Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report

Similar documents
THIRD QUARTER REPORT 2014

Fund for Gender Equality Monitoring and Evaluation Framework Executive Summary

Economic and Social Council

UN BHUTAN COUNTRY FUND

Joint Venture on Managing for Development Results

Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level

Duration of Assignment: Approx. 150 working days from January to September 2015

Duration of Assignment: Apprx. 150 working days from January to September 2015

COUNTRY LEVEL DIALOGUES KEY DOCUMENTS

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS

Annex 1: The One UN Programme in Ethiopia

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen

Global Environment Facility

ANNEX I: TERMS OF REFERENCE (TOR)

BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS

Session C Ownership and Alignment. Gender responsive Budgets in Morocco: illustration of the Paris Declaration Alignment and Ownership principles

I Introduction 1. II Core Guiding Principles 2-3. III The APR Processes 3-9. Responsibilities of the Participating Countries 9-14

WSSCC, Global Sanitation Fund (GSF)

Sixty-fourth session of the WHO Regional Committee for the Western Pacific October 2013 Manila, Philippines

Terms of Reference for the Mid-term Evaluation of the Implementation of UN-Habitat s Strategic Plan,

EAP Task Force. EAP Task

SURVEY GUIDANCE CONTENTS Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness

Guideline for strengthened bilateral relations. EEA and Norway Grants

PROJECT PROPOSAL PAPER FOR GPSA GRANT US$ 800,000 SEARCH FOR COMMON GROUND (SFCG) GUINEA FOR A

SPECIFIC TERMS OF REFERENCE. EU contribution to 2012 Federal PEFA assessment in Pakistan

Coordination and Implementation of the National AIDS Response

Mongolia. Mongolia is a lower-middle income country with a gross national income (GNI) of USD 1 630

Development Account Project on Strengthening Capacity for Post 2015 Monitoring Third Workshop ADDIS ABABA, ETHOPIA, 14 th 18 th May, 2018

Implementing the SDGs: A Global Perspective. Nik Sekhran Director, Sustainable Development Bureau for Policy and Programme Support, October 2016

Mid Term Review of Project Support for enhancing capacity in advising, examining and overseeing macroeconomic policies

with UNDP for the Republic of Congo 12 May 2016 NDA Strengthening & Country Programming

REPUBLIC OF ZAMBIA. Ministry of National Development Planning

UNDP Pakistan Monitoring Policy STRATEGIC MANAGEMENT UNIT UNITED NATIONS DEVELOPMENT PROGRAMME, PAKISTAN

Basic Introduction to Project Cycle. Management Using the. Logical Framework Approach

The Sustainable Development Goals Monitoring and Coordination of SDG 16. Country: Georgia. Mariam Tutberidze IDFI

2011 SURVEY ON MONITORING THE PARIS DECLARATION

PUNTLAND GOVERNMENT OF SOMALIA MINISTRY OF HEALTH. Health Financing Strategic Plan - DRAFT

Betty Ngoma, Assistant Director Aid coordination Magdalena Kouneva, Technical Advisor Development Effectiveness

National Plan Commission April 2018 Addis Ababa

Terms of Reference (ToR)

Action Plan for Pons Danubii EGTC

CAMBODIA. Cambodia is a low-income country with a gross national income (GNI) of USD 610 per

Annex 1. Action Fiche for Solomon Islands

Treasury Board of Canada Secretariat. Performance Report. For the period ending March 31, 2005

HOW ETHIOPIA IS DOING TO MEET SDGS

Bilateral Guideline. EEA and Norwegian Financial Mechanisms

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming

Health in the Post-2015 Development Agenda

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

GOOD PRACTICE CASE STUDY BANGLADESH: CAPACITY DEVELOPMENT IN PUBLIC FINANCIAL MANAGEMENT 1 BACKGROUND

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE TOR - CONSULTANCY IC/2012/026. Date: 16 April 2012

EUROPEAN COMMISSION Job Description Form. Job description version2 (Active) Job no in DEVCO.F.DEL.Afghanistan Valid from 04/01/2018 until

We recommend the establishment of One UN at country level, with one leader, one programme, one budgetary framework and, where appropriate, one office.

Acronyms List. AIDS CCM GFATM/GF HIV HR HSS IP M&E MDG MoH NGO PLHIV/PLH PR SR TA UN UNAIDS UNDP UNESCO UNFPA UNICEF WG WHO NSP NPA MEC

M_o_R (2011) Foundation EN exam prep questions

Country brief MALAWI. Debt and Aid Management Division Ministry of Finance, Economic Planning and Development. October 2014

Internal Audit of the Republic of Albania Country Office January Office of Internal Audit and Investigations (OIAI) Report 2017/24

VOLUME VIII: PROCEDURES MANUAL FOR PLANNING AND RESEARCH UNIT

Second Consolidated Annual Progress Report on Projects Implemented under the Maldives One UN Fund

Statistical Support for Development Effectiveness And Results Measurement. Prepared by the African Development Bank

Strengthening Multisectoral Governance for Nutrition Deborah Ash, Kavita Sethuraman, Hanifa Bachou

CAPACITY DEVELOPMENT WORKSHOP AIDE MEMOIRE AUDITING FOR SOCIAL CHANGE

162,951,560 GOOD PRACTICES 1.9% 0.8% 5.9% INTEGRATING THE SDGS INTO DEVELOPMENT PLANNING BANGLADESH POPULATION ECONOMY US$

Jamaica's Preparedness for Implementation of Sustainable Development Goals (SDG)

FRAMEWORK AND WORK PROGRAM FOR GEF S MONITORING, EVALUATION AND DISSEMINATION ACTIVITIES

Mauritania s Poverty Reduction Strategy Paper (PRSP) was adopted in. Mauritania. History and Context

with Fundación Avina for Republic of Paraguay 11 October 2017 Strategic Frameworks

Terms of Reference. External monitoring mission for the Project Mid-Term Review

INEY IPF Component. Strengthening National and Subnational Capacity

Inter-American Development Bank (BID) Perú PROGRESS MONITORING REPORT (PMR) FOR THE FOREST CARBON PARTNERSHIP FACILITY (FCPF)

Rwanda. Rwanda is a low-income country with a gross national income (GNI) of USD 490

Supplementary matrix 1

SIXTY-SIXTH WORLD HEALTH ASSEMBLY A66/48 Provisional agenda item May WHO reform. Financing of WHO

REPORT 2015/174 INTERNAL AUDIT DIVISION

International Monetary Fund Washington, D.C.

AID EFFECTIVENESS ) By Sri Mulyani Indrawati )

Expert meeting 2. Developing SSPARS and Integration into NSDS. Challenges & Best Practices

Project management guidelines. November 2013

DECISION ADOPTED BY THE CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY AT ITS ELEVENTH MEETING

CONCORD, the European NGO Confederation for Relief and Development, is seeking a:

Project number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level.

TECHNICAL GUIDANCE FOR INVOLVING NON-STATE ACTORS IN THE COUNTRY PROGRAMMING FRAMEWORK (CPF)

with GIZ for the Kingdom of Thailand 3 July 2015 NDA Strengthening & Country Programming

TOWARDS THE FULL OPERATIONALIZATION OF THE GREEN CLIMATE FUND

CBMS Network Evan Due, IDRC Singapore

with UNDP for the Union of the Comoros 25 June 2015 NDA Strengthening & Country Programming

ZIMBABWE_Reporting format for final scoring (Ref. 4)

SOCIAL PROTECTION AND LABOR. Serene Philip Sr. Social Protection specialist

UNDP Initiation Plan to programme the project preparation grant received from the GEF. (otherwise called GEF PPG)

PEFA Handbook. Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA

Year end report (2016 activities, related expected results and objectives)

with the Development Bank of Seychelles for the Republic of Seychelles 18 December 2017 NDA Strengthening & Country Programming

STRATEGIC PLANNING PROCESS (2017) 1.1 The Association s strategic planning framework consists of the preparation of the following documents;

ANNEX. Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode

URBACT III Programme Manual

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management

TERMS OF REFERENCE FOR INDIVIDUAL CONSULTANT

Benin 27 August 2015

REQUIRED DOCUMENT FROM HIRING UNIT

Transcription:

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening (1st January 31st March 2013) First-Quarter Report

Contents 1. BACKGROUND OF PROJECT... 3 2. PROJECT OVERVIEW... 3 3. MAJOR ACTIVITIES & ACHIEVEMENTS: FIRST QUARTER... 6 3.1 Establishing the theoretical arrangement for a visioning process... 8 3.2 Establishing the operational structure to support the project methodology... 8 3.3 Stakeholder endorsement of the project conceptual framework... 8 3.4 Reestablishing the MDG working group... 8 4. CHALLENGES... 9 4.1 Lack of a unified government administration... 9 4.2 The need to build an infrastructure to support the project... 9 4.3 To organize and coordinate community engagement... 10 4.4 Nation building and an emerging national identity... 10 4.Dealing with project preparatory matters... 10 5. LESSONS LEARNED... 11 6. FINANCE... 11 7. CONCLUSION... 12 2

1. BACKGROUND OF PROJECT The project is born out of the dissolution of the Netherlands Antilles on 10 October 2010. As a result, Sint Maarten, with Curacao became autonomous countries within the Kingdom of the Netherlands and now have responsibility for their development. As a consequence, cooperation funds from the Dutch Government; development funds from USONA and AMFO and financial support for the Social Economic Initiative (SEI) will terminate at the end of 2014. With development assistance from the Netherlands about to end, Sint Maarten aims to become self-reliant in meeting its development objectives and if need be, look elsewhere for additional assistance. In order to reach that goal, Sint Maarten needs a plan on nation building and development. To establish this, Sint Maarten expressed a willingness to work collaboratively with and make use of the experience of United Nations Development Programme ( UNDP). In furtherance of that willingness, Sint Maarten and UNDP agreed to the main principles of a corporative project termed, Building a Nation: Sint Maarten National development Plan and Institutional Strengthening in Sint Maarten, (project) through a Letter of Intent dated 7 July 2011 having the following broad objectives: Develop strategies for nation building and national development through a participative approach; Implementation of policies aimed towards reaching the Millennium Development Goals ; Further implementation of the development information database (Devinfo) as a precise and sensitive tool to measure and benchmark Sint Maartens socio-economic development 2. PROJECT OVERVIEW The details of the project are set out in a Project Document (PD) signed between Sint Maarten and UNDP on 30 April 2102. The PD incorporates a cost sharing agreement by which Sint Maarten agrees to contribute US$898,870 to UNDP on a cost sharing basis including in kind contributions. UNDP for its part will provide country office and technical support. The project period is 36 months from April 2012 to March 2015. The project strategy aims to support the Nation Building process by means of: formulation of a National Vision to guide a National Development Plan (NDP) through a participative dialogue process; capacity development in Results and Evidence Based Management that will support implementation of the NDP; strengthened capacities to achieve MDGs through MDG Acceleration Framework (MAF) with two pilot projects on MDG goal 1 and 7; and developing coordination mechanisms on aid effectiveness and international support to supplement local budget in development initiatives. 3

Table 1 Dialogue for National Vision Visionary Priorities Identified through community Dialogue - 2013 - Culture Environment Vision Social & Human development Economics Dialogue Platform.................... Vision Statement to guide the development of the National Development Plan Dialogue for the National Development Plan National Strategies Identified - 2014 - National Development Plan.................... Dialogue Platform National Development Plan The project outputs in the PD were amended to provide greater management clarity by the Project Board at its inaugural meeting when it virtually met in early February to approve the Annual Work Plan 2013. The National Vision (Output 1) will be produced during the first year of the project and will constitute the base for a further planning exercise that will lead to a National Development Plan (Output 2). The visioning process will be participatory involving all sectors of Sint Maarten society as identified through a stakeholder analysis. A National Vision is an articulation of the peoples development aspirations and priorities of the country into the medium long term, as 4

well as identifying main challenges to be addressed. A SWOT analysis will be conducted with the objective to assist the production of a factsheet of past, current and future situation of the country including detail of progress made since 2011 in achieving MDGs in Sint Maarten. The information obtained through the visioning process will be analyzed thematically to identify visionary priorities pertaining to culture, environment, social and human development and economics. The vision statement (referred to as the draft NDP in the AWP/13) will therefore guide the development of the NDP, being the focus of Output 2 Table 1. National Development Plan (Output 2) will be formulated through a participatory process involving a minimum of 30 dialogue sessions within the community as identified and targeted through a stakeholder analysis. The identification, coordination and engagement of stakeholders is developed in consultation with them and institutionalized. The vision statement document will form the baseline for dialogue and is intended to guide stakeholders help solve complex social, environmental, economic and political challenges in the elaboration of a NDP. The NDP will be recollected into a knowledge product emphasizing lessons learned and will be disseminated regionally. Communications (Output 3) strategy will cross cut the project outputs and will be executed to create project awareness and general community involvement in the implementation of the project. Overall the strategy is intended to induce stakeholder involvement and participation towards ownership and enhanced transparency in the development of a NDP. With regard to other outputs, the strategy will promote the importance of the need to develop results based management through training in RBM methodologies and through the implementation of the Devinfo system as a tool to create a central data base to support evidence based management practices. The strategy will also promote the MDG 2011 report and MAF as tools for national development planning. Capacity development (Output 4) is a major outcome of the project. Its focus is to ensure that sufficient capacity is created to ensure that the NDP be implemented according to results and evidence based management practices. Capacity development for program and project management planning, monitoring and evaluation will be achieved through trainings in PRINCE 2 methods. To measure the country s socio-economic development, the DevInfo data base will be implemented. Sectoral MDG data as well as the Census 2011 statistical information will initially populate the database. A pool of data administrators will be trained to keep the data base actual and accessible to users. A knowledge product related to the implementation of results and evidence based management practices will elaborate best practices and highlighting lessons learned in how the country may proceed to improve these practices. MDGs (Output 5) has three subsets: Output 5.1 involves the development of a MAF country action plan; Output 5.2 involves the completion of the MDG country report 2015 and Output 5.2 involves implementing two pilot projects related to MDG goal 1 (poverty) and MDG goal 7 (environment). The MAF will accelerate MDG goals that are identified through the MDG 2011 5

report as lagging. As agreed in the PD, the MAF will prioritize MDG 1 and MDG 7. Interventions and targets will be identified through a participatory process undertaken in conjunction with the dialogue process defining the National Vision and NDP. The production of the MDG country report in 2013, as originally intended in the PD, is delayed with the consent of the Project Board until 2015. International aid coordination (Output 6) will come about through the adoption of a clear strategy involving government, donors, civil society and other development actors agreeing to a strategic action plan coordinating external support and creating alignment between government policies and aid. Training will be conducted in field of international aid and coordination mechanisms. 3. MAJOR ACTIVITIES & ACHIEVEMENTS: FIRST QUARTER The activities for the first quarter span stages 1 (Research) and stage 2 (Strategy) of the project, Table 2. These stages lay the theoretical and organizational foundation for stakeholder engagement and the conduct of dialogues. Four months is given to complete the two stages. A participatory exercise with stakeholders to define how Sint Maarten community will engage the project is set to be completed at the end of April 2013 and will conclude stage 2. The transition to stage 3 (second quarter) will direct itself to setting up the dialogue platforms through which trainings in dialogue facilitation will commence. Table 2 Q1 Q2 Q3 Q4 Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 Research Strategy Platform Training Dialogue Outputs Dialogue Dialogue 2 2 4 4 1 5 Start Duration Finish Platform Dialogues Deliverables 0 2 2 4 1 5 5 5 10 10 2 12 communication Communication 2 2 4 4 1 5 The project annual work plan 2013 and first quarter plans were approved by the Project Board in early February 2013. The project framework and results for the first quarter 2013 can be summarized in Table 3. 6

Table 3 INTENDED OUTPUTS 1: National Vision is produced 2: A National development Plan with sector based implementation plans developed through a democratic dialogue process ANNUAL OUTPUT TARGETS ACTIVITIES ACTIVITY STATUS 1: Methodology and theoretical focus Completed for building a National Visioning process National Vision is identified and disseminated completed Draft National Development Plan completed and launched 2: Project operational procedure and democratic dialogue strategy developed, validated and endorsed with stakeholders Same as for output 1 Completed in regard to above activity completed 3:Communication awareness campaign developed Country wide communication campaign and visibility strategy developed 1: A communication firm recruited to strategize and execute communication strategy 2: A communication and visibility strategy is produced In action (draft terms of reference produced) 4: Government officials trained in Results Based and Evidence Based management (Devinfo-Data) Dev-info data base installed 15 government officers trained Potential users of Dev-info identified and trained Dev-info data base populated with 2011 census and relevant socioeconomic data 1: Dev-Info database system procured and installed 2: 15 government officers trained in Dev-Info 3: DevInfo Database populated In action (strategy agreed to with STATS and ToR prepared)) 5.1:A MAF Country action plan produced MDG working Group established Technical Specialist hired MAF country action plan strategy prepared Interventions and bottlenecks identified 1: MDG working group established with roles and responsibilities 2:Consultant identified to produce a MAF country action plan and MDG report 3: Technical specialist hired to assist the preparation of a MAF action plan Completed (to be formalized) Completed (with procurement UNDP) Start date early May 7

During the first quarter of 2013, the project implemented its activities in the five components National visioning and NDP, communications, capacity building (Devinfo system) and MDG. Timely progress is made in implementing the foundational work to undertake a national visioning process and NDP construction (Outputs 1 & 2) and in establishing the MDG work group (Output 5)and steps to procure a consultant to assist in the preparation and drafting of a MAF country action plan. Less progress is made in regard to initiating the procurement of a consultant firm in communications (Output 3) and initiating the implementation of the Devinfo data system (Output 4). The delay in implementing Outputs 3 and 4 activities are expected to be recovered in the second quarter. The major achievements in the first quarter are highlighted below: 3.1 Establishing the theoretical arrangement for a visioning process The PD is clear in its instruction that the visioning process and development of the NDP be a participatory exercise that engages all sectors of Sint Maarten society. A project methodology is needed to give effect to a bottom up approach allowing the people to express freely their aspirations and for those aspirations to be articulated in a national vision that will in turn inform the NDP. A comparative analysis was undertaken of countries (with a local emphasis) that had undertaken such a nation building exercise. 1 That analysis resulted in the production of a visioning process methodology for the project. 2 In parallel with that, a stakeholder analysis was conducted mapping Sint Maartin society and identifying relative degrees of influence and importance. 3.2 Establishing the operational structure to support the project methodology The project methodology informs the operational structure for the project. 3 One aspect of the operational structure, the Steering Committee, required the drafting of subordinate legislation. The draft is completed and is before the Council of Ministers for consent. 3.3 Stakeholder endorsement of the project conceptual framework On March 7, 2013 an Information workshop was conducted to consult with stakeholders over the conceptual framework that defines the theoretical basis for the project structure. Eighty persons attended representing a cross section of stakeholders identified through the stakeholder analysis. An evaluation of the workshop was undertaken indicating general support for the framework but needs to be communicated less technically. 3.4 Reestablishing the MDG working group The MDG working group that produced the MDG 2011 report is reestablished to oversee the implementation of Output 5. This group is situated within BAK and ensures that different 1 Project document: How does a National Vision inform a National Development Strategy 2 Project document: Visioning Process - Methodology 3 Project document: Conceptual framework defining the theoretical basis for a project structure to support dialogue 8

agencies responsible for MDG results are brought together within an overarching framework based on coordination action. Terms of reference for the working group are prepared and steps are underway to formalize its operation as standing working group within the government system. The working group has endorsed the terms of reference for a consultant to help prepare a MAF country action plan. The procurement is handled by UNDP. 4. CHALLENGES The biggest challenges the project has identified in the first quarter are four fold: 4.1 Lack of a unified government administration Government operation is still much affected by legacies inherited under the Netherlands Antilles administration. Administration tends to operate through silos with little harmonization between agencies. A whole of government system is yet to develop. This creates problems of agency ability to respond timely to project demands since government systems operate with a siloed or departmental structure. Both result from poor coordination across government agencies where processes diverge, use similar or duplicate data and often completely replicate work. The project has identified this as a risk and contingencies include taking a proactive stance to raise awareness of the need for harmonized administration and seek coordination between agencies when parallel systems present themselves. Tasks affected by government administration delays are: Setting up of a project account Notification of Ministry focal points Approval processes i.e. delays in promulgating the Steering Committee Regulation Setting up the Devinfo data base system by ICT Responding to the SWOT questionnaire 4.2 The need to build an infrastructure to support the project This is a cross cutting challenge and arises from the PD which specifically directs a people centered participatory approach in developing a NDP. The organizational structure to support the project needs to be built requiring the support and cooperation of government and the community generally. The core of this structure is a Steering Committee, a body made up of representatives of Sint Maarten society and government that will oversee the development and implementation of the NDP. Putting this structure together is not a specific output of the project but which the project cannot work without. Considerable time was spent in the first quarter in preparing a draft regulation ready for the Council of Ministers approval and organizing a process for appointments to it. The success of the project will depend on the effectiveness of the Steering Committee. Built in the regulation is the need to monitor its 9

performance and evaluative requirement to be undertaken on a yearly basis. Project resources are allocated to monitor the work of the Steering Committee and build capacity. 4.3 To organize and coordinate community engagement Sint Maarten society is diverse and extremely varied. To a large extent access to this society is through a multitude of structured organizations, such as NGOs but a predominate element of society is not accessible through such structures. To a large extent the makeup of this society mimics the government administration with little coordination between the elements that constitute it. Although a stakeholders analysis can identify the individual elements that make up this society and the interests each promote, it is a challenge to organize them effectively in order to engage the project. The project design has not anticipated this. In order to address this, the project needs to spend time preparing society through engagement with them on establishing how best the various sectors can be organized to engage the project with effective outreach. 4.4 Nation building and an emerging national identity A tension exists within Sint Maarten caused by the marginalization of native Sint Maartener in the way the island as whole is being governed and developed. This group has promoted development agenda for some considerable time that is closely aligned to how they perceive themselves as contributors towards an identity affecting both the French and Dutch sides of the island. The inclusion of the native Sint Maartener, being a people who assert a historical connection with the island for 300 years, is vital for the credibility of the project but at the same time presents its own challenges. It raises issues such as status this group should be accorded and whether procedures should be designed to specifically accommodate them. For instance, the Netherlands is a signatory to the UN Declaration for the Rights of Indigenous Peoples. The Declaration, if applicable in this case, clarifies the rights of indigenous peoples and how they should be engaged activities such as the project. According to the Declaration, Free, Prior and Informed Consent (FPIC) is one important principle designed to protect indigenous peoples right of participation. It is embedded in the right of self determination. The duty of States to obtain indigenous peoples FPIC entitles such peoples to effectively participate in the outcome of decision making that affects them, not merely to be involved. The project has connected with the native Sint Maarteners and is in the process of defining what their objectives are and how they should connect and be involved in the project. 4.5 Dealing with project preparatory matters With the arrival of the Project Manager in December 2012, actions were undertaken to restructure the project in accordance with PRINCE 2 methodology. The following matters were attended to: Confirming the organisational arrangement of the project Reviewing the project context and design (expected results, activities and work programme) in dialogue with the BAK project team Creating an AWP and Quarterly plans for 2013 based on that dialogue 10

Setting up a project country account. 4 Project implementation within the first quarter could not proceed until project design and planning details were settled with the project team and agreed to by the Project Board. 5. LESSONS LEARNED Main lessons learned are: To address delays and public sector commitment issues, proactive strategies are needed to encourage Ministries to be more responsive. To some extent this can be done by establishing links with Secretaries General by ensuring that issues affecting the project are on the agenda of the Secretaries Generals weekly meeting. The project management weekly meeting with the Secretary General of BAK (chairman) could be utilized to facilitate such action. There is also need to personally build a relationship with Ministries and demonstrating a connection between what they do and the role of a NDP. The project is much more informed of the realities it faces than it understood them to be in January. Through monitoring and tracking progress it is important to be flexible and adjust to these realities without compromising the integrity of the project. For instance, it was not realizable in January of the difficulty and strategies required to enable the project connect with Sint Maarten society. In establishing what the best fit is for engagement now forms part of the project strategy. Communication is essential. Some of the project presentations at the Info workshop were criticized as being too technical. It is important that future communications be sensitive to the levels of understanding audience may comprehend and adjust the style of presentations to suit the environment in which they are given. 6. FINANCE The only expenditure in the first quarter applied to holding the Info workshop. Due to the delay in setting up the country project account, a reimbursing arrangement was agreed to between BAK and UNDP, where UNDP met the costs based on the AWP/13. The expenditures made during the first quarter (January 1-March 31, 2004) are as follows: 4 Project document: Project Update and Progress Report; February 2013 11

Description USM 550 Catering 550 M Gumbs (moderator) 705 Total 1805 Amount (US$) 7. CONCLUSION During the first quarter of 2013, the project focused on stage I and 2 and transition to stage 3 and 4. The activities for stage 1, 2 and 3 of the project (Outputs 1 and 2) are completed. There were delays in completing Outputs 3 (communications) and implementing the Devinfo system (Output 4). The delay is largely attributable to difficulties in getting the relevant Ministries to respond. However, progress is now made and plans are made to speed up the implementation of those Outputs in the second quarter. 12