OFFICIAL DOCUMENTS. Project Agreement LOAN NUMBER 8655-YF. (Additional Financing for Corridor X Highway Project) between

Similar documents
Project Agreement OFFICIAL DOCUMENTS LOAN NUMBER 8391-UA. Second Urban Infrastructure Project (Urban Infrastructure Project - 2) between

Southern African Power Market Program Project Agreement. (Mozambique Component Mozambique-Malawi Transmission Interconnection Project) between

Tamil Nadu Project Agreement

Project Agreement OFFICIAL DOCUMENTS. Public Disclosure Authorized. Public Disclosure Authorized CREDIT NUMBER 5127-UG

Project Agreement. (WEST AFRICA REGIONAL FISHERIES PROGRAM REPUBLIC OF LIBERIA (Phase I)) between INTERNATIONAL DEVELOPMENT ASSOCIATION.

INTERNATIONAL DEVELOPMENT ASSOCIATION

Project Agreement. (Zanzibar Basic Education Improvement Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and

Project Agreement. (West Beka a Emergency Water Supply Project) between

Project Agreement REPUBLIKA SRPSKA CREDIT NUMBER 4912-BA. (Additional Financing for Health Sector Enhancement Project) between

Project Agreement CONFORMED COPY CREDIT NUMBER 4191-TA. (Financial Sector Support Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION.

(Punjab Barrages Improvement Phase-II Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and PROVINCE OF PUNJAB

Multi Donor Trust Fund for the Zimbabwe Reconstruction Fund Project Agreement

Project Agreement OFFICIAL DOCUMENTS. Public Disclosure Authorized LOAN NUMBER 8457-CN. Public Disclosure Authorized. (Zhengzhou Urban Rail Project)

Project Agreement. (Indonesia Infrastructure Finance Facility Project) among INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT.

OFFICIAL DOCUMENTS. Project Agreement. Public Disclosure Authorized. GRANT NUMBER D336-GN CREDIT NUMBER 6261-GN Public Disclosure Authorized

Project Agreement. (Private Sector Development Support Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and

RECONSTRUCTION AND DEVELOPMENT

Project Agreement. Public Disclosure Authorized OFFICIAL DOCUMENTS LOAN NUMBER 7792-IN. Public Disclosure Authorized

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement DMIUMTS OFFICIAL LOAN NUMBER 8131-CN PEOPLE'S REPUBLIC OF CHINA INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Project Agreement. OffICIAL OCUMENTS I LOAN NUMBER 8121-ID. Jakarta Urgent Flood Mitigation Project (Jakarta Emergency Dredging Initiative) between

Loan Agreement. (South East Europe and Caucasus Catastrophe Risk Insurance Facility Project) between REPUBLIC OF SERBIA. and

OFFICIAL DOCUMENTS. Project Agreement LOAN NUMBER 8715-ID

Haiti Education for All Multi-donor Trust Fund Grant Agreement

Development Credit Agreement

Project Agreement CREDIT NUMBER 3991 MOZ. (Beira Railway Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and

OFFMCAL. olrakdocuments,

Development Financing Agreement

Restated and Amended Project Agreement

Project Agreement. (Energy Efficiency Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Financing Agreement. (Additional Financing for Village Communities Support Program (Phase I)) between REPUBLIC OF GUINEA. and

Loans, Credits, and Grants Assumption and Amendment Agreement

Loan Agreement (Real Estate Management Project)

(Taunsa Barrage Emergency Rehabilitation and Modernization Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT.

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

PEOPLE S REPUBLIC OF CHINA

Liaoning Project Agreement

OFFICIAL DOCUMENTS. Loan Agreement LOAN NUMBER 8734-GD. (OECS Regional Tourism Competitiveness Project) between GRENADA

Global Environment Facility Grant Agreement

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 6343-RW. Public Disclosure Authorized. (Housing Finance Project)

Project Agreement LOAN NUMBER CN. (Second Liuzhou Environment Management Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Ebola Recovery and Reconstruction Trust Fund Grant Agreement

Project Agreement CONFORMED COPY LOAN NUMBER CHA. (Hubei Shiman Highway Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Financing Agreement CONFORMED COPY IDA CREDIT NUMBER 4825-KG IDA GRANT NUMBER H618-KG. (Emergency Recovery Project) between KYRGYZ REPUBLIC.

Loan Agreement OFFICIAL 90CUMENTS1. Public Disclosure Authorized LOAN NUMBER 8263-GE. Public Disclosure Authorized

Financing Agreement OFFICIM. DOCUMENTS1 CREDIT NUMBER 5283-IN. (Low Income Housing Finance Project) between INDIA. and

Loan Agreement. (Institutional Development and Agriculture Strengthening Project) between MONTENEGRO. and

Loan Agreement. (Indonesia Infrastructure Finance Facility Project) between REPUBLIC OF INDONESIA. and

OFFICIAL MDTF-HRI GRANT NUMBER TF between REPUBLIC OF CAMEROON. and

RS Project Agreement. (Second Local Initiatives (Microfinance) Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and REPUBLIKA SRPSKA

Loan Agreement. (Additional Financing for Laguna de Bay Institutional Strengthening and Community Participation Project) between

Financing Agreement. (Environmental and Social Capacity Building for the Energy Sector Project) between THE REPUBLIC OF CAMEROON.

Financing Agreement CREDIT NUMBER VN. (Ho Chi Minh City Green Transport Development Project) between SOCIALIST REPUBLIC OF VIETNAM.

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and

Nile Basin Trust Fund Grant Agreement

Global Environment Facility Trust Fund Grant Agreement

, Honorable Tendai Biti Minister of Finance Ministry of Finance

Multi-Donor Health Results Innovation Trust Fund Grant Agreement

(Real Estate Cadastre and Registration Project Additional Financing) between. FORMER YUGOSLAV REPUBLIC OF MACEDONIA (the Borrower) and

PAD Project Agreement. (Second Transport Sector Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and PORT AUTONOME DE DAKAR. Dated May 13, 1999

Tazama Project Agreement

Loan Agreement OFFIAL DOCUMENTS LOAN NUMBER 8229-AM. (Lifeline Road Network Improvement Project) between REPUBLIC OF ARMENIA. and

Financing Agreement OFFICIAL OCUMENTS. Public Disclosure Authorized CREDIT NUMBER 5152-UZ. Public Disclosure Authorized

Regional Project Agreement

Financing Agreement. (Energy Community of South East Europe APL 3 Montenegro Project) between THE REPUBLIC OF MONTENEGRO. and

PROJECT AGREEMENT. (Power Distribution Enhancement Investment Program Tranche 1, Investment Project and Support Project) between

Financing Agreement. (Additional Financing for Health Sector Development Project) between REPUBLIC OF DJIBOUTI. and

Development Credit Agreement

Multi-Donor Trust Fund for the Malawi Public Finance and Economic Management Reform Program Grant Agreement

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Financing Agreement OFFICIAL DOCUMENTS 1. (Amending and Restating the Development Credit Agreement) Public Disclosure Authorized

HAINAN Project Agreement

ARAB REPUBLIC OF EGYPT

Loan Agreement. (Alma Electricity Transmission Project) between JOINT STOCK COMPANY KAZAKHSTAN ELECTRICITY GRID OPERATING COMPANY.

Financing Agreement CONFORMED COPY GRANT NUMBER H732 -AF. (Financial Sector Rapid Response Project) between ISLAMIC REPUBLIC OF AFGHANISTAN.

OFFICIAL DOCt HMENTS

Project Agreement. (Integrated Modern Agriculture Development Project) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT GANSU PROVINCE

OFFICIAL LvG-K DOCUMENTS

Loan Agreement. (Power System Improvement Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and ELECTROSTOPANSTVO NA MAKEDONIJA

Project Agreement DOCUMENTS. Public Disclosure Authorized LOAN NUMBER PE. Public Disclosure Authorized. (Lima Metropolitan Development Project)

Loan Agreement. (Shandong Ecological Afforestation Project) between PEOPLE S REPUBLIC OF CHINA. and

cocumeasn Loan Agreement OFFICIAL LOAN NUMBER 8095-BR

IDOCUMENTS. Loan Agreement OFFICIAL LOAN NUMBER 8354-CO. (Access with Quality to Higher Education Project-ACCES II-SOP Phase 2) between

Project Agreement. (Shanghai Urban Environment Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and SHANGHAI MUNICIPALITY

OFFICIAL DOCUMENTS. Loan Agreement. Public Disclosure Authorized LOAN NUMBER 8746-IN. Public Disclosure Authorized

Financing Agreement,.

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 6126-MD. Public Disclosure Authorized

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Republic of Senegal: Advance Agreement for the Preparation of the Proposed Casamance Development Pole Project Project Preparation Advance No.

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 2224 BR. Public Disclosure Authorized. (Third Feeder Roads Project)

MULTI-DONOR TRUST FUND GRANT AGREEMENT

Loan Agreement. (Additional Financing for the Rural Poverty Reduction Project - Rio Grande do Norte) between

OFFICIAL DOCUMENTS ZW4

CONFORMED COPY LOAN NUMBER 3717 PE LOAN NUMBER 3717 PE

Development Credit Agreement

Financing Agreement OFFICIAL DOCUMENTS GRANT NUMBER D004-FM FEDERATED STATES OF MICRONESIA INTERNATIONAL DEVELOPMENT ASSOCIATION

Loan Agreement. (Low-Income Sanitation Technical Assistance Project) between FEDERATIVE REPUBLIC OF BRAZIL. and

Transcription:

OFFICIAL DOCUMENTS LOAN NUMBER 8655-YF Project Agreement (Additional Financing for Corridor X Highway Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT and Dated 4o/ eg-p 4L(,2016

-2- PROJECT AGREEMENT Agreement dated AbMVt4GA. 4 q, 2016, entered into between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT ("Bank") and KORIDORI SRBUE d.o.o ("Project Implementing Entity") ("Project Agreement") in connection with the Loan Agreement ("Loan Agreement") of same date between Republic of Serbia ("Borrower") and the Bank. The Bank and the Project Implementing Entity hereby agree as follows: ARTICLE I - GENERAL CONDITIONS; DEFINITIONS 1.01. The General Conditions (as defined in the Appendix to the Loan Agreement) constitute an integral part of this Agreement. 1.02. Unless the context requires otherwise, the capitalized terms used in this Agreement have the meanings ascribed to them in the Loan Agreement or the General Conditions. ARTICLE II - PROJECT 2.01. The Project Implementing Entity declares its commitment to the objectives of the Project. To this end, the Project Implementing Entity shall carry out the Project in accordance with the provisions of Article V of the General Conditions, and shall provide, promptly as needed, the funds, facilities, services and other resources required for the Project. 2.02. Without limitation upon the provisions of Section 2.01 of this Agreement, and except as the Bank and the Project Implementing Entity shall otherwise agree, the Project Implementing Entity shall carry out the Project in accordance with the provisions of the Schedule to this Agreement. ARTICLE III - REPRESENTATIVE; ADDRESSES 3.01. The Project Implementing Entity's Representative is its Director. 3.02. The Bank's Address is: International Bank for Reconstruction and Development 1818 H Street, NW Washington, DC 20433 United States of America Telex: Facsimile: 248423(MCI) or 1-202-477-6391 64145(MCI)

-3-3.03. The Project Implementing Entity's Address is: 21 Kralja Petra Street 11000 Belgrade Republic of Serbia Facsimile: (011) 3248 682 AGREED at RE&( A-O R [=(i. OWci F SEi-9 IPas of the day and year first above written. INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT By A4khorized Representative Name: K Title: v,r / By Authori d Representative Name: llvtp u Title: D4/4

-4- SCHEDULE Execution of the Project Section I. Implementation Arrangements A. Institutional Arrangements 1. The Project Implementing Entity shall be responsible for the overall implementation of the Project under the guidance and supervision of the Steering Committee. The Project Implementing Entity shall be responsible for handling the day-to-day management of the Project including procurement, financial management, Project monitoring and evaluation, and reporting arrangements, as well as management of environmental and social issues under the Project. 2. The Project Implementing Entity shall, at all times throughout the duration of the Project, maintain qualified staff, including procurement and financial management specialists and an environmental safeguards expert, in adequate number and with terms of reference satisfactory to the Bank. 3. The Project Implementing Entity shall carry out the Project in accordance with the Financial Manual. B. Anti-Corruption The Project Implementing Entity shall ensure that the Project is carried out in accordance with the provisions of the Anti-Corruption Guidelines. C. Safeguards 1. The Project Implementing Entity shall ensure that: (a) the Project is carried out in accordance with the respective terms of the Environmental Impact Assessments and the Resettlement Policy Framework, and the policies, procedures and arrangements therein set forth are applied and implemented; and (b) the Environmental Impact Assessments and the Resettlement Policy Framework, or any provision thereof, shall not be amended, suspended, abrogated, terminated or waived or permitted to be amended, suspended, abrogated, terminated or waived, except with the prior written approval of the Bank. 2. Prior to the commencement of works for each proposed road section, the Project Implementing Entity shall: (a) submit to the Bank for its approval: (i) the related section specific Resettlement Action Plan, including the relevant social assessment, in form and substance satisfactory to the Bank; and (ii) the related section specific Environmental Management Plan and Checklist, in form and substance satisfactory to the Bank; (b) ensure that the provisions of said Resettlement Action Plan and Environmental Management Plan and Checklist are adequately included in the proposed contract(s) for said works; and (c) ensure that said Resettlement Action Plan is disclosed and, unless the Bank shall otherwise agree, all related, adequate compensation amounts are paid in full, all in accordance with the related section specific Resettlement Action Plan and Environmental Management Plan and Checklist, the Resettlement Policy Framework and the Environmental Impact Assessments.

-5-3. The Project Implementing Entity shall, during the implementation of works under the Project, maintain a firm of independent consultants with qualifications and terms of reference satisfactory to the Bank, to monitor compliance of each contract for works with the relevant section specific Environmental Management Plan and Checklist referred to in the preceding sub-paragraph 2 (a) (ii). Section II. Project Monitoring, Reporting and Evaluation. A. Project Reports 1. The Project Implementing Entity shall monitor and evaluate the progress of the Project and prepare Project Reports for the Project in accordance with the provisions of Section 5.08 (b) of the General Conditions and on the basis of indicators acceptable to the Bank. Each such Project Report shall cover the period of one calendar quarter, and shall be furnished to the Borrower not later one month after the end of the period covered by such report for incorporation and forwarding by the Borrower to the Bank of the overall Project Report. 2. The Project Implementing Entity, shall ensure that the Project Reports referred to in the preceding paragraph 1 report on the monitoring and implementation of the requirements set forth in the Environmental Impact Assessments and the Resettlement Policy Framework. 3. The Project Implementing Entity shall provide to the Borrower not later than one month after the Closing Date, for incorporation in the report referred to in Section 5.08 (c) of the General Conditions all such information as the Borrower or the Bank shall reasonably request for the purposes of that Section. B. Financial Management, Financial Reports and Audits 1. The Project Implementing Entity shall maintain a financial management system and prepare financial statements in accordance with consistently applied accounting standards acceptable to the Bank, both in a manner adequate to reflect the operations and financial condition of the Project Implementing Entity, including the operations, resources and expenditures related to the Project. 2. The Project Implementing Entity shall have its financial statements referred to above audited by independent auditors acceptable to the Bank, in accordance with consistently applied auditing standards acceptable to the Bank. Each audit of these financial statements shall cover the period of one fiscal year of the Project Implementing Entity. The Project Implementing Entity shall ensure that the audited financial statements for each period shall be: (a) furnished to the Borrower and the Bank not later than six months after the end of the period; and (b) made publicly available in a timely fashion and in a manner acceptable to the Bank. Section III. Procurement All goods, works and services required for the Project and to be financed out of the proceeds of the Loan shall be procured in accordance with the provisions of Section III of Schedule 2 to the Loan Agreement.