CAM Modification 500. CAM-CMP Development Workgroup 2

Similar documents
EU Capacity Regulations Capacity Allocation Mechanisms with Congestion Management Procedures

EU CODES - MODIFICATION CORE LEGAL DRAFTING - EXPLANATORY TABLE. European Interconnection Document (EID)

European Workgroup. European Workgroup 3 rd April 2014

Vision Paper LT UIOLI

EU Codes Legal Roadmap

The Entry Capacity Substitution Methodology Statement

The Entry Capacity Substitution Methodology Statement

Entry Capacity Substitution Methodology Statement

European Update. 5 January 2017

EU Harmonisation of Maintenance Publications at Interconnections Points

Present: Philippe de LADOUCETTE, President, Olivier CHALLAN BELVAL, Hélène GASSIN and Jean- Pierre SOTURA, Commissioners.

0349 Introduction of a Force Majeure. Capacity Management Arrangement. Stage 01: Proposal

Interconnector (UK) Limited. Charging Methodology related to the IUK Access Agreement and IUK Access Code March 2018

CODE MODIFICATION PROPOSAL No 0230 Amendment to the QSEC and AMSEC Auction Timetables Version 2.0 Date: 15/10/2008. Non Urgent

How to register on PRISMA

ANNEX B: Proposed changes to IUK s Charging Methodology (marked version compared to the current approved version) Interconnector (UK) Limited

CODE MODIFICATION PROPOSAL No 0262 Treatment of Capacity affected by Force Majeure Version 4.0 Date: 18/08/2009. Non Urgent

NTS Exit Regime Daily Processes Overview

Quarterly System Entry Capacity (QSEC)

UNIFORM NETWORK CODE TRANSPORTATION PRINCIPAL DOCUMENT SECTION Y CHARGING METHODOLOGIES. 1. The Gas Transmission Transportation Charging Methodology

Joint Office of Gas Transporters 0262: Treatment of Capacity affected by Force Majeure

Public Consultation of the General Terms and Conditions of PRISMA Platform

Variation Request. Modification 0510 Reform of Gas Allocation Regime at GB Interconnection Points

The Model of Implicit Capacity Allocation in the Baltic States

UNC Workgroup 0597 Minutes Rules for the release of incremental capacity at Interconnection Points Tuesday 13 December 2016

MONITORING REPORT. CMP Monitoring Report ENTSOG A FAIR PARTNER TO ALL!

European Update. 1 st October 2015

Implicit Allocation Guidance Document

Inclusion and Amendment of Entry Incremental Capacity Release NPV test in UNC

IME3 Compliance for Allocations

Inclusion and Amendment of Entry Incremental Capacity Release NPV test in UNC

Congestion Management Procedures Guidelines

Interconnector (UK) Limited. Charging Statement related to the IUK Access Agreement and IUK Access Code Issue 15 Applicable from 01 January 2019

Interconnector (UK) Limited. Charging Statement related to the IUK Access Agreement and IUK Access Code Issue 14 Applicable from 22 November 2018

UNC 0680: UNC Changes as a Consequence of no deal United Kingdom Exit from the European Union. UNC Modification

Consultation on Capacity Methodology Statements. Conclusions Report

We appreciate your feedback

UNC European Workgroup Minutes Thursday 06 February 2014 Energy Networks Association, 52 Horseferry Road, London SW1P 2AF

Publishing date: 21/09/2016 Document title: Implementation Monitoring Report on Congestion Management Procedures - Update 2016

Daily Meter Reading Simplification

Implementation. CMP Implementation Monitoring Report. ENTSOG a fair

Analysis of Cross Border Transmission Gas Tariffs between Portugal and Spain. - Public Hearing -

Interconnector (UK) Limited. Charging Statement related to the IUK Access Agreement and IUK Access Code Issue 10 Applicable from 01 June 2018

Gas Target Model Follow up - CEER Work on Incremental Capacity

Inclusion and Amendment of Entry Incremental Capacity Release NPV test in UNC

ANNEX I Data fields included in the Implementing Acts

Interconnector (UK) Limited. Charging Statement related to the IUK Access Agreement and IUK Access Code Issue 12 Applicable from 01 October 2018

RESPONSE TO ACER'S CONSULTATION ON TARIFFS

5) What will be the contract duration (daily,..) of TRU at the SCPs? (UNIPER). Product runtimes of TRU are missing. (Econgas)

Interconnector (UK) Limited. Charging Statement related to the IUK Access Agreement and IUK Access Code Issue 11 Applicable from 01 September 2018

New capacity Incremental auction of Gas Connect Austria & bayernets. Marcus Wadewitz

Tariff for Virtual Reverse Flow Product at Moffat

Addressing under-allocation of flows from BBL arising from misalignment of reference conditions

UNC 0686 (Urgent): Removal of the NTS Optional Commodity Rate with adequate notice. UNC Modification

3 rd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes

UNC Modification Reference Number 0221 Entry Capacity and the Appropriate Allocation of Financial Risk Strawman Modification Proposal

Interconnector (UK) Limited. Charging Methodology Statement related to the IUK Access Agreement and IUK Access Code Applicable from 1 February 2016

CUSC Amendment Proposal Form CAP: 161

0364: An Appeals Process for Entry. Capacity Manifest Errors. Stage 02: Workgroup Report

MOFFAT DESIGNATED ARRANGEMENTS NTS EXIT POINT AT MOFFAT

UNC 0636B: Updating the parameters for the NTS Optional Commodity Charge. UNC Modification

System Management Principles Statement. Compliance report Summary of balancing actions and breaches Performance compared to last year

0338 Remove the UNC requirement for a gas trader User to hold a Gas Shipper Licence

Joint Office of Gas Transporters 0231V: Changes to the Reasonable Endeavours Scheme to better incentivise the detection of theft

CHARGING METHODOLOGY STATEMENT FOR THE ELECLINK INTERCONNECTOR

Amendments to Gas Transmission Charging Regime

Notice of Indicative Gas Transmission Transportation Charges effective from 1 April November 2018

Publishing date: 13/01/2015. We appreciate your feedback. Share this document

CMP303 - Improving local circuit charge cost-reflectivity

IMPROVEMENT OF THE GTS CODE: DAILY BALANCING IMPLEMENTATION. ROMAN SHYKERYNETS Head of Methodology and Project Division PJSC UKRTANSGAZ

Interconnector (UK) Limited. Charging Methodology Statement related to the IUK Access Agreement and IUK Access Code Applicable from 1 February 2017

(Text with EEA relevance)

UNC Text Allocation Register

RECORD OF THE CONSULTATION WITH STAKEHOLDERS ON THE PROPOSED MECHANISM FOR SETTING ASIDE TRANSMISSION CAPACITY AT EVERY INTERCONNECTION POINT

Type of change. Licence (RIIO-T2)

0506A: Gas Performance Assurance Framework and Governance Arrangements. 01 Modi(ication. Stage 01: Modification

P344 Project TERRE implementation into GB market arrangements

MOD 329 Analysis of & Potential Changes to the UNC Rules Governing the Submission of SHQs - Including Transportation Price Incentivising Solution.

Interconnector (UK) Limited. Charging Statement related to the IUK Access Agreement and IUK Access Code Applicable from 1 October 2017

Interconnector (UK) Limited. Charging Statement related to the IUK Access Agreement and IUK Access Code Applicable from 1 August 2017

ON TRANSFER CAPACITY ALLOCATION OVER THE GRID INTERCONNECTING ITALY WITH FRANCE FOR THE YEAR 2004

Gas Networks Ireland Allowed Revenue and Transmission Tariffs 2017/18 Decision Paper

Trading at French PEGs. EFET workshop on Spanish Gas Hub - 23 July 2008

Demand assessment report for incremental capacity between Republic of Ireland [Gas Networks Ireland]

Scope and policy options for Framework Guidelines on Harmonised transmission tariff structures. -Public Hearing -

View on the perspective on Regional Gas Market Development in Eastern Baltic Region

Grid Code Issue Paper

GB TSOs Intraday proposal for arrangements concerning more than one Nominated Electricity Market Operator (NEMO) in the GB Bidding Zone in accordance

LDZ Exit Capacity NTS (ECN) Charges March 2017 Craig Neilson UK GAS DISTRIBUTION

1 Simplified Working Scenarios. Simplified Working Scenarios. Page 1 of 19

System Flexibility Indicators. Operational Forum, 26 May 2010

EASEE-gas. European Association for the Streamlining of Energy Exchange gas

CMP291. Garth Graham for SSE Generation Ltd. CUSC Panel 23 rd February 2018

Modification Proposal 0116V/0116VA/0116VB/0116VC/0116VD: Reform of the NTS Offtake Arrangements

Review Group 0217 Minutes Thursday 13 November 2008 held at Elexon, 350, Euston Road, London

Auction Calendar 2015 for Capacity Allocation Mechanism Network Code

Thank you for providing SSE, with the opportunity to comment on the above Modification Proposal.

Report on the system balancing actions and related procurement activities in the GASPOOL market area in the gas year 2015/2016

20 December Fluxys Belgium SA

A PLATFORM TO FOSTER LIQUIDITY IN THE GAS CAPACITY MARKET. GRTgaz Shippers meeting

Transcription:

CAM Modification 500 CAM-CMP Development Workgroup 2

CMP processes - CMP/CAM interaction TSO oversell Oversubscription and Buyback (Risk & reward) TSO buyback TSO Additional capacity Unsold Technical capacity Auction Shipper Entitlements Nom / Capacity % Utilisation Shipper (Unused) capacity Shipper Surrender Offers Long Term Utilisation Monitoring LT UIOLI Withdrawals

Secondary Processes ¾ CMP Surrender ¾ CMP LT UIOLI ¾ CMP Oversubscription & Buyback ¾ Buyback ¾ Scaleback ¾ Bundling ¾ Unbundling ¾ Secondary Trading Supporting processes (if time) Charging Credit Transitional Arrangements 3

Secondary Processes ¾ Surrender go through section 3.5 of modification 500 ¾ LT UIOLI ¾ Oversubscription & Buyback ¾ Buyback ¾ Scaleback ¾ Bundling ¾ Unbundling ¾ Secondary Trading 4

CAM-CMP Surrender Offer Process GEMINI PRISMA NG Validate Surrender Request Update Surrender status Transmit Offer Display Result Transmit to TSO SHIPPER Enter Surrender Request Confirm Surrender Request Other TSO Validate Surrender Request Receives confirmed request

Secondary Processes ¾ Surrender ¾ LT UIOLI ¾ Oversubscription & Buyback ¾ Buyback ¾ Scaleback ¾ Bundling ¾ Unbundling ¾ Secondary Trading 6

CMP LT UIOLI ¾ Monitoring & Utilisation ¾ As per mod 485: NG to produce a CMP LT UIOLI Guidance Document which includes the method for assessing underutilisation. ¾ Reporting ¾ Currently no changes to mod 485 proposed ¾ Appeals / Justification ¾ Currently no change to mod 485 proposed ¾ LT UIOLI Withdrawal process ¾ Process as per section 3.6 of modification 500 7

Secondary Processes ¾ Surrender ¾ LT UIOLI ¾ Oversubscription & Buyback ¾ Buyback ¾ Scaleback ¾ Bundling ¾ Unbundling ¾ Secondary Trading 8

CMP Oversubscription & Buyback ¾ Oversubscription for NG is the same as existing nonobligated capacity release. ¾ Technical Capacities are baselines (obligated release). ¾ Oversubscription released prior to auctions. ¾ Oversubscription released at NG discretion in response to market demand and subject to incentive risk/reward. ¾ Driver to buyback remains in line with existing regime: ¾ i.e. NG required to deal with whole constraint; and not just required to buy back Oversubscription amount 9

Secondary Processes ¾ Surrender ¾ LT UIOLI ¾ Oversubscription & Buyback ¾ Buyback ¾ Scaleback ¾ Bundling ¾ Unbundling ¾ Secondary Trading 10

Buy back summary slide ¾ NG will buy back entitlements only. ¾ NG will complete buy back auctions on Gemini. ¾ Shippers will offer a number: ¾ Unbundled entitlements will be reduced first ¾ Bundled entitlements will then be reduced after unbundled entitlements reach zero. ¾ If both unbundled and bundled entitlements are reduced to zero then any further reduction will reduce unbundled entitlements to below 0. ¾ Section 3.8 of modification 500 11

Secondary Processes ¾ Surrender ¾ LT UIOLI ¾ Oversubscription & Buyback ¾ Buyback ¾ Scaleback ¾ Bundling ¾ Unbundling ¾ Secondary Trading 12

Scale back Summary Slide ¾ Consistent lead time on interruption for both IP entry and IP exit minimum notice 75 mins. ¾ While CAM requires scale back to be completed in order of timestamp, NG is only proposing 1 single interruptible (day ahead) auction. ¾ Every allocation of interruptible capacity for a gas day will, in practice, have the same timestamp. ¾ Interruptible capacity that has the same timestamp will be pro-rated. ¾ Section 3.7 of modification 500 13

Secondary Processes ¾ Surrender ¾ LT UIOLI ¾ Oversubscription & Buyback ¾ Buyback ¾ Scaleback ¾ Bundling ¾ Unbundling ¾ Secondary Trading 14

Bundled & Unbundled Capacity ¾ Net entitlements referred to as Available NTS Interconnector capacity in modification 500. ¾ Firm entitlements will have sub categories (viewable on Gemini): ¾ Bundled firm entitlements ¾ Unbundled firm entitlements ¾ Bundled/Unbundled entitlements will be increased following primary allocations, and adjusted following any secondary transactions. ¾ Some transactions may result in unbundling of bundled entitlements. ¾ Shippers may also voluntarily bundle entitlements 15

Voluntary Bundling Summary Slide ¾ Entitlements based process ¾ Unbundled entitlements Bundled entitlements ¾ National Grid will consider a request for bundling that has come either: ¾ Direct from a shipper ¾ Via the adjacent TSO ¾ To process a voluntary bundle National Grid will require ¾ The information stated within section 3.12 of modification 500 ¾ Acceptance by the Adjacent TSO 16

Unbundling example Surrenders In the below example Available capacities match so all capacity is bundled. Unbundled Surrender Bundled Surrender unsold demand Bundled Surrender unsold ¾ Both TSOs offer the same available capacity for the bundled auction. ¾ Both have the same bid demand to re-allocate. ¾ Surrenders must be reallocated based on submission timestamp Available capacity TSO A Available capacity TSO B ¾ TSO A will begin to reallocate the bundled surrender before TSO B. 17

Unbundling example LT UIOLI In the below example Available capacities do not match. LT UIOLI Bundled Surrender unsold Available capacity TSO A demand LT UIOLI Bundled Surrender unsold Available capacity TSO B ¾ TSO B has more Available capacity offers excess as unbundled. ¾ TSO B has higher bid demand to re-allocate. ¾ However TSO B also has more unsold capacity to reallocate. ¾ TSO A re-allocate more of the bundled Surrender and more of the LT UIOLI withdrawal than TSO B. 18

Unbundling example - Oversubscription In the below example Available capacities match so all capacity is bundled. Bundled Surrender Oversubscripti on ¾ Both TSOs offer the same available capacity for the bundled auction. unsold Available capacity TSO A demand Bundled Surrender Available capacity TSO B ¾ Both have the same bid demand to re-allocate. ¾ But both will re-allocate different amounts of the bundled surrender. 19

Unbundling example Buy back 70 Shipper capacity TSO A Unbundled Capacity 60 Bundled Capacity 40 Shipper capacity TSO B Buy back ¾ 80 units bought back by National Grid (TSO B). ¾ Unbundled entitlements reduced first (-60). ¾ Bundled entitlements are reduced next (-20). ¾ Shipper will still retain other half of the contract for bundled capacity at TSO A 20

Secondary Processes ¾ Surrender ¾ LT UIOLI ¾ Oversubscription & Buyback ¾ Buyback ¾ Scaleback ¾ Bundling ¾ Unbundling ¾ Secondary Trading 21

Secondary Trading Summary slide ¾ No specific EU rules for trading except for following reference in CAM: ¾ Bundled capacity should be traded as bundled [Article 19.8] ¾ Joint Booking Platform to be used for secondary trading at IPs. ¾ Entitlements will be traded - there will be a transfer of Rights but not Liabilities. ¾ Rules as per Section 3.9 of modification 500 22

OTC Transfer Process NG GEMINI PRISMA SHIPPER A Other TSO Validate Transfer Request Receive Transfer Proposal Receive TSO result Submit Transfer Proposal Receive Outcome Update records (optional) override default Validate Transfer Request Confirm Transfer status SHIPPER B Submit Transfer Acceptance Receive Transfer Acceptance Request TSO approval Receive Outcome View net entitlements View net entitlements Receive Outcome

Supporting Processes CAM-CMP Development Workgroup 2

Secondary Processes ¾ Surrender ¾ LT UIOLI ¾ Oversubscription & Buyback ¾ Buyback ¾ Scaleback ¾ Bundling ¾ Unbundling ¾ Secondary Trading Supporting processes Charging Credit Transitional Arrangements 25

Charging: What stays the same; what changes? ¾ ¾ ¾ ¾ ¾ ¾ ¾ The current methodology applying for Non-Interconnection Points (i.e. UK domestic) will remain as set out in UNC Section Y. NTS prices for unbundled capacity and the NTS component of bundled capacity prices will be the same. There are no amendments to the methodology of calculating Commodity Rates or who pays the Commodity Rates. The existing arrangements concerning the discounts of reserve prices for Daily and Within Day auctions will continue to apply. All reserve prices will continue to be published to 4 decimal places and in p/kwh/day in the Charging Notice. Prices will be displayed in PRISMA in p/kwh/h/runtime or p/kwh/ d/runtime Auctions for Exit. Price for Exit capacity will consist of an administered reserve price plus any auction premium. 26

NTS Entry Capacity Reserve prices - Interconnectors ¾ The NTS Entry Capacity Reserve Prices which will apply for the Interconnector Capacity Auctions will be based on the current methodologies for determining reserve prices for the relevant auctions Interconnector Capacity Auction Annual Yearly Annual Quarterly Applicable Published Prices to which capacity relates QSEC QSEC Rolling Monthly MSEC Rolling Day Ahead DADSEC Within Day WDDSEC Interruptible DISEC 27

NTS Exit Prices Interconnection Points ¾ The introduction of auction based pricing for NTS Exit Prices to apply at Interconnection Points for NTS Interconnector Exit Capacity Interconnector Capacity Auction Annual Yearly Annual Quarterly Rolling Monthly Applicable Published Prices to which capacity relates Indicative Exit Capacity Prices Final Exit Capacity Prices Final Exit Capacity Prices Rolling Day Ahead Final Exit Capacity Prices Within Day Final Exit Capacity Prices Interruptible NTS Exit Off-peak Prices 28

Ascending Clock Auctions ¾ For Ascending Clock Auctions the Large Price Step shall be the greater of [5%] of the reserve price or [0.0005] p/kwh/day. Methodology needs to be determined of how the large price step is calculcated. ¾ For Ascending Clock Auctions the Small Price step will be [one fifth] of the Large Price Step unless specified otherwise in the Joint Booking Platform General Terms and Conditions. 29

Notices/Documentation ¾ ¾ ¾ ¾ New notices of reserve prices will be produced for the Annual Yearly and Annual Quarterly Interconnector Capacity Auctions. ¾ The notices will be issued a minimum of one month before the Interconnector Capacity Auction takes place as specified in National Grid s GT Licence in respect of the NTS. Updates to any applicable Charging Documents will ensure that these are consistent with the approach currently applied for Non- Interconnection Points and the new approach for Interconnection Points. Applicable statements of Transportation charges will be published in accordance with current obligations. UNC Section Y updates will need to ensure that the relevant information is equally applicable to Interconnection Points as well as Non-Interconnection Points 30

Secondary Processes ¾ Surrender ¾ LT UIOLI ¾ Oversubscription & Buyback ¾ Buyback ¾ Scaleback ¾ Bundling ¾ Unbundling ¾ Secondary Trading Supporting processes Charging Credit Transitional Arrangements 31

Credit ¾ A single Transportation Credit for capacity will continue to apply ¾ No separate credit arrangements for Interconnector Capacity ¾ If a sanction is applied on Gemini then NG will apply a credit limit of zero on PRISMA. ¾ This prevents any further purchase of primary capacity. ¾ This prevents any further purchase of capacity through secondary transfers. 32

Secondary Processes ¾ Surrender ¾ LT UIOLI ¾ Oversubscription & Buyback ¾ Buyback ¾ Scaleback ¾ Bundling ¾ Unbundling ¾ Secondary Trading Supporting processes (if time) Charging Credit Transitional Arrangements see section 3.11 33

Next Steps CAM-CMP Development Workgroup 2

Next Steps ¾ PRISMA invited to August 12 th Workshop. ¾ Legal text is planned to be available by Sep 16 th Workshop TBC ¾ Complete walkthrough of mod? 35