Guidelines for submission and processing of GBI Claims (GBI I & II Scheme)

Similar documents
OPERATIONAL GUIDELINES. For. Implementation of. ( Extension Scheme for Generation Based Incentive

File No. 53/1/2008-WE Ministry of New and Renewable Energy Wind Power Division Block No.14, C.G.O. Complex, Lodi Road, New Delhi

CENTRAL GOVERNMENT EMPLOYEES WELFARE HOUSING ORGANISATION JANPATH BHAWAN, `A WING, 6 TH FLOOR, NEW DELHI EOI Document (2 nd call)

1!]~111l LIMITED. a mail id: November 30, Dear Sir,

Scope of Audit. Compilation of Accounts:

No.32/ 76 / /PVSE Government of India Ministry of New and Renewable Energy ***

FOCUS/RAJ&GUJ/CCF/ /13

Request for Proposal For Renewal of Annual Technical Support (ATS) for Oracle & BEA Weblogic Licences

INDIAN OIL CORPORATION LIMITED GUJARAT REFINERY

LIFE INSURANCE CORPORATION OF INDIA DIVISIONAL OFFICE BHOPAL APPLICATION FORM FOR EMPANELMENT OF FIRM

APPAREL EXPORT PROMOTION COUNCIL

Procedure for Input of Paid-up Capital / Total Issue in CDS (Listed & Unlisted)

Bank Note Paper Mill India Private Limited, Mysore

REQUEST FOR PROPOSAL FOR APPOINTMENT OF CHARTERED ACCOUNTANTS/FIRM ON CONTRACT BASIS. Real Estate Regulatory Authority, Karnataka

CENTRAL GOVERNMENT EMPLOYEES WELFARE HOUSING ORGANISATION JANPATH BHAWAN, `A WING, 6 TH FLOOR, NEW DELHI EOI Document (second call)

NOTICE INVITING BID. 1 (a) Essential Pre- Qualification documents required to be submitted for validity of Technical Bids:

Share and Mentor Institutions (Margdarshan) Proforma for submission of proposal under the scheme. Application ID. 1.1 Details of Institute

Government of West Bengal Finance Department Audit Branch. No F (Pen) Dated, Kolkata, the 15 th December, 2009 MEMORANDUM

No. HSMI/Fin./CA/2013 May 2, 2013

Arranger s Stamp / Direct

Policy Surrender Form PLEASE FILL THE FORM IN BLOCK LETTERS. Name of the Policyholder:

UOB Bulk GIRO / FAST Quick Guide

NOTICE INVITING TENDER (NIT)

Notice Applications for Empanelment of Valuers

ENQUIRY. Sub. Inviting sealed Quotations for appointment of Internal auditor for Maharashtra

COMPOUNDING UNDER FEMA BY CA.SUDHA G. BHUSHAN. INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA 25 th July 2015

Request for Proposal (RFP) for Engagement of Statutory Auditors for Indian Institute of Corporate Affairs for the year

Sub.: Group Personnel Accidental Insurance (GPAI) Policy for PDIL s employees

MEMBERSHIP APPLICATION FORM Version 9.0

Listing Requirements Secondary Listing- Exclusively Listed on Regional Stock Exchange

PROFORMA FOR RELEASE OF 2 ND INSTALMENT PROPOSAL UNDER INDIRA AWAAS YOJANA DURING THE YEAR NAME OF THE DISTRICT NAME OF THE STATE

EOI DOCUMENTS FOR PROJECT THERMAL

Request for Proposal (RFP)

LIFE INSURANCE CORPORATION OF INDIA ENGINEERING DEPARTMENT

ALLAHABAD BANK CBS OFFICE, VASHI, NAVI MUMBAI NOTICE INVITING TENDER. Ref No: ALLBANK/CBSO/HW/TENDER/LTO/2018/13 Date: 30/10/2018

(Pre-qualification of construction agency) Page 1/11

Exh.ITPO/FS/FIHAV-HIC/CUBA/2017 INDIA TRADE PROMOTION ORGANISATION (Pragati Maidan: New Delhi)

GOVERNMENT OF PAKISTAN MINISTRY OF COMMERCE ****** O R D E R

CHECKLIST FOR SEBI NOC. Sr.No. Particulars Remarks. 1 Covering Letter Parent/Holding Company Annexure 1

( Sridhar C.) State Project Director

Websites :(

Regn DPIN. Get DSC DSC? FORM 16. yes. DPIN not Approved FORM 1. Drafting. Approved DPIN FORM 3 FORM 4 FORM 2

1. Name of the Buyer : ii) Complete Postal Address :

Citizen's Charter February, 2018

RALLIS INDIA LIMITED

BID FOR HIRING OF AGENCY FOR PRINTING JOBS IN CONSULTANCY DEVELOPMENT CENTRE (CDC) CONSULTANCY DEVELOPMENT CENTRE

IATA TRAVEL AGENT HEAD OFFICE-APPLICATION GUIDE < SOUTH AFRICA >

भ रत य व न श एव अन स ध न स स थ न भ प ल

ANNEXURE- A1 SAMPLE MANDATE E-PAYMENT FORM FOR ELECTRONIC FUND TRANSFER/ INTERNET BANKING PAYMENT To, The General Manager, Dudhichua Project, PO-Khadi

Ref.No. HUDCO/CHRO/TC/ / Date

Procedure for Input of Paid-up Capital / Total Issue in CDS (Listed & Unlisted)

GAIL (INDIA) LIMITED

Prequalification of Contractors.

LIFE INSURANCE CORPORATION OF INDIA ENGINEERING DEPARTMENT

Rajgir, District: Nalanda, Bihar Ph. No: Web: Nalanda University LIMITED TENDER DOCUMENT FOR

TENDER DOCUMENT. (With Revised date of Submission) for ANNUAL MAINTENANCE CONTRACT FOR DIGITAL MULTI-FUNCTION PHOTOCOPIERS

CONTRACT:CC-18 J TENDER DOCUMENTS

RALLIS INDIA LIMITED

BIHAR EDUCATION PROJECT COUNCIL

GUJARAT RAIL INFRASTRUCTURE DEVELOPMENT CORPORATION LTD. (A JV of Government of Gujarat and Ministry Of Railways)

Bank Note Paper Mill India Private Limited, Mysore

F. No.BT/ 10/2017-IFD Government of India Ministry of Science & Technology Department of Bio-Technology *** CIRCULAR

GOA INTERNATIONAL AIRPORT E&M DEPARTMENT GOA. Ref. No.:- AAI/GOA/MT/HIRING/2018 DT:

SAMRIDDHI BHAVAN, BLOCK B, 1, STRAND ROAD, KOLKATA, WEST BENGAL TENDER NOTICE FOR E-REVERSE AUCTION TENDER NO. SBI/LHO/KOL/P&E/ /LIFT-

Metro-Link Express for Gandhinagar and Ahmedabad (MEGA) Co. Ltd.

Ref No: TASK/ /NIT/015 Dated: NOTICE FOR EMPANELMENT

SOFTWARE TECHNOLOGY PARKS OF INDIA

Earnest Money (Rs.) Cost of tender Document (Rs.)

ISSUED BY: SHRI G. C. GAYLONG GENERAL MANAGER & FINANCIAL ADVISOR 2ND FLOOR, SURAKSHA, 170, J. TATA ROAD, CHURCHGATE, MUMBAI

ALL INDIA COUNCIL FOR TECHNICAL EDUCATION 7 th Floor Chander Lok Building, Janpath, New Delhi

Ref.No. HUDCO/RRO/TC/340/ / Date

F. No.BT/ 10/2017-IFD Government of India Ministry of Science & Technology Department of Bio-Technology *** ENGAGEMENT OF CONSULTANT ON CONTRACT BASIS

NEW BUSINESS DEPARATMENT, CORPORATE CENTRE, MUMBAI CORRIGENDUM 2

NOTICE FOR EMPANELMENT OF AIR/ TRAIN TICKETING AGENCIES

Telecommunications Consultants India Ltd. (A Government of India Enterprise)

TENDER DOCUMENT FOR SELECTION OF NABL ACCREDITED MINERAL TESTING LABORATORY FOR THE ANALYSIS OF DIFFERENT ELEMENTS OF THE BAUXITE AND IRON ORE

INVITATION OF GLOBAL/OPEN BIDS

Subject: Quotation for Rate Contract for Toner Cartridges / Ink Cartridges

Odisha Power Generation Corporation L i m i t e d IB Thermal Power Station

NOTICE INVITING TENDER (NIT) (e-tender)

VI. FORMAT FOR SUBMISSION OF PROFILE OF THE BIDDER- INDIVIDUAL. For purchase of as described in Public Notice for Sale

Guru Gobind Singh Indraprastha University

NOTICE FOR EMPANELMENT OF VENDORS FOR SUPPLY OF CURRENCY NOTE SHRINK WRAPPING MACHINES.

BUSINESS PROCESSES ON GST REGISTRATION

THE COMPANIES (AMENDMENT)ACT, 2017

EXPRESSION OF INTEREST (EOI) FOR EMPANELMENT OF INSTITUTIONS FOR ORGANISING WORKSHOPS

PART VI ANNEXURES TO ACCOUNTS MANUAL OF PMGSY ADMINISTRATIVE EXPENSES FUNDS ADMINISTRATIVE EXPENSES FUND (DRAFT VERSION 1REV2) (NOV 2004)

Application Form Selection of CA Firms for Statutory Audit of funds of Sarva Shiksha Abhiyan Rajiv Gandhi Shksha Mission

Public Notice No. 76(RE-2013)/ New Delhi, Dated the 27 th of November, 2014

EXPRESSION OF INTEREST (EOI) FOR EMPANELMENT OF INSURANCE BROKERS FOR GROUP PERSONAL ACCIDENT & GROUP TERM LIFE INSURANCE POLICIES

Sub: Updation of PAN, Bank account details, address of Shareholders of the Company:

NOTICE FOR EMPANELMENT OF FIRMS/ VENDORS

CENTRAL ELECTRICITY REGULATORY COMMISSION New Delhi NOTIFICATION

E-Tender Document for Procurement of Internet Services for CERT-In

SBI. PREMISES & ESTATE DEPT., LOCAL HEAD OFFICE, 3 rd FLOOR KOTI, BANK STREET, HYDERABAD

D BASF We create chemistry

भ रत य व ज ञ न श क ष ए अन स ध न स स थ न भ ऩ ऱ

DELHI METRO RAIL CORPORATION LIMITED

PROCESS FOR TRANSFER OF SHARES. Following documents are required to be submitted to us for transfer of shares:

व श व श वरय य र ष ट र य प र द य व क स स थ न, न प र (भ रत) - ४४००१०

Transcription:

(Revised as on 22.11.2018) Guidelines for submission and processing of GBI Claims (GBI I & II Scheme) For Implementation of Generation Based Incentive for Grid Connected Wind Power Projects (dated 17.12.2009) and Extension Scheme for Generation Based Incentive for Grid Connected Wind Power Projects (dated 04.09.2013) by Indian Renewable Energy Development Agency Limited (Program Administrator) (To be read with the administrative approval of GBI scheme issued by MNRE dated 17.12.2009, administrative approval of Extension of GBI scheme issued by MNRE dated 04.09.2013 and Operational Guidelines issued by IREDA from time to time) Ministry of New & Renewable Energy (MNRE) Indian Renewable Energy Development Agency Limited (A Government of India Enterprise) Block 14, CGO Complex, Lodhi Road, New Delhi 110003 Tel: 011 24360404, 24360707 Fax: 011 24361298 Website: http://mnre.gov.in Corporate Office 3 rd Floor, August Kranti Bhawan, Bhikaji Cama Place, New Delhi 110 066 Tel: 011 26717400 Fax: 011 26717416 Registered Office 1 st Floor, East Court, Core 4A, Lodhi Road New Delhi 110 003 Tel: 011 24682206 Fax: 011 24682202 Website:http://www.ireda.in

1. Timeline for submission of GBI claims All Wind GBI claimants are requested to note the timelines for submission of their claims to IREDA as under: GBI I Half yearly claims being submitted to IREDA can be considered for Processing as per the details given below: April to September claims To be submitted latest by 31 st December of each year October to March claims To be submitted latest by 30 th June of each year GBI II Monthly claims are required to be submitted within three months from respective month i.e. claim for the month of December can be submitted latest by 31 st March. Note: GBI claims which are not in compliance with above timelines, IREDA shall not be responsible to process such claims and GBI for the month may be treated as ZERO, if there is no proper justification for delay. These timelines are required to be strictly followed by all Wind GBI claimants so as to avoid any loss of incentive by them. 2. Documents Required For Claim of GBI (For GBI I & II Scheme) 2.1. Duly filled in online claim form shall be submitted from the link available at IREDA s website. Note: a. No need to send hardcopies of claims document to IREDA, unless requested by IREDA b. IREDA shall send query to GBI beneficiary through GBI portal only. GBI Beneficiaries are requested to check status of claims regularly and submit their reply / information / document in response to query, if any. Further, Current status of their claim would be visible. 2.2. The Company shall submit (latest by December month of the year) a certificate from Tax / Statutory Auditor (as per the format placed at Annexure I) certifying the rate of depreciation for previous financial year. This certificate is applicable to those GBI claimants who have submitted financial documents for two consecutive years subsequent to commissioning of their project. Or The Company has to submit (latest by December month of the year) attested copy of financial documents Viz. Income Tax Return, Income Tax Return Acknowledgement, Tax Audit Report, Audited Annual Report, CA Certificate (Annexure D, E & F) for the previous financial year. The financial documents may be attested by Director, Proprietor, Partner or Authorized signatory. 2.3 IREDA shall not process the GBI claims in the following cases Financial documents / Certificate are not submitted online Document uploaded on website are not legible No justification is given for delay for not submitting GBI claims in compliance of timeline 2.4 IREDA may however, reserves the right to obtain financial documents in following cases: Change in the name of the company Change in ownership of the Company / WTGs

Delay of 1 year or more in submission of GBI Claims Change in Bank Account for remittance of GBI Fund Individual / Proprietary / Partnership Firms 3 Change in Bank Account details The following documents are required for change in bank details: Justification for change in bank details Board resolution for change in bank details (indicating old & new bank details) Authorization of person for submitting request for change in bank details NOC from existing bank Copy of loan sanction letter, if any 4 Change in Name of the Company IREDA may consider request for change in name of the Company subject to submission of: Attested Copy of Memorandum and Article of Association 5 Change in ownership of Windmill IREDA may consider request for change in ownership of Windmill subject to submission of: Attested copy of Agreement for sell / transfer of Windmill Board resolution for sell of Windmill (Seller) Board Resolution for purchase of Windmill (Buyer) Attested copy of PAN Board Resolution for authorization of person to deal with IREDA Attested copy of Memorandum and Article of Association Declaration as per the scheme Attested copy of Amended PPA Certificate from Statutory Auditor confirming the completion of all legal formalities for transfer of Ownership of Windmill 6. Certificate from GBI Claimant and OEM Company This is applicable to those GBI claims where the JMR for the projects contains power generation details of WTGs which are registered under GBI scheme as well as WTGs which are not registered under GBI scheme. Format of the certificate is available at Annexure B & C.

QUERIES: Any queries in regard to claim for GBI, may be sent to the following: To e mail: gbiwind@ireda.in In case of non receipt of suitable reply from the above e mail, you may contact the following officials at IREDA : a. Mr. Om Prakash Assistant Manager (Technical Services), Tel: 011 26717400 Extn.177, E mail omprakash@ireda.in b. Mr. R. K. Vimal Deputy General Manager (Technical Services), Tel: 011 26717400 Extn.124, E mail rkvimal@ireda.in

Bank Details for RTGS Annexure A Sl. No. Particulars Details 6. Account No. 602000301000386 7. Name of Account Holder Indian Renewable Energy Development Agency Ltd. 8. Account Type Current Account 9. Bank Name Vijaya Bank 10. Branch Bhikaji Cama Place, New Delhi 110066 11. 11 digit IFSC Code(for remittance through RTGS) VIJB 0006020 12. Branch Address in brief Flat No. UG 27/35, Ansal Chamber II, Bhikaji Cama Place, New Delhi 110066

(On letterhead of GBI Claimant) Annexure B Chairman and Managing Director, Indian Renewable Energy Development Agency Ltd Third Floor, August Kranti Bhawan, Bhikaji Cama Place, New Delhi 110066 Ref: NGB Dear Sir, With reference to Certificate for Power Generation dated (refer Annexure C), the information provided by the OEM Company has been verified and it is found to be true to the best of our knowledge. We undertake to refund the claimed amount in case it is observed that the Net generation/export by WTGs registered under Wind GBI scheme is found to be incorrect. Signature & date (Name and designation of authorized person) Stamp of the Company

(on letterhead of OEM Company) Annexure C Name of the GBI Claimant: Registration No.: Certificate for Power Generation Project Capacity (MW): Location: Month/ Year Details of Generation: UIN Location No. Controller reading (kwh) Net Export (kwh) Machine shut down period (Hrs.) Signature & date (Name and designation of authorized person) Stamp of the OEM Company

Annexure I CERTIFICATE (To be issued on the letter head of the Tax Auditor who conducted the tax audit of the company under section 44AB of the income tax act for the Financial year..) We, the tax auditor, of M/s. <<Company Name>> having its Registered Office at << Address>>, PAN <<PAN>> under section 44AB of the Income Tax Act for the financial year. We hereby certify that the necessary financial documents has been examined and certify that depreciation claimed on wind mills, registered under Scheme for Implementation of Generation Based Incentive (GBI) for Grid Interactive Wind Power Projects as per administrative approval No. 53/10/2011 WE dated 04.09.2013 / order No. 53/1/2008 WE dated 17.12.2009 (strike out which is not applicable), for the financial year <<Year>> are as under: Details of depreciation claimed by the company on the machines registered under GBI S.NO F.Y. Asset Details Machine Detail Location Date of commissioning Capacity (MW) UIN allotted by IREDA Rate of depreciation claimed as per I. T. Act, 1961 Place Date: Signature Name of the auditor Membership Number Phone E mail Note: In case where tax audit is not applicable, Certificate has to be issued by statutory auditor of the company.

Annexure D (Applicable for the projects commissioned between 01.04.2012 to 31.03.2017 under Extension Scheme for Generation Based Incentive for Grid Connected Wind Power Projects dt. 04.09.2013) CERTIFICATE (To be issued on the letter head of the Tax Auditor who conducted the tax audit of the company under section 44AB of the income tax act for the Financial year..) This is to certify that M/s <<Company Name>> having its Registered Office at << Address>>, PAN NUMBER<<PAN NUMBER>>, has claimed Depreciation for the financial Year<< Year>> @ 15% / 7.69% of the actual cost for the following machines, which have been registered with IREDA with the following Unique Identification Number (UINs) for the purpose of claiming Generation Based Incentive (GBI) under the Extension GBI scheme for Wind Power Projects as per the Ministry of New & Renewable Energy MNRE administrative approval order No. 53/10/2011 WE dated 04.09.2013: Scheme for Implementation of Generation Based Incentive (GBI) for Grid Interactive Wind Power Projects. The rate of depreciation being claimed for the below mentioned machines for the financial Year <<Year>> is as under: S.NO F.Y. Details of depreciation claimed by the company on the machines registered under GBI Machine Detail Location Date of commissioning Asset Details Capacity (MW) UIN allotted by IREDA Rate of depreciation claimed as per I. T. Act,1961 Also, we have certified Annexure E and Annexure F as enclosed with this certificate. The Income Tax Return, Computation of income and Balance sheet for the year <<Year>> has also been duly verified. It is certified that the company has claimed depreciation @ 15% / 7.69% of the actual cost. Copy of Income Tax Return, certified copy of computation showing depreciation claimed as per Income Tax Act and Companies Act, Income Tax Acknowledgement, Tax Audit report and audited Balance Sheet is attached herewith. Place: Date: Signature Name of the auditor Membership Number Phone E mail

Annexure E Cost and Depreciation details for the year for Block of Wind Mills under which Machines are registered with IREDA. Amount in INR Sl. No. Description of Individual Asset Machine Number UIN Allotted by IREDA Date of Put to Use Rate of Depreci ation Actual Cost as at beginni ng of the year (A) Additions during the Year More than 180 days (B) Less than 180 days ( C) Deletions during the year (D) Subtotal (A+B+C D) (1) Up to starting of the year (2) Depreciation (SLM Basis) More than 180 days (i) Less than 180 days (ii) Depreci ation during the Year (i+ii) (3) WDV as on end of the year (1 2 3) Head: Windmills @ 7.69% Head: Windmill s @ 15% Head: Other Windmills

Depreciation Reconciliation Statement Asset Rate of Depreciation Amount Head: Head: Plant & Machinery 1) Windmill 2) Windmill 3) Other Windmill Other Plant & Machinery 1) 2) 3) Sub Total Other Than Plant & Machinery 7.69% 15% _ % _% _% _% Grand Total Note: Total Depreciation as per above Reconciliation Statement should tally with Income Tax Return and Annexure of depreciation as per Tax Audit Report. *In case of any discrepancy, specify with reasons. To be countersigned by the Authorized Signatory ` Authorized Signatory Signature Name of the Auditor Membership No. Contact No. Email

Annexure F Cost and Depreciation details for the year of Block of Wind Mills under which Machines are registered with IREDA (as per Companies Act'1956 / 2013) Sl. No. Description of Individual Asset Machine Number UIN Alloted by IREDA Comm/Cap Date Actual Cost as at starting of the year Gross Block Accumulated Depreciation Balance Upto For As at as at end Additions Sale/Adjusted starting of the end of of the the year Year the year year Amount in INR Net Block as at end of the year Note: Total addition of windmills should match with the additions in windmills as per schedule of Fixed Assets in the Balance Sheet. *In case of any discrepancy, specify with reasons. To be countersigned by the Authorized Signatory ` Authorized Signatory Email Signature Name of the Auditor Contact No