Allegato A. Summary WHEREAS... 3 GENERAL PROVISIONS Article 1 Subject matter and scope Article 2 Definitions... 4

Similar documents
13 th February th February 2017 Page 1 of 7

7 April ENTSO-E AISBL Avenue de Cortenbergh Brussels Belgium Tel Fax www. entsoe.

IU TSOs proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a

Regulatory framework for crossborder redispatching and countertrading

All Baltic CCR TSOs Common Proposal for Regional Design of Long-Term Transmission Rights in Accordance with Article 31 of the Commission Regulation

TSOs perspective of the CACM requirements. Athanasios Troupakis Market Advisor ENTSO-E

All CE TSOs proposal for additional properties of FCR in accordance with Article 154(2) of the Commission Regulation (EU) 2017/1485 of 2

18 April 2016 Draft for consultation


CID Methodology Explanatory note

Energinet.dk s proposal for Arrangements concerning more than one NEMO in one bidding zone in accordance with Article 45 and 57 of the Commission

Explanatory document for the Nordic synchronous area proposal for limits for the exchange of FCR between the TSOs in accordance with Article 163(2)

The Concept of Baltic CoBA

(7) This proposal is submitted for the approval of all National Regulatory Authorities (hereafter referred to as the NRAs ) of the CCR GRIT.

Response to ENTSOE public consultation. Network Code on Capacity Allocation and Congestion Management for. Electricity

ELIA LFC Block Operational Agreement

1/12/2018. Allegato A

INVESTING IN LONG-TERM EUROPE:

REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM ON

GB TSOs Intraday proposal for arrangements concerning more than one Nominated Electricity Market Operator (NEMO) in the GB Bidding Zone in accordance

Business Process. BP_SO_13.1 Interim Long-Term Coordinated Capacity Calculation

(a) maximises market participants opportunities for adjusting their balances by

Content Abbreviations Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Article 8 Article 9 Article 10 Article 11 Article 12

All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for

February February 2017 Page 1 of 12

All TSOs response to the consultation on the Intraday Cross-Zonal Gate Opening and Gate Closure Times

APPROVAL BY ALL CONCERNED CCR HANSA AUTHORITIES

16 July 2018 DRAFT VERSION for public consultation

ACER. Congestion income distribution methodology. in accordance with Article 73 of the Commission Regulation

Intraday cross-zonal gate opening and gate. in accordance with Article 59 of Commission Regulation (EU) 2015/1222 of 24

Capacity Calculation Region Nordics regional design of long-term transmission rights in accordance with Article 31 of the Commission Regulation (EU)

Proposal of the Transmission System Operators of the Baltic. Capacity Calculation Region for the regional design of longterm

System Operating Policies on Compensation between Elia and Nemo Link

Status quo: Network Codes and Guidelines from NRAs perspective. Dace Bite Public Utilities Commission of Latvia Deputy Director of Energy Department

Content Abbreviations Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Article 8 Article 9 Article 10 Article 11 Article 12

The implementation of the Electricity Target Model in Greece. Angeliki D. Mourtzikou Director of Markets Monitoring and Competition, RAE

Specific Annex for the Bidding Zone borders serviced by SEE CAO to the Harmonised Allocation Rules for long-term transmission rights

Introduction. 1.1 The CACM Regulation & all TSOs. 1.2 Geographical application of this proposal

Intraday Cross-Zonal Gate Opening and Gate Closure Times. Consultation document. PC_2018_E_01 9 January 2018

Supporting document for the Danish TSO, Energinet, of the Nordic Capacity Calculation Region proposal for splitting long-term cross-zonal capacity

Mr Alberto Pototschnig, Director ACER. CC: Dr Klaus-Dieter Borchardt, Director Internal Energy Market DG ENER European Commission

Draft Outline of the 2016 Work Programme

ACTIVATION PURPOSES BSG. 7 March 2017

Montenegro as the energy hub of the South East Europe (SEE) Region.

BritNed border specific annex to the Allocation Rules. GB NL border

Methodology and criteria for evaluating investments in electricity and gas infrastructure projects (Article 13(6) Infrastructure Regulation 1 )

ENTSO-E recommendations for Market Design Trilogue negotiations

EAI Response to ACER Consultation on Forward Risk-Hedging Products and Harmonisation of Long-Term Capacity Allocation Rules

CHAPTER 1. General Provisions

We appreciate your feedback

3 rd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes

EUROPEA U IO. Brussels, 12 June 2009 (OR. en) 2007/0198 (COD) PE-CO S 3651/09 E ER 173 CODEC 704

Allocation Rules for Forward Capacity Allocation

REALISEGRID. WP3 Final Workshop. Rome - 31 March TSO incentivization policies for cross-border transmission development

ACER ON ALL TRANSMISSION SYSTEM OPERATORS PROPOSAL FOR INTRADAY CROSS-ZONAL GATE OPENING AND INTRADAY CROSS-ZONAL GATE CLOSURE TIMES

Commission de Régulation de l Electricité et du Gaz. the CWE region. ELCom Forum Alain Marien Technical Operation of the Markets

Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3 rd Countries

Chapter 2: Market Governance, Administration and Operation. Industry Guide to the I-SEM

CROSS BORDER CAPACITY ALLOCATION FOR THE EXCHANGE OF ANCILLARY SERVICES

I-SEM Interconnector Losses. Information Paper

ALL TRANSMISSION SYSTEM OPERATORS OF THE CAPACITY CALCUCULATION REGION CORE, TAKING INTO ACCOUNT THE FOLLOWING: Whereas

ON TRANSFER CAPACITY ALLOCATION OVER THE GRID INTERCONNECTING ITALY WITH FRANCE FOR THE YEAR 2004

Baltic Harmonised Imbalance Settlement Model Document

7 April ENTSO-E AISBL Avenue de Cortenbergh Brussels Belgium Tel Fax www. entsoe.

Network Code on Forward Capacity Allocation

ENTSO-E Network Code on Electricity Balancing

According to article 9 (8) (d) of Regulation 2015/1222 the proposal is subject to approval by each national regulatory authority.

FRENCH GERMAN INTERCONNECTION INTRADAY CAPACITY EXPLICIT ALLOCATION RULES VERSION 3.0. Draft Version

RULES. For. Article 1

APPROVAL BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM

EFET response to RAE consultation on rulebooks for day-ahead, intraday, and balancing markets and the clearing rulebook

Grid Code Issue Paper

Intraday Implicit Cross- Border allocation on BE-FR border. Description of the allocation mechanism

Vision Paper LT UIOLI

MARI. Project in a Nutshell and Accession Conditions. Manually Activated Reserves Initiative. BSG Meeting 07/06/2017

1.4. In accordance with paragraph 4 of Article 17, the decision is made on a case by case basis by the NRAs of the concerned Member States.

Security of Supply. Walter Boltz. 8 th EU/US Roundtable. CEER Vice President, Gas Working Group Chair October 2010, Berlin

Intraday Implicit CrossBorder allocation on BE-NL. and borders (Interim Implicit Cross Border Intraday BE-NL. Description of the allocation mechanism

Minutes of Workgroup European Market Design 29/09/2015

THE MONITORING REPORT FROM 16 MARCH 2018 ON THE IMPLEMENTATION OF THE JOINT DECLARATION

Proposal for Multiple NEMO Arrangements (MNA) for the Belgian bidding zone in accordance with Article 45 and Article 57 of the Commission Regulation

REALISEGRID. Final Conference. Brussels, May TSO incentivization policies for cross-border transmission development

DK1-DE COUNTERTRADE MODELS IMPACT ASSESSMENT

Support for Strengthening Energy Regulatory Authorities in the Western Balkans

***I DRAFT REPORT. EN United in diversity EN. European Parliament 2016/0379(COD)

EU Harmonisation of Maintenance Publications at Interconnections Points

Congestion Management Guidelines. Compliance report

UPDATE ON ELECTRICITY BALANCING

Cross-Border Intraday: Questions & Answers

ELECTRICITY BALANCING IN EUROPE

Table of Contents List of Figures...3 List of Tables...3 Definitions and Abbreviations...4 Introduction...7

EFET Proposal on Regional Independent System Operator (R_ISO) A CEER Response Paper

The current ETSO ITC Model and possible development

EFET reaction 25 April 2017

Harmonised Allocation Rules for Forward Capacity Allocation Summary of the assessment of the comments from the public consultation

South East Europe Electricity Market options paper

Quick Guide to the Integrated Single Electricity Market. Version 1

European Market Desing and focus on Flow-Based Market Coupling

2011 Work Programme of the Agency for the Cooperation of Energy Regulators

Long Term Transmissions Rights

Transcription:

Greece-Italy TSOs proposal for methodology for redispatching and countertrading cost-sharing in accordance with Article 74 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a Guideline on Capacity Allocation and Congestion Management 17 03 2018 17 03 2018 Page 1 of 6

Summary WHEREAS... 3 GENERAL PROVISIONS... 4 Article 1 Subject matter and scope... 4 Article 2 Definitions... 4 ELIGIBLE COSTS FOR COST-SHARING... 4 Article 3 Cross-border relevance of congestions... 4 Article 4 Countertrading costs... 4 Article 5 Redispatching costs... 4 COST SHARING PROPOSAL... 5 Article 7 Methodology for cost sharing of Redispatching... 5 Article 8 Methodology for cost sharing of Countertrading... 5 MISCELLANEOUS... 5 FINAL PROVISIONS... 5 Article 10... 5 Implementation... 5 Article 11 Language... 6 17 03 2018 Page 2 of 6

WHEREAS (1) This document is the common proposal developed by the Transmission System Operators of the Greece - Italy Calculation Region (hereafter referred to as TSOs ) for common methodology for redispatching and countertrading cost sharing (hereafter referred to as the GRIT RD and CT Cost Sharing Methodology ) in accordance with Article 74 of Commission Regulation (EU) 2015/1222 establishing a guideline on Capacity Allocation and Congestion Management (hereafter referred to as the CACM Regulation ). (2) According to Article 9 (9) of the CACM Regulation, a timeline for implementation of the proposed Cost Sharing has to be included. The timeline for implementation is presented in Article 10 of this document. (3) According to Article 9 (9) of the CACM Regulation, the expected impact of the proposed Cost Sharing on the objectives of the CACM Regulation has to be described. The impact is presented below (points 5-8 of whereas). (4) The proposed GRIT RD and CT Cost Sharing Methodology contributes to and does not in any way hinder the achievement of the objectives of Article 3 of CACM Regulation. (5) Article 3 (a) of the CACM Regulation aims at promoting effective competition in the generation, trading and supply of electricity. The GRIT RD and CT Cost Sharing Methodology serves the objective of promoting effective competition in the generation, trading and supply of electricity by defining a set of harmonized rules for cost sharing of remedial action activations. (6) Article 3 (b) of the CACM Regulation aims at ensuring optimal use of the transmission infrastructure. The GRIT RD and CT Cost Sharing Methodology contributes to achieve the objective of ensuring optimal use of the transmission infrastructure giving incentive to each TSO for an optimal use of their grid by let them bear the cost of Remedial Action activation. (7) Article 3 (c) of the CACM Regulation aims at ensuring operational security. The GRIT RD and CT Cost Sharing Methodology contributes to achieve the objective of ensuring operational security by giving incentive to coordinating the redispatching and Countertrading actions at regional level to ensure its reliability and effectiveness for all the TSOs. In conclusion, the coordinated Redispatching and Countertrading cost sharing Methodology Proposal contributes to the general objectives of the CACM Regulation. 17 03 2018 Page 3 of 6

GENERAL PROVISIONS Article 1 Subject matter and scope 1. As required under Article 74 of the CACM Regulation, each TSO of GRIT Capacity Calculation Region, shall develop a proposal for a common methodology for redispatching and countertrading cost sharing. 2. The methodology for coordinated redispatching and countertrading cost sharing as determined in this Proposal is the common proposal of all TSOs of the Greece-Italy Region in accordance with Article 74 of the CACM Regulation. The participating TSOs to the coordinated redispatching and countertrading cost sharing are therefore Terna (Italy) and ADMIE (Greece). Article 2 Definitions 1. For the purpose of this proposal, the definitions in Article 2 of the CACM Regulation shall apply. ELIGIBLE COSTS FOR COST-SHARING Article 3 Cross-border relevance of congestions The Italian and Greek systems are directly connected only via a HVDC interconnector, while the AC interconnection to the synchronous Continental European takes place via borders electrically far each other. Therefore changes in one system have no relevant effect on the other and the system security of Italian and Greek grids can be monitored separately, being each TSO responsible for its own part. Article 4 Countertrading costs 1. According to the methodology proposal related to art. 35 of CACM Regulation, each TSO of the GRIT region shall define for each time-frame its resources available for countertrading and their prices. 2. The resources will be defined for two different services: a. Schedule increase b. Schedule decrease Article 5 Redispatching costs 1. Redispatching resources are only used by each TSO for internal congestion management. 2. Each TSO shall not share redispatching resources and operational processes with the counterpart. 17 03 2018 Page 4 of 6

COST SHARING PROPOSAL Article 7 Methodology for cost sharing of redispatching remedial actions Each TSO shall bear the cost arising from the activation of redispatching measures on its own grid. Article 8 Methodology for cost sharing of countertrading remedial actions As changes in one system have no relevant effect on the other, costs related to countertrading activation as described in art. 4 shall be borne by the TSO who requested the activation. MISCELLANEOUS Article 9 General requirements 1. An ex post analysis is performed on regular basis, liaising on models representing the grid at the time of the remedial action activation in order to verify the actual need for redispatching or countertrading between the TSOs involved. These grid models shall be recorded for this purposes. 2. A periodical monitoring report is foreseen to be sent to NRAs, having the aim to monitor the use of remedial actions. This report shall contain information related but not limited to, the following data: - requesting Party; - requested period and duration of the activation; - grid elements with physical congestion; - amounts of countertrading activated by each TSO; - costs by the TSOs for the activation of internal resources; Based on the analysis of the monitoring, TSOs shall assess the impact on the congested elements evaluating the relieving effect of the remedial action, and their costs relative to financial firmness of the capacity. FINAL PROVISIONS Article 10 Implementation 1. This GRIT RD and CT Cost Sharing Methodology shall be implemented with immediate effect as soon as the following conditions are fulfilled: a. Regulatory approval of this GRIT RD and CT Cost Sharing Methodology in accordance with Article 9 of the CACM Regulation; b. Implementation of the RD and CT Methodology required by Art. 35 of the CACM 17 03 2018 Page 5 of 6

Article 11 Language 1. The reference language for this GRIT RD and CT Cost Sharing Methodology shall be English. For the avoidance of doubt, where TSOs need to translate this GRIT RD and CT Cost Sharing Methodology into their national language(s), in the event of inconsistencies between the English version published by TSOs in accordance with Article 9 (14) of the CACM Regulation and any version in another language the relevant TSOs shall, in accordance with national legislation, provide the relevant national regulatory authorities with an updated translation of the Greece - Italy Borders Cost Sharing Proposal. 17 03 2018 Page 6 of 6