office in Liaoning Province, to be responsible for: overall Project management and coordination, facilitating communication and coordinating Project implementation among the Respective Selected Schools and providing support to each Selected School, including identifying specific needs for technical assistance, assessing investment decisions, developing terms of reference, reviewing and evaluating consultant proposals, monitoring Project progress, assisting in the dissemination of lessons learnt and assessing Project outputs. A Provincial Expert Team ( PET ) responsible for providing technical support to the PMO to enhance quality of Project design and implementation and providing assistance to the PMO in reviewing documents and implementing Parts 1 and 2 of the Project. B. Anti-Corruption Liaoning shall carry out, and cause each of its Respective Selected Schools to carry out, the Project in accordance with the provisions of the Anti-Corruption Guidelines.

4 C. Environmental Protection 1. Liaoning, in carrying out its Respective Parts of the Project : (a) (b) shall implement, and shall cause each of its Respective Selected Schools to implement, the Project, in accordance with the Environmental Management Framework in a manner satisfactory to the Bank and designed to ensure that the Project is implemented in accordance with sound environmental practices and standards; and shall provide, to the Bank for its prior concurrence any proposed modification or waiver of the Environmental Management Framework, and put into effect only such modification or waiver as shall have been agreed by the Bank in writing. D. Financial Arrangements 1. Liaoning shall allocate to each of its Respective Selected Schools a portion of the Loan under Subsidiary Agreements, and under arrangements satisfactory to the Bank, which shall include, without limitation, the following principal terms: (a) (b) (c) Section II. Liaoning shall make available the principal amount, which has been allocated to each of its Respective Selected Schools, in Dollars (on the date, or respective dates, of withdrawal from the Loan Account) of the value of the currency or currencies so withdrawn on account of the implementation of Project by the Respective Selected School. Liaoning shall recover such principal amount so made available (including the fee paid pursuant to Section 2.03 of the Loan Agreement and the amount of the Premium paid pursuant to Section 2.07(c) of this Agreement) over a period of thirty (30) years, inclusive of a grace period of five (5) years. Liaoning shall charge interest on such principal amount, withdrawn and outstanding from time to time at a rate equal to the rate of interest applicable from time to time to the Loan pursuant to Section 2.04 of the Loan Agreement. Project Monitoring, Reporting, and Evaluation A. Project Reports 1. Liaoning shall monitor and evaluate the progress of its Respective Parts of the Project and prepare Project Reports for its Respective Parts of the Project, which

5 shall also include adequate information regarding progress on the implementation of the Environmental Management Framework, in accordance with the provisions of Section 5.08(b) of the General Conditions and on the basis of the indicators set forth in the Annex to this Schedule. Each such Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the Bank by March 15 and September 15 each year, starting March 15, 2011. B. Financial Management, Financial Reports and Audits 1. Liaoning shall maintain a financial management system and prepare financial statements in accordance with consistently applied accounting standards acceptable to the Bank, both in a manner adequate to reflect the operations, resources and expenditures related to its Respective Parts of the Project. 2. Liaoning shall have its financial statements referred to above audited by independent auditors acceptable to the Bank, in accordance with consistently applied auditing standards acceptable to the Bank. Each audit of these financial statements shall cover the period of one (1) fiscal year of Liaoning. The audited financial statements for each period shall be furnished to the Borrower and the Bank not later than six (6) months after the end of the period. 3. Without limitation on the provisions of Part B of this Section, Liaoning shall prepare and furnish, or cause to be prepared and furnished, to the Bank as part of the Project Report by not later than March 15 and September 15 each year, interim un-audited financial reports for its Respective Parts of the Project covering the preceding calendar semester, in form and substance satisfactory to the Bank. Section III. Procurement All goods, works and services required for its Respective Parts of the Project to be financed out of the proceeds of the Loan shall be procured in accordance with the provisions of Schedule 2 to the Loan Agreement. Section IV. Innovation Sub-projects under Part 1(a) of the Project 1. Liaoning shall, and shall cause each of its Respective Selected Schools: (a) By December 1 of each year, commencing on December 1, 2010, to prepare and furnish to the Bank a draft annual work plan for the implementation of the activities under Part 1(a) of the Project proposed for the following calendar year. Said work plan shall include the following:

6 (i) (ii) (iii) (iv) (v) a description of proposed activities, which activities shall not entail land acquisition or civil works; specific outputs of said activities and the reporting and verification requirements; total cost of said activities; expenditures proposed to be financed from the Loan proceeds; and payment schedule and releasing conditions. (b) Thereafter, to carry out the activities under Part 1(a) of the Project in accordance with such work plan that has been approved by the Bank.

7 ANNEX to SCHEDULE Indicators Arrangements for Results Monitoring Project Objective Project Outcome Indicators Use of Project Outcome Information To improve the quality and relevance of technical education in eight schools in Liaoning and Shandong and produce lessons from this experience as a guide for future school reforms and policy development (1) Percentage of graduates who pass skill certification exams (middle and high level) (2) Percentage of graduates finding initial employment within 3 months in the specialties in which they were trained (3) Improved trainee and employer satisfaction Indicates the extent to which training delivered meets market demand and standards for quality Component 1: School-Based Reforms and Innovation Intermediate Outcomes Intermediate Outcome Indicators Use of Intermediate Outcome Monitoring Outcome 1: Strengthened linkage with industry (1) Percentage of instructors trained in industry attachments (Number of instructors trained / total instructors in the same specialties) (2) Percentage of industrial experts from the enterprises participated in teaching in schools (Number of industrial experts teaching in schools/total instructors in the same specialties) Indicates extent to which industry is engaged in school planning and operations Outcome 2: Improved management capacity Outcome 3: Developed and introduced modular, competency-based curriculum and instructional materials Outcome 4: Improved student assessment and quality assurance (1) Number of new or enhanced internal school regulations and procedures (2) Number of new practices/school reforms initiatives implemented Percentage of students enrolled in modular, CBT curricula (Number of students enrolled in modular, CBT curricula / total students enrolled in the same specialties) Percentage of students assessed with outcomes-based student assessment systems (Number of students assessed with outcomes-based student assessment systems / total students studied in the same specialties) Measures the application of learning and the improved capacity of school management Indicates scale of curriculum reform to improve quality and relevance Indicates extent to which instructors have adapted measurement of quality against competency standards

8 Outcome 5: Improved quality of instruction Outcome 6: Upgraded instructional equipment, facilities, and technology Percentage of instructors using new CBT curricula (Number of instructors using new CBT curricula / total instructors in the same specialty departments) Percentage of students utilizing upgraded instructional equipment aligned with new CBT curricula (students utilizing upgraded instructional equipment / total students studied in the same specialties) Indicates the degree to which instructors have adapted flexible, outcomes-focused methods of instruction (CBT) Monitors workshops that are upgraded to use new technologies demanded by employers Component 2: Knowledge development and capacity building Outcome 1: Improved capacity in monitoring and evaluation Outcome 2: Reform lessons disseminated Outcome 3: Improved capacity for planning and implementation of the reforms (1) Improved school Management Information System established (2) Improved student tracer and beneficiary studies implemented and analyzed (3) Employer satisfaction survey implemented and analyzed Number of knowledge products produced and shared with various stakeholders and decision makers (1) Number of provincial capacity building activities (2) Number of participants for provincial capacity building activity Measures improvement in school management and M&E capacity Measures the built capacity in knowledge development and application Measures improved capacity of provincial capacity for project planning and management