Progress report on implementation of the recommendations of the Board of Auditors on the UNICEF accounts for the biennium

Similar documents
Economic and Social Council

Financial report and audited financial statements. Report of the Board of Auditors

Amendments to UNICEF Financial Regulations and Rules. Report of the Advisory Committee on Administrative and Budgetary Questions

Financial reports and audited financial statements and reports of the Board of Auditors for the period ended 31 December 2009

Economic and Social Council

Institutional budget for

Biennial programme budget of the Office of the United Nations High Commissioner for Refugees

Audited financial statements for the biennium

Economic and Social Council

REPORT 2015/115 INTERNAL AUDIT DIVISION

E Distribution: GENERAL !"#!$ %!&"'( )$*$')*+ *$, &,-#*". *##"% %&/0)##, #! #1 )"%# -&+*" %%)!$!2 #1 3'&#)4!*",(

Arrangements for the revision of the terms of reference for the Peacebuilding Fund

Private Fundraising: 2013 workplan and proposed budget

UNITED NATIONS EDUCATIONAL, SCIENTIFIC AND CULTURAL ORGANIZATION EXECUTIVE BOARD. Hundred and seventy-fifth session

United Nations Industrial Development Organization

Economic and Social Council

UNDP Financial Regulations and Rules

Distr. GENERAL. A/RES/49/233 1 March 1995 RESOLUTION ADOPTED BY THE GENERAL ASSEMBLY. [on the report of the Fifth Committee (A/49/803/Add.

Financial report and audited financial statements. Report of the Board of Auditors

Office of the Secretary of the Executive Board EXECUTIVE BOARD DECISION MONITORING TABLE

Report of the Court on the implementation of International Public Sector Accounting Standards*

Financial report and audited financial statements. Report of the Board of Auditors

INTERNAL AUDIT DIVISION AUDIT REPORT 2013/078

MTSP Planned Financial Estimates Executive Board September 2011

INTERNAL AUDIT DIVISION REPORT 2017/003

Financial report and audited financial statements. Report of the Board of Auditors

Framework Convention on Climate Change. Report of the United Nations Board of Auditors

UN-Habitat Policy For Implementing Partners. UN-Habitat. Policy For. Partners

Reporting of UNDP income from cost recovery

Economic and Social Council

Internal Audit of the Republic of Albania Country Office January Office of Internal Audit and Investigations (OIAI) Report 2017/24

OFFICE OF CHIEF SCHOOL PERFORMANCE OFFICER Summary of State Board of Education Agenda Items November 12, 2014

199 EX/5 Part II page 81. F. Structured Financing Dialogue (Follow-up to 197 EX/Decision 5 (IV, B)) A. Background. (i) Initial decision (2012)

REPORT 2016/012 INTERNAL AUDIT DIVISION

UNFPA EXECUTIVE BOARD DECISION-TRACKING MECHANISM

Proposal to adopt International Public Sector Accounting Standards (IPSAS) by the Agency

East Sussex Pension Fund Governance compliance and the Pensions Regulator s code of practice

2016 NASCIO Recognition Award Submission Budget Forecasting Function (BFF)

HSP/GC/25/5/Add.1 Governing Council of the United Nations Human Settlements Programme. Proposed work programme and budget for the biennium

Board Report 2017 United Nations

Joint report on cost recovery

Economic and Social Council

Midterm review of the UNICEF integrated budget, Report of the Advisory Committee on Administrative and Budgetary Questions

Financial report and audited financial statements. Report of the Board of Auditors

Economic and Social Council

Terms of Reference for Financial Audit of Implementing Partners. UNICEF Nigeria Country Office Expenditures

The Global Fund. Financial Management Handbook for Grant Implementers. December 2017 Geneva, Switzerland

SECTION 5 FINANCE AND ACCOUNTING

Report on the midterm review of the UNICEF integrated budget,

REPORT 2016/038 INTERNAL AUDIT DIVISION. Audit of the Office for the Coordination of Humanitarian Affairs operations in South Sudan

AFGHANISTAN ALLOCATION GUIDELINES 22 JANUARY 2014

Improving the efficiency and transparency of the UNFCCC budget process

AUDIT UNDP COUNTRY OFFICE BANGLADESH. Report No Issue Date: 28 May 2015

Economic and Social Council

Internal Audit of the WASH programme of the Kenya Country Office

Department of Human Resources Family Investment Administration

Appendix 2 CLAIMS MANAGEMENT POSITIONAL STATEMENT. Introduction

P. O. Box 3243, Addis Ababa, ETHIOPIA Tel.: (251-11) Fax: (251-11)

REPORT 2016/054 INTERNAL AUDIT DIVISION

United Nations Environment Programme

2008 SENIOR MANAGER S COMPACT

GGGI Project Cycle Management Manual

Preliminary draft of the UNDP results-based biennial support budget estimates, *

Oversight Office Office of Internal Audit GOVERNMENT DONOR RELATIONS INTERNAL AUDIT REPORT AR/12/13

AUDIT UNDP COUNTRY OFFICE AFGHANISTAN FINANCIAL MANAGEMENT. Report No Issue Date: 10 December 2013

UNCTAD-Intergovernmental Working Group of Experts on International Standards of Accounting and Reporting

FCCC/SBI/2016/INF.12/Add.1

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) INTERNAL AUDIT REPORT. 19 October 2017

REPORT 2015/095 INTERNAL AUDIT DIVISION

Follow-up to recommendations of the Board of Auditors on the Accounts for 2008 and 2009

United Nations Environment Programme

SAICM/ICCM.4/INF/9. Note by the secretariat. Distr.: General 11 August 2015 English only

Audit of the UNESCO Office in Bangkok

Financial report and audited consolidated financial statements for the year ended 31 December 2010

Economic and Social Council

Hundred and Thirty-fifth Session. Rome, October Progress Report on Adoption of International Public Sector Accounting Standards

ASEAN-ROK Cooperation Fund (AKCF) Manual

Standard Operating Procedure. For. Financial Resources Management (CU/SOP/FIND/24)

REPORT 2015/079 INTERNAL AUDIT DIVISION. Audit of United Nations Office on Drugs and Crime operations in Peru

REPORT 2016/030 INTERNAL AUDIT DIVISION. Audit of project management at the United Nations Institute for Training and Research

Department of Business and Economic Development

CENTRAL BANK OF ARMENIA

Financial Statements and External Auditor's Report for the year ended 31 December 2017

Internal Audit of the Lao People s Democratic Republic Country Office

Financial report and audited financial statements

Executive Board of the United Nations Development Programme and of the United Nations Population Fund

REPORT 2016/062 INTERNAL AUDIT DIVISION. Audit of the management of trust funds at the United Nations Framework Convention on Climate Change

Contents. Part Two Budget mock-up May Original: English

October Hundred and Fortieth Session. Rome, October Measures to improve Implementation of the Organization's Support Cost Policy

UNICEF FINANCIAL REGULATIONS AND RULES LEGACY FRRs vs AMENDED FRRs MATRIX

Hundred and seventieth Session

Report of the Advisory Committee on Administrative and Budgetary Questions

4. Forest Revenues. GFI Guidance Manual 182

CBD. Distr. GENERAL. UNEP/CBD/ICNP/3/2 12 February 2014 ORIGINAL: ENGLISH

United Nations Environment Programme

REPORT 2015/041 INTERNAL AUDIT DIVISION. Audit of the United Nations Mine Action Service of the Department of Peacekeeping Operations

Work Plan of the External Auditor

REPORT 2014/153 INTERNAL AUDIT DIVISION. Audit of the United Nations Office for Disaster Risk Reduction

Supplementary budget for the implementation of the medium-term strategic and institutional plan

IFAD Policy on Project Restructuring

Transcription:

Distr.: Limited 12 July 2011 Original: English For information United Nations Children s Fund Executive Board Second regular session 2011 12-15 September 2011 Progress report on implementation of the recommendations of the Board of Auditors on the UNICEF accounts for the biennium 2008-2009 Summary As requested by the Executive Board in its decision 2011/4, this report describes the further progress achieved by UNICEF towards implementing the recommendations of the Board of Auditors on the UNICEF accounts for the biennium 2008-2009. The report provides an update on implementation of the main recommendations, including an overview of the strategic implications of the recommendations for the management and strategy of UNICEF.

I. Introduction 1. At its first regular session of 2011, the Executive Board considered the Report of the Board of Auditors on the UNICEF financial report and financial statements for the biennium ended 31 December 2009 (A/65/5/Add.2), together with the report of the Secretary-General on the implementation of recommendations of the Board of Auditors (A/65/296/Add.1) and the report of the Advisory Committee on Administrative and Budgetary Questions (A/65/498). 2. In its decision 2011/4, on the UNICEF financial report and the audited financial statements for the biennium ended 31 December 2009 and the report of the Board of Auditors, the Executive Board requested the Executive Director to build on progress achieved and to continue to implement the recommendations of the Board of Auditors in a timely way. The Executive Board also requested UNICEF to provide the Executive Board with an update on implementation of the main recommendations at its second regular session of 2011. 3. This report describes further progress achieved by UNICEF towards implementing the recommendations of the Board of Auditors, including the main recommendations and their strategic implications for UNICEF. II. Update on implementation of the main recommendations 4. UNICEF rigorously pursues implementation of audit recommendations made by both the Office of Internal Audit and the Board of Auditors. In this respect, UNICEF appreciates that the Board of Auditors classifies its recommendations into main and other recommendations, as this classification helps to identify how to prioritize activities and resources. Nevertheless, once they are discussed and accepted by management, UNICEF is committed to implementing to completion all recommendations made by the Board of Auditors. 5. Responsibility for implementation of the audit recommendations is regularly and closely monitored by the UNICEF Office of the Comptroller, using an Internet-based system, which forms the basis for reporting to the Board of Auditors. 6. The Report of the Board of Auditors (A/65/5/Add.2) contained 50 recommendations, of which 21 were classified as main. This report focuses on the status of the implementation of the main recommendations. 7. As of 30 April 2011, 10 of the 21 main recommendations were fully implemented and 10 were under implementation. UNICEF did not agree with one recommendation. Of the 10 under implementation, 6 will be completed by January 2012, with the roll-out of the single Enterprise Resource Planning virtual integrated system of information (VISION) and the adoption of International Public Sector Accounting Standards (IPSAS). The remaining four recommendations have a set target date by which UNICEF anticipates full implementation. 8. In compiling the 2008-2009 audit recommendations, the Board of Auditors considered the status of the 2006-2007 audit recommendations. Any recommendations not fully implemented were re-raised in the 2008-2009 report. Of the 21 main recommendations, 5 were re-raised from the 2006-2007 report. Of these five, three are under implementation and one UNICEF considers closed; UNICEF did not agree with the other one. 2

9. All reporting by UNICEF on the status of audit recommendations is subject to verification by the Board of Auditors at the end of the biennium. 10. Details of the 21 main recommendations and the actions taken to comply with them are provided in the annex. III. Strategic implications of the recommendations for the management and strategy of UNICEF 11. Several of the main recommendations in the Report of the Board of Auditors on the UNICEF financial report and financial statements for the biennium ended 31 December 2009 (A/65/5/Add.2) involve improving management practices and information reporting with respect to non-expendable property, land and buildings; end-of-service liabilities; and cash transfers. Most of these recommendations will be implemented with the roll-out of VISION and the adoption of IPSAS by January 2012. 12. IPSAS will improve the quality of UNICEF financial reporting by requiring new information across a range of areas, thereby increasing the transparency of programmatic and operational management practices. This additional information will enable improved governance and accountability and will assist in ensuring that UNICEF employs current best-management practices and achieves more efficient and effective use of financial and human resources. Key areas of change for UNICEF resulting from IPSAS adoption relate to management of inventory, premises, equipment and revenue; accounting for cash transfers; recording of expenses on delivery of goods and services; and reporting information related to employee benefits. 3

Annex Implementation of the main recommendations of the Board of Auditors on the financial statements of UNICEF for the financial period ended 31 December 2009 I. s fully implemented 1 Para 22 UNICEF agreed with the Board s recommendation to update its IPSAS communication and training plan according to the new timeline of full IPSAS adoption. 26 The Board recommends that UNICEF review its current practice of obtaining assurance on programme expenditures and take appropriate measures to obtain such assurance to ensure the validity of the programme expenditures. 123 UNICEF agreed with the Board s reiterated recommendation to intensify its efforts to settle long outstanding cash transfers. Training and communication plans have been updated based on the revised timeline for IPSAS adoption UNICEF works jointly with the United Nations Development Programme, the United Nations Population Fund and the World Food Programme to apply the harmonized approach to cash transfers framework. This requires all implementing partners to submit regular certification of actual expenditures (via the FACE form, referring to Funding Authorization and Certification of Expenditures) and to conduct assurance activities commensurate with the assessed risks. UNICEF obtains audit reports at least once during the programme cycle if the harmonized approach to cash transfers criteria for audits are met. UNICEF has implemented a monitoring mechanism for longoutstanding cash transfers. Priority was also given to resolving these cash transfers, and they have decreased substantially. Due to the nature of the UNICEF working environment, this will continue to be an ongoing effort. Direct cash transfers outstanding for over nine months were 1.98 per cent of the $493 million total at the end of the first quarter of 2011. Division of Financial and Administrative Management (DFAM) Division of Policy and Practice (DPP) DFAM 1 Although UNICEF considers these recommendations fully implemented, they will be officially closed only when the Board of Auditors verifies the status at the end of the 2010-2011 biennium. 4

Para 128 The Board reiterates its previous recommendation that UNICEF ensure that its field offices comply with the Financial Circular 15 on the issuance of official receipts by recipients of cash transfers. 134 UNICEF agreed with the Board s recommendation to ensure that all the completed evaluation reports are submitted and rated in a timely manner in accordance with the provisions of the UNICEF Evaluation Policy (E/ICEF/2008/4). 158 UNICEF agreed with the Board s recommendation to strictly comply with the provisions in the Supply Manual in relation to competitive bidding and to maintain written justifications in related files for exceptions. 177 The Board recommends that UNICEF take appropriate measures to improve its management of non-expendable property including ensuring the completeness and accuracy of the non-expendable property records. 185 UNICEF agreed with the Board s recommendation to ensure that the Supply Division adhere strictly to Supply Division Procedure 006 to deal with the stock materials UNICEF has implemented this recommendation in all concerned offices and will continue to work with them to ensure official receipts are received from recipients of cash assistance. A new strategy for evaluation reports was implemented, resulting in clearance of the rating backlog, and submission rates have increased significantly. For 2010 evaluation reports the submission rate was 82 per cent. All of the 2010 evaluation reports submitted will be reviewed/rated. UNICEF has improved procedures in the audited offices to ensure compliance with the provisions in the Supply Manual related to competitive bidding. Written justifications for exceptions are also being maintained in related files. UNICEF has reviewed and strengthened its non-expendable property management procedures in audited offices, while awaiting implementation of VISION in 2012. VISION includes an asset accounting module that will automate many of the processes currently performed manually. As part of the roll-out of this new system, nonexpendable property policies and procedures are also being reviewed and revised to reflect system changes and new roles and responsibilities in purchasing divisions regarding accountability for assets they purchase. Following this audit recommendation, UNICEF revised Supply Division Procedure 006 and now ensures adherence to it. Monthly meetings have been held by the Property Survey Board since August 2010 to ensure proper handling of obsolete stocks. The number of Country/ regional offices Evaluation Office Country offices Country/ regional offices Supply Division (SD) 5

Para nearing the end of their shelf life. days between the receipt of Property Survey Board meeting minutes and the date of sign-off by the director has also been reduced significantly for meetings held since August 2010. 205 UNICEF agreed with the Board s recommendation to: (a) adhere strictly to provisions of UNICEF Human Resources Manual in relation to performance evaluation; and (b) establish a mechanism to monitor the overall completion rate of the Performance Evaluation Reports. 240 UNICEF agreed with the Board s recommendation to strengthen advocacy and communication with current and potential donors to increase regular resources and global thematic funds. Since launching e-pas in 2010, UNICEF can report completion metrics in real time at each stage of the e-pas process for the offices where this recommendation was raised and all offices for target groups (i.e., for international Professional staff in 2010). An in-depth review of the e-pas system is also being conducted to ascertain its potential use for broader staff audiences in the near future. This will allow overall performance tracking and compliance metrics. The UNICEF Public Sector Resource Mobilization Strategy and Implementation Plan have been approved and are currently being implemented and monitored by PARMO. These fundraising strategy documents for public- and private-sector donors focus on securing quality, predictable, multi-year and flexible funding. The overall aim is to achieve the financial targets set in the medium-term strategic plan. Division of Human Resources (DHR) Public Sector Alliances and Resource Mobilization Office (PARMO) s under implementation 36 The Board recommends that UNICEF consider amending its Financial Regulations to ensure that the accounting treatment in relation to cash transfers provided in advance to the implementing partners are recorded as advances, and are only recognised as programme expenditure until the appropriate financial In anticipation of the adoption of IPSAS in January 2012, UNICEF has amended its Financial Regulations to allow cash transfers provided in advance to implementing partners to be recorded as advances. The amended Financial Regulations and Rules are to be presented to the Executive Board for approval in at its second regular session of 2011, in September, and to Timeframe for implementation Q1/2012 DFAM 6

utilization reports are received. become effective in January 2012. 62 The Board recommends that UNICEF revise its UNICEF is in the process of drafting a Financial accounting policy and disclose its end-of-service Statements policy that will require end-of-service liabilities on the face of the financial statements liabilities to be disclosed on the face of financial in conjunction with the adoption of IPSAS. statements, in accordance with IPSAS. This policy will be effective from 1 January 2012. Timeframe for implementation Q1/2012 DFAM 71 UNICEF agreed with the Board s recommendation to take appropriate measures to ensure the accuracy of the data used in computation of end-of-service liabilities (including ASHI) in the future financial periods. Human Resources-SAP (Systems, Applications and Products) is undergoing roll-out throughout UNICEF, which will be completed by the end of 2011. This will allow UNICEF to provide accurate data to the valuation actuary for computation of end-of-service liabilities (including after-service health insurance) in future financial periods. Q1/2012 DFAM 96 The Board recommends that UNICEF: (a) develop training courses for staff members in respect of results-based budgeting methodology; Training/guidance materials to further strengthen results-based budgeting are being developed as part of the VISION training package and will also be included in the Programme Policy and Procedures Manual. Q4/2011 DFAM (b) include in future budget submissions resources estimates as well as activities for each expected result; and The 2012-2013 budget submissions to be approved by the Executive Board at its second regular session in September 2011 include resource estimates as well as activities for each expected result. Q4/2011 (c) establish a monitoring mechanism to facilitate tracking of budget implementation as well as progress towards achievement of results. Dashboards and a performance management tool will be established in VISION to facilitate tracking of budget implementation. Q2/2012 102 UNICEF agreed with the Board s recommendation to: (a) provide necessary support to the offices with higher extension rates to improve programme implementation; and (b) put in place measures to monitor the timeliness As part of VISION, the grants reporting schedule has been redesigned to enable fund recipient offices to log their requests for extension in the VISION system. Thus the date of submission can be tracked along with the rationale for the extension request and date of request Q1/2012 PARMO 7

of submission of requests for program me budget allotments extension from field offices. approval or rejection. This solution allows electronic collection of data, analysis of trends and identification of gaps in performance. It will also lead to recommendations for corrective action. Timeframe for implementation 195 UNICEF agreed with the Board s recommendations to: (a) review the necessity for posts that had been vacant for a long period; and (b) take appropriate measures to fill the remaining vacancies. 226 The Board recommends that UNICEF expedite the implementation of the One ERP project in accordance with its project plan. 233 UNICEF agreed with the Board s recommendation to accelerate the implementation of the internal audit recommendations stemming from Headquarters and regional office audits. 245 The Board reiterates its previous recommendation that the Private Fundraising and Partnerships Division adhere strictly to the provision of UNICEF FRR [Financial Regulations and Rules] in relation to the retention of income by National Committees. 252 UNICEF agreed with the Board s reiterated recommendation to determine the cause of the delays in donor reporting by field offices and UNICEF has implemented a vacancy monitoring mechanism by which DHR will follow up with individual hiring units on all posts exceeding 90 days vacancy. This process has already led to closure of some positions and acceleration of the process to fill others. This monitoring will continue until December 2012, the target date for resolving the backlog. VISION is on schedule for roll-out to all UNICEF locations by end of 2011. UNICEF has introduced a quarterly Office of Internal Audit activity report that is used to monitor and follow up on outstanding internal audit recommendations. All recommendations older than 18 months are also reported regularly to the Audit Advisory Committee and annually to the Executive Board, as requested. UNICEF is working with the National Committees for UNICEF to achieve appropriate remittances as stipulated in the Financial Regulations and Rules and has just concluded a new cooperation agreement to this effect. As part of the VISION project, the grants reporting schedule has been redesigned to improve the capture of information on the timely submission of donor reports. Q4/2012 DHR Q4/2011 VISION team Q4/2011 Office of Internal Audit Q1/2012 Private Fundraising and Partnerships Q1/2012 PARMO 8

institute measures to ensure that reports are submitted in accordance with donor agreements. The system redesign and reports will enable improved monitoring and identification of the issues related to timely submission of reports. Timeframe for implementation not agreed by UNICEF Para 163 The Board reiterates its previous recommendation that UNICEF ensure that all offices include in purchase orders a penalty clause for late delivery in accordance with the provisions in the UNICEF Supply Manual. Division / Office SD UNICEF notes that its Supply Manual does not require offices to include a penalty clause in purchase orders for late delivery; rather, liquidated damages are optional. UNICEF notes that the cases mentioned thus comply with the Supply Manual. Reference is made to chapter 8 of the Supply Manual, which lists optional contract remedies. 9