OTCQX:CROCF. February. completed % U 3 O 8 Cut Off Grade. contained. repetitions. significant the aim of. Gold retains

Similar documents
CROCODILE GOLD OBTAINS APPROVAL TO PROCEED AT ITS INTERNATIONAL MINE

PLAN. Creek mine. site and was. amounted. Gold also. Hole RTRC021 Hole BKRC492 Hole BKRC526 Hole BKRC523 TSX:CRK OTCQX:CROCF.

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.52 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS PROJECT

NEWS RELEASE Orca Gold Intersects 13m at 10.19g/t Au and 93.7m at 1.72g/t Au at its Block 14 Gold Project in Sudan

NEWS RELEASE. Resources at Galat Sufar South ( GSS ), in-pit and outside current design, continue to increase

For personal use only

ASX ANNOUNCEMENT 18 SEPTEMBER More High Grade Results at the Zara Gold Project in Eritrea

PMI Targets Maiden Gold Resource for Dynamite Hill After Further High Grade Hits

TSX.V:ORG Page 1 of 7. Orca Gold Inc West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: Fax: HIGHLIGHTS

MEDIA RELEASE OCEANAGOLD UPDATES DIDIPIO NI TECHNICAL REPORT

Cumberland Completes Cannu Gold Resource Estimate, Plans for New Reserves and Continued Exploration in 2007 at Meadowbank Gold Project

September Quarterly Report

West African Resources awards underground mining contract for M1 South to Byrnecut

NEWS RELEASE Orca Gold Intercepts 39m at 2.52 g/t Au in The Republic of The Sudan and 27.7 m at 1.74 g/t Au in Côte d Ivoire

Detour Gold Reports Fourth Quarter and Full-Year 2014 Results and Year-end 2014 Mineral Reserve and Resource Estimates

For personal use only. Drilling at Torrecillas July 2011

QUARTERLY REPORT APRIL TO JUNE 2014

For Immediate Release Date: July 4, 2017 # ORVANA PROVIDES UPDATE ON DON MARIO OPERATION; ANNOUNCES US$11.3 MILLION DEBT FINANCING

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia

DRAGON MINING LIMITED An Established Nordic Gold Producer with an Exciting Future RIU Melbourne Resources Round-up 29 September 2011

Toachi Mining Inc. Starts Drill Program at La Plata Project

NEWS RELEASE 03/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742

For personal use only

For personal use only

FORREST GIMP COPPER-GOLD DISCOVERY UPDATE

Avnel Gold Reports that Indicated Resources Increased 55% to 2 Million Ounces at the Kalana Main Project

For further information: Investor Relations (416)

Press Release 31 January 2018

QUARTERLY REPORT OCTOBER TO DECEMBER 2014

SAS REPORTS 2013 THIRD QUARTER RESULTS, WITH A SIXTH CONSECUTIVE QUARTER OF POSITIVE CASH FLOW FROM OPERATIONS

LARGE STRIKE LENGTH SPODUMENE PEGMATITE DISCOVERED AT MALLINA

PAYDIRT AUSTRALIAN NICKEL CONFERENCE OCTOBER 2016

WESDOME ANNOUNCES FOURTH QUARTER AND FULL YEAR 2016 FINANCIAL RESULTS AND RESERVE AND RESOURCE UPDATE

MEDIA RELEASE OCEANAGOLD ANNOUNCES UPDATED RESOURCE & RESERVE STATEMENT

SIGNIFICANT GOLD INTERCEPTS AT PIGIBO PROSPECT

MEDIA RELEASE. OCEANAGOLD HAILE OPTIMISATION STUDY DELIVERS ENHANCED VALUE (All financial figures in US Dollars unless otherwise stated)

QUARTERLY ACTIVITY STATEMENT

SAS REPORTS STRONG 2015 FIRST QUARTER RESULTS

For personal use only

DRAGON MINING LIMITED An Established Nordic Gold Producer with an Exciting Future Fennoscandian Exploration and Mining Conference 3 November 2011

Lepidico Drilling Update: lithium pegmatites intersected in each of three programs

Prophecy Reports 2.08 Million Tonnes of Indicated Resource Grading: 455 g/t Silver, 3.19% Zinc, 2.18% Lead (594 g/t Ag Eq.) for Pulacayo Project

Velocity Continues to Expand East Zone Discovery at Rozino Gold Project, Southeast Bulgaria

Annual & Special Meeting of Shareholders Tuesday, May 2, 2017

EDV EVR NEWS RELEASE. ENDEAVOUR MINING UPDATES HOUNDÉ PROJECT ECONOMICS FOLLOWING INCREASE IN MINERAL RESERVES TO 2.1Mozs

MARCH 2018 QUARTERLY ACTIVITIES REPORT

PRODUCING AND EXPLORING Q WEBCAST

High Grade Gold Intercepts Extend Akoko North. New High Grade East Lode Discovered. 12 th January ASX Announcement

March 2019 Quarterly Activities Report

MCEWEN MINING ANNOUNCES RECORD RESOURCE ESTIMATE AT THE SAN JOSÉ MINE IN ARGENTINA

HIGHLIGHTS DETAILS. Commenting on the new discovery, Hugh Stuart, President and Director of Orca Gold, said Our aim in Côte 1 O r c a G o l d I n c.

INVESTOR PRESENTATION

Velocity Hole RDD-009 Intersects New Zone at Rozino Gold Project, Southeast Bulgaria

Northgate Minerals Reports Second Quarter Results

SARAMA RESOURCES ANNOUNCES PRIVATE PLACEMENT

DRILLING TO RE-COMMENCE AT FOUR EAGLES GOLD PROJECT

INDEPENDENCE GROUP NL

NEWS RELEASE New York AG February 25, 2019 Toronto FR Frankfurt FMV

Company Announcements Office. PNG Chamber of Mines and Petroleum Mining Seminar Wafi-Golpu Joint Venture

Paulsens Project resource soars 41% to 318,000oz as 2012 surplus cashflow forecast hits $35m

TIRIS URANIUM PROJECT EXPLOITATION LICENCE GRANTED KEY MILESTONE ACHIEVED FOR PROJECT MOMENTUM FOR DEVELOPMENT BUILDING

Velocity Files NI Technical Report on SEDAR for the Maiden Inferred Mineral Resource Estimate at Rozino Gold Project, Southeast Bulgaria

Teranga Gold Reports High-Grade Gold from Phase 2 Drilling at Golden Hill s C-Zone Prospect

PNG Mining and Petroleum Conference

News Release B2Gold Announces Positive Exploration Drill Results from the Fekola Property and Regional Targets in Mali, West Africa

SHAHUINDO GOLD PROJECT DELIVERS POSITIVE ECONOMICS

June 2014 Quarterly Results. Sandeep Biswas Managing Director & Chief Executive Officer

New Drilling Results and Mineral Resource Update for Certej Deposit Gold Resources Increase by 1,570,000 ounces

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA

2017Year End Conference Call

Press Release 25 October 2017

SYDNEY MINING CLUB FEBRUARY 2019 DUNCAN GIBBS MANAGING DIRECTOR & CEO

SilverCrest Announces Babi Sur Vein High-Grade Discovery at Las Chispas 2.2 Metres Grading 556 gpt AgEq. 1.5 Metres Grading 606 gpt AgEq

MIDWAY ANNOUNCES SIGNIFICANT UPGRADE IN RESOURCE AND 2014 BUDGET INCREASE AT SPRING VALLEY PROJECT, NEVADA

Press Release 31 July 2017

Mining and Exploring for Nickel. Diggers and Dealers, Kalgoorlie, August 2014

For personal use only

Scoping study (assuming toll milling) estimates $A24M (US$17M) operating surplus

For personal use only

Management s Discussion and Analysis

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416)

Agreement to Acquire Remaining Interest in the Golden Ridge Gold and Nickel Project

Dalradian Resources Intersects 2.34 m Grading g/t Au and 3.97 m Grading 38 g/t Au and 4 m Grading 7.38 g/t Au at the Curraghinalt Gold Deposit

TECHNICAL PRESENTATION MARCH 2014

For personal use only

AZUMAH MINING LEASES GRANTED

FOR THE PERIOD ENDING 31 DECEMBER 2018 CORPORATE EXPLORATION. Cash and Cash Equivalents. As at 31 December 2018, the Company had cash of $28,253,941.

Quarterly Results. June 2015

2008 PRODUCTION FORECAST HIGHLIGHTS

Platinum Group Metals Update and First Quarter Results

Quarterly Activities Report

MCEWEN MINING PROVIDES FIRST QUARTER 2012 OPERATIONAL AND DEVELOPMENT UPDATE

Gold Hawk Resources Inc.

1. Production numbers are considered approximate because monthly production has not been reconciled yet for November 2017.

September 2014 Quarterly Results

MEDIA RELEASE. OCEANAGOLD REPORTS THIRD QUARTER 2017 RESULTS; DECLARES DIVIDEND (All financial figures in US Dollars unless otherwise stated)

ABN Interim Financial Report 31 December 2012

Platinum Group Metals Reports 2014 Annual Results

Detour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance

AGM PRESENTATION (ASX: MML)

Transcription:

65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD ANNOUNCES INITIAL URANIUM RESOURCE ESTIMATE AT THUNDERBALL COMPLETED BY JV PARTNER THUNDELARRA February 8, 2011 Crocodile Gold Corp. (TSX:CRK) (OTCQX:CROCF) (Frankfurt:XGC) ( Crocodile Gold or the Company ) is pleased to announce an initial JORC compliant mineral resource estimate completed by its joint venture partner, Thundelarra Exploration Ltd ( Thundelarra ) on the Thunderball uranium prospect located within the Hayes Creek Project located approximately 140 kilometres south of Darwin in the Northern Territory of Australia. The mineral resource estimate was completed by SRK Consulting. The resource estimate is based upon chemical assay data from 16 diamond and 39 reverse circulation drill holes completed at Thunderball since the deposit was discovered by Thundelarra in late 2008. All drill sample data was aggregated into four metree composites prior to modeling. All dataa composites with a grade above 0.40 % U 3 O 8 were cut to that level. Resource estimates were then calculated at lower cut-offf grades of 0.02% U 3 O 8 and 0.04% U 3 O 8 for each of the two parallel zones of mineralization, as presented in Table 1 below. Table 1: Thunderball Uranium Deposit Inferred Resource Estimate (JORC compliant) 0.02% U 3 O 8 Cut Off Grade 0. 04% U 3 O 8 Cut Off Grade Tonnes Contained Contained Grade Grade Metal Tonnes Metal (% U 3 O 8 ) (% U (pounds U 3 3O 8 ) 3 O 8 ) (pounds U 3 O 8 ) Lower Zone Upper Zone Total Inferred Resource 848,0000 207,0000 1,056,000 0.0907 0.0343 0.0796 1,696,000 157,0000 1,853,000 795,000 34,0000 829,000 0.0945 0.0434 0.0924 1,656,000 33,0000 1,689,000 The Thunderball prospect has returned a number of high grade drill intercepts to date, however the current drill hole spacing is considered to be insufficient to prove continuity of this high grade mineralization. Consequently, a cautious approach has been taken to the classification of the resource and a top cut applied to limit the influence of the high grade intercepts. The 0.40 % U 3 O 8 top cut affected five data composites that had uncut average grades of up to 7.6% U 3 O 8 and disproportionally increased contained metal by 200%. The uncut model comprises 775,000 tonnes at an average grade of 0.3196% U 3 O 8 for 5.5 million pounds of U 3 O 8 (0.04% U 3 O 8 lower cut). Geological modeling associated with the resource estimation has highlighted the potential to identify repetitions of the existing mineralized zones at Thunderball. In particular the contact between the Gerowie Tuff and Zamu Dolerite, approximately 70 metres stratigraphically below the Lower Zone resource, is considered a priority target. The declaration of an inaugural resource at Thunderball is an important milestone in the development of Thundelarra s Hayes Creek Uranium Project. Five prospects at Hayes Creek have now returned significant drill intercepts and Thundelarra has stated that in 2011 it will focus drilling on these targets with the aim of upgrading one or more to resource status. Drilling will also be carried out at Thunderball to test for repetitions of mineralization at depth and along strike from the current resource. Thundelarra s objective is to define sufficient uranium resources within the project area to justify establishmentt of a central processing facility that can treat ore from several satellite deposits. The above information regarding the Thunderball deposit and Thundelarra s plans for exploration of the deposit have been taken from Thundelarra s public disclosure. Crocodile Gold has an agreement with Thundelarra in which Thundelarra has the right to explore for uranium on certain Crocodile Gold tenements while Crocodile Gold retains all other metal rights including TSX:CRK OTCQX:CROCF FRANKFURT: XGC www.crocgold.com

precious metals and base metals. Crocodile Gold has a 30% free carried interest until development in the uranium rights on the Exploration Lease where Thunderball is located while Thundelarra holds the remaining 70% interest. The location of the properties included in the joint venture and of the Thunderball deposit can be viewed in Figure 1 below. Further details on this press release can be viewed at the Thundelarra web site at http://www.thundelarra.com. About Crocodile Gold Crocodile Gold is a Canadian company with operating gold mines in the Northern Territory of Australia and a land package of over 2,500 km 2. Crocodile Gold is currently mining from the Howley, North Point and Princess Louise open pit mines and the Brocks Creek underground mine. Crocodile Gold commenced mining in November 2009 and announced its first gold pour in December 2009 at its Union Reefs Mill. The Company is currently developing the Cosmo underground mine. Ore is currently processed at the 2.4 million tonne per year Union Reefs Mill. Crocodile Gold has 3.5 million ounces of NI 43-101 compliant measured and indicated resources (57 million tonnes at an average grade of 1.9 g/t gold) and 2.2 million ounces of inferred resources (38 million tonnes at an average grade of 1.8 g/t gold) (see the Amended Annual Information Form dated November 5, 2010 and Crocodile Gold press releases dated September 8, 2009, January 25, 2010, October 14, 2010 and December 2, 2010). The Company has an exploration program in place with a main focus on the Cosmo/Howley corridor which covers a five kilometre strike length of a 25 kilometre trend. Qualified Persons The information in this report relating to mineral resources is based on information compiled by Mr. Peter Gleeson, BSc Hons (Mining Geology), MSc (applied Geostatistics/Mining Geology), AIG, GSA, who has more than five years experience in estimation of mineral resources and ore reserves. Mr Gleeson is a fulltime employee of SRK Consulting and has sufficient experience relevant to the assessment of this style of mineralisation to qualify as a Competent Person as defined in the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr Gleeson consents to the inclusion in the report in the form and context in which it appears. The details contained in this report that pertain to exploration results, ore and mineralization, other than the Thunderball JORC Compliant Resource Estimate, are based upon information compiled by Mr. Brian Richardson. Mr. Richardson is a qualified person as such term is defined in National Instrument 43-101 and has reviewed and confirmed the technical information and data included in this press release. Mr. Richardson is a Member of the Australasian Institute of Mining and Metallurgy (AUSIMM) and has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the December 2004 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr. Richardson consents to the inclusion in this report of the matters based upon his information in the form and context in which it appears. For further information, please contact: Michael Hoffman Ashleigh Clelland President and CEO Manager, Investor Relations Crocodile Gold Corp. Crocodile Gold Corp. Tel: 416-861-2964 Tel: 416-861-5899 info@crocgold.com Cautionary Note Certain information set forth in this press release contains forward-looking statements, and forwardlooking information under applicable securities laws, including management s assessment of Crocodile Gold s targeted production, future plans, operations, weather forecasts and mineral resource estimates and are based on Crocodile Gold s current internal expectations, estimates, projections, assumptions and - 2 -

beliefs, which may prove to be incorrect. Some of the forward-looking statements may be identified by words such as expects anticipates, believes, projects, plans, and similar expressions. These statements are not guarantees of future performance and undue reliance should not be placed on them. Such forward-looking statements necessarily involve known and unknown risks and uncertainties, which may cause Crocodile Gold s actual performance and financial results in future periods to differ materially from any projections of future performance or results expressed or implied by such forward-looking statements. These risks and uncertainties include, but are not limited to those risks described in the annual information form of the Company. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Crocodile Gold undertakes no obligation to update forward-looking statements if circumstances or management s estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking statements. - 3 -

Figure 1: Crocodile Gold Northern Territory Location Map - 4 -

Figure 2: 3D Image of Thunderball Resource Model Shell at 0.02% U 3 O 8 Cut Off - 5 -

Figure 3: Thunderball Resource Block Model Long Section - 6 -

Figure 4: Thunderball Resource Block Model Plan - 7 -