FY 2013/14 Preliminary Regional Wastewater, Recycled Water and Recharge Water Program Budget and TYCIP. Regional Committees April 4, 2013

Similar documents
FY 2013/14 Budget and FY 2013/ /23 Ten Year Capital Improvement Plan. Board of Directors June 19, 2013

Through: Finance, Legal, and Administration Committee (3/11/15) Chief Financial Officer/Assistant General Manager

Through: Finance, Legal, and Administration Committee (06/10/15) Chief Financial Officer / Assistant General Manager



Transparency Continue to provide a platform for transparent communication and timely reporting.


INLAND EMPIRE UTILITIES AGENCY RESERVE POLICY Updated as of May 2014 Policy Statement. Purpose of Fund Reserve Policy

May Fiscal Year 2018/19 Ten Year Capital Improvement Plan

Regional Sewerage Program Policy Committee Meeting AGENDA

2016 Water and Recycled Water Rate Study WEBINAR WITH DISTRICT STAFF JUNE 29, 2016

FINANCIAL PLAN REVIEW AND FORECAST

SAUSALITO-MARIN CITY SANITARY DISTRICT 1 EAST ROAD SAUSALITO, CALIFORNIA Telephone: (415) Fax: (415)

Wastewater Utilities. FY Budget Presentation

2016 Water and Recycled Water Rate Study PUBLIC HEARING DECEMBER 12, 2016

DELTA DIABLO Five-Year Capital Improvement Program PROJECTED EXPENDITURES

Water and Wastewater Utility Rates

BIENNIAL BUDGET SUMMARY FY 2016/17 & 2017/18

CITY OF THOUSAND OAKS

Final COST OF SERVICE STUDY SEPTEMBER City of San Clemente


Study Workshops are designed to be both educational and to seek broad direction from the Board

Comprehensive Annual Financial Report For the Fiscal Year Ended June 30, 2007

AGENDA MEETING OF THE BOARD OF DIRECTORS WEDNESDAY, JULY 16, :00 A.M.

Water Rate Study FINAL January 31, 2018

Water Consultancy. Montecito Sanitary District Wastewater Rate Study Report. Montecito Sanitary District

Table 2-2 Projected Water Production and Costs

Fiscal Year 2004/05 Draft Budget Presentation April 14, 2004

Los Angeles 4th Regional Investors Conference March 19-20, Los Angeles Wastewater System

Capital Improvement Program (CIP) FY and Rob Thompson Director of Engineering Administration Committee May 11, 2016

AGENDA DATE: June 21, 2017 ITEM NO: 13. Zone 7 adopted its first two-year budget for fiscal years FY in June of 2016.

Long-Term Financial Stability Workshop #4. Capital Investment & Financing. Board of Directors September 23, 2014

WATER UTILITY FINANCIAL PLAN AND RATE STUDY CITY OF WHITEFISH, MT MARCH 2016

The City of Sierra Madre

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009

MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013

COUNTY SANITATION. DISTRICTS OF LOS ANGELES COUNTY

City of Benicia. Rate Study Update: Water & Wastewater Rates

Third Quarter Financial Report Fiscal Year and. Mid-Term Budget Update - Fiscal Year June 15, 2015

GOLETA SANITARY DISTRICT BUDGET FISCAL YEAR

Squaw Valley PSD. Water & Sewer Rate and Connection Fee Study. Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc.

WASTEWATER FINANCIAL PLAN STUDY REPORT

From: Lex Warmath and Elaine Conti, Raftelis Financial Consultants, Inc.

Goleta Water District

FY 2013/14 Proposed Operating Budget

EASTERN MUNICIPAL WATER DISTRICT BIENNIAL BUDGET FISCAL YEARS AND

PREFERRED FINANCIAL PLAN SCENARIO & WATER RATE DESIGN ALTERNATIVE

Mammoth Community Water District Budget for the Fiscal Year April 1, March 31, 2018

Water and Sewer Rates

PETERS TOWNSHIP SANITARY AUTHORITY 2011 BUDGET WORKSHOP. November 30, 2010

Department of Water and Power City of Los Angeles. City of Los Angeles 4th Regional Investors Conference March 19, 2018

Beaumont-Cherry Valley Water District 2018 Operating Budget

Comprehensive Rate Study & Cost Allocation Analysis. Public Workshop December 4, 2017

Temescal Valley Water District

City of Rohnert Park SEWER FINANCIAL PLAN

General Manager s Recommended Budget for Fiscal Years 2018 & Maureen A. Stapleton, General Manager

WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results. January 5, 2016

YORBA LINDA WATER DISTRICT

Revenue Plan. August 12, Dennis Davies Deputy Director of Public Works 200 Civic Center Way El Cajon, CA 92020

CITY OF DETROIT, MICHIGAN_Sewage Disposal System Revenue

April 6, Katherine Godbey Director of Finance, Coachella Valley Water District Hovley Lane East Palm Desert, CA 92260

WATER AND SEWER UTILITIES RATE STUDY

SIGNIFICANT BUDGET CHANGES

Strategic Business Plan Department of Water Resources. Gwinnett County Department of Water Resources

City of San Carlos Sewer Financial Plan & Rate Update

CITY OF REDLANDS WATER AND WASTEWATER RATE STUDY. Prepared by:

City of Signal Hill Cherry Avenue Signal Hill, CA RESOLUTION DECLARING INTENTION TO AMEND SIGNAL HILL

SAWPA. FYE 2018 and 2019 Draft Budget

Fiscal Year Budget Proposal

MDE FINANCIAL ASSISTANCE FOR CHASEPEAKE BAY WATERSHED IMPLEMENTATION PLAN CAPITAL PROJECTS

Florida Governmental Utility Authority (FGUA) Phase Two Due Diligence Evaluation Results. City of Dunnellon September 18, 2017

Sanitation Rate Study Final Report

ANNUAL BUDGET WORKSHOP. Operating and Capital Budget Fiscal Year Ending June 30, 2019

RUNNING SPRINGS WATER DISTRICT ANNUAL FINANCIAL REPORT. Years Ended June 30, 2018 and 2017

CITY OF OXNARD WASTEWATER COST OF SERVICE STUDY. FINAL May 2017

Santa Ana Watershed Project Authority. Financial Report for the Inland Empire Brine Line Enterprise/CIP for the 1st Quarter Ending September 30, 2017

CITY OF SAN JUAN CAPISTRANO FOCUSED MUNICIPAL SERVICE REVIEW

FINANCIAL PERFORMANCE OBJECTIVES

2019 Draft Rate Supported Operating Budget and 2019 Draft Capital Budget and Forecast

Alameda County Water District. Financial Workshop Proposed Rates & Charges

WATER AND WASTEWATER RATE STUDY

Dallas Water Utilities Revenue Refunding Bond Issuance. Finance, Audit and Accountability Committee May 12, 2008

CITY OF ANAHEIM WATER UTILITY FUND. Financial Statements. June 30, 2016 and (With Independent Auditors Report Thereon)

Town Hall Meeting Community Utilities of Indiana, Inc. Wednesday, Wednesday 29, :00PM - 8:00PM at Seasons Lakehouse 1048 N.

July 1, Tier Percent of Allocation Cost per ccf $0.91 $1.27 $2.86 $4.80 $ % % % % 201+%

OPERATING BUDGET. Fiscal Year Dedicated to Satisfying our Community s Water Needs. MesaWater.org. Mesa Water District, Costa Mesa, California

TABLE OF CONTENTS. Letter of Transmittal. i-viii Summary of Operating Fund & Capital Fund Balances... 1

CITY OF SAN JUAN CAPISTRANO FOCUSED MUNICIPAL SERVICE REVIEW

Town of Yountville Wastewater Rate Study Update 2017/18

FY 2019 Approved Budget Approved by the Board of Directors on March 1, 2018

CREATING AND MANAGING RESERVES THAT ARE RIGHT FOR YOUR AGENCY AND RATEPAYERS

(per 1,000 gal.) General - American City and County Municipal Cost Index 20-Year Average as of April 2017

Central Basin Municipal Water District Fiscal Year Budget and Rates Workshop May 10, 2013

Cost Recovery Policy. Revised January Mount Pleasant Waterworks Cost Recovery Policy

Master Planning Ohio s Fastest Growing County Delaware County Regional Sewer District

Utility Rates. October 13, 2015

Valencia Water Company. Cost of Service Study

Long Beach Water Department Fiscal Year 2014 Annual Budget Summary

Public Hearing FY15 Proposed Non-Prop 218 Rates, Charges & Regulations. June 10, 2014

Union Sanitary District Union City, California. Operating & CIP Budgets FY 2016

Transcription:

FY 2013/14 Preliminary Regional Wastewater, Recycled Water and Recharge Water Program Budget and TYCIP Regional Committees April 4, 2013

Preliminary TYCIP FY 2014-2023 FY 2013/14 Preliminary Budget Adopted Rates Key Revenue & Funding Sources Assumption Program Budget Key Assumptions Revenue & Expense Highlights Fund Balances Debt Coverage Ratio

TYCIP & Budget Schedule 4/04/13 Regional Tech & Policy Committees Information Item: Draft TYCIP 5/02/13 Regional Tech Committee Action Item: Recommendation for Adoption 6/06/13 Regional Policy Committee Action Item: Recommendation for Adoption 6/19/13 Board (Adoption) Action Item: Adoption 3

Preliminary TYCIP FY 2013/14 FY 2022/23

Member Agency New Connections (EDUs) Growth Survey Growth by Year Fiscal Year Residential (EDUs) Commercial/ Industrial (EDUs) Total (EDUs) 12/13 1,174 1,173 2,347 13/14 1,952 875 2,827 Growth by Agency (EDUs) 14/15 3,329 816 4,145 15/16 3,924 850 4,774 16/17 3,814 902 4,716 17/18 3,424 837 4,261 18/19 2,467 684 3,151 19/20 2,240 701 2,941 20/21 1,649 536 2,185 21/22 1,621 526 2,147 Totals 25,594 7,900 33,494 5

Ten-Year Growth Forecast Geographical Distribution RP-4 Growth 3,841 EDUs 1.04 MGD CCWRF Growth 2,175 EDUs 0.59 MGD RP-1 Growth 10,667 EDUs 2.88 MGD RP-2 Growth* 18,985 EDUs * Solids From RP-5 & CCWRF RP-5 Growth 16,810 EDUs 4.54 MGD 6

10-Year Flow Forecast Current Wastewater Flow o 54.7 MGD o Slight increase over last year o Utilizing 64% of system capacity Projected 2023 Flows o 64.7 MGD o Reaching 75% of system capacity o 75% triggers expansion planning 7

01/02 02/03 03/04 04/05 05/06 06/07 07/08 08/09 09/10 10/11 11/12 12/13 13/14 14/15 15/16 16/17 17/18 18/19 19/20 20/21 21/22 22/23 FLOW (MGD) Agency Wide Flow Forecast 90 CAPACITY =85.7 80 66.2 76.2 77.4 70 60 53.7 55.7 56.9 61.4 60.8 64.5 62.7 59.8 58.1 54.6 54.7 55.3 56.1 57.6 58.9 60.2 61.3 62.2 63.0 63.6 64.1 64.7 76% Capacity 50 40 30 20 10 0 HISTORICAL FLOWS FORECASTED FLOWS FISCAL YEAR 8

10-Year Capacity Utilization FY 2022/23 Projection RWRP Influent MGD Capacity MGD Capacity Utilization RP-1 30.4 44.0 69% RP-4 10.8 14.0 77% CCWRF 9.5 11.4 83% RP-5 14.0 16.3 86% TOTAL 64.7 85.7 76% 9

01/02 02/03 03/04 04/05 05/06 06/07 07/08 08/09 09/10 10/11 11/12 12/13 13/14 14/15 15/16 16/17 17/18 18/19 19/20 20/21 21/22 22/23 FLOW (MGD) RP-5 Flow Forecast 18 CAPACITY = 16.3 16 14 12 10 CAPACITY = 15.0 9.1 12.8 11.5 11.4 9.6 9.4 10.3 10.5 9.3 10.2 11.0 11.7 12.4 13.5 13.7 14.0 13.3 12.8 15.47 MGD (95%) Southern Area Expansion 8.3 8 6 4 4.2 4.7 5.3 Assumptions going forward: >Minimal bypass from CCWRF >Minimal bypass from RP-1 >Includes 1.5 MGD RP-2 recycle flow >Adding 0.4 MGD from the Preserve in 14/15 2 0 HISTORICAL FLOWS FORECASTED FLOWS FISCAL YEAR RP-5 Treated Influent Flow

TYCIP Comparison Current & Proposed $185M Increase* FY 2013/14 Proposed TYCIP $413M Admin Service $10.7, 2% Recharge Water, $.8, 0% NRW, $23.6, 6% FY 2012/13 Amended TYCIP $228M Admin Service $10.5, 5% Recharge Water $0.7, 0% Regional Capital $156.8, 38% Recycled Water $106.1, 26% Regional Capital $55.2, 24% NRW, $24.9, 11% Regional O&M $114.9, 28% Regional O&M $52.9, 23% Recycled Water $84.2, 37% *Numbers subject to change. Updated 3/20/2013 11

Millions TYCIP 2012-2022 Amended vs FY 2013-2023 Proposed $185M Increase 180 160 140 $157 Key Program Additions: Treatment Expansion (RC) - $108M RP-1 Headworks (RC) - $11M Facility Projects (RO) - $76M RW Pumping Expansion (WC) - $13M GWR Basin Improvements (WC/RW) - $10M 120 100 80 $84 $106 $115 60 $55 $53 40 20 $36 $35 - WC Fund RC Fund RO Fund Non-Major Funds FY 2012/13 Amended TYCIP FY 2013/14 Proposed TYCIP 12

CAPITAL PROJECTS Capital projects expenditures shared equally by CBWM and IEUA CAPITAL PROJECTS Budget Funding From CBWM WC Fund Funding from IEUA Total Funding WR11017 Turner Basin Improvements $1,275,000 $434,144 $434,144 $868,288* EN13031 Wineville Proof of Concept $300,000 $150,000 $150,000 $300,000 EN12019 RW & GWR SCADA Upgrades $2,207,040 $1,103,520 $1,103,520 $2,207,040 EN13001 San Sevaine Improvements $2,500,000 $875,000 $875,000 $1,750,000* RW Fund WR13022 Prado Basin Habitat Well Monitoring $50,000 $25,000 $25,000 $50,000 EN12025 Hickory Basin Arizona Crossing $309,000 $154,500 $154,500 $309,000 EN14038 CB20 Noise Mitigation $160,000 $80,000 $80,000 $160,000 Jurupa Pump Station Improvements $300,000 $150,000 $150,000 $300,000 TOTAL $7,101,040 $2,972,164 $2972,164 $5,944,328 *Additional funding of $1,156,712 is obtained via grants 13

FY 2013/14 Preliminary Budget Regional Wastewater, Recycled Water and Recharge Water Programs 14

Adopted Rates Multi-Year Adopted Rates FY 2012/13 through FY 2014/15 Adopted Program Rate Description FY 2012/13 FY 2013/14 FY 2014/15 Regional Wastewater Monthly EDU Volumetric Fee per EDU $12.39 $13.39 $14.39 New EDU Connection Fee per EDU $4,909 $5,007 $5,107 Recycled Water Direct Delivery per AF $155 $215 $290 Groundwater Recharge per AF $195 $255 $335 15

FY 2013/14 Key Revenue Assumptions Monthly EDU Volumetric Charges: $43.3M o Assumes 0.50%, $200k increase in EDUs compared to 0% budgeted. FY 2012/13 projected 2% growth tracking FY 2011/12 growth of 2.5%. Recycled Water Sales Revenue: $7.2M o Assumes 42%, $2.1M increase of total direct and recharge sales. FY 2013/14 adopted rate of $290/AF for direct sales at a projected 21,400 AF and $45/AF surcharge at a projected 10,000/AF 16

FY 2013/14 Other Key Funding Sources Assumptions New Connection (EDUs) Fees: $9M o Assumes 38%, $2.5M increase to 1,800 EDUs compared to the prior years projection of 1,300 EDUs o Increase FY 12/13 projected EDUs from 1,100 to 1,700 EDUs, as YTD Feb 2013 reported 1,300 units. FY 2011/12 recorded 1,600 EDUs o Increase EDU rate by 2.5% starting FY 2015/16 in line with ENR index (averages 3% for past ten years) Property Tax Receipt: $33.3M o Assumes 1%, $1.1M increase compared to 1% decrease projected in FY 2012/13. County estimated an increase of 1.25% in property valuation for FY 2013/14 and reported 0.8% increase for FY 2012/13 17

FY 2013/14 Other Key Funding Source Assumptions SRF Loans: $24.9M o Assumes $10.9M for Southern area projects. Project is scheduled for completion in 2014. Loan repayment begins in FY 2015/16 o Assumes $14.4M for Central/Wineville area projects. Previously delayed projects are scheduled for completion in December 2015. Loan repayment begins in FY 2015/16 Grants: $8.8M o Assumes $6.5M, from SWRCB for the Southern and Central/Wineville areas, $2.1M from various sources for projects in the Recycled Water, Regional Operations and Water funds 18

Regional Wastewater Capital Improvement (RC Fund)

Regional Wastewater Capital Improvement (RC) Fund Records activities associated with acquisition, construction, replacement and expansion of the Agency s wastewater treatment plants, energy cogeneration, solids handling facility, sewage interceptors and appurtenant facilities FY 2013/14 Major Sources of Funds $9M New EDU connection fees $21.7M property tax receipts, 65% allocation FY 2013/14 Major Expenses and Other Uses of Funds $22M Debt service costs $7.4M CIP FY 2013/14One Time Sources & Uses of Funds $2.3M sale of asset $5.5M Inter-fund loan to Recycled Water fund

FY 2013/14 Preliminary Budget RC Fund ($ Millions) DESCRIPTION 2010/11 2011/12 2012/13 2012/13 2013/14 Amended Projected Proposed 2014/15 2015/16 2016/17 2017/18 Connection Fee Rate $4,766 $4,766 $4,909 $4,909 $5,007 $5,107 $5,235 $5,392 $5,553 No. of New EDU Connections 1,100 1,700 1,800 2,200 2,500 3,000 3,000 Operating Revenue $.5 $.5 $.4 $.4 $.3 $.3 $.3 $.4 $.4 Operating Expense 5.7 6.5 5.1 5.0 5.5 6.0 5.5 6.1 5.7 Net Operating Incr./(Decr.) ($5.2) ($6.1) ($4.7) ($4.7) ($5.2) ($5.8) ($5.2) ($5.7) ($5.3) Other Funding Sources 48.5 33.4 23.2 31.1 28.7 29.6 32.7 44.5 41.0 Other Uses of Funds 33.9 23.4 31.5 22.5 29.4 24.4 23.4 38.7 30.6 Net Increase/(Decrease) $14.6 $10.0 ($8.3) $8.6 ($.7) $5.2 $9.3 $5.8 $10.3 Total Net 9.4 3.9 (13.0) 4.0 (5.8) (.6) 4.1.1 5.0 Beginning Fund Balance 29.7 39.1 43.0 43.0 47.0 41.1 40.5 44.7 44.8 Ending Fund Balance $39.1 $43.0 $30.0 $47.0 $41.1 $40.5 $44.7 $44.8 $49.8 Target Fund Balance $50.0 21

Regional Wastewater Operations & Maintenance (RO) Fund Accounts for the revenue and operating costs directly related to the domestic sewage treatment service to the contracting agencies. FY 2013/14 Major Sources of Funds $43.3M monthly EDU volumetric charges $7.3M property tax receipts, 22% allocation $3.2M labor cost reimbursement from IERCA FY 2013/14 Major Uses of Funds: $48.7M O&M costs $9.8M R&R capital costs $0.2M debt service costs

FY 2013/14 Proposed Budget Compared to FY 12/13 Projected ($ Millions) Employment Costs: $2.3M, 7% increase o Average vacancy factor of 7% above the budgeted 5% o Increase in pension costs; CalPERS employer rate increased from 15.33% to 16.10% o Rising health insurance premiums $40 $35 $30 $25 $20 $15 $10 $5 $0 2010/11 2011/12 2012/13 Amended Budget 2012/13 Projected 2013/14 Proposed Budget 2014/15 Forecast 2015/16 Forecast 2016/17 Forecast 2017/18 Forecast 23

FY 2013/14 Proposed Budget Compared to FY 12/13 Projected ($ Millions) Professionals Fees & Services: $1.5M, 25% increase o o Higher maintenance support for Recycled Water and Non- Reclaimable systems Expanded support for new operating systems and equipment $9 $8 $7 $6 $5 $4 $3 $2 $1 $0 2010/11 2011/12 2012/13 Amended Budget 2012/13 Projected 2013/14 Proposed Budget 2014/15 Forecast 2015/16 Forecast 2016/17 Forecast 2017/18 Forecast 24

FY 2013/14 Proposed Budget Compared to FY 12/13 Projected ($ Millions) Utilities: $0.8M, 9.3% increase $14 $12 $10 $8 $6 $4 $2 $0 o o o Fuel cell and RP-1 Dewatering facilities to be fully operational all year CPI increase for renewal energy based on Purchase Power Agreements Assumes electricity rate of 12.0 cents/kwh versus the actual rate of 11.0 cents/kwh in FY 2012/13 2010/11 2011/12 2012/13 Amended Budget 2012/13 Projected 2013/14 Proposed Budget 2014/15 Forecast 2015/16 Forecast 2016/17 Forecast 2017/18 Forecast 25

FY 2013/14 Proposed Budget Compared to FY 12/13 Projected ($ Millions) Chemicals: $0.7M, 18% increase o o Increase in ferric chloride dosage maintain digester gas H2S concentration below RP-1 s fuel cell PPA requirement Increased polymer rates and higher dosage for RP-1 Dewatering facility $6 $5 $4 $3 $2 $1 $0 2010/11 2011/12 2012/13 Amended Budget 2012/13 Projected 2013/14 Proposed Budget 2014/15 Forecast 2015/16 Forecast 2016/17 Forecast 2017/18 Forecast 26

FY 2013/14 Preliminary Budget RO Fund ($ Millions) DESCRIPTION 2010/11 2011/12 2012/13 2012/13 2013/14 Amended Projected Proposed 2014/15 2015/16 2016/17 2017/18 EDU Rate $11.14 $11.14 $12.39 $12.39 $13.39 $14.39 $14.74 $15.09 $15.44 Operating Revenue $42.3 $42.2 $41.5 $43.4 $47.0 $50.5 $51.8 $53.2 $54.4 Operating Expense 41.7 42.2 47.2 43.6 48.7 48.7 49.8 51.1 52.3 Net Operating Incr./(Decr.) $.7 $.0 ($5.7) ($.3) ($1.7) $1.8 $2.0 $2.1 $2.2 Other Funding Sources 2.2 4.5 7.9 8.3 8.1 9.8 10.0 10.1 10.2 Other Uses of Funds 2.1 3.7 7.5 5.2 10.0 6.9 15.1 10.8 11.0 Net Increase/(Decrease) $.1 $.9 $.4 $3.1 ($2.0) $3.0 ($5.2) ($.7) ($.9) Total Net.8.9 (5.3) 2.9 (3.7) 4.8 (3.2) 1.3 1.3 Beginning Fund Balance 22.7 23.4 24.3 24.3 27.2 23.5 28.3 25.1 26.4 Ending Fund Balance $23.4 $24.3 $19.0 $27.2 $23.5 $28.3 $25.1 $26.4 $27.7 Target Fund Balance $30.0 27

RO Fund: Cost of Service per EDU O&M and R&R Costs ($ Millions) O&M costs projected to be fully covered beginning FY 2014/15 Future rate increases will be needed to fully support R&R costs $21.0 $18.0 $15.0 $12.0 $9.0 $6.0 $3.0 $0.0 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 Cost of Service O&M CAPITAL R&R EDU Rate 28

Recycled Water (WC) Fund Accounts for total revenue and expenses associated with the Agency s recycled water distribution system, including debt service and capital expenditures. FY 2013/14 Major Sources of Funds $7.2M total recycled water sales $2.1M MWD LPP rebate, ($154/AF) $1.7M property tax receipts, 5% temporary allocation $33.4M SRF loan and grant receipts $5.5M inter-fund loan from RC Fund FY 2013/14 Major Uses of Funds: $7.0M O&M costs $39.0M CIP $5.0M debt service costs

FY 2013/14 Preliminary Budget WC Fund ($ Millions) 31,400 AF total deliveries, 21,400 AF of direct and 10,000 AF MWD LPP rebates set to expire June 2017 5% property tax allocation reverts to RO fund in FY 2014/15 DESCRIPTION 2010/11 2011/12 2012/13 Amended 2012/13 Projected 2013/14 Proposed 2014/15 2015/16 2016/17 2017/18 Total AF Deliveries 24,470 28,988 30,000 30,000 31,400 36,250 40,900 42,900 45,100 Direct/GWR Rates ($) 85/30 115/30 155/40 155/40 215/40 290/45 325/60 350/60 375/70 Operating Revenue $4.5 $6.1 $7.9 $7.3 $10.7 $14.9 $16.6 $18.4 $18.4 Operating Expense 5.1 6.5 6.3 5.7 7.0 6.9 6.6 6.8 6.8 Net Operating Incr./(Decr.) ($.6) ($.4) $1.6 $1.6 $3.7 $8.0 $10.1 $11.7 $11.6 Other Funding Sources 15.4 8.7 20.4 9.8 41.7 15.7 3.3 1.1 1.1 Other Uses of Funds 27.7 17.4 29.7 13.7 44.0 24.2 10.6 12.4 15.9 Net Increase/(Decrease) ($12.4) ($8.8) ($9.3) ($3.9) ($2.4) ($8.6) ($7.2) ($11.3) ($14.8) Total Net (13.0) (9.2) (7.7) (2.3) 1.3 (.6) 2.9.4 (3.2) Beginning Fund Balance 34.8 21.9 12.7 12.7 10.4 11.7 11.1 14.0 14.4 Ending Fund Balance $21.9 $12.7 $5.1 $10.4 $11.7 $11.1 $14.0 $14.4 $11.2 Target Fund Balance $13.0 30

Recycled Water Cost of Service per AF (Includes O&M and Debt Service Costs) Cost of service will vary from changes in AF deliveries, revenues and costs. $500 $450 $400 $350 $300 $250 $200 $150 $100 $50 $0 FY 11/12 FY 12/13 Proj. FY 13/14 Prop. Budget FY 14/15 FY 15/16 FY 16/17 FY 17/18 Proposed AF Rate $145 $195 $255 $335 $385 $410 $445 Cost of Service AF $254 $251 $298 $326 $311 $340 $409 Total AF, direct and GWR: 28,988 30,000 31,400 36,250 40,900 42,900 45,100 31

WC Fund Inter Fund Loan Repayment Timeline Inter Fund Loan Issued From To FY 2007/08 FY 2007/08 FY 2009/10 Non-Reclaimable Wastewater Regional Wastewater Capital Non-Reclaimable Wastewater Recycled Water Recycled Water Recycled Water Loan Amount $9.0M $3.0M $6.0M Repayment Schedule 2016/17 $1.0M 2017/18 $1.5M 2018/19 $1.0M 2019/20 $3.5M 2020/21 $2.0M 2017/18 $1M 2018/19 $1M 2019/20 $1M 2020/21 $1.0M 2021/22 $3.0M 2022/23 $2.0M FY 2013/14 Regional Wastewater Capital Recycled Water $5.5M 2021/22 $3.0M 2022/23 $2.5M Grand Total $23.5M $23.5M 32

Recharge Water (RW) Fund Accounts for the revenues and expenses associated with the groundwater recharge operations and maintenance through the joint effort of the Chino Basin Watermaster (CBWM), the Chino Basin Water Conservation District (CBWCD), the San Bernardino County Flood Control District (SBCFCD), and the Agency. FY 2013/14 Major Sources of Funds $1.3M O&M funded by CBWM ($795K) and IEUA ($464K) pro-rata share $1.7M Debt service and CIP reimbursed by CBWM and IEUA FY 2013/14 Major Uses of Funds $1.5M O&M costs $1.7M debt services & CIP costs

FY 2013/14 Preliminary Budget RW Fund ($ Millions) $1.5M O&M budget includes filtration restoration and slope repairs 6 groundwater basins with total recharge capacity of 6,300 AF. Value of 6,300 AF @ $593/AF = $3.7M (MWD Tier 1 Rate) DESCRIPTION 2010/11 2011/12 2012/13 2012/13 2013/14 Amended Projected Proposed 2014/15 2015/16 2016/17 2017/18 Operating Revenue $.7 $.7 $.7 $.8 $1.1 $1.0 $.8 $.9 $.9 Operating Expense.8 1.2 1.1 1.1 1.6 1.4 1.2 1.3 1.3 Net Operating Incr./(Decr.) ($.1) ($.5) ($.4) ($.3) ($.5) ($.4) ($.4) ($.4) ($.4) Other Funding Sources 1.4 1.4 1.4 1.2 2.1 1.8 1.8 1.8 1.8 Other Uses of Funds 4.5.9 1.7 1.4 1.7 1.4 1.4 1.4 1.4 Net Increase/(Decrease) ($3.0) $.4 ($.4) ($.2) $.5 $.4 $.4 $.4 $.4 Total Net (3.2) (.0) (.8) (.5) (.0) (.0) (.0) (.0) (.0) Beginning Fund Balance 5.6 2.5 2.4 2.4 1.9 1.9 1.9 1.9 1.9 Ending Fund Balance $2.5 $2.4 $1.7 $1.9 $1.9 $1.9 $1.9 $1.9 $1.9 Target Fund Balance $2.0 34

Fund Balances and Debt Coverage Ratio

Millions Fund Balances Regional Wastewater & Recycled Water Programs Regional Capital Regional O&M Recycled Water Capital Construction $90 $80 $70 $13 $10 $12 $11 $14 $60 $50 $24 $5 $27 $23 $28 $25 $40 $19 $30 $20 $10 $43 $30 $47 $41 $41 $45 $0 ACTUAL AMENDED PROJECTED BUDGET FORECAST FORECAST 2011/2012 2012/2013 2012/2013 2013/2014 2014/2015 2015/2016 36

Total Debt Coverage Ratio (DCR) Projected to exceed the Board established DCR targets, based on current assumptions Improvement in total DCR will better position the Agency to acquire new debt at a lower borrowing costs DCR Target established by IEUA Board on February 2012 FY 2011/12 Projected FY 2012/13 Forecast FY 2013/14 Forecast FY 2014/15 1.43x 1.50x 1.70x Forecast FY 2015/16 DCR projections based on current assumptions 1.67x 1.92x 1.75x 2.01x 2.18x Rating agency medians for medium sized wastewater agencies : AA rated AAA rated Fitch 1.9x 2.7x 37

Questions? 38