Georgia s Foreign Debt and Sustainable Development

Similar documents
Ministry of Finance of Georgia State Budget in Brief Citizens Guide

INITIATIVES AND LEGISLATIVE AMENDMENTS FOR PROMOTING BUSINESS ACTIVITIES IN GEORGIA

BATUMI BUSINESS TOUR 27 SEPTEMBER - 01 OCTOBER 2016 BUSINESS TOUR

Entrepreneurship Development Agency

5. Assistance. European Integration Index for the Eastern Partnership Countries 2013 edition

GEO: Sustainable Urban Transport Investment Program, Tranche 2 Tbilisi-Rustavi Urban Road Link (Section-1: km 0 to 4 Tbilisi Phonichala) (Addendum)

World Bank Georgia Partnership Program Snapshot

GEORGIA JOINT NEEDS ASSESSMENT

Cambodia. Impacts of Global Financial Crisis

Knowledge FOr Resilient

Roles & Challenges of Development Assistance in LDCs

FOREIGN INVESTMENT, LOANS AND ASSISTANCE IN MONGOLIAN DEVELOPMENT

Facing the need for a sustainable growth strategy, Moldova has

Poverty Profile Executive Summary. Azerbaijan Republic

Performance Audit of the Government s On-lending Activities

Ex-Ante Evaluation (for Japanese ODA Loan)

Poverty Reduction And Economic Growth Program OF Georgia

Legislative Environment Regulating Charity Activities in Georgia

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

WEST POKOT COUNTY GAZETTE SUPPLEMENT

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA1417

Georgian Oil and Gas Corporation JSC

(Policy Dialogue on Infrastructure Financing Strategies for Sustainable Development in South-East Asia August 2017, Manila, the Philippines)

Sendai Cooperation Initiative for Disaster Risk Reduction

FOR OFFICIAL USE ONLY

State Audit Office of Georgia

OFFICIAL DEVELOPMENT ASSISTANCE STATE CHANCELLERY JULY 9, 2015

Bank of Georgia Group Consolidated Financial Statements. Years ended December 31, 2004 and 2003 Together with Report of Independent Auditors

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN])

Western Balkans and Europe 2020 Supporting Convergence and Growth

Kazakhstan: on the wave of structural reforms. Aset Irgaliyev, PhD First Deputy Chairman Economic Research Institute

Sixteenth Plenary Session of the Committee for Development Policy. New York, March 2014

Budgeting for Disaster Risk in the Philippines. Bureau of the Treasury

North-South Road Corridor Investment Program. Republic of Armenia

European Scientific Journal December 2015 /SPECIAL/ edition Vol.2 ISSN: (Print) e - ISSN

REPUBLIC OF BULGARIA

LRTF Quarterly Report March 1, As of February 22, 2012, the LRTF status was as follows: USD million

AM005e-X 1 AZERBAIJAN

VISIONFUND CREDO FOUNDATION. Consolidated Financial Statements for the year ended 31 December 2007, and Independent Auditors Report

Saknakhshiri (GIG group) - Company Profile

Jordan Country Brief 2011

GEORGIA: DROUGHT. The context. appeal no. 31/00 situation report no. 1 period covered: November January 2001.

Investment Climate & Opportunities in Georgia

TRADE, FINANCE AND DEVELOPMENT DID YOU KNOW THAT...?

Country Operations Business Plan. Armenia October 2015

The Greek and EU crisis Athens, KEPE, June 27, 2012

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project

FEATURES OF FISCAL AND BUDGETARY POLICY FROM THE PERSPECTIVE OF COMPETITIVENESS

Preliminary evaluation table of the project 1. Subject name Country name 2. Background and necessity of the project

Context/ Questions/ Methods/ Findings/ Policy Implications

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Infrastructure Pre-Investment Facility

Palu, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

IMPROVING LOCAL FINANCING SYSTEMS

Investment Climate & Opportunities in Georgia

Vihiga County Disaster Management Bill, 2018 PART I - PRELIMINARY

Ministry of Finance of Georgia. Georgia The Outlook. January 2018

ENVIRONMENTAL AND SOCIAL POLICY (APPROVED IN NOVEMBER 2013; REVISED IN MARCH 2016)

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015

OFFICIAL DOCUMENTS. Thilisi, 25 March, Dear President Kim,

Project ADC I TBILISI JULY 2018

RECENT ECONOMIC AND SECTORAL DEVELOPMENTS. Growth and External Performance. Fiscal Developments

Please also refer to the PID of the parent project (Report No.: AB3812) disclosed on 04/29/2008

LLC MICROFINANCE ORGANIZATION CREDO. Financial Statements for the year ended December 31, 2008, and Independent Auditors Report

Afghanistan: Regional Airports Rehabilitation Project (Phase 1)

Consolidated Annual Monitoring Report. Regional Development Programme of Georgia for

THE KILIFI COUNTY DISASTER MANAGEMENT ACT, 2016 ARRANGEMENT OF SECTIONS PART I PRELIMINARY

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Project Name. Railway Infrastructure Rehabilitation Project Region

Japanese ODA Loan. Ex-Ante Evaluation

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project

AES GROUP & WORLD BANK PARTNERSHIP

Session 4 Status of Climate Finance in the Philippines

Independent Auditor s Report

Response from the World Bank and ADB (dated 16 December 2016) to Mekong Watch s inquiries

Liberia s economy, institutions, and human capacity were

CARIBBEAN DEVELOPMENT BANK SUPPORT FOR HAITI TO MEET COMMITMENT TO CARIBBEAN CATASTROPHE RISK INSURANCE FACILITY FOR THE HURRICANE SEASON

THE KILIFI COUNTY DISASTER MANAGEMENT BILL, 2016 ARRANGEMENT OF CLAUSES PART I PRELIMINARY

PROGRAM OF INDICATORS OF DISASTER RISK AND RISK MANAGEMENT IN THE AMERICAS. Review and Update. Omar D. Cardona

I Proiect Name I TRANSPORT SECTOR SUPPORT PROJECT 1

Georgia: Emergency Assistance for Post-Conflict Recovery

Government of Georgia Basic Data and Directions for

UN: Global economy at great risk of falling into renewed recession Different policy approaches are needed to address continued jobs crisis

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER

1. Introduction. 1 Government of Kosovo, Decision no. 01/61, accessed on: ,

Synopsis. Challenge. More Results. Turkey-Sustained and Equitable Growth for Continued Economic Success

Planning, Budgeting and Financing

for small and medium business enterprises, simplifying procedures for obtaining permits to conduct business, start and exit the business and more.

Palu, Indonesia. Local progress report on the implementation of the Hyogo Framework for Action ( )

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities

OFFICE OF THE COORDINATING MINISTER FOR ECONOMIC AFFAIRS OF THE REPUBLIC OF INDONESIA

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

World Bank Georgia Partnership Program Snapshot

COST-BENEFIT ANALYSIS

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

ANNEX. European Union Budget contribution to the NIF Additional commitment for Sector

Developing Catastrophe and Weather Risk Markets in Southeast Europe: From Concept to Reality

Georgian Oil and Gas Corporation JSC

Aid Effectiveness: Making Aid Transparent in Afghanistan

Viet Nam GDP growth by sector Crude oil output Million metric tons 20

GEORGIA - PROMISING MARKET FOR INVESTMENTS

Bucharest, 21 May 2016 FINANCING PRODUCTS FOR EU FUNDS PROJECTS

Transcription:

Georgia s Foreign Debt and Sustainable Development 1 1. Background Information According to the data of the Finance Ministry of Georgia, the foreign debt of Georgia is USD 4,206 billion as of 2011 with USD 3,015 billion making a share of international financial institutions. The diagram below gives the dynamics of Georgia s foreign debt for 1996-2011. 4500 4000 3500 3000 2500 2000 1500 1000 500 0 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 Diagram 1. Dynamics of foreign debt of Georgia for 1996-2011 As shown in the diagram, Georgia s foreign debt has increased sharply since 1996 after the Government of Georgia started taking of debts intensively from the International Monetary Fund and the World Bank. As seen from the table, during past 15 years the country s foreign debt increased approximately four times 1. Simultaneously, if in 1996 foreign debt amounted to 44% of GDP, by the end of 2010 its amount decreased to approximately 33,8% of GDP 2 that is only 40% of the entire foreign debt. The diagram also shows sharp growth of foreign debt starting from 2008 that can be explained by the economic and financial policy of the Georgian government, as well as by the consequences of the 2008 August war 3. The Project is implemented with financial support from the Open Society - Georgia Foundation. In August 2008 the Joint Needs Assessment Document was prepared under the aegis of the World Bank and the UN Development Programme (with the participation of Asian Development Bank, European Bank for Reconstruction and Development, European Investment Bank and the European Commission). The document defined the needs for rendering financial assistance to Georgia. The key goal of the document was to submit a plan of recovery from the consequences of the August hostilities. The document was prepared solely by the international financial institutions and the government. On October 22, 2008 the document was submitted to the donor conference in Brussels, where the 1 www.mof.gov.ge 2 However, according to expert explanations, the debt to export ratio is still grave. Last year Georgia s export amounted to only USD 1,6 billion. 3 The International community responded both political, as well as socio economic problems of Georgia, after Russian military incursion into Georgia in August 2008 through increased international assistance and cooperation.

2 international financial institutions and donor countries pledged to allocate USD 4.5 billion (grant/credit) to support Georgia s financing needs for post-conflict recovery. The table below gives the distribution of financial aid allocated by the international financial institutions after 2008 by sectors. Sector Credit Mln USD Grant Mln USD Road infrastructure 761 Municipal infrastructure (water, landfills) 357.5 13.98 Railway 138 12,4 Energy infrastructure 465 176 Agriculture 13.3 Environment protection 6,9 Total 1721.7 223 Table 1. The financial aid allocated after 2008 by sectors 2. Social, Environmental and Sustainable Development-Related Aspects of Infrastructural Projects A great part of financial aid allocated to Georgia was earmarked for the implementation of infrastructure (road and energy) projects. According to the government and the donors, similar projects should promote the economic development and growth, as well as the employment and settlement of social problems. The table below gives the list of infrastructure projects implemented in Georgia during 2008-2011 with the support of international financial institutions. Project cost Donor 4 Project name Credit (mln USD) Grant World Bank Vaziani-Gombori-Telavi Highway Project 30 East-West Highway Improvement Project Second disbursement East-West Highway Improvement Project Third disbursement 20 147 Rikoti Tunnel Rehabilitation Project 28 Municipal Development Facilitation (MDF ) 40 Local Roads Project 70 ADB Regional and Municipal Infrastructure 45 Municipal Development Facilitation (MDF) 37 4 ADB Asian Development Bank, EBRD European Bank for Reconstruction and Development, EIB European Investment Bank, BP- British Petroleum, JICA Japanese International Cooperation Agency, KfW German Reconstruction Bank, MDF Municipal Development Fund NIF Neighborhood Investment Facility, SIDA Swedish International Development Agency, USAID US Agency for International Development, WB World Bank.

3 Kobuleti Bypass Road Project 119 Batumi Bypass Road Project 150 Sustainable Urban Transport Investment Program I 85 Urban Service Improvement Program I 80 JICA Zestaponi-Kutaisi-Samtredia Highway Project 197 EBRD-EIB Enguri Rehabilitation Project, Third disbursement 55,2 6,9 - NIF EBRD Tbilisi Railway Bypass Project 138 12,42 NIF EBRD Rustavi Landfill Project 2,208 BP 3,7 EBRD Adjara Landfill Project 4,1 SIDA 7,4 EBRD Borjomi Water Supply Project 2 2.5 KfW Batumi Water Project 62,1 2,76 KfW, EBRD, EIB, NIF Black Sea Transmission Line Project 372,52 45,87 USAID Energy Infrastructure Development Project 30 124 Table 2. Infrastructure projects implemented in Georgia during 2008-2011 with the support of international financial institutions - distribution by donors A great part of the projects given in the table are either implemented or remain at the stage of implementation. However, it is already possible to state at this point that they have failed to provide economic development and growth, to catalyze foreign direct investments, to increase employment as well as to promote the settlement of social problems persisting in the country. In some cases these projects have even created the basis for violation of economic and social rights of Georgian citizens. Tbilisi Railway Bypass Project and Vaziani-Gombori-Telavi Road Project can serve as the examples of what kind of environmental, social and economic problems may emerge as a result of inadequate planning of investment projects. Tbilisi Railway Bypass Project In May 2010 the European Bank for Reconstruction and Development and the European Investment Bank approved an Euro 100 million credit each for the Georgian Railway Ltd (100% state-owned company) to implement the Tbilisi Railway Bypass Project. The main goal of the project is to relocate transit of hazardous goods from the densely populated area outside the capital with the purpose of increasing the efficiency and safety of railway operations. According to the project, the reconstruction of abandoned territories will promote the development of the northern part of the capital. Although the general project goal to increase the efficiency and safety of railway operations is praiseworthy, the project is rather problematic from both environmental and social points of view. The project envisages the construction of a new railway line in the densely populated Avchala district, thus posing a threat to the local population because of transiting hazardous freights (oil, oil products). Forceful resettlement was planned and implemented inadequately and incorrectly, as a result of which a part of the population suffered material and economic losses. Minimal distance of the new railway line from the Tbilisi Sea (900m) poses a threat to supplying water to the capital. Even in case of spilling half a tank, i.e. 30 thousand liters, about 50% of useful capacity of the reservoir will become useless that will

4 leave the population of three districts of Tbilisi as well as about 20 thousand ha of agricultural lands of the Gardabani district without water. The railway project does not envisage cleaning of the abandoned territory from hazardous waste; real expenses of cleaning the abandoned territory are not calculated either; thus, it becomes impossible to estimate the total economic cost of the project. It should be noted that in September 2010 the Georgian government finally rejected the credit subsidized by the European Investment Bank. The management of the Georgian Railway said that in order to complete the Railway Bypass Project the company would use USD 250 million Eurobonds issued on July 22, 2010 (percentage rate 9,875% per coupon). The project yielded no positive results. It failed to provide at least temporary employment opportunities the railway is being constructed by the Georgian-Chinese company Khidmsheni and basically the Chinese manpower is used. As a result of poor environmental and social impact assessment and resettlement action plan hundreds of people experienced the involuntary resettlement (both physical and economic) without adequate compensation 45, that worsen their economic situation. Vaziani-Gombori-Telavi Road Project Vaziani-Gombori-Telavi Road Project, which was much highlighted by the Georgian Government, is yet another example of inadequate planning of infrastructure projects implemented with donor assistance. According to the initial project submitted by the Motor Roads Department of Georgia, instead of rehabilitation of a 66 kilometer road, it should have been widened (the width of the motor road corridor was 20 meters, while the road bed 10.5 meters). The project envisaged the construction of four new bridges with a total length of 348 meters. The project cost was USD 60 million. Road widening would necessitate forceful resettlement of several families living near the roadside. At the same time, the project-proposed compensations were extremely scarce and unfair. Furthermore, road widening would also trigger the destruction of a part of forests and other ecosystems, as well as agricultural plots. The proposed project envisaged replacement of the asphalted road by concrete cover that would necessitate extraction of a great amount of inert materials from the river beds. Furthermore, because of the difficult relief (the road passes through the Gombori Pass at a height of 1620 meters) and because of the fact that the road is running through the villages of Ujarma, Paldo, Otaraant Kari, Sasadilo, Gombori, Kobadze and Tetrtsklebi, the perspective of using the road as a highway for transiting various freights was rather doubtful. It should also be noted that the project documents did not provide the feasibility study about the necessity of road widening. Vaziani-Gombori-Telavi Motor Road passes through geologically very difficult Gombori Pass, which falls under extremely high risk of geological disasters. Because of difficulty and depth of landslides, surface stabilization is actually impossible there. Thus, the wide road constructed through using expensive technologies would be damaged shortly after its construction because of landslides. In the opinion of civil society, it would be expedient to rehabilitate the road by using the simplest technologies to ensure that annual repairs, which would be unavoidable, cost inexpensive. 5 Green Alternative filed compliant to the EBRD s Project Compliant Mechanism and demanded investigation of the compliance of project standards with the Bank s performance standards. It also helped the project-affected communities to submit two complaints two bank. All three complaints are under consideration. EBRD carried out project internal audit to verify wheter the project is in line with the Bank s environmental and social standards. It should be noted that the Bank postponed allocation of the first disbursement to the Georgian Railway company.

The World Bank shared the opinions expressed by non-governmental organizations and financed the project worth USD 30 million envisaging the rehabilitation of the existing road and implementation of road safety measures on both Vaziani-Gombori-Telavi and Tbilisi-Gurjaani-Telavi motor roads. 5 Landslide on a problematic section of Vaziani-Gombori-Telavi road in 2011 showed once again how important it is to plan similar infrastructure projects adequately and to avoid exaggerated expectations. Energy Projects As far as the energy sector is concerned, the major efforts were directed to the development of energy infrastructure. Development of energy infrastructure is important for further development of the country and the construction of the Black Sea Transmission Line is a good example of long-term energetically profitable projects. However, neither the government, nor international financial institutions financed and supported large-scale energy efficiency projects (at both legislative and practical levels), the implementation and rate of return of which require comparatively short time and which are economically effective, since they are oriented to resource saving. The Georgian Government and international financial institutions support the construction of new big hydro power plants (HPPs). Besides the fact that similar projects deepen social and environmental problems, giving due consideration to the current tax environment of Georgia, the effectiveness of their implementation for the state budget is extremely doubtful. For example, the European Bank for Reconstruction and Development and the International Financial Corporation allocated a USD 115 million credit for the construction of a 87 megawatt Paravani HPP. The credit has not been allocated under the state guarantee, though money was allocated in frames of a pledge given by donors at the Brussels conference. The credit was given to Urban-Energy Georgia, a daughter company of Turkish Anadolu Group. Since the project is being implemented under the Build- Own-Operate scheme, the project revenue USD 36.6 million will be the property of the company and only the state taxes will be directed to the state budget 56. According to the project, during winter the HPP should supply electricity to the Georgian market; however, it should be taken into consideration that during winter the Paravani River frequently freezes that makes the possibility of supplying electricity rather doubtful. It should also be noted that water abstraction and discharges are exempted from any taxes in Georgia; it means that use of natural resources is free of charge and respectively, it occurs irrationally. From environmental point of view, throwing of 90% of the Paravani River into the tunnel is rather problematic, since it will have a negative influence on the river biodiversity. At the same time, exploitation of Paravani HPP will pose a threat of flooding to the village of Khertvisi. In the process of construction of Paravani HPP-related transmission lines, the local population already lost access to rural pastures. According to the construction company, 60% of the hired employees will be local, though they will mainly perform unqualified work. According to the company, the Turkish manpower will be hired as technicians and engineers. 6 Revenue tax at 12% will be transferred to the state budget; property tax at 1% - to the local budget.

6 3. Real Economy and Foreign Debt The country s economic problems and foreign debt are closely interlinked. Without economic and social development it will be impossible to pay off foreign debts. According to the Georgian statistics office, Geostat, 16% of Georgia s population is officially unemployed 67, while 55% of the employed population is working in the sphere of agriculture 78. Simultaneously, according to the World Bank survey, 60% of poor population lives in rural areas 8 9. 1,7 million persons have been registered in the base of socially vulnerable people of the Social Service Agency that constitutes approximately 40% of the population 910. It is essential to invest in real economy to overcome these problems. Foreign direct investments (FDI) significantly decreased during 2008-2011 that can be explained by the August war. Following the 2008 August war, in order to maintain the liquidity of the banking sector, a great part of international assistance (European Bank for Reconstruction and Development, International Finance Corporation) was placed in commercial banks. However, because of the existing business environment, commercial banks failed to invest these sums in real economy. In 2010 EBRD President Thomas Mirow said that Georgia suffers lack of healthy companies thus explaining low credit activity of commercial banks. This problem is more properly described in the World Bank report: While there was widespread recognition of the improvement in the business environment in recent years, in terms of taxes, red-tape, corruption and so on, one area where investors continue to find fault with the government is in tax administration. Across sectors, there is a widespread perception that the tax authorities are overly aggressive in levying taxes and penalties on those companies that are doing their best to comply; and they are overly slow in processing appeals or reimbursing VAT 1011. Although 60% of rural population stays below poverty line, out of the assistance pledged at the Brussels conference, only USD 13 million was earmarked for agricultural sphere. It should be noted that the situation is extremely difficult in agricultural sphere: from 2002 to 2009 the cultivated land area decreased by 43%; wheat production decreased from 199 000 tons to 80 000 tons. In 2010 the government spent less than 1% of the state budget on agrarian sector that is only GEL 53 million. Respectively, food supplies in the country mostly depend on imported products. This, in turn, has much aggravated poverty and inflationary processes in the country. Theoretically, the mission of international financial institutions is to provide the economic, social and sustainable development of the country. At the same time, all international financial institutions recognize Millennium Development Goals 1112. In practice, as it seems, international financial institutions, as well as the Georgian Government, believe that the market will itself regulate everything and will provide the economic and social development of the country. Just this is where the root of the problem is hidden the Government does not have a long-term, consistent model of coherent economic development of the country. Such model should cover real problems unemployment, poverty, negative trade balance and reflect all aspects of the country s economic development. It should not be tied to the expectations that the development of any one sector (tourism, 7 www.geostat.ge 8 They are categorized as self-employed. 9 World Bank, Poverty Assessment, 2009 10 In November 2010 President Saakashvili acknowledged that according to the governmental data, 30 percents of Tbilisites are completely or partially unemployed. He described this parameter as catastrophic. The recent survey of the Caucasus Research Resource Centers offers much grave picture only 27 percents of Tbilisites believe that they work at a full or partial capacity. 11 World Bank Investment Climate Advisory Services, Georgia Manufacturing Sector Competitiveness Assessment, May 2009. 12 Millennium Development Goals

energy or other) will provide the sustainable development of the country. Respectively, the international financial institutions should assist the Georgian Government in preparing such plan 1213, on the one hand, and should provide the adequacy and efficiency of financing allocated by them in respect of settlement of problems existing in the country, on the other. 7 As the economists explain, although, Georgia s foreign debt is not so big from theoretical point of view, the rates of its growth create the basis for concern. Ultimately, Georgia faces a serious challenge; despite self-restriction imposed by the Georgian Constitution, according to which the state debt should not exceed 60% of GDP, during last years the rate of growth of Georgia s debt exceeds the rate of GDP growth that should lead the authorities to the decision of tightening their belts and even freezing the debts. It is also important that Georgia minimizes budgetary deficit as one of the major factors of accumulating foreign debts as well as launches gradual redemption of emitted Eurobonds 1314. In expert opinions, the government should focus on Eurobonds emitted by the Georgian Railway as well as on serving the debts taken by the Railway. Furthermore, it would be better if the Georgian Government, along with international financial institutions and donor countries, starts searching of alternative ways to pay off foreign debt and/or service payment. For this purpose, it is possible to use various mechanisms, such as, for example, debt-for-nature swap 1415 or debt-for-development swap 1516. 13 The so called poverty reduction strategies developed by the World Bank and the International Monetary Fund are the examples of such plans. 14 State Foreign Debt of Georgia, Nodar Khaduri, July 2011 15 Debt-for-nature swap 16 Debt-for-development swap

The views, opinions and statements expressed by the authors are theirs only and do not necessarily reflect the position of Open Society - Georgia Foundation. Open Society - Georgia Foundation is not responsible for the content of the information material. The publication supported by OSI East East: Partnership Beyond Borders Program Green Alternative, 2011 Author: Manana Kochladze 27/29 Paliashvili St. 0179 Tbilisi, Georgia Tel: (995 32) 229 27 73 Fax: (995 32) 222 38 74 greenalt@greenalt.org www.greenalt.org