Two gas projects to nearly triple gas production by Dec 2018(1)

Similar documents
This presentation may include certain forward looking statements. All statements other than

Diversified production. For the remainder of % insensitive to global oil prices. 9 wells left 4 exploration 5 development. 12,500 13,000 boepd

Diversified production. 14 program. 56 wells 13 exploration (8 remaining) 43 development (8 remaining) 13,000 14,000 boepd

Diversified production. 14 program. 56 wells 13 exploration (8 left) / 43 development. 13,000 14,000 boepd

Forward Looking Statements

Canacol Energy Ltd. Reports Record Production Levels

Canacol Energy Ltd. Reports Q Results

Canacol Energy Ltd. Announces 2016 Year End Results Posting $135.5 Million of EBITDAX

Canacol Energy Ltd. Increases First Quarter Sales 20% to 11,220 BOEPD and Corporate Netback 9% to $23.90/BOE

Forward Looking Statements

Canacol Energy Ltd. Reports Q Results

Canacol Energy Ltd. Announces Conventional Natural Gas Prospective Resources

CANACOL ENERGY LTD. MANAGEMENT S DISCUSSION AND ANALYSIS THREE MONTHS ENDED MARCH 31, 2017

Operations Update LLA23 E&P Contract (Llanos Basin 90% operated interest)

Canacol Energy Ltd. Reports Q Results

CANACOL ENERGY LTD. MANAGEMENT S DISCUSSION AND ANALYSIS SIX MONTHS ENDED DECEMBER 31, 2015

VALEURA ANNOUNCES SECOND QUARTER 2018 RESULTS AND RESTART OF OPERATIONS AT YAMALIK-1

2017 EARNINGS CALL. Bahar Central Production Facility

Corporate Presentation September 2010

March 2013 TD 2013 Securities Calgary Energy Conference

POSITIONED FOR SUCCESS

2016 Results and 2017 Outlook

CANACOL ENERGY LTD. MANAGEMENT S DISCUSSION AND ANALYSIS THREE MONTHS ENDED SEPTEMBER 30, 2012

Point Loma Resources Announces Third Quarter 2018 Financial and Operating Results

TD Securities Duvernay Overview October 8, 2013

2015 Results and 2016 Outlook February 19, 2016

Positioning for Growth

VALEURA ANNOUNCES FOURTH QUARTER 2017 FINANCIAL AND OPERATING RESULTS AND YEAR-END 2017 RESERVES

Peters & Co. Low Cost and Large Scale Resource Conference Winnipeg, Montreal, Toronto - March 2013

Glacier Montney Outperformance Improves Capital Efficiencies, Enables Lower Capital and Maintains Future Production Growth. Highly Efficient 2014

BUILDING MOMENTUM IN TURKEY CANACCORD GENUITY GLOBAL ENERGY CONFERENCE OCTOBER 12, 2011 MIAMI

Horizon Petroleum Ltd.

Investor Presentation May 2015 ERINENERGY.COM

Uruguay Presentation. July David Casey Managing Director & CEO

PETRUS RESOURCES ANNOUNCES FOURTH QUARTER AND YEAR END 2017 FINANCIAL & OPERATING RESULTS AND YEAR END RESERVE INFORMATION

DISCIPLINED GROWTH + SHAREHOLDER RETURNS OUR 10 YEAR JOURNEY

Corporate Presentation

News Release January 9, Parex Announces Drilling Success on Aguas Blancas and Cabrestero Blocks and Continued Production Growth on LLA-34

TSX V: HME. Achieved a two year average F&D cost of $9.22/boe (including changes in FDC) for a recycle ratio of 1.8.

2016 the year of Answers. David Casey, Managing Director

Howard Weil Energy Conference

Liquids-Rich Montney Natural Gas Resource Play in Alberta s Deep Basin Q4 2012

Corporate Presentation

Press Release March 11, 2014 VALEURA ANNOUNCES FOURTH QUARTER 2013 FINANCIAL AND OPERATING RESULTS AND YEAR-END 2013 RESERVES

CHINOOK ENERGY INC. ANNOUNCES FOURTH QUARTER 2016 RESULTS AND PROVIDES OPERATIONAL UPDATE

Gran Tierra Energy Inc. Announces First Quarter 2014 Results

Investor Update August 3, 2017

HEMISPHERE ENERGY ANNOUNCES 2017 FOURTH QUARTER AND YEAR-END FINANCIAL AND OPERATING RESULTS

BNK PETROLEUM INC. ANNOUNCES THIRD QUARTER 2018 RESULTS WITH POSITIVE NET INCOME

Corporate Presentation

Growth + Shareholder Returns

NOT FOR DISTRIBUTION TO U.S. NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE U.S.

BNK Petroleum Inc. Announces 4th Quarter and Annual 2013 results

BAYTEX REPORTS 2016 RESULTS, STRONG RESERVES GROWTH IN THE EAGLE FORD AND RESUMPTION OF DRILLING ACTIVITY IN CANADA

M a n a g e m e n t s D i s c u s s i o n a n d A n a l y s i s and Audited Financial Statements and Notes

Corporate Presentation. May 15, 2018

HIGHLIGHTS. Analysis.

Proven Performance, Assets and Opportunity. October 2017

MARQUEE ENERGY LTD. ANNOUNCES FIRST QUARTER 2014 FINANCIAL RESULTS WITH RECORD FUNDS FLOW AND PRODUCTION

Premium Pipestone Asset Acquisition. August 9, 2018

Press Release March 22, 2012 VALEURA ANNOUNCES FOURTH QUARTER 2011 FINANCIAL AND OPERATING RESULTS AND YEAR-END 2011 RESERVES AND CONTINGENT RESOURCES

TRANSATLANTIC 3 RD QUARTER RESULTS & COMPANY UPDATE NOVEMBER 2016

News Release March 7, Parex Resources Announces 2016 Fourth Quarter and Full Year Results

Bengal Energy Announces Fourth Quarter and Fiscal 2018 Year End and Reserve Results

Annual and Special Shareholder Meeting May 17, 2018

Scotiabank CAPP Conference April 2016 CORPORATE PRESENTATION

AUSTRALIA FOCUSED EXPLORATION & PRODUCTION COMPANY

Press Release November 15, 2011 VALEURA ANNOUNCES THIRD QUARTER 2011 FINANCIAL AND OPERATING RESULTS

SPARTAN ENERGY CORP. ANNOUNCES STRATEGIC LIGHT OIL ASSET ACQUISITION IN SOUTHEAST SASKATCHEWAN AND $505 MILLION EQUITY FINANCINGS

NOT FOR DISTRIBUTION TO U.S. NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE U.S.

SUSTAINABLE DIVIDEND & GROWTH May 2018

TRANSGLOBE ENERGY Q4 & YEAR-END 2017 RESULTS MARCH 7, 2018 TSX:TGL NASDAQ:TGA

TransGlobe Energy Corporation Announces 2017 Year-End Reserves

INPLAY OIL CORP. ANNOUNCES 2016 YEAR END RESERVES AND AN OPERATIONS UPDATE

Spartan Energy Corp. Suite 500, nd Street SW Calgary, AB T2P 0R8 Canada. Ph.: (403) Fax: (403)

HIGHLIGHTS with an effective date of December 31, 2011.

TRANSGLOBE ENERGY CORPORATION ANNOUNCES FOURTH QUARTER AND YEAR-END 2009 FINANCIAL AND OPERATING RESULTS TSX: TGL & NASDAQ: TGA

Corporate Presentation, November 2017

Advantage Production Reaches 183 mmcfe/d Target During Commissioning of Expanded Glacier Plant in July Excess Standing Well Productivity &

Advantage Announces 2011 Year End Financial Results and Provides Interim Guidance

Corporate Presentation. August 2018

Low Risk Glacier Montney Development, Strong Balance Sheet & Hedging Program Supports Profitable & Sustainable Growth

FORWARD-LOOKING STATEMENTS

Corporate Presentation. June 2018

Corporate Presentation March 2017

BONAVISTA ENERGY CORP. MAY 2017 SOUTH CENTRAL ALBERTA ASSET OFFERING

SUSTAINABLE DIVIDEND & GROWTH January 2018

GEOPARK REPORTS RESULTS FOR THE SECOND QUARTER ENDED JUNE 30, 2015

Forward-Looking Information and Definitions

Corporate Presentation. May 2018

ANNUAL INFORMATION FORM FOR THE YEAR ENDED JUNE 30, 2015

Q third quarter report

SUSTAINABLE DIVIDEND & GROWTH July 2018

MANAGEMENT S DISCUSSION AND ANALYSIS

Corporate Presentation

Corporate Presentation

to announce Operating Results March 22, 2011 boe/d. $38.5 million to funds from cash flow for $45.1 million the increasing optimization of our other

Unlocking Latin America

QUARTERLY REPORT. For Quarter ending 30 September 2011 HIGHLIGHTS COMPANY OVERVIEW

Investor Presentation TSX, NYSE: AAV July, Page 1

Transcription:

November 2017 Two gas projects to nearly triple gas production by Dec 2018(1) (1) From 85 230 MMcf/d, or 2.7x

Forward Looking Statements Gas deficit This presentation may include certain forward looking statements. All statements other than statements of historical fact, included herein, including, without limitation, statements regarding future plans and objectives of Canacol Energy Ltd. Canacol or the Corporation, are forward-looking statements that involve various risks, assumptions, estimates, and uncertainties. These statements reflect the current internal projections, expectations or beliefs of Canacol and are based on information currently available to the Corporation. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. All of the forward looking statements contained in this presentation are qualified by these cautionary statements and the risk factors described above. Furthermore, all such statements are made as of the date this presentation is given and Canacol assumes no obligation to update or revise these statements. 20 blocks / 2.1 MM net acres Natural Gas S. Pacific Ocean Colombia Barrels of Oil Equivalent Barrels of oil equivalent (boe) is calculated using the conversion factor of 5.7 Mcf (thousand cubic feet) of natural gas being equivalent to one barrel of oil. Boes may be misleading, particularly if used in isolation. A boe conversion ratio of 5.7 Mcf:1 bbl (barrel) is based on an energy equivalency conversion method primarily applicable at the burner tip and does not represent a value equivalency at the wellhead. Production and Reserves Production represents net before royalty Reserves represent 2P reserves and before tax NPV-10 as of December 31, 2016 USD All dollar amounts are shown in US dollars, unless indicated otherwise 140 280 Km 420 560 2 2

The Path To ~$300 MM EBITDA In MM, except CDN $/share amounts TSX $/share (12/18/17) CDN $4.20 Fully diluted shares outstanding(1) Market capitalization(2) Net debt(3) Enterprise value TSX: CNE BVC: CNE.C to realized contract sales 85 130 MMcf/d % gas ~80% 178 US $588 $243 US $831 Insider ownership (1) Includes in-the-money options based on CDN $4.20 / share price ~140 MM shares in the float (2) Converted from CDN USD exchange rate (0.79) as of 12/18/17 (3) As of 9/30/17 to realized contract sales 130 230 MMcf/d 22% 3

Strong Track Record Of Asset Optimization Added 314 BCF in 2P reserves over the trailing 4-yrs. A conventional gas success story +51% CAGR in 2P reserves In MMboe(1) oil gas Recent 2P NPV-10 Gas exploration success 1P / 2P reserve replacement Avg. F&D cost 80 74 8 9 39 31 65 19 72 $1.2 B(2) 9/10 wells (90%) 166% / 194% y/y $0.44 / MCF(3) 90% gas The lowest cost gas operator always wins 14 For the 3 months ended 9/30/17 7 8 11 14 '09 '10 '11 '12 Oil 17 '13 20 '14 '15 '16 Gas In US dollars unless otherwise noted (1) Represents before tax corporate total (oil + natural gas) 2P reserves value as of 12/31/16 Pro forma for the sale of Canacol s assets in Ecuador as of Dec (2) Represents before tax natural gas only 2P reserves value as of 12/31/16 (3) Average over the trailing 2-yr. period (4) Includes $0.26/MCF of transportation expense Natural gas revenues Royalties Production expenses(4) Operating netback $ / MCF % margin $ 4.96 $ (0.51) 10% $ (0.62) 12% $ 3.83 77% 4

Two Gas Projects To Nearly Triple Gas Production By 2019 Chuchupa Ballena Barranquilla 1 Sabanas Pipeline Co. Caribbean Sea +40 MMcf/d 130 MMcf/d 2018 Building 6-in. pipeline Jobo Sincelejo Cartagena Reficar La Creciente 2 1 Jobo facility +100 MMcf/d 230 MMcf/d Twin Jobo Sincelejo pipeline 8 gas fields 5 blocks 1.1 MM net acres Canacol gas blocks Gas pipeline pipeline pipeline 2 New compressor Compressor 10 km Gas field 2019 Construct new pipeline Cartagena Barranquilla 5

Canacol s Sweet Spot Replacing Chevron s gas supply to the Caribbean Replacing Chevron as the largest Caribbean supplier of gas(1) Not many gas supply options MMcf/d 550 2019ĺ Excess demand > 100MMcf/d 230 75 85 400 ~380 MMscfpd LNG > $8/MMbtu 475 130 Barranquilla 395 Canacol 355 325 Cartagena Deep Water > 2000m 300 250 246 202 175 Hocol 30 MMscfpd Frontera 30 MMscfpd ~80 MMscfpd Chevron 100 '16 '17E '18E (1) Source: Wood Mackenzie and UPME Colombia estimates '19E '20E Cero Matosa 6

A Conventional Natural Gas Success Story X 4 discoveries in 2017 1 Sincelejo Bremen 2 1 VIM 19 SSJN7 VIM 5 7 Gaiteros-1 (exploration) 3D Pandereta-1 Oboe 7 Pandereta-2 (appraisal) VIM 21 Clarinete Canahuate Jobo Large resource upside Net acres Blocks Gross mean unrisked resources BT EMV-10 Prospects / leads (1) (2) 1.1 MM 5 2 TCF (1) US $789 MM (2) 44 (2) Gaffney, Cline & Associates GCA prospective conventional natural gas resource report, effective Dec Expected Monetary Value discounted at %, GCA Dec Legend Trombon Cañandonga-1 Toronja Palmer Strong base production and reserves 3 acquisitions ('12-'14) 96 BCF Trailing 3-yr. 2P reserve adds 314 BCF Recent 2p reserves 410 BCF Gas exploration success 10/11 wells (91%) Producing wells 17 3D Nispero 3D Canacol Gas Nelson Esperanza Gas field Prospects Leads Facilities Existing pipeline 1 Sabanas planned pipeline (12/1/17) 2 Promigas planned pipeline (12/1/18) 20 km 7

AVO Reduces Exploration Risk Discovered 10 gas fields over the trailing 4-yrs. The hunt for repeatable anomalies PANDERETA-1 CLARINETE-1 Applying AVO technology to gascharged sandstones 1,200 1,400 Tubara Marker 1,600 Lower Tubara Gas exploration success Utilizing AVO Avg. net pay/well Avg. test rate/well 10-for-11 (91%) 7-for-7 (100%) 84 ft. TVD 32 MMcf/d 1,800 Mid Miocene / Top CDO 2,000 2,200 >2 TCF of running room(1) Upper CDO Mid CDO 2.400 Basal CDO Fluid Factor (AVO) section (1) Represents gross unrisked mean resources from the Gaffney, Cline & Associates prospective gas resource report, effective Dec 8

Pandereta-2 Appraisal Well Depth structure map top reservoir interval tied to PAN-1 AVO seismic attribute section parallel to proposed PAN-2 wellbore trajectory A B PAN-2 PAN-1 Penetration point at Top CDO Reservoir B A PAN-2 P-90 P-10 AVO event at mid CDO PAN-1 AVO event at BASEMENT 500 M Pandereta-1 tested 29 MMcf/d Spud October 25, 2017 TD & Drill time 9,347 ft md, 15 days Petrophysical interpretation (logs) Primary target CDO 64 ft tvd net gas pay Secondary targets Lower Tubara 34 ft tvd net gas pay Fractured basement 51 ft tvd gas pay Pandereta-2 Objective Investigate AVO seismic attribute in adjacent fault block with view to book additional reserves in CDO reservoir section Anticipated spud December 6, 2017 Anticipated TD & Drill time 10,306 ft md, 20 days Primary target CDO Secondary targets: Lower Tubara, fractured basement 9

Drilling For Repeatable Anomalies In The Porquero Jun : Toronja-1 exploration well tested 46 MMcf/d TORONJA-1 Jun 1 NELSON-6 Nov 1 1 1,200 1,400 1,600 Intra Porquero NELSON-5 PORQUERO 1,800 NELSON-4 NELSON-2 NELSON-3 Top CDO 2.000 2 2,200 PALMER-1 NELSON-8 Basement 2.400 Mid Porquero time structure 1KM 1 2 Fluid Factor (AVO) section Tested 46 MMcf/d Exploration target Porquero reservoir sandstones Well cost 41% below budget Tied Toronja into Jobo (3 kms) Porosity 20% 10

Toronja-1 Suggests Much More In Store For The Porquero Nelson-5, Nelson-6 added 25 Bcf from the Porquero Formation(1) Nov Nelson-6 spelled opportunity Net pay Tested 39 ft. TVD 23 MMcf/d ARANDALA-1 Dec Nelson-5 Porquero recompletion Ĺ confidence Net pay Tested CARAMBOLO-1 79 ft. TVD 13 MMcf/d BREVA-1 Jun Toronja-1 says more running room Tested TORONJA-1 46 MMcf/d NELSON-5 Aranadala-1, Breva-1, Carambolo-1 offer 3 follow-up exploration locations NELSON-6 AVO extraction over Mid Porquero SST marker Represents P reserves as of Dec 1 KM reserve report 11

Active 4Q 2017 Exploration Program Gaiteros-1 rig mobilization 3D 3D Gaiteros-1 Pandereta-1 Oboe-1 7 Pandereta-2 (appraisal) Clarinete-1 Reservoirs Net pay 3D Arianna Canaflecha Sucre Castor Katana Nispero-1 Trombon-1 3D Toronja-1 VIM 5 block Cañandonga-1 Palmer-1 Nelson Field 193 BCF Spud Jan 2018 Fault dependent closure Reservoir target CDO Drill & test / Depth $5.5 MM / ~10k ft. MD Pandereta-1 tested 29 MMcf/d VIM 21 & Esperanza blocks Jobo Station Prospect Lead Canacol fields Mature fields Flow line Gas well 5 km CDO, Tubara 64 ft TVD (CDO) 34 ft TVD (Tubara) Porosity 21% (CDO) 15% (Tubara) Pandereta-2 spud on December 3rd Cañandonga-1 Reservoir CDO Net pay 32 ft TVD Porosity 18% Well test with workover rig 2018 13

Path to 130 MMscfpd 20 MMscfpd of initial transport capacity on Dec 1, 2017 Bremen Station VIM 19 San Luis Station La Union Station SSJN 7 40 MMscfpd of transport capacity in mid January 2018 VIM 5 Promigas 195 MMscfpd of productive capacity 200 MMscfpd of gas processing capacity VIM 21 Jobo Facility Esperanza 20 m 14

Aim To Deliver 230 MMcf/d By 2018 Exit Only $30 MM to maintain 230 MMcf/d US $85 MM to increase gas production from 130 230 MMscfpd in Dec 9 average sales price of ~ $ /MMbtu 80 MMscfpd of new productive capacity $50 MM for 10 new wells and tie ins 100 MMscfpd of new processing capacity $35 MM in modular expansion of existing facility at Jobo 100 MMscfpd of new transport capacity US $ 0 for second expansion of the Promigas pipeline Construction of the new Sabanas pipeline project 15

Outlook 85 130 230 MMcf/d +49% CAGR in gas production Substantial liquidity enables execution MMcf/d US $ in MM forecast Q 7 net debt 9e ebitda ~$300 $243 MM ~$300 MM 230 $135 130 70 '16 85 '17 '17 exit For the remainder of 2017e: 2 gas exploration wells Sabanas flow line '18 exit '16 '19e Senior secured term loan Credit Suisse + syndicate / L+5.50% No re-determination if oil prices fall Mar 9 Mar ~$24 MM of principal payments for 13 consecutive quarters 16

Canacol s Acreage Is Colombia s Shale Oil Sweet Spot > 2.3 trillion oil barrels in S.A. has La Luna source rock Source: 2010 Journal of Petroleum Geology Mono Araña Mono Capuchino VMM 2 Source: 2013 U.S. EIA study Canacol blocks Gross / net acres 5 625k / 371k Canacol s VMM and VMM offer over pressured, Tier acreage in the La Luna fairway Pico Plata Normal pressure 1.7 M acres of La Luna fairway in Colombia Gross/net acres 159k / 32k Operating partner ConocoPhillips Solid results from multiple fracs in the latest well (Pico Plata) Over pressured VMM 3 Tier 1 Tier 2 % Vro 0.6-1.2 Potential prize: 1.9 B barrels of net mean OOIP(1) Source: DeGolyer & McNaughton unconventional oil prospective resource report, Oct % Vro >0.6 10 km Wells Oil fields Canacol wells (1) Pro forma for the relinquishment of the Santa Isabel block DeGolyer & McNaughton D&M Resource Report as of / /. D&M provided mean estimates of Original Oil In Place (OOIP). These estimates have not been adjusted for the probability of geologic success. 17

GALEMBO C PicoPlata-1 Vertical Unconventional Well Operated By Conoco Frac #3 VMM3 gross acres 83k Canacol WI 20% GALEMBO D-1 La Luna shales Frac #2 Gross thickness 1369 ft. Net pay 866 ft. Avg. porosity 10% Jan 2017, 3 successful fracs Highly over pressured SALADA A All fracture treatment successfully placed Induced fractures grow in height (125-200 ft.) Frac #1 Variable flow rates 60 500 bopd (no water) 31 API gravity oil 18

Contact Carolina Orozco Director, Investor Relations 44 (0) 755.537.3873 corozco@canacolenergy.com Kevin Flick VP, Investor Relations 214.235.4798 kflick@canacolenergy.com Phil Heinrich Investor Relations Manager 403.561.1648 pheinrich@canacolenergy.com 18